Text

(3) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source of special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

(6) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to store byproduct, source and special nuclear materials not intended for use at Columbia Generating Station. The materials shall be no more than 9 sealed neutron radiation sources designed for insertion into pressurized water reactors and no more than 40 sealed beta radiation sources designed for use in area radiation monitors. The total inventory shall not exceed 24 microcuries of strontium-90, 20 microcuries of uranium-235, 30 curies of plutonium-238, and 3 curies of americium-241.

C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level The licensee is authorized to operate the facility at reactor core power levels not in excess of full power (3486 megawatts thermal). Items in Attachment 1 shall be completed as specified. Attachment 1 is hereby incorporated into this license.

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 210 and the Environmental Protection Plan contained in l Appendix B, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

a. For Surveillance Requirements (SRs) not previously performed by existing SRs or other plant tests, the requirement will be considered met on the implementation date and the next required test will be at the interval specified in the Technical Specifications as revised in Amendment No. 149.

Amendment No. 210

Table 3.3.5.2-1 (page 1 of 1)

Reactor Core Isolation Cooling System Instrumentation CONDITIONS REQUIRED REFERENCED CHANNELS FROM PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION FUNCTION ACTION.A.1 REQUIREMENTS VALUE

1. Reactor Vessel Water 4 B SR 3.3.5.2.1 > -58 inches Level - Low Low, SR 3.3.5.2.2 Level 2 SR 3.3.5.2.3 SR 3.3.5.2.4
2. Reactor Vessel Water 2. C SR 3.3.5.2.1 < 56 inches Level -High, Level 8 SR 3.3.5.2.2 SR 3.3.5.2.3 SR 3.3.5.2.4
3. Condensate Storage Tank Level -Low 2 0 SR SR SR 3.3.5.2.1 3.3.5.2.2 3.3.5.2.3

> 447 ft 7 inches elevation I

SR 3.3.5.2.4

4. Manual Initiation 2 C SR 3.3.5.2.4 NA u nt1 i amGener,'ajt irig Stat i n 3...-
1. 5 .2- 4 Amrd ntr.449--9 Amendment No . ý49 , 1.69 ,210

ECCS- Shutdown 3.5.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.2.1 Verify, for each required low pressure ECCS 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> injection/spray subsystem, the suppression pool water level is > 18 ft 6 inches.

SR 3.5.2.2 Verify, for the required High Pressure Core 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Spray (HPCS) System, the:

a. Suppression pool water level is

> 18 ft 6 inches; or

b. Condensate storage tank (CST) water level is > 16.5 ft in a single CST or

> 10.5 ft in each CST. I SR 3.5.2.3 Verify, for, each required ECCS injection/ 31 days spray subsystem, the piping is filled with water from the pump discharge valve to the injection valve.

SR 3.5.2.4 -------------------- NOTE------------------

One low pressure coolant injection (LPC1) subsystem may be considered OPERABLE during alignment and operation for decay heat removal, if capable of being manually realigned and not otherwise inoperable.

Verify each required ECCS injection/spray 31 days subsystem manual, power operated, and automatic valve in the flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position.

(continued)

Columbia Generating Station 3.5.2-3 Amendment No.

1 rJ g, 1 ji , 1-C , 1,69 ,210