Letter Sequence Request |
---|
|
|
MONTHYEARML20063G1522020-03-0202 March 2020 NRR E-mail Capture - Columbia Generating Station - Acceptance of Requested Licensing Action TSTF-564 Amendment Project stage: Acceptance Review ML20276A2952020-10-0202 October 2020 Westinghouse Electric Company - Responses to Requests for Supplemental Information for the Application for the Sentry Dry Storage Cask System (Certificate of Compliance (CoC) No. 72-1026; Proposed Amendment 5) Project stage: Supplement ML20302A0262020-12-15015 December 2020 Issuance of Amendment No. 262 to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR Project stage: Approval 2020-12-15
[Table View] |
|
---|
Category:Letter type:GO
MONTHYEARGO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing GO2-24-005, Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-1702024-01-0808 January 2024 Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 GO2-23-136, Guarantee of Payment of Deferred Premium2023-12-20020 December 2023 Guarantee of Payment of Deferred Premium GO2-23-135, Notice of Readiness for Supplemental Inspection2023-12-14014 December 2023 Notice of Readiness for Supplemental Inspection GO2-23-130, Reply to a Notice of Violation; EA-23-0542023-12-14014 December 2023 Reply to a Notice of Violation; EA-23-054 GO2-23-105, Licensing Basis Document Update and Biennial Commitment Change Report2023-12-12012 December 2023 Licensing Basis Document Update and Biennial Commitment Change Report GO2-23-107, Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation2023-12-0505 December 2023 Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-23-126, Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-012023-11-28028 November 2023 Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-01 GO2-23-121, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-27027 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation GO2-23-097, In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26)2023-09-0606 September 2023 In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26) GO2-23-100, Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication2023-08-31031 August 2023 Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication GO2-23-056, Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2023-08-29029 August 2023 Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling GO2-23-093, Supplement to Reply to a Notice of Violation: EA-21-1702023-07-27027 July 2023 Supplement to Reply to a Notice of Violation: EA-21-170 GO2-23-068, Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation2023-07-19019 July 2023 Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation GO2-23-090, Reply to a Notice of Violation2023-07-12012 July 2023 Reply to a Notice of Violation GO2-23-073, Notification of NPDES Permit Issuance2023-06-26026 June 2023 Notification of NPDES Permit Issuance GO2-23-072, Cycle 27 Core Operating Limits Report2023-06-0505 June 2023 Cycle 27 Core Operating Limits Report GO2-23-055, Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report GO2-23-006, License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications2023-05-0101 May 2023 License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications GO2-23-053, 2022 Annual Environmental Operating Report2023-04-26026 April 2023 2022 Annual Environmental Operating Report GO2-23-057, 2022 Annual Radioactive Effluent Release Report2023-04-25025 April 2023 2022 Annual Radioactive Effluent Release Report GO2-23-012, Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2023-03-27027 March 2023 Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-041, Generation Station - Level of Financial Protection - Annual Reporting Requirement2023-03-15015 March 2023 Generation Station - Level of Financial Protection - Annual Reporting Requirement GO2-23-038, Plant Decommissioning Fund Status Report2023-03-15015 March 2023 Plant Decommissioning Fund Status Report GO2-23-034, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462023-03-13013 March 2023 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 GO2-23-035, Supplement to License Amendment Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-03-0909 March 2023 Supplement to License Amendment Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling GO2-23-019, Emergency Plan - Summary of Changes and Analysis for Revision 68 of the EP-012023-02-0808 February 2023 Emergency Plan - Summary of Changes and Analysis for Revision 68 of the EP-01 GO2-22-131, Guarantee of Payment of Deferred Premium2022-12-19019 December 2022 Guarantee of Payment of Deferred Premium GO2-22-122, Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-11-28028 November 2022 Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GO2-22-076, Status of License Renewal Commitments2022-10-31031 October 2022 Status of License Renewal Commitments GO2-22-110, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactor2022-10-17017 October 2022 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactor GO2-22-096, Supplement to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-10-0404 October 2022 Supplement to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GO2-22-085, Docket No. 50-397, Evacuation Time Estimate Analysis2022-08-30030 August 2022 Docket No. 50-397, Evacuation Time Estimate Analysis GO2-22-075, Response to Request for Additional Information Related to Revised Pressure-Temperature Limit Curves2022-07-11011 July 2022 Response to Request for Additional Information Related to Revised Pressure-Temperature Limit Curves GO2-22-072, Summary of Changes and Analysis for Revision 57 of PPM 13.14.4 - Emergency Equipment Maintenance and Testing2022-07-11011 July 2022 Summary of Changes and Analysis for Revision 57 of PPM 13.14.4 - Emergency Equipment Maintenance and Testing GO2-22-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Colling Using the Consolidated Line Item Improvement Process2022-05-25025 May 2022 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Colling Using the Consolidated Line Item Improvement Process GO2-22-062, Registration of Spent Fuel Cask Use2022-05-19019 May 2022 Registration of Spent Fuel Cask Use GO2-22-049, Supplement to Licensing Amendment Request to Adopt 10CFR50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Rectors2022-05-10010 May 2022 Supplement to Licensing Amendment Request to Adopt 10CFR50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Rectors GO2-22-054, Independent Spent Fuel Storage Installation, 2021 Annual Radiological Environmental Operating Report2022-05-0909 May 2022 Independent Spent Fuel Storage Installation, 2021 Annual Radiological Environmental Operating Report GO2-22-056, Registration of Spent Fuel Cask Use2022-04-21021 April 2022 Registration of Spent Fuel Cask Use GO2-22-055, 2021 Annual Environmental Operating Report2022-04-20020 April 2022 2021 Annual Environmental Operating Report GO2-22-048, 2021 Annual Radioactive Effluent Release Report2022-04-15015 April 2022 2021 Annual Radioactive Effluent Release Report GO2-22-045, Registration of Spent Fuel Cask Use2022-04-0606 April 2022 Registration of Spent Fuel Cask Use GO2-22-044, Level of Financial Protection - Annual Reporting Requirement2022-03-21021 March 2022 Level of Financial Protection - Annual Reporting Requirement GO2-22-038, Docket No. 50-397, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462022-03-0909 March 2022 Docket No. 50-397, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 GO2-22-031, Response to Audit Plan and Online Reference Portal Request2022-02-15015 February 2022 Response to Audit Plan and Online Reference Portal Request GO2-22-011, Docket No. 72-35; Independent Spent Fuel Storage Installation, 2021 Annual Effluent Release Report2022-02-0808 February 2022 Docket No. 72-35; Independent Spent Fuel Storage Installation, 2021 Annual Effluent Release Report GO2-22-001, License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-02-0303 February 2022 License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GO2-22-012, Independent Spent Fuel Storage Installation - Biennial 50.59/72.48 Report2022-01-24024 January 2022 Independent Spent Fuel Storage Installation - Biennial 50.59/72.48 Report 2024-01-08
