GO2-07-123, License Amendment Request to Technical Specifications Associated with Condensate Storage Tank Level

From kanterella
Jump to navigation Jump to search
License Amendment Request to Technical Specifications Associated with Condensate Storage Tank Level
ML072330087
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/08/2007
From: Gambhir S
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GO2-07-123
Download: ML072330087 (17)


Text

ý J Sudesh K. GaiDbhir ENERGY Vice President, Technical Services P.O. Box 968, Mail Drop PE04 NORTHW ESTRichand, Ph.

WA 99352-0968 509-377-8313 F. 509-377-2354 sgambhir@energy-northwest.com August 8, 2007 G02-07-123 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397 LICENSE AMENDMENT REQUEST TO TECHNICAL SPECIFICATIONS ASSOCIATED WITH CONDENSATE STORAGE TANK LEVEL

Reference:

Letter dated July 26, 2007, G02-07-109, SK Gambhir (Energy Northwest) to NRC, "License Amendment Request to Technical Specifications Associated with Condensate Storage Tank Level"

Dear Sir or Madam:

This license amendment request (LAR) supersedes the LAR referenced above in order to correct a typographical error in sections 4.0 and 5.0 of attachment 1 to the letter.

Pursuant to 10 CFR 50.90, Energy Northwest hereby requests an amendment to the Technical Specifications (TS) for Columbia Generating Station (Columbia) Operating License (NPF-21). The proposed change would revise the requirements of TS LCO 3.3.5.2, Reactor Core Isolation Cooling (RCIC) System Instrumentation and TS LCO 3.5.2, ECCS - Shutdown. It is requested that these sections be modified to reflect an increase in the allowable value for Condensate Storage Tank level-low function in Table 3.3.5.2-1 and an increase in the required Condensate Storage Tank level of SR 3.5.2.2.

These changes reflect corrections that were made to supporting calculations for these two values.

The proposed changes have been evaluated in accordance with 10 CFR 50.91 using criteria in 10 CFR 50.92(c) and this change presents a no significant hazards consideration. The basis for this determination is provided in Attachment 1 to this letter.

The proposed change does not involve any new commitments.

Energy Northwest requests approval of these changes prior to August 1, 2008. Once approved, the amendment will be implemented Within 60 days. This implementation period will provide adequate time for station documents to be revised using the appropriate change control mechanisms.

LICENSE AMENDMENT REQUEST TO TECHNICAL SPECIFICATIONS ASSOCIATED WITH CONDENSATE STORAGE TANK LEVEL Page 2 In accordance with 10 CFR 50.91, "Notice for public comment; State consultation,"

paragraph (b), Energy Northwest is notifying the State of Washington of this application for change to the TS by transmitting a copy of this letter and its attachments to the designated State Official.

If you have any questions or require additional information, please contact GV Cullen, Licensing Supervisor at (509) 377-6105.

I declare under penalty of perjury that the foregoing is true and correct. Executed on the date of this letter.

Re, tfuIly, SK Gambhir Vice President, Technical Services Attachments:

1. Evaluation of the Proposed Change
2. Proposed Technical Specification Changes (mark-up)
3. Proposed Technical Specification Pages (re-typed)
4. Changes to Technical Specification Bases (reference only) cc: BS Mallett - NRC RIV CF Lyon - NRC NRR NRC Senior Resident Inspector/988C RN Sherman - BPA/1 399 WA Horin -Winston & Strawn JO Luce - EFSEC RR Cowley - WDOH

LICENSE AMENDMENT REQUEST TO TECHNICAL SPECIFICATIONS ASSOCIATED WITH CONDENSATE STORAGE TANK LEVEL Attachment I Page 1 of 5 Licensee Evaluation

1.0 DESCRIPTION

This letter is a request to amend the Operating License (NPF-21) for Columbia Generating Station (Columbia).

The proposed change would revise the requirements of TS LCO 3.3.5.2, Reactor Core Isolation Cooling (RCIC) System Instrumentation and TS LCO 3.5.2, ECCS - Shutdown.

It is requested that these sections be modified to reflect an increase in the allowable value for Condensate Storage Tank level-low function in Table 3.3.5.2-1 and an increase in the required Condensate Storage Tank level of SR 3.5.2.2. These changes reflect corrections that were made to supporting calculations for these two values.

