In Response to NRC ,Ge Has Decided That NEDO-24048 Should Be Reviewed Under Third Category,In Which Costs Incurred Are Assessed to Final Design Approval Application.W/Table Re Review of Documents Sent to NRC
ML19263D282
Person / Time
Site: 05000447, 05000531, 05000550
Issue date: 03/13/1979
From: Sherwood G
GENERAL ELECTRIC CO.
To: Boyd R
Office of Nuclear Reactor Regulation
References
MFN-075-79, MFN-75-79, NUDOCS 7903270320
Download: ML19263D282 (3)


Text

..

GENERAL h ELECTRIC NUCLEAR ENERGY PROJECTS DIVISION GENERAL ELECTRIC COMPANY,175 CURTNER AVE., SAN JOSE, CALIFORNIA 95125 MC 682, (408) 925-5040 so-447 MFN-075-79 March 13,1979 S -5FD so-sal U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D. C.

20555

~

Attention:

Mr. Roger S. Boyd, Director Division of Project Management Gentlemen:

SUBJECT:

LICENSE FEES FOR POST PDA ACTIVITIES Your letter of January 17, 1979 regarding license fees for post PDA activities requested that we indicate the appropriate review category for submittal of our report NED0-24048, " Evaluation of Acoustic Pressure Loads on BWR/6 Internal Components", and all future submittals relating to the GESSAR PDA application.

Your letter also described three review categories available to us (PDA amendments, topical reports, or mis-cellaneous reports and letters) and the associated fee assessment for each.

We have reviewed the options available to us as outlined in your letter and have decided that the report NED0-24048 should be reviewed under the third category in which costs incurred are assessed to the FDA application.

To clarify our intentions for review of various documents submitted since the effective date of the fee schedule, we are providing the attached table.

Thank you for your letter providing the staff position on fee assessment.

Please contact Mr. J. F. Quirk of my staff if any further clarification is required.

Sincerely, G'.

herwoo ',

ana r Safety and Licensing Operation GGS:mm/1375 Attachment cc: Olan D. Parr (NRC)

S g

William F. Kane (NRC)

L L. S. Gifford (GE) 7003270 3 20

INTENDED REVIEW 0F DOCUMENTS SUBMITTED TO THE NRc ITEM SUBJECT GE REPORT NO.

COMMENTS AND/0R DATE OF. TTER 1.

Interim Contain-22A4365(4/21/78)

For information.

No approval ment Loads Report Rev. 2 /11/15/78) requested.

2.

Reactor Internals April 24, 1978 For information.

No approval Vibration Assur-G.G. Sherwood to requested.

ance Program H.R. Denton 3.

Feedwa'er Flow April 25, 1978 For information.

No approval Rate U certainty G.G. Sherwood to requested.

Factor E.G. Case 4.

Feedwater Nozzle NEDE-21821 Final report of a series and Sparger May 8, 1978 sent for review before the fee Cracking H.T. Watanabe to schedule became effective.

R.P. Snaider 5.

Qualification Oct. 11, 1978 For information.

No approval Pressure for G.G. Sherwood to requested.

Safety Related H.R. Denton Equipment in the Drywell 6.

Evaluation of NED0-24048 To be reviewed for approval Acoustic Pressure Sept. 29, 1978 under FDA application.

Loads on BWR/6 Internals 7.

PDA Extension To be reviewed for approval Amendment 46 Nov. 30, 1978 under FDA application.

Amendment 47 Dec. 21, 1978 8.

ADS Solenoid Valve NED0-23978 To be reviewed for approval Reliability Demon-Dec. 4, 1978 under FDA application.

stration Program G.G. Sherwood to H.R. Denton 9.

Recirculation Pump NED0-24083 To be reviewed for approval Shaft Seal Leak-Nov. 22, 1978 under FDA application.

age Analysis 10.

Qualification of NEDE-24154-P A compilation of previously the One Dimensional NE00-24154 reviewed submittals prepared Core Transient Dec. Ib, 1978 at the staff's request.

The Model (0DYN) review was, tarted at the staff's rejuest before the fee schedule became effective.

daj/953 3/6/79

INTENDED REVIEW 0F DOCUMENTS SUBMITTED TO THE NRC (Continued)

ITEM SUBJECT GE REPORT NO.

COMMENTS AND/0R DATE OF LETTER

11. Airborne NE00-21159-2 For information only.

No I-131 Releases Dec. 21, 1978 approval requested from BWR's 12.

Fast Scram HEDE-24142 For information only. No Control Rod Dri"a Dec. 22, 1978 app ; val requested.

Qualificati-Program 13.

Generi;.aload NEDE-24011-P-A, Second submittal to keep Fuel Application Appendix 0.

the approved document current February 28, 1979 according to the scheme devised with NRC concurrence before the fee schedule became effective.

daj954 3/6/79