05000285/LER-1979-008-03, /03L-0 on 790321:during Normal Operation,Loop Safety Injection Valve Failed to Open from Lockout Relay Activation.Caused by Dirty Auxiliary Interlock Switch. Switch Cleaned

From kanterella
(Redirected from ML19263E023)
Jump to navigation Jump to search
/03L-0 on 790321:during Normal Operation,Loop Safety Injection Valve Failed to Open from Lockout Relay Activation.Caused by Dirty Auxiliary Interlock Switch. Switch Cleaned
ML19263E023
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 03/22/1979
From: Connolly J
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19263E021 List:
References
LER-79-008-03L, LER-79-8-3L, NUDOCS 7904240360
Download: ML19263E023 (3)


LER-1979-008, /03L-0 on 790321:during Normal Operation,Loop Safety Injection Valve Failed to Open from Lockout Relay Activation.Caused by Dirty Auxiliary Interlock Switch. Switch Cleaned
Event date:
Report date:
2851979008R03 - NRC Website

text

..

(7 77)

LICENSEE EVENT REPORT CONTROL BLOCK !

l l

l l

(PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)

@l 0

1 lI l E FlCl3 1

lQl0l0l0 0

0 0

7 0

0 l0 @l L l' l, 1

i 1

A 3 LICE P.S E E CO O E 14

S UCENSE NuvdEH

.7 26 LICEa.sE T N PE JJ 57 YAT W COYT

$$ l L hj 0 l 5 l 0 l 0 l 0 l a l 3 l 5 @l u l 7 l 2 l 1 l ~ l o l@l ' l 3 1 ' I > I ~ l o @

o 1

4 ea ei cOCsETNoveER u

sa event cATE 74 5

REPORT D ATE iJ EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h l Curind normal power operation vnile performng.ST-SF-2, Loop 3arety in.'eccion tal te 1

o[2 lHC7-311 failed to open frc= lockcut relay actuation.

The remaining Icop in.iection l

o 3

o ;.2 ltalres remained operable (Tech. Spec. 2.3)

See Abnormal Cccurrence TLA-8, 75-23 and l

70-14.

l o

s 0

6 l

0l l

1 o14 1

30 7

3

'4 SYSTEU CALSE CALSE COMP VALyg CCCE CODE SLBCODE COMPONENT CODE SUSCOCE SUBCODE o

o i s IF l@ IE @ 13 l@ l cl Kl Tl al al Kl@ l El@ 1:l@

7 4

3 10 it 12 13 r8 19

.u

  • E OLENTI A L OCCL A R E '.CE REPORT REVISiCN EVENTYEAR REPORT NO.

CODE TvPE N O.

3 q pg

@.ay.g; 17 19 l-1 lo lo I S I l/l 10 3

IL i 1-1 101

_l' 22 23 24 26 27 28 29 JJ 31 3J AC TION ELTURE EFEECT SH U T OO WN ATT AC HM EN T N P R O.4 PRIYE COMP, COYPONENT TAKEN ACTION ON PLANT YETHCO HOURS SUBvlTTED FOR9 WB SLPPLIER YANUFACTURER lx l@l z l@

l21@

'zl@

lo1010101 LI_l@

I :t l@

I^l@

10101810 @

JJ J4 A

6 il 40 41 42 43 44 47 CAUSE CESCRIPTION AND COR AECTivE ACT!ONS h 1

a lihe Gener11 riect-i-t ce 0710tX auxiliare inter' yk avit a ear ~md *^ te bi 44-I Itnus pretenting the talre frca electricallt dririn7 cren.

This witch van M vnM i

i j and lubricated and tne talre cycled three times satisf actoril:t.

I i

3 l

l l

1 4

80 7

8 9 YETHOO CF 8ACluTY STATUS

% POWE R OTHER STA TUS DISCCV ERY DISCOVERY OESCRiPTION

lA l

} B l@l Sur teillance Test l

lE l 0l 9 9 @l 1

s 80 7

3 3 to 12 11 44 45 46 AC TIVI TY CONTENT AUGUNT OF ACTIVITY LOCAT:ON OF RELE ASE RELE ASEO@OF RELE ASE12 l@l IzI

u l

n i

i s

7 i 9 10 tt 44 45 80 PERSONNEL EX POSURES NLveEA DESCRIPTION 39 d i a l 0 @ TYPE @l l

u 7

2 go 7

8 9 11 12 13 PEDSONNEL iNJURtE3 NvM9ER DESCR;PTION 0 l 0 \\ 0 lh

iA 1

4 ao 7

3 9 11

'2 LOSS OF OR DAVAGE TO FACILtTV TvPE GESCRIPTION 1

9 El 3A f

B0 7

1

)

'O DESCRIPTION @

7004:340 % O

$ [ j,

}

^

SLE i ;

es e aa ;

3 i

7 8 3 to 02 26-holl 2,

^

NAME OF PREPARER PHONE:

LER 79-008 Onaha Public Power District Fort Calhoun Station Unit No. 1 Docket No. 05000235 Attachment No. 1

Safety Analysis

The Engineered Safeguards System is so designed that no single failure can jeopardize the safe shutdown of the plant if required.

The safeguards system at Fort Calhoun Station is separated into two trains of systems either of which would provide adequate accident protection.

The railure of a single high pressure loop valve does not degrade any of the safety analyses performed on Fort Calhoun Station No. 1.

During the time HC7-311 was inoperable, the remaining loop safety in-j ection valves were considered operable and available to perform their design function.

Since the last failure of this tr.;e, ( April 1976), the surveillance tests associated with the operational testing of all Safety Injection valves have been revised to electrically verify the operability of these valves.

The failure to verify operability of HCV-311 was a result of operating HC7-311 to correct level in a safety injection tank during back shift hours.

This problem vill be resolved by verification of valve operability following each valve operation in accordance with the revised operating instruction.

It should be noted that during the 1978 Refueling Outage, the problems described in IE Bulletin 78-05 of this type of Aux. Interlock switch binding was resolved by removing and installing new plunger arms and overicad relay insulation.

\\ '.\\