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARGO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan GO2-23-107, Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation2023-12-0505 December 2023 Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-23-056, Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2023-08-29029 August 2023 Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling GO2-23-012, Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2023-03-27027 March 2023 Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-035, Supplement to License Amendment Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-03-0909 March 2023 Supplement to License Amendment Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling GO2-22-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Colling Using the Consolidated Line Item Improvement Process2022-05-25025 May 2022 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Colling Using the Consolidated Line Item Improvement Process GO2-22-001, License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-02-0303 February 2022 License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GO2-21-133, License Amendment Request to Adopt 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2021-11-0909 November 2021 License Amendment Request to Adopt 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors GO2-21-016, License Amendment Request to Change Technical Specification 3.4.11 Reactor Coolant System Pressure and Temperature Limits2021-10-13013 October 2021 License Amendment Request to Change Technical Specification 3.4.11 Reactor Coolant System Pressure and Temperature Limits GO2-21-042, License Amendment Request to Adopt TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement2021-05-0808 May 2021 License Amendment Request to Adopt TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement GO2-20-104, On-Site Cooling System Sediment Disposal2020-12-21021 December 2020 On-Site Cooling System Sediment Disposal GO2-20-108, License Amendment Request to Adopt TSTF-439, Elinate Second Completion Times Limitng Time from Discovery of Failure to Meet an LCO2020-12-0202 December 2020 License Amendment Request to Adopt TSTF-439, Elinate Second Completion Times Limitng Time from Discovery of Failure to Meet an LCO GO2-20-095, Application to Revise Technical Specifications to Adopt TSTF-582, 'Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-09-24024 September 2020 Application to Revise Technical Specifications to Adopt TSTF-582, 'Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements GO2-20-063, Exigent License Amendment Request for Extension of Implementation Period for Amendment 255 Change to Control Room Air Conditioning System2020-04-15015 April 2020 Exigent License Amendment Request for Extension of Implementation Period for Amendment 255 Change to Control Room Air Conditioning System GO2-20-052, Exigent License Amendment Request for One-Time Change to Completion Times for Inoperable Electrical Distribution Systems2020-04-15015 April 2020 Exigent License Amendment Request for One-Time Change to Completion Times for Inoperable Electrical Distribution Systems GO2-20-004, Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR2020-01-27027 January 2020 Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR GO2-20-008, License Amendment Request to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process2020-01-27027 January 2020 License Amendment Request to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process GO2-19-090, License Amendment Request to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-08-15015 August 2019 License Amendment Request to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program GO2-19-053, License Amendment Request to Remove Operating License Condition 2.C.(11) and Attachment 32019-03-27027 March 2019 License Amendment Request to Remove Operating License Condition 2.C.(11) and Attachment 3 GO2-19-027, License Amendment Request for Licensing Basis Change to Control Room Air Conditioning System2019-02-25025 February 2019 License Amendment Request for Licensing Basis Change to Control Room Air Conditioning System GO2-17-137, License Amendment Request to Update Appendix B to the Renewed Facility Operating License to Incorporate 2017 Biological Opinion2017-12-18018 December 2017 License Amendment Request to Update Appendix B to the Renewed Facility Operating License to Incorporate 2017 Biological Opinion GO2-17-181, License Amendment Request to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2017-12-12012 December 2017 License Amendment Request to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements GO2-17-038, License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.2017-10-23023 October 2017 License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. GO2-17-028, License Amendment Request for Change to Technical Specification 3.5.1, ECCS-Operating.2017-07-25025 July 2017 License Amendment Request for Change to Technical Specification 3.5.1, ECCS-Operating. GO2-17-009, License Amendment Request - Revise Technical Specification 5.5.12 for Permanent Extension of Type a Test and Type C Leak Rate Test Frequencies2017-03-27027 March 2017 License Amendment Request - Revise Technical Specification 5.5.12 for Permanent Extension of Type a Test and Type C Leak Rate Test Frequencies GO2-17-062, License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Revision 22017-03-27027 March 2017 License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Revision 2 GO2-16-119, License Amendment Request for One-Time 7 Day Extension of Completion Time for TS Condition 3.5.1.A, 3.6.1.5.A, and 3.6.2.3.A2016-11-0808 November 2016 License Amendment Request for One-Time 7 Day Extension of Completion Time for TS Condition 3.5.1.A, 3.6.1.5.A, and 3.6.2.3.A ML16243A5152016-08-30030 August 2016 License Amendment Request for Reclassifying Quality Group of Low Temperature Portions of Reactor Water Cleanup System ML16244A8332016-08-30030 August 2016 License Amendment Request for Reclassifying Quality Group of Low Temperature Portions of Reactor Water Cleanup System - Drawing M523-1-3, Revision 10, Flow Diagram Reactor Water Clean-up System Radwaste Bldg. ML16210A5282016-07-28028 July 2016 Request for Amendment to Emergency Plan GO2-16-087, License Amendment Request for Changes to Technical Specification 2.1.1, Reactor Core SLs2016-07-12012 July 2016 License Amendment Request for Changes to Technical Specification 2.1.1, Reactor Core SLs GO2-16-096, License Amendment Request to Revise Operating License and Technical Specifications for Measurement Uncertainty Recapture Power Uprate2016-06-28028 June 2016 License Amendment Request to Revise Operating License and Technical Specifications for Measurement Uncertainty Recapture Power Uprate GO2-16-079, Erratum for License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 and SR 3.4.4.1 Safety/Relief Valves (Srvs) Setpoint Lower Tolerance2016-05-18018 May 2016 Erratum for License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 and SR 3.4.4.1 Safety/Relief Valves (Srvs) Setpoint Lower Tolerance GO2-16-046, License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 and SR 3.4.4.1 Safety/Relief Valves (Srvs) Setpoint Lower Tolerance2016-05-10010 May 2016 License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 and SR 3.4.4.1 Safety/Relief Valves (Srvs) Setpoint Lower Tolerance GO2-16-047, License Amendment Request to Revise Technical Specifications to Adopt TSTF-522, Revision 02016-03-0303 March 2016 License Amendment Request to Revise Technical Specifications to Adopt TSTF-522, Revision 0 GO2-15-070, Application for Technical Specification Change (TSTF-427) to Add LCO 3.0.9 on the Unavailability of Barriers Using the Consolidated Line Item Improvement Process2015-09-0202 September 2015 Application for Technical Specification Change (TSTF-427) to Add LCO 3.0.9 on the Unavailability of Barriers Using the Consolidated Line Item Improvement Process GO2-16-112, License Amendment Request for Reclassifying Quality Group of Low Temperature Portions of Reactor Water Cleanup System - Drawing M523-3, Revision 10, Flow Diagram Reactor Water Clean-up System Radwaste Bldg.2015-06-17017 June 2015 License Amendment Request for Reclassifying Quality Group of Low Temperature Portions of Reactor Water Cleanup System - Drawing M523-3, Revision 10, Flow Diagram Reactor Water Clean-up System Radwaste Bldg. GO2-15-075, Exigent License Amendment Request - Extension of Implementation Period for Amendment 232 Changing Technical Specification Table 3.3.1.1-1 Function 7 Scram Discharge Volume Water Level-High.2015-05-15015 May 2015 Exigent License Amendment Request - Extension of Implementation Period for Amendment 232 Changing Technical Specification Table 3.3.1.1-1 Function 7 Scram Discharge Volume Water Level-High. GO2-15-007, License Amendment Request for Adoption of Technical Specification Task Force Traveler-425, Revision 32015-03-17017 March 2015 License Amendment Request for Adoption of Technical Specification Task Force Traveler-425, Revision 3 ML14336A0062014-11-17017 November 2014 License Amendment Request for Technical Specification Change to Safety