GO2-02-111, Amendment Request to Revise Minimum Emergency Diesel Generator Output Voltage Specified in Technical Specification Limiting Condition for Operation 3.8.1 | 16 July 2002 | Amendment Request to Revise Minimum Emergency Diesel Generator Output Voltage Specified in Technical Specification Limiting Condition for Operation 3.8.1 | Offsite Circuit Overspeed trip |
GO2-02-192, Request for Amendment to TS 4.2.1 and 5.6.5.b, Corrections to Original Submittal | 27 November 2002 | Request for Amendment to TS 4.2.1 and 5.6.5.b, Corrections to Original Submittal | Affidavit |
GO2-04-137, Request for Amendment to Technical Specifications for One-Time Extension of Containment Leak Rate Test Interval | 5 August 2004 | Request for Amendment to Technical Specifications for One-Time Extension of Containment Leak Rate Test Interval | Safe Shutdown Earthquake Probabilistic Risk Assessment Coatings Operating Basis Earthquake Local Leak Rate Testing Large early release frequency Stress corrosion cracking Integrated leak rate test Maintenance Rule Program |
GO2-05-184, Supplement to the License Amendment Request for a One-Time Extension to Technical Specification 3.7.1 | 15 November 2005 | Supplement to the License Amendment Request for a One-Time Extension to Technical Specification 3.7.1 | Ultimate heat sink |
GO2-06-042, Revised Technical Specification Bases Change (for Information) and Summary of Commitments Associated with the License Amendment Requests for Extension of Diesel Generator Completion Time | 20 March 2006 | Revised Technical Specification Bases Change (for Information) and Summary of Commitments Associated with the License Amendment Requests for Extension of Diesel Generator Completion Time | Safe Shutdown Fire Protection Program |
GO2-06-061, Request for Amendment to Technical Specifications Surveillance Requirements for the Suppression Chamber-to-Drywell Vacuum Breakers and the Drywell-to-Suppression Chamber Bypass Leakage Test | 18 April 2006 | Request for Amendment to Technical Specifications Surveillance Requirements for the Suppression Chamber-to-Drywell Vacuum Breakers and the Drywell-to-Suppression Chamber Bypass Leakage Test | Local Leak Rate Testing |
GO2-07-024, GO2-07-024 - Columbia Generating Station - Exigent License Amendment Request - Amend Operating License to Revise TS 3.6.1.7 Suppression Chamber-to-Drywell Vacuum Breakers | 2 February 2007 | GO2-07-024 - Columbia Generating Station - Exigent License Amendment Request - Amend Operating License to Revise TS 3.6.1.7 Suppression Chamber-to-Drywell Vacuum Breakers | |
GO2-07-109, License Amendment Request to Technical Specifications Associated with Condensate Storage Tank Level | 26 July 2007 | License Amendment Request to Technical Specifications Associated with Condensate Storage Tank Level | Anticipated operational occurrence |
GO2-07-111, License Amendment Request for Proposed Changes to Columbia Technical Specifications: Adoption of Approved Generic Technical Specification Changes Associated with Containment Isolation Valves | 30 July 2007 | License Amendment Request for Proposed Changes to Columbia Technical Specifications: Adoption of Approved Generic Technical Specification Changes Associated with Containment Isolation Valves | Reactor Vessel Water Level High Radiation Area Ultimate heat sink Stroke time Anticipated operational occurrence Post Accident Monitoring Excess Flow Check Valve Power Operated Valves |
GO2-07-112, License Amendment Request for Proposed Changes to Technical Specifications: Miscellaneous Administrative Changes Including Adoption of Approved TSTF Travelers 284, 479, and 485 | 30 July 2007 | License Amendment Request for Proposed Changes to Technical Specifications: Miscellaneous Administrative Changes Including Adoption of Approved TSTF Travelers 284, 479, and 485 | Ultimate heat sink Enforcement Discretion Incorporated by reference Missed surveillance Offsite Circuit |
GO2-07-116, Request for Amendment to Technical Specification to Modify Requirements Regarding Control Room Envelope Habitability Using the Consolidated Line Item Improvement Process (CLIIP) | 30 July 2007 | Request for Amendment to Technical Specification to Modify Requirements Regarding Control Room Envelope Habitability Using the Consolidated Line Item Improvement Process (CLIIP) | Safe Shutdown Incorporated by reference Control Room Habitability |