2.0 PROPOSED CHANGE

Energy Northwest (EN) proposes the following two changes to the Columbia Technical Specifications (TSs):

1. Revise the allowable value for Condensate Storage Tank Level - Low in Table 3.3.5.2-1, Reactor Core Isolation Cooling System Instrumentation, from "> 446 ft 0 inches elevation" to "> 447 ft 7 inches elevation"
2. Revise the required Condensate Storage Tank (CST) water level in SR 3.5.2.2 from "> 14.8 ft in a single CST or> 9.1 ft in each CST" to '> 16.5 ft in a single CST or > 10.5 ft in each CST"

3.0 BACKGROUND

Both of the proposed changes were identified during the process of developing a formal design basis record for the Reactor Core Isolation Cooling (RCIC) system. These proposed changes represent corrections related to calculational errors that were identified in the process of documenting the design basis.

Change to TS Table 3.3.5.2-1 TS Table 3.3.5.2-1 provides a list RCIC system functions for which instrumentation is required to be provided. The instruments required to meet function three, "Condensate Storage Tank Level-Low" are RCIC-LS-1 5A and 15B. These instruments initiate an automatic transfer of RCIC pump suction from the CST to the suppression pool on low CST level. They are required to be set high enough to ensure adequate pump suction head while water is being taken from the CST. The value for automatic transfer is set high enough to ensure that during swap-over of suction from the CST to the suppression pool, the volume in the CST will remain above the required submergence level to prevent vortexing. The current TS allowable value is >446 0".

LICENSE AMENDMENT REQUEST TO TECHNICAL SPECIFiCAT'IONS ASSOCIATED WITH CONDENSATE STORAGE TANK LEVEL Attachment I Page 2 of 5 It was discovered that the plant specific calculation (E/l-02-93-1272) used to support.the existing values for the CST level setpoin't.incorrectly based the vortex limit on the centerline of the suction pipe (445' 4") feeding the RCIC pump when it should have been based on the upper edge of the pipe (446' 3.625"). The new lower analytical limit was subsequently determined to be 447' 1". Accounting for drift and loop uncertainties at approximately 1", the new calculated minimum setting would need to be 447' 2". To provide additional conservatism, EN proposes to add another 5" for a TS allowable of

>447' 7". Currently, the ;level switch setting for both level switches are set conservatively at 448' 3" in compliance with Licensee Controlled Specifications (LCS) Table 1.3.5.3-1.

Change to SR 3.5.2.2 This surveillance requires that for operability of the High Pressure Core Spray (HPCS)

System, either the suppression pool or the CSTs provide adequate volume (135,000 gallons) to minimize the consequences of a drain down event while in Mode 4 or Mode 5 (if required). There are two Condensate Storage Tanks, each with a nominal capacity of 400,000 gallons. For the CSTs to satisfy this surveillance requirement there must either be two tanks each with 67,500 gallons available or else one tank with 135,000 gallons available.

While in standby, the HPCS pump is normally aligned to the CSTs to minimize the injection of suppression pool water into the Reactor Pressure Vessel (RPV). However, on low CST level or high suppression pool level an automatic transfer of the HPCS pump suction to the suppression pool occurs upon activation of the level switches. Of particular concern are the measurement effects on the CST low level switches (HPCS-LS-1A and 1B). When the level in the CSTs fall below a preset level, contact closure from HPCS-LS-1A and 1B, with one out of two logic, signals the HPCS suction valve from the suppression pool to open. Opening of the suppression pool suction valve signals the CST suction valve to close.

It was discovered that the calculated minimum level to assure 135,000 gallons in the CSTs in plant specific calculation (E/I-02-91 -1011) did not take into consideration the plant conditions at which automatic transfer from the CST to the suppression pool could take place. These level switches are not connected directly to the CSTs but rather on a standpipe located downstream on the suction line in the reactor building. Thus, they are influenced by such factors as differential head between the tank and the standpipe (due primarily to flow losses), reactor building temperature, and reactor building pressure.

Previously, the calculation did not address the head loss that occurs in the switches when the HPCS pump is drawing water from the CST. When taking into consideration the effects of full HPCS flow on the sensing instrument, it was discovered that premature switching could occur due to a sensed lower level by HPCS-LS-1 A and 1 B than that which actually exists in the tanks. After taking into consideration the effect that flow had on the level sensors, it was determined that an additional margin of 1.4 ft in two tanks and 1.7 ft in one tank was necessary to assure 135,000 gallons was available to inject into the Reactor Pressure Vessel (RPV).

LICENSE AMENDMENT REQUEST -TO TECHNICAL SPEC IIi TO ASSOCIATED WITH CONDENSATE STORAGE TANK LEVEL Page 3 of 5 As a compensatory measure, the surveillance procedures that are used to satisfy SR 3.5.2.2 for CST level have been revised to reflect this concern.