Limit Minimum Critical Power Ratio ML14268A2332014-09-0404 September 2014 Erratum for License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Using the Consolidated Line Item Improvement Process GO2-14-126, License Amendment Request to Revise Technical Specification Surveillance Requirement for the Ultimate Heat Sink2014-08-22022 August 2014 License Amendment Request to Revise Technical Specification Surveillance Requirement for the Ultimate Heat Sink ML14234A4572014-08-12012 August 2014 License Amendment Request for Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-423, Revision 1, Using the Consolidated Line Item Improvement Process GO2-14-103, Proposed Revision to License Amendment Request to Adopt TSTF-493, Revision 4, Option a, and Response to Request for Additional Information2014-06-19019 June 2014 Proposed Revision to License Amendment Request to Adopt TSTF-493, Revision 4, Option a, and Response to Request for Additional Information ML14086A3892014-03-18018 March 2014 License Amendment Request to Revise Technical Specifications to Adopt TSTF-535, Revision 0 ML13316A0092013-10-31031 October 2013 License Amendment Request for Change to Emergency Core Cooling Systems Surveillance Requirements GO2-13-138, License Amendment Request for Adoption of TSTF-493, Revision 4, Option a2013-10-0202 October 2013 License Amendment Request for Adoption of TSTF-493, Revision 4, Option a ML13247A6592013-07-25025 July 2013 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF 477, Revision 3 GO2-13-002, License Amendment Request to Implement Prnm/Arts/Mellla - Revised Reports2013-01-0707 January 2013 License Amendment Request to Implement Prnm/Arts/Mellla - Revised Reports GO2-12-003, License Amendment Request to Make Administrative and Editorial Changes to Technical Specifications and the Operating License2012-01-0909 January 2012 License Amendment Request to Make Administrative and Editorial Changes to Technical Specifications and the Operating License 2024-01-30
[Table view] Category:Technical Specification
MONTHYEARGO2-23-107, Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation2023-12-0505 December 2023 Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-23-006, License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications2023-05-0101 May 2023 License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications GO2-23-035, Supplement to License Amendment Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-03-0909 March 2023 Supplement to License Amendment Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling GO2-22-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Colling Using the Consolidated Line Item Improvement Process2022-05-25025 May 2022 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Colling Using the Consolidated Line Item Improvement Process GO2-21-016, License Amendment Request to Change Technical Specification 3.4.11 Reactor Coolant System Pressure and Temperature Limits2021-10-13013 October 2021 License Amendment Request to Change Technical Specification 3.4.11 Reactor Coolant System Pressure and Temperature Limits GO2-20-004, Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR2020-01-27027 January 2020 Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR ML19343C0352019-12-0505 December 2019 Rev. 111 to Licensee Controlled Specifications Manual - Part 2 of 2 GO2-19-098, License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules2019-09-12012 September 2019 License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules GO2-19-123, Supplemental Information Related to Exigent License Amendment Request for Change to Technical Specification 3.8.7 Distribution Systems-Operating2019-08-19019 August 2019 Supplemental Information Related to Exigent License Amendment Request for Change to Technical Specification 3.8.7 Distribution Systems-Operating GO2-19-119, Exigent License Amendment Request for Change to Technical Specification 3.8.7 Distribution Systems - Operating2019-08-15015 August 2019 Exigent License Amendment Request for Change to Technical Specification 3.8.7 Distribution Systems - Operating ML17355A6562017-12-21021 December 2017 Technical Specification Bases GO2-17-181, License Amendment Request to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2017-12-12012 December 2017 License Amendment Request to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements GO2-17-194, Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2017-11-15015 November 2017 Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control GO2-17-022, Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-522 Revision 02017-01-19019 January 2017 Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-522 Revision 0 GO2-16-119, License Amendment Request for One-Time 7 Day Extension of Completion Time for TS Condition 3.5.1.A, 3.6.1.5.A, and 3.6.2.3.A2016-11-0808 November 2016 License Amendment Request for One-Time 7 Day Extension of Completion Time for TS Condition 3.5.1.A, 3.6.1.5.A, and 3.6.2.3.A GO2-16-086, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 32016-07-14014 July 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3 GO2-16-096, License Amendment Request to Revise Operating License and Technical Specifications for Measurement Uncertainty Recapture Power Uprate2016-06-28028 June 2016 License Amendment Request to Revise Operating License and Technical Specifications for Measurement Uncertainty Recapture Power Uprate ML15355A4812015-12-21021 December 2015 Revision 87 to Technical Specification Bases GO2-15-070, Application for Technical Specification Change (TSTF-427) to Add LCO 3.0.9 on the Unavailability of Barriers Using the Consolidated Line Item Improvement Process2015-09-0202 September 2015 Application for Technical Specification Change (TSTF-427) to Add LCO 3.0.9 on the Unavailability of Barriers Using the Consolidated Line Item Improvement Process GO2-15-108, Provides Affected Technical Specification Pages Supporting License Amendment Request for Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-423, Revision 1, Using the Consolidated Line Item Improvement Process2015-08-11011 August 2015 Provides Affected Technical Specification Pages Supporting License Amendment Request for Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-423, Revision 1, Using the Consolidated Line Item Improvement Process GO2-15-075, Exigent License Amendment Request - Extension of Implementation Period for Amendment 232 Changing Technical Specification Table 3.3.1.1-1 Function 7 Scram Discharge Volume Water Level-High.2015-05-15015 May 2015 Exigent License Amendment Request - Extension of Implementation Period for Amendment 232 Changing Technical Specification Table 3.3.1.1-1 Function 7 Scram Discharge Volume Water Level-High. GO2-15-007, License Amendment Request for Adoption of Technical Specification Task Force Traveler-425, Revision 32015-03-17017 March 2015 License Amendment Request for Adoption of Technical Specification Task Force Traveler-425, Revision 3 GO2-14-139, Attachment 6 - GNF-001N8896-R3-NP, Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR, Columbia Cycle 232014-10-31031 October 2014 Attachment 6 - GNF-001N8896-R3-NP, Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR, Columbia Cycle 23 GO2-14-126, License Amendment Request to Revise Technical Specification Surveillance Requirement for the Ultimate Heat Sink2014-08-22022 August 2014 License Amendment Request to Revise Technical Specification Surveillance Requirement for the Ultimate Heat Sink ML14010A0302014-02-11011 February 2014 Issuance of Amendment No. 227, Request to Adopt Technical Specification Task Force (TSTF)-477, Revision 3, Adding an Action Statement for Two Inoperable Control Room Air Conditioning Subsystem ML14010A2902013-12-30030 December 2013 Columbia, 10 CFR 50.71 Maintenance of Records Licensing Basis Document Update ML13247A6592013-07-25025 July 2013 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF 477, Revision 3 GO2-13-043, Request for Technical Specification Interpretation Regarding the Offsite Power Supplies to the Onsite Class 1E AC Power Distribution System2013-03-13013 March 2013 Request for Technical Specification Interpretation Regarding the Offsite Power Supplies to the Onsite Class 1E AC Power Distribution System ML12011A1492011-12-14014 December 2011 Columbia, Technical Specification (TS) Basis, Rev. 69, Licensee Controlled Specifications (LCS) Rev. 67 and Operational Quality Assurance Program Description (Oqapd), Rev. 44 ML1013903692010-05-11011 May 2010 Columbia Generating Station, License Amendment Request to Change Technical Specifications in Support of Prnm/Arts/Mella Implementation GO2-09-011, License Amendment Request to