AECM-85-0354, Nuclear Qualification Test Plan for Generic Equipment Qualification for Grand Gulf 1 & Clinton 1 Nuclear Power Stations | 30 June 1982 | Nuclear Qualification Test Plan for Generic Equipment Qualification for Grand Gulf 1 & Clinton 1 Nuclear Power Stations | |
ML15264A157 | 2 January 1990 | Revised Crisis Mgt Implementing Procedures,Including Rev 32 to CMIP-1,Rev 29 to CMIP-4,Rev 33 to CMIP-5,Rev 38 to CMIP-6,Rev 37 to CMIP-7,Rev 32 to CMIP-9,Rev 1 to CMIP-14 & Rev 30 to CMIP-21 | Health Physics Network |
ML16152A895 | 2 January 1990 | Rev 33 to Public Version of Crisis Mgt Plan for Nuclear Stations. | |
ML17301A039 | 30 April 1983 | Detailed Control Room Design Reviews Program Plan. | Emergency Lighting Backfit |
ML17342B064 | 30 December 1987 | Rev 1 to Independent Mgt Appraisal Program Plan for Florida Power & Light Co. | Systematic Assessment of Licensee Performance |
ML17345B406 | 15 December 1983 | Public Version of Revised Emergency Plan Implementing Procedure 1301, Emergency Roster - Offsite Emergency Organization. W/831229 Ltr | |
ML17346A460 | 8 August 1984 | Emergency Plan Implementing Procedure EPIP-1301, Emergency Roster - Offsite Emergency Organization. | |
ML17346A539 | 1 September 1984 | Emergency Plan Implementing Procedure 1107, Duties of Emergency Planning Supervisor,Offsite Emergency Organization. | |
ML17346A540 | 1 September 1984 | Emergency Plan Implementing Procedure 1211, Activation & Use of Emergency News Ctr (Turkey Point),Offsite Emergency Organization. | |
ML17347A224 | 22 December 1986 | Emergency Plan Implementing Procedures,Including Procedure 1101, Duties of Emergency Control Officer,Offsite Emergency Organization & Procedure 1102, Duties of Recovery Officer,Offsite Emergency.... W/861222 Ltr | |
ML18025B854 | 9 November 1979 | Revision R to Acceptance Test Procedure IT 527 P/N 1801104. | |
ML18025B857 | 13 June 1979 | Revision T to Acceptance Test Procedure IT 519 P/N 1801102. | Breakaway torque |
ML18025B859 | 16 February 1979 | Revision R to Acceptance Test Procedure IT 524 for 1801106. | Breakaway torque |
ML18025B861 | 15 August 1979 | Revision R to Acceptance Test Procedure IT 523 P/N 1801103. | |
ML18025B865 | 10 May 1977 | Revision J to Acceptance Test Procedure IT 534 P/N 1801112. | Breakaway torque |
ML18025B868 | 7 April 1977 | Revision H to Acceptance Test Procedure IT 533 P/N 1801119. | Safe Shutdown Earthquake Nondestructive Examination Breakaway torque Overtravel Earthquake |
ML18047A324 | 3 May 1982 | Requalification Program - Reactor Operator & Senior Reactor Operator. | Boric Acid Shutdown Margin Fuel cladding Power change |
ML18047A351 | 31 May 1982 | EPRI PWR Safety & Relief Valve Test Program,Power Operated Relief Valve Block Valve Info Package. | |
ML18092B498 | 28 February 1986 | Number 1,Generator Operating Guide. | |
ML18092B499 | 20 March 1987 | Artificial Island Stability Limitation Operating Restrictions. | High winds |
ML18139B838 | 8 April 1982 | Emergency Operations Facility. | |
ML18141A045 | 18 May 1983 | Administrative Procedure Adm 98, Emergency Usage Procedures Writers Guide. | Boric Acid Health Physics Network Post Accident Monitoring Design basis earthquake Earthquake |
