Issue date | Title | Topic | |
---|---|---|---|
ML19246C143 | 25 June 1979 | LER 79-013/03L-0 on 790625:during Normal Operation,Hot Leg Temp Indications C/TI-122H Failed Low.Caused by Power Supply Failure Due to Blown Fuse.Ge/Mac Power Supply Model GR700 Replaced & Sys Returned to Normal | |
ML19249A251 | 9 August 1979 | LER 79-018/03L-0 on 790724:steam Generator a Pressure Indicator Ccontroller for C Channel Would Not Reset.Caused by Failure of Sigma Meter Integrally Installed Trip Setpoint.Trip Circuit Replaced & Meter Calibr | |
ML19257D438 | 24 January 1980 | LER 79-020/03L-2:on 791229,during Continuing Insps of Accessible Piping,Two Addl Snubbers on Safety Injection Sys Piping Found Inoperable.Caused by Improper Installation of Anchor Bolts.Redesigned Modified Baseplate Installed | Earthquake |
ML19257D450 | 23 January 1980 | LER 80-002/01T-0:on 800117,while Performing Surveillance Test ST-SI/CS-1,containment Sump Safety Injection Recirculation Valve HCV-383-4 Failed to Close from Control Room Switch.Caused by Binding Auxiliary Interlock | |
ML19259A771 | 2 January 1979 | LER 78-045/01T-0 on 781220:during Plant heatup,1 Pressure Channel for Power Operated Relief Valve (PORV) Sys Was Responding.Operator Pulled Recorder Fuses Causing PORV Valves to Open,Then Closed Them to Terminate Transient | |
ML19260B206 | 14 November 1979 | LER 79-021/21L-0:on 791106,during Insp Required by IE Bulletin 79-14 Re safety-related Piping Sys,Discrepancies Found Between Design Documents & as-built Configuration of Seismic Restraints.Caused by Probable QC Installation Error | |
ML19260D977 | 6 February 1980 | LER 80-004/01T-0:on 800126,while Fire Barrier Inside Empty Breaker Cubicle Was Degraded to Pull in New Cabling,Fire Watch Was Not Maintained Continuously.Caused by Fire Watch Not Receiving Accurate Info on Status of Barrier | Fire Barrier Fire Watch |
ML19262A969 | 5 December 1979 | LER 79-020/03L-0:on 791031,during Insps of Accessible Piping,Eight Snubbers on Safety Injection Sys Piping Found Inoperable.Caused by Improper Installation of Anchor Bolts. Base Plate Redesigned & Anchor Bolts Reinstalled | |
ML19262C266 | 7 January 1980 | LER 80-001/03L-0:800102,while Operating at Approx 98% Power, Breaker Feeding Containment Cooling Fan Motor VA-3B Tripped.Caused by Trip Units Out of Calibr.Units A&C Were Replaced,Calibr & Tested Satisfactorily | |
ML19263C048 | 24 January 1979 | LER 79-002/03L-0 on 790117:reactor Protective Sys for Axial Power Distribution Channel a Trip Setpoint Fluctuated Nonconservatively.Caused by Bell & Howell Potentiometer Module Part 384612/001 Failure | |
ML19263E023 | 22 March 1979 | LER 79-008/03L-0 on 790321:during Normal Operation,Loop Safety Injection Valve Failed to Open from Lockout Relay Activation.Caused by Dirty Auxiliary Interlock Switch. Switch Cleaned | Safe Shutdown |
ML19263E218 | 30 May 1979 | LER 79-016/01T-0 on 790517:testing on First Removed Irradiated Surveillance Capsule Showed Higher than Predicted Nil Ductility Transition Temp New Pressure.Temp Limitation Curves Have Been Developed | |
ML19263E229 | 29 May 1979 | LER 79-003/03L-1 on 790127:during Containment Pressure Release,Containment Air Monitor Readings Were Abnormally Low.Caused by Closed Isolation Valves.Containment Ventilation Valves Were Closed & Pressure Valves Opened | |
ML19269D558 | 16 May 1979 | LER 79-014/01T-0 on 790515:ASCO Solenoid Valves Lacked Sufficient Environ Qualification Data.Caused by Inadequate Specs During Design & Installation Period.Valves Will Be Replaced Following 1980 Refueling Outage | Safe Shutdown |
ML19270E896 | 22 December 1978 | LER 78-040/03L-0 on 781205:during Performance of Type B & C Containment Leak Rate Tests,Noted That Total Leakage Exceeded Tech Spec Limits.Leakage Caused by Penetrations to Containment Purge Valves | |
ML19270F363 | 31 January 1979 | LER 79-001/01T-0 on 790118:during Check of Diesel Driven Fire Pump,Engine Cooling Fluid Boiled Out of Holding Tank. Diesel Engine Cooling Sys Refilled & Manual Isolation Valve Found Closed.Valve Opened & Fire Pump Returned to Svc | |