Revise Control Rod Notch Testing Frequency Using the Consolidated Line Item Improvement Process (CLIIP) for TSTF-4752009-01-14014 January 2009 License Amendment Request to Revise Control Rod Notch Testing Frequency Using the Consolidated Line Item Improvement Process (CLIIP) for TSTF-475 ML0826100562008-09-30030 September 2008 Tech Spec Pages for Amendment No. 210 Revised TS 3.3.5.2 RCIC System Instrumentation, and TS 3.5.2 ECCS-Shotdown to Increase Storage Tank Level GO2-08-124, License Amendment Request for Proposed Changes to Columbia Technical Specification 3.3.3.1; Change Group 1 Primary Containment Isolation Valves Reactor Water Level Isolation Signal from Level 2 to Level 12008-09-0909 September 2008 License Amendment Request for Proposed Changes to Columbia Technical Specification 3.3.3.1; Change Group 1 Primary Containment Isolation Valves Reactor Water Level Isolation Signal from Level 2 to Level 1 ML0822506802008-07-16016 July 2008 Columbia - License Amendment Request for Changes to Technical Specifications Involving Core Operating Limits Report and Scram Time Testing GO2-08-071, License Amendment Request for Adoption of TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities2008-05-0707 May 2008 License Amendment Request for Adoption of TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities GO2-07-123, License Amendment Request to Technical Specifications Associated with Condensate Storage Tank Level2007-08-0808 August 2007 License Amendment Request to Technical Specifications Associated with Condensate Storage Tank Level GO2-07-116, Request for Amendment to Technical Specification to Modify Requirements Regarding Control Room Envelope Habitability Using the Consolidated Line Item Improvement Process (CLIIP)2007-07-30030 July 2007 Request for Amendment to Technical Specification to Modify Requirements Regarding Control Room Envelope Habitability Using the Consolidated Line Item Improvement Process (CLIIP) GO2-07-112, License Amendment Request for Proposed Changes to Technical Specifications: Miscellaneous Administrative Changes Including Adoption of Approved TSTF Travelers 284, 479, and 4852007-07-30030 July 2007 License Amendment Request for Proposed Changes to Technical Specifications: Miscellaneous Administrative Changes Including Adoption of Approved TSTF Travelers 284, 479, and 485 GO2-07-111, License Amendment Request for Proposed Changes to Columbia Technical Specifications: Adoption of Approved Generic Technical Specification Changes Associated with Containment Isolation Valves2007-07-30030 July 2007 License Amendment Request for Proposed Changes to Columbia Technical Specifications: Adoption of Approved Generic Technical Specification Changes Associated with Containment Isolation Valves GO2-07-109, License Amendment Request to Technical Specifications Associated with Condensate Storage Tank Level2007-07-26026 July 2007 License Amendment Request to Technical Specifications Associated with Condensate Storage Tank Level ML0709204712007-05-0101 May 2007 Technical Specification Pages - Issuance of Amendment No. 204 AC and DC Electrical Power ML0706400652007-03-23023 March 2007 Technical Specification, AC Sources - Operating 3.8.1 GO2-07-024, GO2-07-024 - Columbia Generating Station - Exigent License Amendment Request - Amend Operating License to Revise TS 3.6.1.7 Suppression Chamber-to-Drywell Vacuum Breakers2007-02-0202 February 2007 GO2-07-024 - Columbia Generating Station - Exigent License Amendment Request - Amend Operating License to Revise TS 3.6.1.7 Suppression Chamber-to-Drywell Vacuum Breakers GO2-06-061, Request for Amendment to Technical Specifications Surveillance Requirements for the Suppression Chamber-to-Drywell Vacuum Breakers and the Drywell-to-Suppression Chamber Bypass Leakage Test2006-04-18018 April 2006 Request for Amendment to Technical Specifications Surveillance Requirements for the Suppression Chamber-to-Drywell Vacuum Breakers and the Drywell-to-Suppression Chamber Bypass Leakage Test GO2-06-042, Revised Technical Specification Bases Change (for Information) and Summary of Commitments Associated with the License Amendment Requests for Extension of Diesel Generator Completion Time2006-03-20020 March 2006 Revised Technical Specification Bases Change (for Information) and Summary of Commitments Associated with the License Amendment Requests for Extension of Diesel Generator Completion Time GO2-05-184, Supplement to the License Amendment Request for a One-Time Extension to Technical Specification 3.7.12005-11-15015 November 2005 Supplement to the License Amendment Request for a One-Time Extension to Technical Specification 3.7.1 ML0507000912005-03-0909 March 2005 Technical Specification Pages (Amd. 190) Re Elimination of Requirements to Provide Monthly Operating Reports & Annual Occupational Radiation Exposure Reports GO2-04-137, Request for Amendment to Technical Specifications for One-Time Extension of Containment Leak Rate Test Interval2004-08-0505 August 2004 Request for Amendment to Technical Specifications for One-Time Extension of Containment Leak Rate Test Interval ML0415405452004-05-19019 May 2004 Application for Amendment of Facility Operating for Extension of Diesel Generator Completion Time GO2-02-192, Request for Amendment to TS 4.2.1 and 5.6.5.b, Corrections to Original Submittal2002-11-27027 November 2002 Request for Amendment to TS 4.2.1 and 5.6.5.b, Corrections to Original Submittal 2023-05-01
[Table view] Category:Amendment
MONTHYEARGO2-23-107, Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation2023-12-0505 December 2023 Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-23-006, License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications2023-05-0101 May 2023 License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications GO2-23-035, Supplement to License Amendment Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-03-0909 March 2023 Supplement to License Amendment Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling GO2-22-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Colling Using the Consolidated Line Item Improvement Process2022-05-25025 May 2022 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Colling Using the Consolidated Line Item Improvement Process GO2-20-004, Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR2020-01-27027 January 2020 Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR GO2-19-098, License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules2019-09-12012 September 2019 License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules GO2-19-119, Exigent License Amendment Request for Change to Technical Specification 3.8.7 Distribution Systems - Operating2019-08-15015 August 2019 Exigent License Amendment Request for Change to Technical Specification 3.8.7 Distribution Systems - Operating GO2-17-181, License Amendment Request to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2017-12-12012 December 2017 License Amendment Request to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements GO2-17-194, Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2017-11-15015 November 2017 Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control GO2-17-022, Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-522 Revision 02017-01-19019 January 2017 Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-522 Revision 0 GO2-16-119, License Amendment Request for One-Time 7 Day Extension of Completion Time for TS Condition 3.5.1.A, 3.6.1.5.A, and 3.6.2.3.A2016-11-0808 November 2016 License Amendment Request for One-Time 7 Day Extension of Completion Time for TS Condition 3.5.1.A, 3.6.1.5.A, and 3.6.2.3.A GO2-15-108, Provides Affected Technical Specification Pages Supporting License Amendment Request for Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-423, Revision 1, Using the Consolidated Line Item Improvement Process2015-08-11011 August 2015 Provides Affected Technical Specification Pages Supporting License Amendment Request for Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-423, Revision 1, Using the Consolidated Line Item Improvement Process GO2-15-075, Exigent License Amendment Request - Extension of Implementation Period for Amendment 232 Changing Technical Specification Table 3.3.1.1-1 Function 7 Scram Discharge Volume Water Level-High.2015-05-15015 May 2015 Exigent License Amendment Request - Extension of Implementation Period for Amendment 232 Changing Technical Specification Table 3.3.1.1-1 Function 7 Scram Discharge Volume Water Level-High. ML14010A0302014-02-11011 February 2014 Issuance of Amendment No. 227, Request to Adopt Technical Specification Task Force (TSTF)-477, Revision 3, Adding an Action Statement for Two