ML17317B54411 October 1978Forwards Info Re Qualification Pressure for safety-related Equipment in Drywell.Drywell Pressure of 0.7 Psia Calculated & Will Be Used to Qualify All safety-related Equipment in Drywell Required During & After LOCA
ML19263D28213 March 1979in Response to NRC 790117 Ltr,Ge Has Decided That NEDO-24048 Should Be Reviewed Under Third Category,In Which Costs Incurred Are Assessed to Final Design Approval Application.W/Table Re Review of Documents Sent to NRC
ML19274E84620 February 1979Requests Info Re Fees Required for Final Design Approval for Standardization Design Under Ref Sys Concept
ML19282C60921 March 1979Requests NRC Assessment Review of GE Preliminary Design Approval Extension Submittal.Discusses Past Meetings Re Deferral or Extension
ML19290B67630 November 1979Forwards Revision 3 Pages to GE Rept 22A4365, Interim Containment Loads Rept - Mark III Containment. Proprietary Version Withheld (Ref 10CFR2.790)
ML19291E63730 December 1981Forwards Proprietary Portions of Application for Amend 3 to Gessar II Re Technical Basis for Improved BWR LOCA Decay Heat Correlation.Proprietary Portion Withheld (Ref 10CFR2.790).Affidavit Encl
ML19322A07927 December 1978Gessar Amend 47 Has Been Distributed Per 10CFR50.30 & NRC 760512 Ltr to If Stuart.W/Encl Affidavit
ML19340C7852 December 1980Forwards Proprietary Info for Review of 238 Nuclear Island GESSAR-II.Info Part of Amend 1,responding to NRC 800722 Questions Re Safety Relief Valve Actuation Methodology. Affidavits Encl.Rept Withheld (Ref 10CFR2.790)
ML19343B1712 December 1980Forwards Amend 1 to Gessar II
ML19344B29018 August 1980Forwards Response to Ofc of Technology Assessment Request for Info Re Decay Heat Removal Sys,Std Control Room Design, Review Methods & Design Changes,In Response to NRC 800815 Telcon.Confirms 800829 Meeting to Discuss StandardizationReactor Vessel Water Level
Ultimate heat sink
Fuel cladding
ML20009C53813 July 1981Forwards Summary on Gessar Commitments Re Nsps.All Commitments Have Been or Are Being Met.Prompt NRC Approval of BWR 6 Solid State Design Anticipated
ML20010G64418 September 1981Forwards Responses to NRC Questions Re Safety Relief Valve Pool Dynamic Loads for Use in Gessar II Amend
ML20024A39215 June 1983Forwards Supplemental Response to Question 410.24 of NRC 820825 Response & Summary of Measures Taken in GESSAR-II Design to Avoid Intergranular Stress Corrosion Cracking. Info Will Be Included in Amend 18 Scheduled for Jul 1983
ML20024A91928 June 1983Forwards marked-up Proposed Rev to Response to Cp/Ml Rule (10CFR50.34(f)) Re Hydrogen Control.Amend to Be Formally Filed in Early Jul 1983Safe Shutdown
ML20024B8305 July 1983Ack Receipt of ACRS 830615 Ltr Re Completion of Review of GESSAR-II Application for Final Design Approval of BWR/6 Mark III Design.No Items Remain as Outstanding IssuesSafe Shutdown Earthquake
Earthquake
ML20027E5359 November 1982Forwards Suppression Pool Scrubbing Factors for Postulated BWR Accident Conditions.Probabilistic Risk Assessment
ML20027E54219 April 1982Advises That Tests to Confirm Fission Product Scrubbing Efficiency of BWR Suppression Pool Show Overall Scrubbing Decontamination Factor of at Least 10,000.Results of Scrubbing Test Will Be Submitted in May 1982Probabilistic Risk Assessment
ML20028G0792 February 1983Forwards Revised Final Draft Responses to NRC 820825,1005 & 1115 Info Requests & Mechanical Engineering Branch Draft SER Meetings
ML20038A6659 November 1981Forwards Final Responses to NRC 810919 Positions on App 38 of GESSAR-11.Responses Will Serve as Basis for 811120 Meeting.Formal Submittal on Gessar Is Currently Planned for 811130.Copies Sent to a Sonin & G Maise Per Request
ML20039C11628 December 1981Defines Activities & Schedule for Action Plan to Resolve Severe Accident Licensing Issues for BWR/6 Mark III Gessar. Series of BWR Technology Update Meetings W/Nrc Proposed. Supporting Info EnclProbabilistic Risk Assessment
ML20039D98930 December 1981Forwards Nonproprietary Version of Amend 3 to Gessar II, Providing Technical Basis Describing Improved Correlation Based on 1979 Revised Decay Heat Std for Determining BWR LOCA Decay Heat Generation
ML20041C54423 February 1982Forwards Affidavit Attesting Proprietary Classification of 811109 Response to NRC Positions on App 3B of Gessar II
ML20041F63025 February 1982Forwards Amend 1 to Application for Ol,Containing Amend 1 to FSAR
ML20041F94625 February 1982Forwards Proprietary Portion of Amend 1 to Gessar II Re Basis for Improved BWR LOCA Decay Heat Correlation & Mark III Containment Safety Relief Valve & LOCA-related Pool Dynamics Load Criteria.Withheld (Ref 10CFR2.790)
ML20049H25912 February 1982Forwards Gessar & General Info AttachmentSafe Shutdown
Shutdown Margin
Ultimate heat sink
Incorporated by reference
Feedwater Controller Failure
Pressure Boundary Leakage