ML19270F374 | 29 January 1979 | LER 78-005/03L-1 on 780214:CH-1C Charging Pump Was Out for Maint on Leaking End Cap.Crack in Valve Block Noted.Pump Not Inoperable & Returned to Svc.Crack Due to Heavy Usage & Excessive Vibration.New Block Installed 790105 | |
ML19270F787 | 19 March 1979 | LER 79-005/03L-0 on 790226:at 15% Power C Channel Loss of Load Trip Did Not Annunciate.Caused by Bistable Multivibrator Set to 18.1%.Bistable Reset & Surveillance Test Performed | Power change |
ML19273B131 | 30 January 1979 | LER 78-041/03L-1 on 781207:flow Rate Deficiencies for Charcoal Filter Units Noted;Halide Removal Efficiency for VA-66 Found to Be Below 99%.Application for Amend to License Re Revision of Ventilation Flow Rate Requirements Submitted | |
ML19289D746 | 8 March 1979 | LER 79-004/01T-0 on 790226:during Containment Insp After Outage,Weld Leak Discovered on Controlled bleed-off Line on Reactor Coolant Pump RC-3C.Caused by Vibration Induced Fatigue.Repairs Performed | |
ML19290E220 | 25 February 1980 | LER 80-005/03L-0:on 800131,during Containment Integrated Leak Rate Test,Release to Atmosphere Occurred.Caused by Failure of Rupture Disk.Containment Pressure Monitored for Remainder of Test | |
ML19294B014 | 15 February 1980 | LER 80-003/03L-0:on 800122,during Special 24-h Diesel Generator Test,While Attempting to Load Generator,Generator Field Went to Max Excitation.Caused by Faulty Zener Diode & Corresponding Draft in A-C Regulator Panel | Safe Shutdown |
ML19294B749 | 27 February 1980 | LER 79-014/01T-1:on 800216,two Addl Solenoid Valves Found Not Environmentally Qualified.Caused by Inadequate Solenoid Valve Specs.Solenoids Will Be Replaced Prior to Startup | |
ML19310A276 | 19 May 1980 | LER 80-008/03L-0:on 800515,during Check of Power Supply Trip Indicating lights,AB-1 Matrix Relay of Reactor Protective Sys Failed to Trip Clutch Power Supplies.Caused by Failure of Mercury Wetted Relay in Matrix Circuit | |
ML19310A290 | 29 May 1980 | LER 80-009/99T-0:on 800522,during Maint on Stack Iodine Process Monitor,New Sensitivity Calibr Was Required.Caused by Use of Wrong Calibr Procedure.Training Will Be Conducted to Ensure Familiarity W/Procedures | |
ML19312A132 | 19 January 1979 | LER 78-012/03L-1 on 781229:during Routine Maint of Charging Pump CH-1B,crack in Valve Block at Piston 3 Was Found.Caused by Excessive Vibration During Operation | |
ML19312D503 | 19 March 1980 | LER 79-007/01T-1:on 800303,during Review Required by IE Bulletin 79-01,stem-mounted Limit Switches on HCV-864 & HCV-865 Not Found Environmentally Qualified.Caused by Inadequate Design Specs.Switches Will Be Replaced | Boric Acid |
ML19312D506 | 19 March 1980 | LER 79-007/01T-2:on 800305,during Review Required by IE Bulletin 79-01,limit Switches on HCV-742A/C,HCV-724 a & 725A Not Found Environmentally Qualified.Caused by Inadequate Design Specifications | Boric Acid |
ML19312D510 | 19 March 1980 | LER 79-007/01T-3:on 800305,during Review Required by IE Bulletin 79-01,Barksdale Pressure Switch Not Found Environmentally Qualified.Caused by Switch Not Being Properly Specified for Intended Svc.Switch Will Be Upgraded | |
ML19312D892 | 28 April 1980 | LER 80-006/01T-0:on 800415,as Required by IE Bulletin 79-01B,util Has Been Obtaining & Reviewing Test Data on Electrical Equipment.Samples Failed to Meet Acceptance Criteria.Caused by Steam & Moisture in Environ | |
ML19318C050 | 17 June 1980 | LER 80-010/01T-0:on 800516,during Cold Pressure Test,Leakage Discovered at Gasket Joint Between Pump Casing & Pump Cover on Reactor Coolant Pumps RC-3A,3B & 3C.Closure Studs Corroded by Boric Acid.Leaks Caused by Deteriorated Gaskets | Boric Acid Liquid penetrant |
ML19318D131 | 16 June 1980 | LER 80-011/03L-0:on 800528,during 1980 Refueling Outage Type B & C Containment Leak Rate Tests,Total Leakage Exceeded 0.6La Limit.Caused by Leaking Fuel Transfer Tube, Electrical,Mechanical Sleeve & Piping Penetrations | |
ML19321A742 | 25 June 1980 | LER 80-016/03L-0:on 800621,weld on Suction Side of Pump CH-1B in Demineralized Water Flush Line Cracked.Caused by Vibration of Piping in Svc.Crack Was Ground Out & Rewelded Using Certified Procedure & Line Tested | |