Inoperable Control Room Air Conditioning Subsystem ML13247A6592013-07-25025 July 2013 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF 477, Revision 3 GO2-09-011, License Amendment Request to Revise Control Rod Notch Testing Frequency Using the Consolidated Line Item Improvement Process (CLIIP) for TSTF-4752009-01-14014 January 2009 License Amendment Request to Revise Control Rod Notch Testing Frequency Using the Consolidated Line Item Improvement Process (CLIIP) for TSTF-475 ML0826100562008-09-30030 September 2008 Tech Spec Pages for Amendment No. 210 Revised TS 3.3.5.2 RCIC System Instrumentation, and TS 3.5.2 ECCS-Shotdown to Increase Storage Tank Level GO2-08-124, License Amendment Request for Proposed Changes to Columbia Technical Specification 3.3.3.1; Change Group 1 Primary Containment Isolation Valves Reactor Water Level Isolation Signal from Level 2 to Level 12008-09-0909 September 2008 License Amendment Request for Proposed Changes to Columbia Technical Specification 3.3.3.1; Change Group 1 Primary Containment Isolation Valves Reactor Water Level Isolation Signal from Level 2 to Level 1 ML0822506802008-07-16016 July 2008 Columbia - License Amendment Request for Changes to Technical Specifications Involving Core Operating Limits Report and Scram Time Testing GO2-08-071, License Amendment Request for Adoption of TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities2008-05-0707 May 2008 License Amendment Request for Adoption of TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities GO2-07-123, License Amendment Request to Technical Specifications Associated with Condensate Storage Tank Level2007-08-0808 August 2007 License Amendment Request to Technical Specifications Associated with Condensate Storage Tank Level GO2-07-111, License Amendment Request for Proposed Changes to Columbia Technical Specifications: Adoption of Approved Generic Technical Specification Changes Associated with Containment Isolation Valves2007-07-30030 July 2007 License Amendment Request for Proposed Changes to Columbia Technical Specifications: Adoption of Approved Generic Technical Specification Changes Associated with Containment Isolation Valves GO2-07-116, Request for Amendment to Technical Specification to Modify Requirements Regarding Control Room Envelope Habitability Using the Consolidated Line Item Improvement Process (CLIIP)2007-07-30030 July 2007 Request for Amendment to Technical Specification to Modify Requirements Regarding Control Room Envelope Habitability Using the Consolidated Line Item Improvement Process (CLIIP) GO2-07-109, License Amendment Request to Technical Specifications Associated with Condensate Storage Tank Level2007-07-26026 July 2007 License Amendment Request to Technical Specifications Associated with Condensate Storage Tank Level ML0709204712007-05-0101 May 2007 Technical Specification Pages - Issuance of Amendment No. 204 AC and DC Electrical Power ML0706400652007-03-23023 March 2007 Technical Specification, AC Sources - Operating 3.8.1 GO2-06-061, Request for Amendment to Technical Specifications Surveillance Requirements for the Suppression Chamber-to-Drywell Vacuum Breakers and the Drywell-to-Suppression Chamber Bypass Leakage Test2006-04-18018 April 2006 Request for Amendment to Technical Specifications Surveillance Requirements for the Suppression Chamber-to-Drywell Vacuum Breakers and the Drywell-to-Suppression Chamber Bypass Leakage Test GO2-05-184, Supplement to the License Amendment Request for a One-Time Extension to Technical Specification 3.7.12005-11-15015 November 2005 Supplement to the License Amendment Request for a One-Time Extension to Technical Specification 3.7.1 ML0507000912005-03-0909 March 2005 Technical Specification Pages (Amd. 190) Re Elimination of Requirements to Provide Monthly Operating Reports & Annual Occupational Radiation Exposure Reports GO2-04-137, Request for Amendment to Technical Specifications for One-Time Extension of Containment Leak Rate Test Interval2004-08-0505 August 2004 Request for Amendment to Technical Specifications for One-Time Extension of Containment Leak Rate Test Interval ML0415405452004-05-19019 May 2004 Application for Amendment of Facility Operating for Extension of Diesel Generator Completion Time GO2-02-192, Request for Amendment to TS 4.2.1 and 5.6.5.b, Corrections to Original Submittal2002-11-27027 November 2002 Request for Amendment to TS 4.2.1 and 5.6.5.b, Corrections to Original Submittal GO2-02-111, Amendment Request to Revise Minimum Emergency Diesel Generator Output Voltage Specified in Technical Specification Limiting Condition for Operation 3.8.12002-07-16016 July 2002 Amendment Request to Revise Minimum Emergency Diesel Generator Output Voltage Specified in Technical Specification Limiting Condition for Operation 3.8.1 2023-05-01
[Table view] |
Text
ENERGY J. Kent Dittmer Vice President, Engineering P.O. Box 968, Mail Drop PE01 NORTHWEST Richland, WA 99352-0968 Ph. 509-377-4348 F. 509-377-2354 jkdittmer@energy-northwest.com January 27, 2020 GO2-20-004 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
COLUMBIA GENERATING STATION, DOCKET NO. 50-397 APPLICATION TO REVISE TECHNICAL SPECIFICATIONS TO ADOPT TSTF-564, SAFETY LIMIT MCPR
Dear Sir or Madam:
Pursuant to 10 CFR 50.90, Energy Northwest hereby requests a license amendment to revise the Columbia Generating Station (Columbia) Technical Specification (TS).
Energy Northwest requests adoption of TSTF-564 Safety Limit MCPR, Revision 2, which is an approved change to the Improved Standard Technical Specifications (ISTS),
into the Columbia TS. The proposed amendment revises the TS safety limit (SL) on minimum critical power ratio (MCPR) to reduce the need for cycle-specific changes to the value while still meeting the regulatory requirement for a SL.
The proposed change has been evaluated in accordance with 10 CFR 50.91(a)(1) using criteria in 10 CFR 50.92(c), and it has been determined that this change involves no significant hazards considerations. The bases for these determinations are included in of this submittal.
The proposed TS markup pages are included as Enclosure 2 to this submittal. Markups of the proposed TS Bases are included for information only as Enclosure 3 of this submittal. Clean pages of the proposed TS changes are included as Enclosure 4 of this submittal.
This letter and its enclosures contain no regulatory commitments.
Approval of the proposed amendment is requested within one year of the date of the submittal. Once approved, the amendment shall be implemented after startup from the next refueling outage (RFO).
In accordance with 10 CFR 50.91, Energy Northwest is notifying the State of Washington of this amendment request by transmitting a copy of this letter and enclosures to the designated State Official.
GO2-20-004 Page 2 of 2 If there are any questions or if additional information is needed, please contact Ms. D.M.
Wolfgramm, Licensing Supervisor, at 509-377-4792.
I declare under penalty of perjury that the foregoing is true and correct.
Executed this z7rt1 day of J.o..v..\Jt.-,,.1 , 2020.
~£ ?I/____
Respectfully, J. Kent Dittmer Vice President, Engineering
Enclosures:
As stated cc: NRG RIV Regional Administrator NRG NRR Project Manager NRG Senior Resident lnspector/988C CD Sonoda - BPA/1399 (email)
EFSECutc.wa.gov - EFSEC (email)
E Fordham - WDOH (email)
R Brice-WDOH (email)
L Albin -WDOH (email)
GO2-20-004 Page 1 of 4 DESCRIPTION AND ASSESSMENT
1.0 DESCRIPTION
Energy Northwest requests adoption of Technical Specifications Task Force (TSTF)
TSTF-564, "Safety Limit MCPR," Revision 2, which is an approved change to the Improved Standard Technical Specifications (ISTS), into the Columbia Generating Station (Columbia) Technical Specifications (TS). The proposed amendment revises the TS safety limit (SL) on minimum critical power ratio (MCPR) to reduce the need for cycle-specific changes to the value while still meeting the regulatory requirement for a SL.
2.0 ASSESSMENT 2.1 Applicability of Safety Evaluation Energy Northwest has reviewed the safety evaluation for TSTF-564 provided to the Technical Specifications Task Force in a letter dated November 16, 2018. This review included a review of the Nuclear Regulatory Commission (NRC) staffs evaluation, as well as the information provided in TSTF-564. Energy Northwest has concluded that the justifications presented in TSTF-564 and the safety evaluation prepared by the NRC staff are applicable to Columbia and justify this amendment for the incorporation of the changes to the Columbia TS.
Columbia is currently fueled with Global Nuclear Fuel (GNF) GNF2 fuel bundles. The proposed Safety Limit in SL 2.1.1.2 is 1.07, consistent with Table 1 of TSTF-564.