4.0 TECHNICAL ANALYSIS

In each case, the proposed change reflects.a correction to previously calculated values used to support existing TS limits. Therefore, in order to restore the TS values to ensure that the underlying premise of LCOs 3.3.5.2 and 3.5.2.2 are met, this amendment request is necessary.

5.0 REGULATORY ANALYSIS

5.1 No Significant Hazard Consideration EN has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of Amendment" as discussed below:

1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?

Response: No.

The operation of Columbia in accordance with the proposed amendment will not involve a significant increase in the probability or consequences of an accident previously evaluated. Neither of these changes affects the probability of any accident previously evaluated as they do not involve or impact accident initiators.

The proposed change to TS 3.3.5.2 would ensure that the consequences would remain the same as that previously evaluated for during any event in which the RCIC pump was utilized. Adequate volume would be maintained in the CST whenever the RCIC pump was aligned to it to ensure that it did not experience loss of suction due to vortexing.

The proposed changes to TS 3.5.2.2 would ensure that the previously assumed volume of water in the CST would still be available to inject into the reactor vessel during Modes 4 and 5 should the suppression pool not meet minimum volume requirements. Therefore, operation of Columbia in accordance with the proposed amendment will not involve a significant increase in the probability or consequences of an accident previously evaluated.

2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?

Response: No.

LICENSE AMENDMENTREQU*ST..TO-TECHNICALSPECIFICATIONS ASSOCIATED WITH CONDEN'SATE ýTORAGE TANK LEVEL"'..

Page 4 of 5 The operation of Columbia in accordance with the proposed amendment will not create the possibility of a new or different kind of accident from any accident previously evaluated. The proposed change will not create a new or different kind of accident since it only affects the amount of water held in reserve to support reactor vessel inventory loss. The proposed change does not introduce any credible mechanisms for unacceptable radiation release nor does it require physical modification to the plant. The plant has operated well within the existing allowable values. The increased margin provided by the increased level will assure no new or different kinds of accidents result from the proposed change. Therefore, the operation of Columbia in accordance with the proposed amendment will not create the possibility of a new or different kind of accident from any accident previously evaluated.

3. Does the proposed change involve a significant reduction in a margin of safety?

Response: No.

The operation of Columbia in accordance with the proposed amendment will not involve a significant reduction in the margin of safety. The proposed amendment provides assurance that the RCIC pump suction will be transferred without loss of suction and that 135,000 gallons of CST inventory will continue to be available for injection into the RPV under worst case conditions. Therefore, operation of Columbia in accordance with the proposed amendment will not involve a significant reduction in the margin of safety.

5.2 Applicable Regulatory RequirementslCriteria The applicable regulatory criteria are found in 10 CFR 50, Appendix A, Criterion 13, and in 10 CFR 50 Appendix B, Criterion XII.

10 CFR 50, Appendix A, Criterion 13-Instrumentation and control Instrumentation shall be provided to monitor variables and systems over their anticipatedranges for normal operation, for anticipatedoperational occurrences, and for accident conditions as appropriateto assure adequate safety, including those variables and systems that can affect the fission process, the integrity of the reactorcore, the reactorcoolant pressure boundary, and the containment and its associatedsystems.

Appropriate controls shall be provided to maintain these variables and systems within prescribedoperatingranges.

10 CFR 50, Appendix B, Criterion XII-Control of Measuring and Test Equipment Measures shall be established to assure that tools, gages, instruments, and other measuring and testing devices used in activities affecting quality

LICENSE AMENDMENT REQUEST TO TECHNICAL SPECIFICATIONS ASSOCIATED WITH CONDENSATE STORAGE TANK LEVEL Page 5 of 5 are properly controlledi calibrated,and adjusted at specified periods to maintain accuracy within necessary limits.

Revising the TSs to the ranges specified in this submittal will result in the prescribed CST operating ranges being maintained for normal operation, anticipated operational occurrences, and for accident conditions. In addition, the establishment of the new ranges will provide the necessary limits for the instruments currently being used to satisfy the affected surveillance requirements.

6.0 ENVIRONMENTAL CONSIDERATION

EN has evaluated the proposed amendment against the criteria for identification of licensing and regulatory actions requiring environmental assessment in accordance with 10 CFR 51.21. The proposed change meets the criteria for categorical exclusion as provided for in 10 CFR 51.22(c)(9). The change request does not pose a significant hazards consideration nor does it involve an increase in the amounts, or a change in the types, of any effluent that may be released off-site. Furthermore, this proposed request does not involve an increase in individual or cumulative occupational exposure.