GO2-07-123, License Amendment Request to Technical Specifications Associated with Condensate Storage Tank Level | 8 August 2007 | License Amendment Request to Technical Specifications Associated with Condensate Storage Tank Level | Anticipated operational occurrence |
GO2-08-071, License Amendment Request for Adoption of TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities | 7 May 2008 | License Amendment Request for Adoption of TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities | Hydrostatic Incorporated by reference |
GO2-08-124, License Amendment Request for Proposed Changes to Columbia Technical Specification 3.3.3.1; Change Group 1 Primary Containment Isolation Valves Reactor Water Level Isolation Signal from Level 2 to Level 1 | 9 September 2008 | License Amendment Request for Proposed Changes to Columbia Technical Specification 3.3.3.1; Change Group 1 Primary Containment Isolation Valves Reactor Water Level Isolation Signal from Level 2 to Level 1 | Reactor Vessel Water Level Feedwater Controller Failure Fuel cladding Loss of condenser vacuum |
GO2-09-011, License Amendment Request to Revise Control Rod Notch Testing Frequency Using the Consolidated Line Item Improvement Process (CLIIP) for TSTF-475 | 14 January 2009 | License Amendment Request to Revise Control Rod Notch Testing Frequency Using the Consolidated Line Item Improvement Process (CLIIP) for TSTF-475 | Incorporated by reference Scram Discharge Volume Overtravel |
GO2-13-043, Request for Technical Specification Interpretation Regarding the Offsite Power Supplies to the Onsite Class 1E AC Power Distribution System | 13 March 2013 | Request for Technical Specification Interpretation Regarding the Offsite Power Supplies to the Onsite Class 1E AC Power Distribution System | Safe Shutdown Anticipated operational occurrence Qualified Offsite Circuit Offsite Circuit |
GO2-14-126, License Amendment Request to Revise Technical Specification Surveillance Requirement for the Ultimate Heat Sink | 22 August 2014 | License Amendment Request to Revise Technical Specification Surveillance Requirement for the Ultimate Heat Sink | Safe Shutdown Ultimate heat sink |
GO2-14-139, Attachment 6 - GNF-001N8896-R3-NP, Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR, Columbia Cycle 23 | 31 October 2014 | Attachment 6 - GNF-001N8896-R3-NP, Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR, Columbia Cycle 23 | Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence Water rod |
GO2-15-007, License Amendment Request for Adoption of Technical Specification Task Force Traveler-425, Revision 3 | 17 March 2015 | License Amendment Request for Adoption of Technical Specification Task Force Traveler-425, Revision 3 | Safe Shutdown Reactor Vessel Water Level High Radiation Area Mission time Stroke time Post Accident Monitoring Internal Flooding Hydrostatic Probabilistic Risk Assessment Squib Incorporated by reference Surveillance Frequency Control Program Scram Discharge Volume Feedwater Controller Failure Large early release frequency Excess Flow Check Valve Spiral reload Battery sizing Overtravel License Renewal Earthquake Power Operated Valves Fuel cladding Pressure Boundary Leakage Offsite Circuit Unidentified leakage Overspeed Operational leakage Water hammer |
GO2-15-070, Application for Technical Specification Change (TSTF-427) to Add LCO 3.0.9 on the Unavailability of Barriers Using the Consolidated Line Item Improvement Process | 2 September 2015 | Application for Technical Specification Change (TSTF-427) to Add LCO 3.0.9 on the Unavailability of Barriers Using the Consolidated Line Item Improvement Process | Fire Barrier Tornado Missile Internal Flooding Incorporated by reference High Energy Line Break Turbine Missile |
GO2-15-075, Exigent License Amendment Request - Extension of Implementation Period for Amendment 232 Changing Technical Specification Table 3.3.1.1-1 Function 7 Scram Discharge Volume Water Level-High. | 15 May 2015 | Exigent License Amendment Request - Extension of Implementation Period for Amendment 232 Changing Technical Specification Table 3.3.1.1-1 Function 7 Scram Discharge Volume Water Level-High. | Commercial Grade Dedication Scram Discharge Volume |