The MCPR value calculated as the point at which 99.9% of the fuel rods would not be susceptible to boiling transition (i.e., reduced heat transfer) during normal operation and anticipated operational occurrences is referred to as MCPR99.9%. Technical Specification 5.6.3, "Core Operating Limits Report (COLR)," is revised to require the MCPR99.9% value to be included in the cycle-specific COLR.
2.2 Variations Columbia is a Boiling Water Reactor (BWR)/5 plant. Columbias TS 2.1.1 and 5.6.3 are aligned with BWR/6 Standard Technical Specifications (STS) (NUREG-1434).
Columbias TS contain a requirement that differs from the Standard Technical Specifications on which TSTF-564 was based, such as reactor steam dome pressure in SL 2.1.1.2, but this difference does not affect the applicability of the TSTF-564 justification.
GO2-20-004 Page 2 of 4
3.0 REGULATORY ANALYSIS
3.1 No Significant Hazards Consideration Analysis Energy Northwest requests adoption of Technical Specifications Task Force (TSTF)
TSTF-564, "Safety Limit (SL) [Minimum Critical Power Ratio] (MCPR)," which is an approved change to the Improved Standard Technical Specifications (ISTS), into the Columbia Generating Station (Columbia) Technical Specifications (TS). The proposed change revises the TS safety limit on minimum critical power ratio (SLMCPR). The revised limit calculation method is based on using the Critical Power Ratio (CPR) data statistics and is revised from ensuring that 99.9% of the rods would not be susceptible to boiling transition to ensuring that there is a 95% probability at a 95% confidence level that no rods will be susceptible to transition boiling. A single SLMCPR value will be used instead of two values applicable when one or two recirculation loops are in operation. TS 5.6.3, "Core Operating Limits Report (COLR)," is revised to require the current SLMCPR value to be included in the COLR.
Energy Northwest has evaluated whether or not a significant hazards consideration is involved with the proposed amendment(s) by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of amendment," as discussed below:
- 1. Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No The proposed amendment revises the TS SLMCPR and the list of core operating limits to be included in the Core Operating Limits Report (COLR). The SLMCPR is not an initiator of any accident previously evaluated. The revised safety limit values continue to ensure for all accidents previously evaluated that the fuel cladding will be protected from failure due to transition boiling. The proposed change does not affect plant operation or any procedural or administrative controls on plant operation that affect the functions of preventing or mitigating any accidents previously evaluated.
Therefore, the proposed change does not involve a significant increase in the probability or consequence of an accident previously evaluated.
- 2. Does the proposed amendment create the possibility of a new or different kind of accident from any previously evaluated?
Response: No
GO2-20-004 Page 3 of 4 The proposed amendment revises the TS SLMCPR and the list of core operating limits to be included in the COLR. The proposed change will not affect the design function or operation of any structures, systems or components (SSCs). No new equipment will be installed. As a result, the proposed change will not create any credible new failure mechanisms, malfunctions, or accident initiators not considered in the design and licensing bases.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any previously evaluated.
- 3. Does the proposed amendment involve a significant reduction in a margin of safety?
Response: No The proposed amendment revises the TS SLMCPR and the list of core operating limits to be included in the COLR. This will result in a change to a safety limit, but will not result in a significant reduction in the margin of safety provided by the safety limit. As discussed in the application, changing the SLMCPR methodology to one based on a 95% probability with 95% confidence that no fuel rods experience transition boiling during an anticipated transient instead of the current limit based on ensuring that 99.9% of the fuel rods are not susceptible to boiling transition does not have a significant effect on plant response to any analyzed accident. The SLMCPR and the TS Limiting Condition for Operation (LCO) on MCPR continue to provide the same level of assurance as the current limits and do not reduce a margin of safety.
Therefore, the proposed change does not involve a significant reduction in a margin of safety.
Based on the above, Energy Northwest concludes that the proposed change presents no significant hazards consideration under the standards set forth in 10 CFR 50.92(c),
and, accordingly, a finding of "no significant hazards consideration" is justified.
3.2 Conclusion In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
GO2-20-004 Page 4 of 4 4.0 ENVIRONMENTAL EVALUATION The proposed change would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would change an inspection or surveillance requirement. However, the proposed change does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluents that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed change meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed change.
GO2-20-004 Enclosure 2 Proposed Columbia Technical Specification Changes (Mark-Up)
SLs 2.0 2.0 SAFETY LIMITS (SLs) 2.1 SLs 2.1.1 Reactor Core SLs 2.1.1.1 With the reactor steam dome pressure < 686 psig or core flow < 10%
rated core flow:
THERMAL POWER shall be 25% RTP.
2.1.1.2 With the reactor steam dome pressure 686 psig and core flow 10%
rated core flow:
The MCPR shall be 1.10 07for two recirculation loop operation or 1.13 for single recirculation loop operation.
2.1.1.3 Reactor vessel water level shall be greater than the top of active irradiated fuel.
2.1.2 Reactor Coolant System Pressure SL Reactor steam dome pressure shall be 1325 psig.
2.2 SL Violations With any SL violation, the following actions shall be completed within 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />s:
2.2.1 Restore compliance with all SLs; and 2.2.2 Insert all insertable control rods.
Columbia Generating Station 2.0-1 Amendment No. 169,186 225 234, 242
Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.3 CORE OPERATING LIMITS REPORT (COLR)
- a. Core operating limits shall be established prior to each reload cycle, or prior to any remaining portion of a reload cycle, and shall be documented in the COLR for the following:
- 1. The APLHGR for Specification 3.2.1;
- 2. The MCPR and MCPR99.9% for Specification 3.2.2;
- 3. The LHGR for Specification 3.2.3;
- 4. Deleted;
- 5. The Oscillation Power Range Monitor (OPRM) Instrumentation for Specification 3.3.1.1; and
- 6. The Rod Block Monitor Instrumentation for Specification 3.3.2.1.
- b. The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:
- 1. XN-NF-81-58(P)(A), "RODEX2 Fuel Rod Thermal-Mechanical Response Evaluation Model," Exxon Nuclear Company
- 2. XN-NF-85-67(P)(A), "Generic Mechanical Design for Exxon Nuclear Jet Pump BWR Reload Fuel," Exxon Nuclear Company
- 3. EMF-85-74(P) Supplement 1(P)(A) and Supplement 2(P)(A),
"RODEX2A (BWR) Fuel Rod Thermal-Mechanical Evaluation Model,"
Siemens Power Corporation
- 4. ANF-89-98(P)(A), "Generic Mechanical Design Criteria for BWR Fuel Designs," Advanced Nuclear Fuels Corporation
- 5. XN-NF-80-19(P)(A) Volume 1, "Exxon Nuclear Methodology for Boiling Water Reactors - Neutronic Methods for Design and Analysis,"
Exxon Nuclear Company
- 6. XN-NF-80-19(P)(A) Volume 4, "Exxon Nuclear Methodology for Boiling Water Reactors: Application of the ENC Methodology to BWR Reloads," Exxon Nuclear Company Columbia Generating Station 5.6-2 Amendment No. 190 225 226 253
GO2-20-004 Enclosure 3 Proposed Technical Specification Bases Markup Pages For information Only
Reactor Core SLs B 2.1.1 B 2.0 SAFETY LIMITS (SLs)
B 2.1.1 Reactor Core SLs BASES BACKGROUND GDC 10 (Ref. 1) requires, and SLs ensure, that specified acceptable fuel design limits are not exceeded during steady state operation, normal operational transients, and anticipated operational occurrences (AOOs).
The fuel cladding integrity SL is set such that no fuel damage is calculated to occur if the limit is not violated. Because fuel damage is not directly observable, a stepback approach is used to establish an SL, such that the Minimum Critical Power Ratio (MCPR) is not less than the limit specified in Specification 2.1.1.2. MCPR greater than the specified limit represents a conservative margin relative to the conditions required to maintain fuel cladding integrity.
