LER-1979-002, /03L-0 on 790117:reactor Protective Sys for Axial Power Distribution Channel a Trip Setpoint Fluctuated Nonconservatively.Caused by Bell & Howell Potentiometer Module Part 384612/001 Failure |
| Event date: |
|
|---|
| Report date: |
|
|---|
| 2851979002R03 - NRC Website |
|
text
mm '
LATORY COMMISSION LICENSEE EVENT REPORT CONTROL BLOCK: l l
l l
l l
lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 6
l Nl El Fl C l Sl 1l@l 0 l 0 l 0 l 0 l 0 l 0 l O l 0 0l0l0l@lh 1l1l1l1 @l l
l@
o i
7 8 9 UCENSEE CODE 14 15 UCENSE % MSER 25 26 UCENSE TYPE JO 57 CAT 54 CON'T 011
]L @l015l0l010l2l8l5 @l0111117171o @ of1l2lhl7Iol@
eURcE 7
4 ao 61 COCKET NUMBER 68 69 EVENT DATE 74 75 REPCRT CATE 80 EVENT DESCRIPTION AND PROBABLE CONSECUENCES h io 2
lDuring steady state power operation it was noted that the A channel of the reactor i
l protective system (RPS) for axial power distribution (APD) trip setpoint was fluctu '
o 3
ling in the nonconservative direction.
The RPS A channel for APD was bypassed with thel o
o s Ithree remaining channels still operable.
l o
s l0i7 l l
ITITI f I
7 8 9 "O
SYSTEM CAUS E
CAUSE
COMP.
VALVE CCOE COCE SU8COCE COMPONENT CODE SueCCDE SU8 CODE ois II lA l@ W@ l Gl@ lI lN l S lT lR lU l@ l Yl@ l Zl@
/
d 9
10 11 12 13 18 19 20 SEQUENTIAL CCCU R R E NCE REPORT R EVISION LE R' AO EVENT YEAR R EPCRT NC.
CODE TYPE N O.
@ AEPORT '7l9l l-l l0l0l2l
]/l l 0l 3l l Ll l-l lo l 21 22 23 24 26 27 28 29 30 31 32 K N ' C C C P T
ME HOURS 22 58 I POR 8.
SU LIE MA P
RER lZ[@
l0l0l0l0l l Y l@
Nl@
lNl@ lBl1l6l5l{
lCl@lZl@
l Z l@.
26 37 40 4
42 as u
47 22 24 as CAUSE OESCRIPTION AND CORRECTIVE ACTICNS i;a lThe Bell and Howell Potentio=2ter Module Part No. 38h612/001 failed allowing the RPS I
i lA channel APD setpoints to fluctuate in the nonconservative direction.
The module was1
,,,, l replaced, recalibrated and tested and the channel was rett:rned to normal.
The RPS wilh l continue to te monitored by both visual inspection and surveillance testing to detect i 3
lany future failures.
t i
4 7
8 9 80
% POWER CTHER STATUS C1 O RY DISCOVERY CESCRIFUCN lE l@ l 0 l 9 l 9 ]@l NA l
lAl@l Visual Inspection l
5 Co'OTENT ACriviw AMOUNT 07 ACriviry @ l aELEASE@ocPaELEASEl Z I@l LOCATION CF RELIASE lZ l NA l
NA l
1 l6 7
3 3 10 ti 44 45 30
CESCRIPTION h Nuv8ER
- YPE jii7 l0l0l0l@lZl@l NA i
' rERSONNeI.'mu' lies C ESCRiprtCNh w user l010l0l@l NA i
j-7 3 9 11 12 10 LCSS CP OR OAMAGE TO 3ACluTY,
W8 5 C ESCPIJTION lZ j@l NA l
lt Is 7
4 9
'G hC s
USLICITY NFC USE C"L /
?SSq ED C ESCRiPTION -
((/
J lN lhl NA
/ /
I I'
i f II' 1:
al 7 9 d 2 0 A R.Jc),{,,,
J.L.connolley/o.R.IeIercon
$02Su26h011
~
LER 79-002 Omaha Public Power District Fort Calhoun Station Unit No. 1 Docket No. 05C00285 Attachment No. 1 Safety Anal sis The Reactor Protective System (RPS) is so designed that no single failure can prevent the safe and systematic shutdown of the unit if required.
During the time the RPS A channel for Axial Power Distribution ( APD) was inoperable, the three remaining RPS channels were operable to perform their design function, providing adequate reactor protection.
The RPS A channel for APD was repaired, calibrated and tested and returned to service; this and all RPS channels vill continue to be monitored by both visual inspection and the surveillance testing program to detect any future failures.