ML18141A530 | 1 March 1984 | Control Room Design Review Program Plan for North Anna & Surry Power Stations, in Response to Suppl 1 to NUREG-0737 | Backfit |
ML18142A093 | 2 October 1981 | Rev 0 to Procedure 466, Insp Record Checklist. | |
ML18142A094 | 19 November 1980 | Rev 4 to Procedure 9833, Design Spec for HD310 High Speed Data Acquisition Sys. | |
ML18142A095 | 8 December 1981 | Rev 13 to Procedure 9834, Qualification Spec for Remote Multiplexer Units & Associated Signal Conditioner Modules. | Safe Shutdown Earthquake Earthquake |
ML18142A096 | 5 November 1984 | Procedure 466, Remote Multiplexer Integrated Functional Test Procedure. | Safe Shutdown |
ML18142A097 | 15 January 1981 | Rev B to Acceptance Test Procedure ATP442 MC170AD-Q2 (Less Plug-In Cards). | |
ML18142A098 | 29 October 1981 | Rev a to Acceptance Test Procedure ATP464, MC370AD-Q2 (Less Plug-In Cards). | |
ML18142A099 | 10 December 1980 | Acceptance Test Procedure ATP445, AB295-Q2 Analog Board Assembly. | |
ML18142A100 | 15 January 1981 | Rev a to Acceptance Test Procedure Atp 447, AD296-Q2-1,-2 Digital Pcba. | Reverse polarity |
ML18142A101 | 26 February 1981 | Rev a to Acceptance Test Procedure Atp 451, PS294-Q2. | |
ML18142A102 | 28 May 1981 | Rev a to Acceptance Test Procedure ATP454, PS171-Q2 Power Supply for MC170. | |
ML18142A103 | 26 March 1981 | Rev a to Acceptance Test Procedure ATP440, CM249-Q2 Carrier Modulator. | |
ML18142A106 | 28 May 1981 | Rev a to Acceptance Test Procedure ATP450, BA332-Q2 Buffer Amplifier. | |
ML18142A107 | 30 June 1981 | Rev C to Acceptance Test Procedure Atp 452, DI325-Q2 Digital Encoder,Four Input. | |
ML18142A108 | 14 April 1981 | Rev a to Acceptance Test Procedure ATP444-1, PT174-1-Q2 Thermometer Signal Conditioner. | |
ML18142A109 | 13 April 1981 | Rev B to Acceptance Test Procedure ATP444-2, PT174-2-Q2 Resistance Thermometer Signal Conditioner. | |
ML18142A110 | 13 April 1981 | Acceptance Test Procedure Atp 453, TC292-Q2 Thermocouple Conditioner. | |
ML18142A111 | 28 May 1981 | Rev a to Acceptance Test Procedure ATP449, PC202-Q2 Buffer Amplifier. | |
ML18142A112 | 17 April 1981 | Rev B to Acceptance Test Procedure ATP443, CD173-Q2 High-Gain Carrier Demodulator. | |
ML18142A113 | 9 April 1981 | Acceptance Test Procedure ATP446, JC177-Q2 Jumper Card. | |
ML18142A114 | 21 April 1983 | Qualification Test Rept QTR 82-003, Surge Withstand Capability Tests,MC170AD-Q2 & MC370AD-Q2. | |
ML18142A136 | 4 November 1983 | Procedure OP-4.3, Shipping of Spent Fuel TN-8L Shipping Cask,Loading & Handling Procedures. | |
ML18142A137 | 15 September 1983 | Procedure 1-OP-4.19, Receipt & Storage of Spent Fuel TN-8L Shipping Cask,Unloading & Handling Procedures. | |
ML19249E412 | 25 September 1979 | Draft of Revised Reactor Trip Procedure | |
ML19256F651 | 10 October 1979 | Shop Insp Procedure for Air Lock Doors,Revision 0 | Liquid penetrant |
ML19323D018 | 8 February 1980 | Emergency Operating Procedure EP/1/A/5000/01, Reactor Trip. | Shutdown Margin |
ML19323D019 | 5 March 1980 | Emergency Operating Procedure EP/1/A/5000/03, Loss of Reactor Coolant. | |
ML19323D023 | 15 February 1980 | Emergency Operating Procedure EP/1/A/5000/04, Steam Generator Tube Failure. |