GO2-15-108, Provides Affected Technical Specification Pages Supporting License Amendment Request for Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-423, Revision 1, Using the Consolidated Line Item Improvement Process | 11 August 2015 | Provides Affected Technical Specification Pages Supporting License Amendment Request for Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-423, Revision 1, Using the Consolidated Line Item Improvement Process | Offsite Circuit |
GO2-16-086, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3 | 14 July 2016 | Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3 | High Radiation Area Stroke time Squib Surveillance Frequency Control Program Excess Flow Check Valve Pressure Boundary Leakage Unidentified leakage Water hammer |
GO2-16-096, License Amendment Request to Revise Operating License and Technical Specifications for Measurement Uncertainty Recapture Power Uprate | 28 June 2016 | License Amendment Request to Revise Operating License and Technical Specifications for Measurement Uncertainty Recapture Power Uprate | Shutdown Margin Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio Ultimate heat sink Probabilistic Risk Assessment High Energy Line Break Scram Discharge Volume Feedwater Controller Failure MELLLA Biofouling Downpower Flow Induced Vibration Power Uprate Measurement Uncertainty Recapture Affidavit |
GO2-16-119, License Amendment Request for One-Time 7 Day Extension of Completion Time for TS Condition 3.5.1.A, 3.6.1.5.A, and 3.6.2.3.A | 8 November 2016 | License Amendment Request for One-Time 7 Day Extension of Completion Time for TS Condition 3.5.1.A, 3.6.1.5.A, and 3.6.2.3.A | Hot Short High winds Mission time Internal Flooding Probabilistic Risk Assessment Large early release frequency License Renewal Earthquake Fuel cladding Fire Watch Failure to Scram Control Room Habitability |
GO2-17-022, Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-522 Revision 0 | 19 January 2017 | Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-522 Revision 0 | Surveillance Frequency Control Program |
GO2-17-181, License Amendment Request to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements | 12 December 2017 | License Amendment Request to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements | Surveillance Frequency Control Program |
GO2-17-194, Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control | 15 November 2017 | Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control | Reactor Vessel Water Level Water Inventory Control Surveillance Frequency Control Program |
GO2-19-098, License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules | 12 September 2019 | License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules | |
GO2-19-119, Exigent License Amendment Request for Change to Technical Specification 3.8.7 Distribution Systems - Operating | 15 August 2019 | Exigent License Amendment Request for Change to Technical Specification 3.8.7 Distribution Systems - Operating | Safe Shutdown Anticipated operational occurrence Probabilistic Risk Assessment |
GO2-19-123, Supplemental Information Related to Exigent License Amendment Request for Change to Technical Specification 3.8.7 Distribution Systems-Operating | 19 August 2019 | Supplemental Information Related to Exigent License Amendment Request for Change to Technical Specification 3.8.7 Distribution Systems-Operating | |
GO2-20-004, Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR | 27 January 2020 | Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR | Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence Fuel cladding |
GO2-21-016, License Amendment Request to Change Technical Specification 3.4.11 Reactor Coolant System Pressure and Temperature Limits | 13 October 2021 | License Amendment Request to Change Technical Specification 3.4.11 Reactor Coolant System Pressure and Temperature Limits | Unanalyzed Condition Anticipated operational occurrence Hydrostatic Finite Element Analysis Pressure and Temperature Limits Report License Renewal Power Uprate Affidavit |
GO2-22-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Colling Using the Consolidated Line Item Improvement Process | 25 May 2022 | Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Colling Using the Consolidated Line Item Improvement Process | Surveillance Frequency Control Program |