ML20050A41119 March 1982Forwards Proprietary Amend 2 to Gessar II Re Probabilistic Risk Assessment.Rept Available in Central Files Only. Affidavit EnclProbabilistic Risk Assessment
ML20052G21219 March 1982Forwards Nonproprietary Version of Amend 2 to Application for Final Design Approval Review of 238 Nuclear Island Gessar Ii,Containing Probabilistic Risk AssessmentProbabilistic Risk Assessment
ML20053C74928 May 1982Forwards Amend 4 to Application for Review of Gessar II, Providing Addl Info Requested by 811209 Acceptance Review Ltr,Unresolved Safety Issues,Atws & Balance of Severe Accident Submittal
ML20054G40114 June 1982Forwards Recent Gessar II Submittal Re Suppression Pool Scrubbing Test Program.W/O Encl
ML20054M23618 June 1980Forwards NEDO-21471-01, Analytical Model for Estimating Drag Forces on Rigid Submerged Structures Caused by LOCA & Safety Relief Valve Ramshead Air Discharges,Suppl for X-Quencher Air Discharges
ML20058G53430 July 1982Forwards Application for Amend 5 to Gessar Ii,Providing Addl Info Re Environ Qualification of safety-related Equipment, Per NRC 811209 Request
ML20058H42830 July 1982Forwards Proprietary Portion of Amend 5 to Gessar II Re Environ Qualification of safety-related Equipment.Affidavit Requesting Proprietary Classification of Info Encl.Amend 5 Withheld (Ref 10CFR2.790)
ML20063L50631 August 1982Forwards Amend 6 to Sar,Incorporating GE Std Application for Reactor Fuel.Proprietary Pages Sent Separately
ML20063M61131 August 1982Forwards Proprietary Portion of Amend 6 to SAR Re Environ Qualification of safety-related Equipment.Affidavit Re Proprietary Nature of Amend Encl.Amend 6 Proprietary Portion Withheld (Ref 10CFR2.790)
ML20063N68523 September 1982Forwards Amend 7 to Application for Final Design Acceptance Review of GESSAR-238,correcting Typographical Errors & Clarifying Discrepancies in Portions of Chapters 1,3,4,6 & 15
ML20064G38321 December 1982Forwards Nonproprietary Version of Amend 12 to Gessar II
ML20064K75821 January 1983Forwards Revised Final Draft Responses to Procedures & Test Review Branch,Structural Engineering Branch,Radiation Assessment Branch & Power Sys Branch 820825 Requests for Addl Info Re GESSAR-II,per Util 821110 & 1217 Submittals
ML20065A75217 February 1983Forwards Assessment of Unresolved Safety Issue Task A-46 & Final Draft Responses to Selected Questions of 820825,1115 & 1231 Commission Info RequestsSafe Shutdown
Loop seal
Fire Barrier
Earthquake
Backfit
ML20065H9821 October 1982Submits GE Understanding of Major Agreements & Ground Rules Re NRC Review of Gessar Ii,In Response to NRC Request at 820915 Meeting.Concurrence Requested
ML20065Q37818 October 1982Forwards Amend 8 to Gessar Ii,Responding to NRC 811203 Acceptance Review Ltr Re Geotechnical,Radiation Sources & Failure Mode & Effects Analysis & Committing Applicant to Address NRC Acceptance Criteria
ML20066H53419 November 1982Forwards Draft Responses to Commission 821005 Request for Addl Info on Chapter 7 of Gessar II Sar.Responses Reflect Nrc/Ge Info Exchange 821014-15 Meetings in Bethesda,MdSafe Shutdown
Anticipated operational occurrence
Scram Discharge Volume
ML20066J4558 November 1982Forwards Proprietary Portion of Amend 9 to GESSAR-II, Describing Main Control Room & Control Ctrs Outside Control Room.Affidavit Encl.Info Withheld (Ref 10CFR2.790)
ML20066J49610 November 1982Forwards Final Draft Responses to Structural Engineering Branch 820825 Request for Addl Info.Responses Reflect Nrc/Ge 821007-26 Info Exchange Meeting in Bethesda.Remaining Responses Will Be Submitted in Dec 1982Safe Shutdown
High winds
Ultimate heat sink
Non-Destructive Examination
Grab sample
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Coatings
Operating Basis Earthquake
Emergency Lighting
Tornado Generated Missile
Earthquake
Control of Heavy Loads
Grace period
ML20066J5078 November 1982Forwards Amend 9 to Gessar Ii.Amend Furnishes Chapter 18, Human Factors, & Clarifies Discrepancies
ML20067D27023 November 1982Forwards Proprietary Amend 10 to Gessar II Re Enhanced Level Instrumentation.Amend Withheld (Ref 10CFR2.790)
ML20067D34323 November 1982Forwards Amend 10 to Application for Review of Gessar Ii. Amend Furnishes App 1D,assessment of Reg Guide 1.97,Revision 2 Against Gessar II Design
ML20067E1513 December 1982Requests 830105 Meeting to Discuss Review Status & Schedule for SER & Final Design Approval
ML20069A1279 March 1983Reaffirms Request Re Issuance of Final Design Approval for GESSAR-II.Resolution of Technical Requirements Currently Imposed by NRC Proposed in Submittal Docketed 820222
ML20069B84215 March 1983Forwards Revised Final Draft Responses to Power Sys & Reactor Sys Branch Questions,Per 820825 & 1115 Requests.Only Mods (New or Revised) to Responses of Referenced Ltrs Provided
ML20069C51916 March 1983Forwards Final Draft Responses to Auxiliary Sys Branch Questions & Equipment Qualification Branch Discussion Items, in Response to NRC 820825 Request for Info