The fuel cladding is one of the physical barriers that separate the radioactive materials from the environs. The integrity of this cladding barrier is related to its relative freedom from perforations or cracking.
Although some corrosion or use related cracking may occur during the life of the cladding, fission product migration from this source is incrementally cumulative and continuously measurable. Fuel cladding perforations, however, can result from thermal stresses, which occur from reactor operation significantly above design conditions.
While fission product migration from cladding perforation is just as measurable as that from use related cracking, the thermally caused cladding perforations signal a threshold beyond which still greater thermal stresses may cause gross, rather than incremental, cladding deterioration. Therefore, the fuel cladding SL is defined with a margin to the conditions that would produce onset of transition boiling (i.e.,
MCPR = 1.00). These conditions represent a significant departure from the condition intended by design for planned operation. This is accomplished by having a Safety Limit Minimum Critical Power Ratio (SLMCPR) design basis, referred to as SLMCPR95/95, which corresponds to the 95% probability at a 95% confidence level (the 95/95 MCPR criterion) that transition boiling will not occur.
Operation above the boundary of the nucleate boiling regime could result in excessive cladding temperature because of the onset of transition boiling and the resultant sharp reduction in heat transfer coefficient.
Inside the steam film, high cladding temperatures are reached, and a cladding water (zirconium water) reaction may take place. This chemical reaction results in oxidation of the fuel cladding to a structurally weaker Columbia Generating Station B 2.1.1-1 Revision
Reactor Core SLs B 2.1.1 BASES BACKGROUND (continued) form. This weaker form may lose its integrity, resulting in an uncontrolled release of activity to the reactor coolant.
The reactor vessel water level SL ensures that adequate core cooling capability is maintained during all MODES of reactor operation.
Establishment of Emergency Core Cooling System initiation setpoints higher than this safety limit provides margin such that the safety limit will not be reached or exceeded.
APPLICABLE The fuel cladding must not sustain damage as a result of normal SAFETY operation and AOOs. The Tech Spec SL is set generically on a fuel ANALYSES product MCPR correlation basis as the MCPR which corresponds to a 95% probability at a 95% confidence level that transition boiling will not occur, referred to as SLMCPR95/95.The reactor core SLs are established to preclude violation of the fuel design criterion that a MCPR limit is to be established, such that at least 99.9% of the fuel rods in the core would not be expected to experience the onset of transition boiling.
The Reactor Protection System setpoints (LCO 3.3.1.1, "Reactor Protection System (RPS) Instrumentation"), in combination with other LCOs, are designed to prevent any anticipated combination of transient conditions for Reactor Coolant System water level, pressure, and THERMAL POWER level that would result in reaching the MCPR limit.
2.1.1.1 Fuel Cladding Integrity GE critical power correlations are applicable for all critical power calculations at pressures > 686 psig and core flows > 10% of rated flow.
For operation at low pressures or low flows, another basis is used, as follows:
Since the pressure drop in the bypass region is essentially all elevation head, the core pressure drop at low power and flows will always be
> 4.5 psi. Analyses (Ref. 2) show that with a bundle flow of 28 E3 lb/hr, bundle pressure drop is nearly independent of bundle power and has a value of 3.5 psi. Thus, the bundle flow with a 4.5 psi driving head will be
> 28 E3 lb/hr. Full scale ATLAS test data taken at pressures from 14.7 psia to 800 psia indicate that the fuel assembly critical power at this flow is approximately 3.35 MWt. With the design peaking factors, this corresponds to a THERMAL POWER > 50% RTP. Thus, a THERMAL POWER limit of 25% RTP for reactor pressure < 686 psig is conservative.
Columbia Generating Station B 2.1.1-2 Revision
Reactor Core SLs B 2.1.1 BASES APPLICABLE SAFETY ANALYSES (continued) 2.1.1.2 MCPR The fuel cladding integrity SL is set such that no significant fuel damage is calculated to occur if the limit is not violated. Since the parameters that result in fuel damage are not directly observable during reactor operation, the thermal and hydraulic conditions that result in the onset of transition boiling have been used to mark the beginning of the region in which fuel damage could occur. Although it is recognized that the onset of transition boiling would not result in damage to BWR fuel rods, the critical power at which boiling transition is calculated to occur has been adopted as a convenient limit. The Technical Specifications SL value is dependent on the fuel product line and the corresponding MCPR correlation, which is cycle independent. The value is based on the Critical Power Ratio (CPR) data statistics and a 95% probability with 95% confidence that rods are not susceptible to boiling transition, referred to as SLMCPR95/95. However, the uncertainties in monitoring the core operating state and in the procedures used to calculate the critical power result in an uncertainty in the value of the critical power. Therefore, the fuel cladding integrity SL is defined as the critical power ratio in the limiting fuel assembly for which more than 99.9% of the fuel rods in the core are expected to avoid boiling transition, considering the power distribution within the core and all uncertainties.
The MCPR SL is determined using a statistical model that combines all the uncertainties in operating parameters and the procedures used to calculate critical power. The probability of the occurrence of boiling transition is determined using the approved GE critical power correlations.
Details of the fuel cladding integrity SL calculation are given in Reference 2. Reference 2 also includes a tabulation of the uncertainties used in the determination of the MCPR SL and of the nominal values of the parameters used in the MCPR SL statistical analysis.
The SL is based on GNF2 fuel. For cores with a single fuel product line, the SLMCPR95/95 is the MCPR95/95 for the fuel type. For cores loaded with a mix of applicable fuel types, the SLMCPR95/95 is based on the largest (i.e., most limiting) of the MCPR values for the fuel product lines that are fresh or once-burnt at the start of the cycle.
2.1.1.3 Reactor Vessel Water Level During MODES 1 and 2, the reactor vessel water level is required to be above the top of the active irradiated fuel to provide core cooling capability. With fuel in the reactor vessel during periods when the reactor is shut down, consideration must be given to water level requirements due to the effect of decay heat. If the water level should drop below the top of the active irradiated fuel during this period, the ability to remove decay heat is reduced. This reduction in cooling capability could lead to Columbia Generating Station B 2.1.1-3 Revision
Reactor Core SLs B 2.1.1 BASES SAFETY LIMITS The reactor core SLs are established to protect the integrity of the fuel clad barrier to prevent the release of radioactive materials to the environs.
SL 2.1.1.1 and SL 2.1.1.2 ensure that the core operates within the fuel design criteria. SL 2.1.1.3 ensures that the reactor vessel water level is greater than the top of the active irradiated fuel in order to prevent elevated clad temperatures and resultant clad perforations.
APPLICABILITY SLs 2.1.1.1, 2.1.1.2, and 2.1.1.3 are applicable in all MODES.
SAFETY LIMIT Exceeding an SL may cause fuel damage and create a potential for VIOLATIONS radioactive releases in excess of 10 CFR 50.67 limits (Ref. 3). Therefore, it is required to insert all insertable control rods and restore compliance with the SL within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. The 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> Completion Time ensures that the operators take prompt remedial action and the probability of an accident occurring during this period is minimal.
REFERENCES 1. 10 CFR 50, Appendix A, GDC 10.
- 2. NEDE-24011-P-A, General Electric Standard Application for Reactor Fuel, Revision 16(most recent approved version referenced in COLR).
- 3. 10 CFR 50.67, Accident Source Term.
- 4. NEDC-33419P, GEXL97 Correlation Applicable to ATRIUM-10 Fuel, Revision 0, June 2008.