GO2-23-006, License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications | 1 May 2023 | License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications | Safe Shutdown Water Inventory Control Internal Flooding Probabilistic Risk Assessment Surveillance Frequency Control Program Scram Discharge Volume License Renewal |
GO2-23-035, Supplement to License Amendment Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling | 9 March 2023 | Supplement to License Amendment Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling | Surveillance Frequency Control Program |
GO2-23-107, Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation | 5 December 2023 | Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation | Reactor Vessel Water Level |
ML041540545 | 19 May 2004 | Application for Amendment of Facility Operating for Extension of Diesel Generator Completion Time | Safe Shutdown Fitness for Duty High winds Ultimate heat sink Mission time Anticipated operational occurrence Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Zebra Mussel Qualified Offsite Circuit Large early release frequency Integrated leak rate test Exemption Request Earthquake Maintenance Rule Program Fuel cladding Offsite Circuit Power Uprate Failure to Scram Loss of condenser vacuum Water hammer |
ML050700091 | 9 March 2005 | Technical Specification Pages (Amd. 190) Re Elimination of Requirements to Provide Monthly Operating Reports & Annual Occupational Radiation Exposure Reports | Offsite Dose Calculation Manual Post Accident Monitoring Annual Radiological Environmental Operating Report Process Control Program |
ML070640065 | 23 March 2007 | Technical Specification, AC Sources - Operating 3.8.1 | |
ML070920471 | 1 May 2007 | Technical Specification Pages - Issuance of Amendment No. 204 AC and DC Electrical Power | Ultimate heat sink Hydrostatic Offsite Circuit Overspeed |
ML082250680 | 16 July 2008 | Columbia - License Amendment Request for Changes to Technical Specifications Involving Core Operating Limits Report and Scram Time Testing | Anticipated operational occurrence Post Accident Monitoring Hydrostatic Abnormal operational transient Fuel cladding Affidavit |
ML082610056 | 30 September 2008 | Tech Spec Pages for Amendment No. 210 Revised TS 3.3.5.2 RCIC System Instrumentation, and TS 3.5.2 ECCS-Shotdown to Increase Storage Tank Level | |
ML101390369 | 11 May 2010 | Columbia Generating Station, License Amendment Request to Change Technical Specifications in Support of Prnm/Arts/Mella Implementation | Shutdown Margin Half scram Anticipated operational occurrence Cyber Security High Energy Line Break MELLLA Fuel cladding Power change Affidavit |
ML12011A149 | 14 December 2011 | Columbia, Technical Specification (TS) Basis, Rev. 69, Licensee Controlled Specifications (LCS) Rev. 67 and Operational Quality Assurance Program Description (Oqapd), Rev. 44 | |
ML13247A659 | 25 July 2013 | License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF 477, Revision 3 | Incorporated by reference |
ML14010A030 | 11 February 2014 | Issuance of Amendment No. 227, Request to Adopt Technical Specification Task Force (TSTF)-477, Revision 3, Adding an Action Statement for Two Inoperable Control Room Air Conditioning Subsystem | |
ML14010A290 | 30 December 2013 | Columbia, 10 CFR 50.71 Maintenance of Records Licensing Basis Document Update | |
ML15355A481 | 21 December 2015 | Revision 87 to Technical Specification Bases | |
ML17355A656 | 21 December 2017 | Technical Specification Bases | Safe Shutdown Unanalyzed Condition Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Grab sample Fire Barrier Stroke time Anticipated operational occurrence Tornado Missile Post Accident Monitoring Internal Flooding Hydrostatic Squib Qualified Offsite Circuit Emergency Lighting High Energy Line Break Missed surveillance Abnormal operational transient Surveillance Frequency Control Program Local Leak Rate Testing Foreign Material Exclusion Feedwater Heater Scram Discharge Volume Intergranular Stress Corrosion Cracking Feedwater Controller Failure Excess Flow Check Valve Operability Determination Spiral reload Battery sizing Overtravel Power-Operated Valves Turbine Missile Fuel cladding Pressure Boundary Leakage Offsite Circuit Power change Coast down Unidentified leakage Overspeed trip Manual Operator Action Operational leakage Water hammer Control Room Habitability |