Forwards Nonproprietary Version of Amend 2 to Application for Final Design Approval Review of 238 Nuclear Island Gessar Ii,Containing Probabilistic Risk Assessment
ML20052G212
Person / Time
Site: 05000447
Issue date: 03/19/1982
From: Sherwood G
GENERAL ELECTRIC CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML20052G213 List:
References
NUDOCS 8205140409
Download: ML20052G212 (2)


Text

._ _.

GENER AL h ELECTRIC NUCLEAR POWER SYSTEMS DIVISION GENERAL ELECTRIC COMPANY.175 CURTNER AVE. SAN JOSE, CALIFORNIA 95125 MC 682, (408) 925-5040 March 19, 1982 - s x

t-9 U. S. Nuclear Regulatory Commission S -

Office of Nuclear Reactor Regulation p. VE f -

-~

Washington, DC 20555 -

N4PJ g Attention: D. G. Eisenhut, Director Division of Licensing /

Gentlerten: // -

SUBJECT:

IN THE MATTER OF 238 NUCLEAR ISLAND GENERAL ELECTRIC STANDARD SAFETY ANALYSIS REPORT (GESSAR II); DOCKET NO. STN 50-447

Reference:

Letter to H. R. Denton from G. G. Sherwood, " Severe Accident Licensing Issues for BWR/6 Mark III GESSAR",

MFN-214-81.

Enclosed please find 3 original copies (transmitted under separate cover are 60 conformed copies) of Amendment No. 2 to the 238 General Electric Standard Safety Analysis Report (GESSAR II) for the above numbered application.

In Reference 1, General Electric outlined a proposal for using the GESSAR docket as the vehicle for submittal of information to address severe accident issues for the BWR/6 Mark III Standard Plant design. In implementing that proposal, General Electric is making two submittals.

This initial submittal includes a Probabilistic Risk Assessment (PRA) of the BWR/6 Standard Plant. Accordingly, Appendix 15D Section 3 has been added to GESSAR II to provide the PRA which quantifies the risk associated with operating a BWR/6 standard plant with a reference Mark III con-tainment for the purpose of electrical power generation. The remaining submittal, to be submitted in May 1982, will discuss specific BWR features and their capabilities to prevent and mitigate degraded core accidents.

It will be identified as Appendix 15D Sections 1, 2, and 4.

The details of the Appendix 15D submittal will be discussed with the NRC at a series of BWR Technology Update Meetings beginni.ig in early May.

These meetings with appropriate NRC staff personnel are designed to review technical information relating to severe accident issues included in the GESSAR submittal. The intent of the advanced PRA submittal with the subsequent Technology Update Meetings is to facilitate an accelerated J NRC review schedule.

M an h 8,f g5140409820319 ADOCK 05000447

[dOSeg far f'M g

PDR

e G E N ER A L () E LE CTRIC U.S. Nuclear Regulatory Commission March 19, 1982 Page 2 Amendment No. 2 consists of two parts - a non proprietary portion and a portion considered by the General Electric Company to be proprietary.

The pages considered to be proprietary are so marked and are transmitted under separate cover.

We request that this proprietary information be withheld from public disclosure and be considered proprietary pursuant to Section 2.790 of 10CFR Part 2 for the reasons presented in the separate cover.

Very truly yours, Glenn G. Sherwood, Manager Nuclear Safety and Licensing Operation GGS:hmc/0031619 Attachments cc: R. L. Tedesco, (w/o att.) R. J. Mattson (w/o att.)

R.- B. Minogue (w/o att.) H. J. Faulkner (w/o att.)

J. R. Miller (w/o att.) P. S. Shewmon (ACRS) (w/o att.)

L. S. Gifford (w/o att.) M. C. Thadani (w/o att.)

D. F. Ross (w/o att.)

i l1

~

l

/

6

_w-

/ g L