7.0 REFERENCES

1. Calculation E/1-02-91 -1011, "Calculation for Setting Range Determination for Instrument Loop" (HPCS-LS-1A and 1B)
2. Calculation E/I-02-93-1272, "Calculation for Setting Range Determination for Instrument Loop RCIC Level Switch 15A & 15B"

LICENSE AMENDMENT REQUEST TO TECHNICAL SPECIFICATIONS ASSOCIATED WITH CONDENSATE STORAGE TANK LEVEL Proposed Technical Specifications Changes (mark-up)

. ECCS -Shutdown 3.5.2 SURVEILLANCE REQUIREMENTS-SURVEILLANCE FREQUENCY SR 3.5.2.1 Verify, for each required low pressure ECCS 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> injection/spray subsystem, the suppression pool water level is > 18 ft 6 inches.

SR 3.5.2.2 Verify, for the required High Pressure Core 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Spray (HPCS) System, the:

a. Suppression pool water level is

> 18 ft 6 inches; or 16.5

-b. Condens7at-ee')storage tank (CST) water level is > t in a single CST or ft in each CST.

' le.

SR 3.5.2.3 Verify, for each required ECCS injection/ 31 days spray subsystem, the piping is filled with water from the pump discharge valve to the injection valve.

SR 3.5.2.4 ------------------ NOTE --------------------

One low pressure coolant injection (LPCI) subsyýtem may be considered OPERABLE during alignment and operation for decay heat removal, if capable of being manually realigned and not otherwise inoperable.

Verify each required ECCS injection/spray 31 days subsystem manual, power operdted, and automatic valve in the flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position.

(continued)

Columbia G12nerating Stýjticn 3.5.2-3 Amendment No. 149,150,165 1691

IA,

'RC IC System: Instrumentation 3.3.5.2 T,ible 3.3.5.2-1 (page I of 1)

Reactor Core Isolation Cooling System Instrumentdtion CC NO ITIONS REQUIRED REFERENCED FROM CHANNELS PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION FUNCTION ACTICN A.1 REQUIREMENTS VALUE

1. Reactor Vessel Water 4 SR 3.3.5.2.1 > -58 inches Level - Low Low, Level 2 SR 3.3.5.2.2 SR 3.3.5.2.3 SR 3.3.5.2.4 2, Reactor Vossel Water C SR 3.3.5,2.1 < 56 inches Level -High, Level 8 SR 3.3.5.2.2 SR 3.3.5.2.3 SR 3.3.5. 2.4

<ammwt 7 inches

3. Condensdte Storage Tank SR 3.3.5.2.1 Level - Low SR 3.3.5. 2.2 "elevatl~n SR 3.3.5:2.3 SR 3.3.5.2.4 4, Manual Initiation 2 C SR 3.3.5.2.4 " ,NA Columbia Genera ting Station 3.31.5.2-4 Amendwnt Na. +4-9 1691

LICENSE AMENDMENT REQUEST TO TECHNICAL SPECIFICATIONS ASSOCIATED WITH CONDENSATE STORAGE TANK LEVEL Proposed Technical Specification Pages (re-typed)

RCIC System Instrumentation 3.3.5.2 SURVEILLANCE REQUIREMENTS


NOTES----------------------------------

1. Refer to Table 3.3.5.2-1 to determine which SRs apply for each RCIC Function.
2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed as follows: (a) for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for Functions 2 and 4; and (b) for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for Functions 1 and 3 provided the associated Function maintains RCIC initiation capability.

SURVEILLANCE FREQUENCY SR 3.3.5.2.1 Perform CHANNEL CHECK. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.3.5.2.2 Perform CHANNEL FUNCTIONAL TEST. 92 days SR 3.3.5.2.3 Perform CHANNEL CALIBRATION. 18 months SR 3.3.5.2.4 Perform LOGIC SYSTEM FUNCTIONAL TEST. 24 months

!-.olumbia Generjtinq Station .. ' . 5.2- Ainc, ndilie.r,t No. 4-44 1691

Table 3.3.5.2-1 (page 1 of 1)

Reactor Core Isolation Cooling System Instrumentation CONDITIONS REQUIRED REFERENCED CHANNELS FROM PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION FUNCTION ACTION.A.1 REQUIREMENTS VALUE

1. Reactor Vessel Water 4 B SR 3.3.5.2.1 > -58 inches Level - Low Low, SR 3.3.5.2.2 Level 2 SR 3.3.5.2.3 SR 3.3.5.2.4
2. Reactor Vessel Water 2. C SR 3.3.5.2.1 < 56 inches Level -High, Level 8 SR 3.3.5.2.2 SR 3.3.5.2.3 SR 3.3.5.2.4
3. Condensate Storage Tank Level -Low 2 0 SR SR SR 3.3.5.2.1 3.3.5.2.2 3.3.5.2.3

