05000285/LER-1979-007-01, /01T-3:on 800305,during Review Required by IE Bulletin 79-01,Barksdale Pressure Switch Not Found Environmentally Qualified.Caused by Switch Not Being Properly Specified for Intended Svc.Switch Will Be Upgraded

From kanterella
(Redirected from ML19312D510)
Jump to navigation Jump to search
/01T-3:on 800305,during Review Required by IE Bulletin 79-01,Barksdale Pressure Switch Not Found Environmentally Qualified.Caused by Switch Not Being Properly Specified for Intended Svc.Switch Will Be Upgraded
ML19312D510
Person / Time
Site: Fort Calhoun 
Issue date: 03/19/1980
From: Mehaffey R
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19312D500 List:
References
LER-79-007-01T, LER-79-7-1T, NUDOCS 8003240524
Download: ML19312D510 (3)


LER-1979-007, /01T-3:on 800305,during Review Required by IE Bulletin 79-01,Barksdale Pressure Switch Not Found Environmentally Qualified.Caused by Switch Not Being Properly Specified for Intended Svc.Switch Will Be Upgraded
Event date:
Report date:
2851979007R01 - NRC Website

text

-

(7 77L LICENSEE EVENT REPORT o@

CONTROL BLOCK: l l

l l

l l

l (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)

ITIUlNIEIFlClSl 1 l@l 0 l 0 l 0 l 0 l 0 l 0 l 0 l 0 l 0 l 0 l 0 l@l h l 7 lt l7 l,l@l l

l@

7 8 9 LICENSEE CODE 14 15 LaCENSE NuMSER 25 26 LaCEN34 TvPE 40 57 jai 54 CON'T lolil C"c'lLl@lol 510101012l815l@l013loIc;IAlo @l0lol'loI0 in l@

7 3

60 61 COCK ET NUMBER 68 59 EVENT C ATE I4 75 RE*CRT OATE 30 EVENT DESCRIPTION AND PRCB ASLE CONSEQUENCES h I o 12 I l During the review required by IE 79-013 the Barksdale pressure switch which inter-I locks with'a contain=ent isolation signal to isolate the instrument air header en I

t o i 3, j l o 14 l l lov header pressure and containment isolation was found to not have enviren= ental 1

l0,sl l qualifications. The operators have been instructed to manually isolate the contain- ]

lo se 1 l =ent instru=ent air header if low pressure is indicated during an accident.

I l

lo I7I l I

'l o ! 81 l SO 7

8 9 SYSTEM

CAUSE

CAUSE COVP.

VALV E CCCE CCCE SUSCODE COMPONENT COCE SU8COCE SU8COCE l S l D l@ l3 l@ l A l@ l Il Nl Sl Tl Rl Ul@ l S l@ W @

13 l il 7

8 9

10 11 12 1J 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVl510N Lgg a0 EVENTvEAR REPORT NO.

CCOE TYPE NO.

@ at;g; 17 19 I l-1 10 10 17 l 1/l 1 017 I I Tl I--I I 3l

_ 21 22 23 24 26 27 28 23 Ju 31 32 N ~ AC ON C PL NT ME HOURS S8 i PCR 8.

SU P*LI E VANUPACTLRER lx l@l l@

! F l@

[JJ@

l 01 01 0l 01

[{j@

l Ul@

l Al@

IB l0 16 l9 l@

33 J4 35 36 37 40 di 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h l i t oj l The 3arksdale D2T pressure svitch was not srecified croreriv fer its intended serrice]

It lil l The oterstors have been instructed to isolate instr. ent W to tha c ~+ C -- t l during an accident if the system shows lov pressure.

The pressure switch vill be l

i1,7l g,;3; l upgrading to LOCA qualifications or moved to a less severe environment.

I I

l i 14 I I 80 7

6 3 5A

% PCWER OTl4ER STATUS 015 RY CISCOVERY OESCRiPTION IE Bulletin 70-013 l

NA l

L.2]@l li I s l I w l@ l 01 01 Ol@l 4

80

'2 n

CO# TENT AMOUNT OF ACTIVITY @ l LOCATION OF REMASE @

ACTiviTv QUASED OP REMASE l

l NA li ie I Lz_j @ laj@l NA 7

8 9 10 11 44 45 60 PER$0NNEL EXPOSURES NUV8ER

' TYPE CESCRIPTICN 39 1

I

li 171 101010 l@l z l@l NA 5

PERsCNNE N u'4Es oEsCRiPTiON@

l NUMBER l

li la l 10 l 0 l 0 l@f NA 80 i

7 8 9 11 12 l

LCSS 07 CR OAMAGE TO PACILITY Q TYPE CESCRIPTtON V

l f

l i i s i I z l@l NA 80 7'

8 9 10 tSS DE CRIPTicN

miLdUE8 n

i iiiiiiiiiiiiii 68 69 80 3

[

7 8 3 to LO2-536 h000-g

'I PHONE:

NAME OF PREPARER q'

8 003 2 4 (Qh

T:

c -

LIP.79-007, Supplement 3

. Omaha'Public Power District' Fort'Calhoun Statica Unit-No. 1-Docket No.LO5000235 Attachment No. 1

Safety Analysis

The pressure switch PC-16h9 serves to isolate the containment instrument-air header if the pressure falls belov -70 psig and containment isolation is required. The instrument air header is left in service to enhance shutdown

. operation.

~In the event that the header and pressure switch fail, adequate in-strumentation exists outside the containment to detect a lov system pressure.

'At' this-time the header =ay be manually isolated. An operations memorandum has been issued to instruct the operators to isolate the header on-lov pres-

~

.sure.

In the long term, an Engineering Evaluation Assistance Request vill be issued to upgrade the pressuma.svitch to LOCA qualifications or to =ove the-existing pressure switch cutside containment.

0 crTl o

i l

I i

e-

c

~

a::,,

..., s.

~

.,*, y ?l k:

e r

f g m'- 79-00T,: supplement 3.

s Omaha:Public. Power District'

- l Fort Calhoun~ Station. Unit:No.'1

/ Docket No.-105000235:

~

4

- w

,f...

LAttachment No. 2

. Failure Data.

- This is'the firstienvironmentallylrelated report for a Barksdale pres-g.

' sure - switch. --