LER 80-016/03L-0:on 800621,weld on Suction Side of Pump CH-1B in Demineralized Water Flush Line Cracked.Caused by Vibration of Piping in Svc.Crack Was Ground Out & Rewelded Using Certified Procedure & Line Tested
ML19321A742
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 06/25/1980
From: Jewell W
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19321A738 List:
References
LER-80-016-03L, LER-80-16-3L, NUDOCS 8007240134
Download: ML19321A742 (4)


Text

_ _ _ _ _ _ _ _ _ _ __ _

~ ~

LICENSEE EVENT REPORT

' CONTROL BLOCK: l 8

l l l l l lh 6

(PLEASE P91NT OR TYPE ALL REQUIRED INFORMATION) 0 t l Nl UCENSEEEl Fi CODE Cl Sl 11@l 0l 01 01UCENSE 14 15 0 l NUMBER 0 l 0l 0 l 0 l 025 l 0 l 0UCENSE l@26l4l1l1l1l1l@l TvPE JO l

57 CAT 58 l@

7 8 9 CON'T IOI1I s*ujy lL l@l0 l 5 10 l 0l O f 21 8l S l@l 0 l 612 l l l 810 74l@l 750 l 6REPORT l 215 l 8 l 080 l@

DATE 7 8 60 61 DOCKET NUMcER 68 69 EVENT DATE EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h EI The weld on the suction side of the pump CH-1B in the demineralized water flush I r5 trl I line cracked. Redundent charging pumps CH-1A and CH-1C were operable therefore I

OiAi l Technical Specifications 2.2. requirements were satisfied . Related LER's are I iO isi I LER 78-005,78-006, 78-046. I l

10161l I

10171 I 10,811 I SCI: E $ao*E ssCO$E COMPONENT CODE SUSC dE SU E lO19l 7 8 lP IC l@ l Bl@ l Cl@ l P lIl P l E l Y lX l@ l Al@ @ @

9 10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION _

EVENT Y E AR R EPORT NO. COCE TYPE N O.

LER

@ yg/RO a 1810l l-l 1011161 l/l 1013 l l Ll l-l l 0l

._21 22 23 24 26 27 28 29 30 31 32 KN ACT O P T

  • NOURS 22 SB 4 FOR B. $U MA UF C RER I33Bl@l34Zl@ l35Z l@ l36Zi@ l0l0l0l0l 37 40 l41N l@ l42NI@ lAl@ lC12l9l5l@

43 44 47 CA;JSE DESCRIPTION AND CORRECTIVE ACTIONS h li101i The crack was due to vibration of the oicino in service. The crack was around out I it sil I and rewelded usino a certified procedure and the line was hydrostatically tested i D TT1 I before returning to service. No other corrective measures required. I I

L'_L3.1 I l

Li_L* ! I

' ClEY ipOwER OTNERsTATus b$iSCOYE0v' oiscovERv eEsCRirTiON @

4 NA l lAl@l Operator Observation l 1 s

[E_J@ l 110l Ol@l " " '

48TiviTv CO'0 TENT RELEASED OF RELEASE AMOUNTOF ACT1VITv tOCAT10N OF RELEASE ylZ l @ W@l NA l-'

l NA l

,ERso~ net Ex,0.SEs NuMeER Type oEsCRieTiON @

l l1 l 7l 10 l 0 l1 l@l E l@l1 Maintenance man 20 mrem **

PERsONNEtiN2U4ES NUMSER DESCRIPTION E 10 7 8 9 l 0 l 0 l@l 11 12 NA 80 l

^ '

'Tvi's " "M"R #0 *"" @

NA l ITTo1 8 9 LZ J@l10 80

. 7 U NRC USE ONLY DESCRIPTION 45

<V )

2 O isdsut @l NA l 11lllililllll{

  • 7 8 9 10 68 69 80 -

NAME OF PREPARER W. . sleWell PHONE: 402-426-4011 2, me omosy

LER No.80-016 Omaha Public Power District Fort Calhoun Station Unit No.1 Docket No. 05000295 ATTACHMENT NO. 1 Safety Analysis During the time that CH-1B was out of service for repair of the crack in the demineralized flush line, CH-1A and CH-1C were operable except for a two hour period that CH-lC was out of service due to a solenoid that failed open on the leak off line.

- na Technical Specifications 2.2(3) Modification of Minimum Require-ments ments were met and there was no significant exposure to plant personnel or activity released to the atmosphere.

1

v. m y ,+>-

LER No.80-016 Omaha Public Power District Fort Calhoun Station Unit No.1 Docket No. 05000285 ATTACHMENT NO. 2 Corrective Action The crack in the weld of the demineralized flush line was repaired by grinding out the old weld and rewelded using a certified procedure.

The line was hydrostatically tested before returning to service.

The vibration in the piping has been addressed and a modific.ation to install suporessors on the pump suction and discharge side has tieen partially completed.

A . _ b .2 L.t$w 7

p s. c.s.

LER No.80-016 Omaha Public Power District Fort Calhoun Station Unit No.1 Docket No. 05000285 ATTACHMENT NO. 3 Failure Data This is the fourth reportable failure of this type at Fort Calhoun Station. Incidents that are related to this failure were previously documented on LER 78-005,78-006 and 78-046.

l 1

l

$ ~

p c. 5

.