> 447 ft 7 inches elevation I

SR 3.3.5.2.4

4. Manual Initiation 2 C SR 3.3.5.2.4 NA u nt1 i amGener,'ajt irig Stat i n 3...-
1. 5 .2- 4 Amrd ntr.449--9 Amendment No . ý49 , 1.69

ECCS- Shutdown 3.5.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.2.1 Verify, for each required low pressure ECCS 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> injection/spray subsystem, the suppression pool water level is > 18 ft 6 inches.

SR 3.5.2.2 Verify, for the required High Pressure Core 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Spray (HPCS) System, the:

a. Suppression pool water level is

> 18 ft 6 inches; or

b. Condensate storage tank (CST) water level is > 16.5 ft in a single CST or

> 10.5 ft in each CST. I SR 3.5.2.3 Verify, for, each required ECCS injection/ 31 days spray subsystem, the piping is filled with water from the pump discharge valve to the injection valve.

SR 3.5.2.4 -------------------- NOTE------------------

One low pressure coolant injection (LPC1) subsystem may be considered OPERABLE during alignment and operation for decay heat removal, if capable of being manually realigned and not otherwise inoperable.

Verify each required ECCS injection/spray 31 days subsystem manual, power operated, and automatic valve in the flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position.

(continued)

Columbia Generating Station 3.5.2-3 Amendment No.

1 rJ g, 1 ji , 1-C , 1,69

. , ,,,- ..EC.CS Shutdown 3.5.2 SURVEILLANCE REOUI REMENTS SURVEILLANCE FREQUENCY SR 3.5.2.5 Verify each required ECCS pump develops t he In accordance specified flow rate with the specified with the developed head. Inservice Testing Program TOTAL DEVELOPED SYSTEM FLOW RATE HEAD LPCS > 6350 gpm > 128 psid LPCI > 7450 gpm > 26 psid HPCS > 6350 gpm > 200 psid SR 3.5.2.6 -------------------- NOTE-------------------

Vessel injection/spray may be excluded.

Verify each required ECCS injection/spray 24 months subsystem actuates on an actual or simulated automatic initiation signal.

ol umbi I Genera Li ng Sta tii on ,325_-4 A d Affifýndment No.o ý19,!SG 169n 1691

LICENSE AMENDMENT REQUEST TO TECHNICAL SPECIFICATIONS ASSOCIATED WITH CONDENSATE STORAGE TANK LEVEL Changes to Technical Specifications Bases (reference only)

ECCS- Shutdown B 3.5.2 BASES ACTIONS C.1. C.2, D.1. D.2, and D.3 (continued) stationing a dedicated operator, who is in continuous communication with the control room, at the controls of the isolation device. In this way, the penetration can be rapidly isolated when a need for secondary containment isolation is indicated). This may be performed by an administrative check, by examining logs or other information, to determine if the components are out of service for maintenance or other reasons. It is not necessary to perform the Surveillances needed to demonstrate OPERABILITY of the components. If, however, any required component is inoperable, then it must be restored to OPERABLE status. In this case, the Surveillances may need to be performed to restore the component to OPERABLE status.

Actions must continue until all required components are OPERABLE.

SURVEILLANCE SR 3.5.2.1 and SR 3.5.2.2 REQUIREMENTS The minimum water level of 18 ft 6 inches required for the suppression pool is periodically verified to ensure that the suppression pool will provide adequate net positive suction head (NPSH) for the ECCS pumps, recirculation volume (135,000 gallons consistent with the CST volume requirements described below), and vortex prevention. With the suppression pool water level less than the required limit, all ECCS injection/spray subsystems are inoperable unless they are aligned to an OPERABLE CST (Ref. 5).

When the suppression pool level is < 18 ft 6 inches, the HPCS System is considered OPERABLE only if it can take suction from the CST and the CST water level is sufficient to provide the required NPSH for the HPCS pump. Therefore, a verification that either the suppression pool water level is > 18 ft 6 inches or the HPCS System is aligned to take suction from the CST and the CST contains > 135,000 gallons of water. This volume of water is equivalent to a level of

!-4-.ft in a single CST or 9-l1'ft in each CST above the top of the suction line. This ens res that the HPCS System can supply makeup water to the RPV. Calculations that determine this water level are listed as Peferences 3 and 4.

(

Columbia Generating Station B 3.5.2_-4 Revision 41