GO2-17-022, Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-522 Revision 0

From kanterella
Jump to navigation Jump to search

Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-522 Revision 0
ML17019A423
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/19/2017
From: Hettel W
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GO2-17-022
Download: ML17019A423 (8)


Text

W. Grover Hettel Vice President, Operations P.O. Box 968, Mail Drop PE04 Richland, WA 99352-0968 Ph. 509-377-8311 F. 509-377-4150 wghettel@energy-northwest.com January 19, 2017 10 CFR 50.90 GO2-17-022 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397 SUPPLEMENT TO LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS TO ADOPT TSTF-522 REVISION 0

Reference:

1. Letter GO2-16-047 from W. G. Hettel (Energy Northwest) to NRC:

"License Amendment Request to Revise Technical Specifications to Adopt TSTF-522 Revision 0," dated March 3, 2016 (ADAMS Accession No. ML16067A390)

2. Letter from L. John Klos (NRC) to M. E. Reddemann (Energy Northwest):

"Columbia Generating Station - Issuance of Amendment RE: Adoption of Technical Specification Task Force traveler TSTF-425, Revision 3 (CAC No. MF6042)," dated November 3, 2016 (ADAMS Accession No. ML16253A025)

Dear Sir or Madam:

By letter dated March 3, 2016 (Reference 1), Energy Northwest submitted a license amendment request (LAR), to adopt TSTF-522 Revision 0, for Columbia Generating Station (Columbia) to revise the technical specification (TS) requirements to operate ventilation systems with charcoal filters for 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> each month. Subsequent to submitting this LAR, Energy Northwest received amendment 238 (Reference 2) to Columbia's operating license and TS which moved certain surveillance requirement (SR) frequencies to an owner controlled Surveillance Frequency Control Program (SFCP).

Amendment 238 (Reference 2) moved the 31 day SR frequency to the SFCP for both TS SR 3.6.4.3.1 and 3.7.3.1.

This supplement modifies the description of change in Reference 1 LAR to adopt TSTF-522 Revision 0 in the following manner: the proposed change revises the TS operation of the ventilation system to 15 minutes at a frequency controlled in accordance with the Surveillance for TS SR 3.6.4.3.1 and 3.7.3.1. Markups and clean pages of these changes are provided in Attachments 1 and 2 respectively.

G02-17-022 Page 2 of 2 The No Significant Hazards Consideration Determination (NSHCD) technical conclusions provided in the original submittal remain valid.

This letter and its attachments contain no regulatory commitments.

If you should have any questions regarding this submittal, please contact Mr. R. M.

Garcia, (509) 377-8463.

I declare under penalty of perjury that the foregoing is true and corr<?ct. Executed on \C\,....,. day of :["~' 9A-P ':'/ , 2017.

Respectfully, W. G. Hettel Vice President, Operations Attachments: As stated.

cc: NRC Region IV Administrator NRC NRA Project Manager NRC Sr. Resident Inspector - 988C CD Sonoda - BP A/1399 (email)

WA Horin - Winston & Strawn (email)

RR Cowley - WDOH (email)

EFSEC @utc.wa.gov (email)

GO2-17-022 PROPOSED TECHNICAL SPECIFICATIONS CHANGES (MARK-UPS)

Page 3.6.4.3-3 Page 3.7.3-3

SGT System 3.6.4.3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME E. Two SGT subsystems E.1 Initiate action to suspend Immediately inoperable during OPDRVs.

OPDRVs.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.4.3.1 Operate each SGT subsystem for 10 15 In accordance continuous hours minutes with heaters operating. with the Surveillance Frequency Control Program SR 3.6.4.3.2 Perform required SGT filter testing in accordance In accordance with the Ventilation Filter Testing Program (VFTP). with the VFTP SR 3.6.4.3.3 Verify each SGT subsystem actuates on an actual In accordance or simulated initiation signal. with the Surveillance Frequency Control Program SR 3.6.4.3.4 Verify each SGT filter cooling recirculation valve can In accordance be opened and the fan started. with the Surveillance Frequency Control Program Columbia Generating Station 3.6.4.3-3 Amendment No. 169,199 225 238

CREF System 3.7.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.3.1 Operate each CREF subsystem for 10 15 In accordance continuous hours minutes with the heaters with the operating. Surveillance Frequency Control Program SR 3.7.3.2 Perform required CREF filter testing in accordance In accordance with the Ventilation Filter Testing Program (VFTP). with the VFTP SR 3.7.3.3 Verify each CREF subsystem actuates on an actual In accordance or simulated initiation signal. with the Surveillance Frequency Control Program SR 3.7.3.4 Perform required CRE unfiltered air inleakage In accordance testing in accordance with the Control Room with the Control Envelope Habitability Program. Room Envelope Habitability Program Columbia Generating Station 3.7.3-3 Amendment No. 199,207 225 238

GO2-17-022 PROPOSED TECHNICAL SPECIFICATION PAGES (CLEAN)

Page 3.6.4.3-2 Page 3.7.3-3

SGT System 3.6.4.3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME E. Two SGT subsystems E.1 Initiate action to suspend Immediately inoperable during OPDRVs.

OPDRVs.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.4.3.1 Operate each SGT subsystem for 15 continuous In accordance minutes with heaters operating. with the Surveillance Frequency Control Program SR 3.6.4.3.2 Perform required SGT filter testing in accordance In accordance with the Ventilation Filter Testing Program (VFTP). with the VFTP SR 3.6.4.3.3 Verify each SGT subsystem actuates on an actual In accordance or simulated initiation signal. with the Surveillance Frequency Control Program SR 3.6.4.3.4 Verify each SGT filter cooling recirculation valve can In accordance be opened and the fan started. with the Surveillance Frequency Control Program Columbia Generating Station 3.6.4.3-2 Amendment No. 169,199 225 238

CREF System 3.7.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.3.1 Operate each CREF subsystem for 15 continuous In accordance minutes with the heaters operating. with the Surveillance Frequency Control Program SR 3.7.3.2 Perform required CREF filter testing in accordance In accordance with the Ventilation Filter Testing Program (VFTP). with the VFTP SR 3.7.3.3 Verify each CREF subsystem actuates on an actual In accordance or simulated initiation signal. with the Surveillance Frequency Control Program SR 3.7.3.4 Perform required CRE unfiltered air inleakage In accordance testing in accordance with the Control Room with the Control Envelope Habitability Program. Room Envelope Habitability Program Columbia Generating Station 3.7.3-3 Amendment No. 199,207 225 238