Columbia Generating Station B 2.1.1-5 Revision 87
MCPR B 3.2.2 B 3.2 POWER DISTRIBUTION LIMITS B 3.2.2 MINIMUM CRITICAL POWER RATIO (MCPR)
BASES BACKGROUND MCPR is a ratio of the fuel assembly power that would result in the onset of boiling transition to the actual fuel assembly power. The MCPR Safety Limit (SL) is such that 99.9% of the fuel rods avoid boiling transition if the limit is not violated (refer to the Bases for SL 2.1.1.2). The operating limit MCPR is established to ensure that no fuel damage results during anticipated operational occurrences (AOOs) and that 99.9% of the fuel rods are not susceptible to boiling transition if the limit is not violated.
Although fuel damage does not necessarily occur if a fuel rod actually experiences boiling transition (Ref. 5), the critical power at which boiling transition is calculated to occur has been adopted as a fuel design criterion.
The onset of transition boiling is a phenomenon that is readily detected during the testing of various fuel bundle designs. Based on these experimental data, correlations have been developed to predict critical bundle power (i.e., the bundle power level at the onset of transition boiling) for a given set of plant parameters (e.g., reactor vessel pressure, flow, and subcooling). Because plant operating conditions and bundle power levels are monitored and determined relatively easily, monitoring the MCPR is a convenient way of ensuring that fuel failures due to inadequate cooling do not occur.
APPLICABLE The analytical methods and assumptions used in evaluating the AOOs to SAFETY establish the operating limit MCPR are presented in the FSAR, Chapters ANALYSES 4, 6, and 15, and References 6, 7, 8 and 9. To ensure that the MCPR Safety Limit (SL) is not exceeded during any transient event that occurs with moderate frequency, limiting transients have been analyzed to determine the largest reduction in critical power ratio (CPR). The types of transients evaluated are loss of flow, increase in pressure and power, positive reactivity insertion, and coolant temperature decrease. The limiting transient yields the largest change in CPR (CPR). When the largest CPR is added to combined with the MCPR99.9%, the required operating limit MCPR is obtained.
MCPR99.9%is determined to ensure more than 99.9% of the fuel rods in the core are not susceptible to boiling transition using a statistical model that combines all the uncertainties in operating parameters and the procedures used to calculate critical power. The probability of the occurrence of boiling transition is determined using the approved Critical Power correlations. Details of the MCPR99.9% calculation are given in Reference 2. Reference 2 also includes a tabulation of the uncertainties Columbia Generating Station B 3.2.2-1 Revision
MCPR B 3.2.2 and the nominal values of the parameters used in the MCPR99.9%
statistical analysis.
Columbia Generating Station B 3.2.2-2 Revision
MCPR B 3.2.2 BASES APPLICABLE SAFETY ANALYSES (continued)
The MCPR operating limits are derived from the MCPR99.9% value and the transient analysis, and are dependent on the operating core flow and power rate (MCPRf and MCPRp, respectively) to ensure adherence to fuel design limits during the worst transient that occurs with moderate frequency as identified in FSAR, Chapter 15.
Flow dependent MCPR limits are determined by steady-state thermal hydraulic methods using the three-dimensional BWR simulator code (Ref. 7) and a multi-channel thermal-hydraulic code (Refs. 8 and 9).
MCPRf curves are provided based on the maximum credible flow runout transient for ASD operation (i.e., runout of both loops).
Power dependent MCPR limits (MCPRp) are determined by approved transient analysis models the three-dimensional BWR simulator code (Ref. 7) and a multi-channel thermal-hydraulic code (Refs. 8 and 9). Due to the sensitivity of the transient response to initial core flow levels at power levels below those at which the turbine stop valve closure and turbine control valve fast closure scram trips are bypassed, high and low flow MCPRp operating limits are provided for operating between 25% RTP and the previously mentioned bypass power level.
The MCPR satisfies Criterion 2 of Reference 4.
LCO The MCPR operating limits specified in the COLR (MCPR99.9% value, MCPRf values and MCPRp values) are the result of the Design Basis Accident (DBA) and transient analysis. MCPR operating limits that include the effects of analyzed equipment out-of-service are also included in the COLR. The MCPR operating limits are determined by the larger of the MCPRf and MCPRp limits, which are based on the MCPR99.9% limit specified in the COLR.
APPLICABILITY The MCPR operating limits are primarily derived from transient analyses that are assumed to occur at high power levels. Below 25% RTP, the reactor is operating at a slow recirculation pump speed and the moderator void ratio is small. Surveillance of thermal limits below 25% RTP is unnecessary due to the large inherent margin that ensures that the MCPR SL is not exceeded even if a limiting transient occurs.
Statistical analyses indicate that the nominal value of the initial MCPR at 25% RTP is expected to be very large. Studies of the variation of limiting transient behavior have been performed over the range of power and flow conditions. These studies encompass the range of key actual plant parameter values important to typically limiting transients. The results of these studies demonstrate that a margin is expected between performance and the MCPR requirements, and that margins increase as Columbia Generating Station B 3.2.2-3 Revision
GO2-20-004 Enclosure 4 Proposed Columbia Technical Specification Changes (Re-Typed)
SLs 2.0 2.0 SAFETY LIMITS (SLs) 2.1 SLs 2.1.1 Reactor Core SLs 2.1.1.1 With the reactor steam dome pressure < 686 psig or core flow < 10%
rated core flow:
THERMAL POWER shall be 25% RTP.
2.1.1.2 With the reactor steam dome pressure 686 psig and core flow 10%
rated core flow:
The MCPR shall be 1.07.
2.1.1.3 Reactor vessel water level shall be greater than the top of active irradiated fuel.
2.1.2 Reactor Coolant System Pressure SL Reactor steam dome pressure shall be 1325 psig.
2.2 SL Violations With any SL violation, the following actions shall be completed within 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />s:
2.2.1 Restore compliance with all SLs; and 2.2.2 Insert all insertable control rods.
Columbia Generating Station 2.0-1 Amendment No. 169,186 225 234, 242
Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.3 CORE OPERATING LIMITS REPORT (COLR)
- a. Core operating limits shall be established prior to each reload cycle, or prior to any remaining portion of a reload cycle, and shall be documented in the COLR for the following:
- 1. The APLHGR for Specification 3.2.1;
- 2. The MCPR and MCPR99.9% for Specification 3.2.2;
- 3. The LHGR for Specification 3.2.3;
- 4. Deleted;
- 5. The Oscillation Power Range Monitor (OPRM) Instrumentation for Specification 3.3.1.1; and
- 6. The Rod Block Monitor Instrumentation for Specification 3.3.2.1.
- b. The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:
- 1. XN-NF-81-58(P)(A), "RODEX2 Fuel Rod Thermal-Mechanical Response Evaluation Model," Exxon Nuclear Company
- 2. XN-NF-85-67(P)(A), "Generic Mechanical Design for Exxon Nuclear Jet Pump BWR Reload Fuel," Exxon Nuclear Company
- 3. EMF-85-74(P) Supplement 1(P)(A) and Supplement 2(P)(A),
"RODEX2A (BWR) Fuel Rod Thermal-Mechanical Evaluation Model,"
Siemens Power Corporation
- 4. ANF-89-98(P)(A), "Generic Mechanical Design Criteria for BWR Fuel Designs," Advanced Nuclear Fuels Corporation
- 5. XN-NF-80-19(P)(A) Volume 1, "Exxon Nuclear Methodology for Boiling Water Reactors - Neutronic Methods for Design and Analysis,"
Exxon Nuclear Company
- 6. XN-NF-80-19(P)(A) Volume 4, "Exxon Nuclear Methodology for Boiling Water Reactors: Application of the ENC Methodology to BWR Reloads," Exxon Nuclear Company Columbia Generating Station 5.6-2 Amendment No. 190 225 226 253