ML19323C619 | 7 May 1980 | LER 80-007/01T-0:on 800430,penetration Cable Splices for Containment Ventilation Fans Found to Lack Documentation for LOCA Qualification.Splices Will Be Coated w/LOCA-qualified Sealant | |
ML19325D247 | 13 October 1989 | LER 89-012-01:on 890502,main Feedwater Isolation Valve to Steam Generator a Found Inoperable Due to Improperly Set Torque Switch.Caused by Inadequate Program for Maint of Motor Operated Valves.Torque Switches reset.W/891013 Ltr | |
ML19327B548 | 24 October 1989 | LER 89-019-00:on 890924,indication of High Temp for Reactor Coolant Pump RC-3A Upper Motor Thrust Bearing Received in Control Room.Caused by Damaged Cable for Bearing Resistive Temp Device.Damaged Cable replaced.W/891024 Ltr | |
ML19330C340 | 18 July 1980 | LER 80-015/03L-0:on 800710,during Insp,Noted That Trip Unit Setpoints on C Channel Had Become Positive Rather than Negative.Caused by Failure of 15-volt Power Supply for Trip Unit 4.Unit Calibr | |
ML19330C349 | 11 July 1980 | LER 80-012/03L-0:on 800708,during Performance of ST-RPS-3, F.2,discovered That Trip Unit 3 Setpoints Had Drifted Out of Spec in Nonconservative Direction.Caused by Normal Setpoint Drift.Setpoints Adjusted | |
ML19330C372 | 8 July 1980 | LER 80-013/03L-0:on 800707,during Normal Power Operation, Noted That Channel a Dc Sequencer SI-1 Had de-energized on-auto Light.Caused by Sequencer Circuitry Failure Due to Faulty Relay | Safe Shutdown |
ML19331B658 | 1 August 1980 | LER 80-014/03L-0:on 800709,transformer T4 of Diesel Generator 1 Failed.Caused by Shorted Coil.Transformer Replaced | Safe Shutdown |
ML19332E268 | 1 December 1989 | LER 89-016-02:on 890616,for Unknown Period Since 890614, Auxiliary Feedwater Pump FW-10 Operated Outside Design Basis for Certain Accident Conditions.Caused by Inoperable Speed Control Loop.Action Plan implemented.W/891201 Ltr | |
ML19332E743 | 8 December 1989 | LER 88-037-01:on 881214,one of Two Supply Headers Supplying Fire Suppression Headers in Auxiliary Bldg Isolated.Caused by Lack of Procedural Guidance & Inadequate Procedural Controls.Standing Order G-58 Will Be revised.W/891208 Ltr | Continuous fire watch Hourly Fire Watch |
ML19337A317 | 5 September 1980 | LER 80-018/03L-0:on 800808,while Attempting to Monitor Gas Space on Vct,Inadvertent Release of Radioactive Matl to Auxiliary Bldg Environ Occurred.Caused by Deteriorated Surgical Tubing on Gas Analyzer.Tubing Replaced | |
ML19337A329 | 25 August 1980 | LER 80-017/03L-0:on 800804,during Normal Power Operation, Personnel Discovered Setpoint Selector Switches for RMO-61, Particulate Radiation Monitor,In Wrong Position.Caused by Personnel Error While Performing Test on Radiation Monitors | |
ML19338E591 | 8 September 1980 | LER 80-020/03L-0:on 800905,axial Power Distribution Setpoints on D Channel Discovered Out of Tolerance in Nonconservative Direction.Caused by Dependent Setpoint Selection Switch Failure.Switch Cleaned & Returned to Svc | |
ML19338F088 | 11 September 1980 | LER 80-022/03L-0:on 800911,during Safety Injection Actuation Signal Surveillance test,86B/VIAS Lockout Failed to Trip. Caused by Burned Coil.Coil Replaced W/Spare & Tested Satisfactorily for Proper Operation | |
ML19338G448 | 21 October 1980 | LER 80-024/03L-0:on 800926,while Completing Repairs on B Charging Pump,A Charging Pump Became Inoperable.Caused by Packing Cooling Pump Failure.Motor Replaced | |
ML19340B863 | 30 October 1980 | LER 80-026/03L-0:on 801030,AB-1 Matrix Relay Failed to Trip Clutch Power Supplies.Caused by Failure of Matrix Circuit to Break Contact.Relay Replaced & Applicable Surveillance Test Performed to Demonstrate Operability | |
ML19340E260 | 17 December 1980 | LER 80-031/03L-0:on 801207,during Normal Operation,Leak Developed in Weld Connecting Demineralized Water Flush Line to Discharge Manifold of Charging Pump.Caused by Probable Piping Vibration.Crack Repaired & Pump Returned to Svc | |
ML19341B246 | 15 January 1981 | LER 81-001/01T-0:on 810114,discovered That FT-236 Changing Header Flow Lacks Complete Info to Qualify for Harsh Radiation Svc Required by IE Bulletin 79-01B.Caused by Incomplete Matls List.Transmitter Will Be Replaced | Safe Shutdown |