U/l lnlghtfit!
>l-
a
'LER 79-002 Omaha Public Pover District Fort Calhoun Station Unit No. 1 Docket No. 05000285 Attachment No. 2 Failure Data This is the first event of a potentiometer medule failure in the reactor protective system.
, ' f lh I
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000285/LER-1979-001, Forwards LER 79-001/01T-0 | Forwards LER 79-001/01T-0 | | | 05000285/LER-1979-001-01, /01T-0 on 790118:during Check of Diesel Driven Fire Pump,Engine Cooling Fluid Boiled Out of Holding Tank. Diesel Engine Cooling Sys Refilled & Manual Isolation Valve Found Closed.Valve Opened & Fire Pump Returned to Svc | /01T-0 on 790118:during Check of Diesel Driven Fire Pump,Engine Cooling Fluid Boiled Out of Holding Tank. Diesel Engine Cooling Sys Refilled & Manual Isolation Valve Found Closed.Valve Opened & Fire Pump Returned to Svc | | | 05000285/LER-1979-002-03, /03L-0 on 790117:reactor Protective Sys for Axial Power Distribution Channel a Trip Setpoint Fluctuated Nonconservatively.Caused by Bell & Howell Potentiometer Module Part 384612/001 Failure | /03L-0 on 790117:reactor Protective Sys for Axial Power Distribution Channel a Trip Setpoint Fluctuated Nonconservatively.Caused by Bell & Howell Potentiometer Module Part 384612/001 Failure | | | 05000285/LER-1979-002, Forwards LER 79-002/03L-0 | Forwards LER 79-002/03L-0 | | | 05000285/LER-1979-003, Forwards LER 79-003/03L-1 | Forwards LER 79-003/03L-1 | | | 05000285/LER-1979-003-03, /03L-1 on 790127:during Containment Pressure Release,Containment Air Monitor Readings Were Abnormally Low.Caused by Closed Isolation Valves.Containment Ventilation Valves Were Closed & Pressure Valves Opened | /03L-1 on 790127:during Containment Pressure Release,Containment Air Monitor Readings Were Abnormally Low.Caused by Closed Isolation Valves.Containment Ventilation Valves Were Closed & Pressure Valves Opened | | | 05000285/LER-1979-004-01, /01T-0 on 790226:during Containment Insp After Outage,Weld Leak Discovered on Controlled bleed-off Line on Reactor Coolant Pump RC-3C.Caused by Vibration Induced Fatigue.Repairs Performed | /01T-0 on 790226:during Containment Insp After Outage,Weld Leak Discovered on Controlled bleed-off Line on Reactor Coolant Pump RC-3C.Caused by Vibration Induced Fatigue.Repairs Performed | | | 05000285/LER-1979-004, Forwards LER 79-004/01T-0 | Forwards LER 79-004/01T-0 | | | 05000285/LER-1979-005-03, /03L-0 on 790226:at 15% Power C Channel Loss of Load Trip Did Not Annunciate.Caused by Bistable Multivibrator Set to 18.1%.Bistable Reset & Surveillance Test Performed | /03L-0 on 790226:at 15% Power C Channel Loss of Load Trip Did Not Annunciate.Caused by Bistable Multivibrator Set to 18.1%.Bistable Reset & Surveillance Test Performed | | | 05000285/LER-1979-005, Forwards LER 79-005/03L-0 | Forwards LER 79-005/03L-0 | | | 05000285/LER-1979-007-01, /01T-3:on 800305,during Review Required by IE Bulletin 79-01,Barksdale Pressure Switch Not Found Environmentally Qualified.Caused by Switch Not Being Properly Specified for Intended Svc.Switch Will Be Upgraded | /01T-3:on 800305,during Review Required by IE Bulletin 79-01,Barksdale Pressure Switch Not Found Environmentally Qualified.Caused by Switch Not Being Properly Specified for Intended Svc.Switch Will Be Upgraded | | | 05000285/LER-1979-008, Forwards LER 79-008/03L-0 | Forwards LER 79-008/03L-0 | | | 05000285/LER-1979-008-03, /03L-0 on 790321:during Normal Operation,Loop Safety Injection Valve Failed to Open from Lockout Relay Activation.Caused by Dirty Auxiliary Interlock Switch. Switch Cleaned | /03L-0 on 790321:during Normal Operation,Loop Safety Injection Valve Failed to Open from Lockout Relay Activation.Caused by Dirty Auxiliary Interlock Switch. Switch Cleaned | | | 05000285/LER-1979-013-03, /03L-0 on 790625:during Normal Operation,Hot Leg Temp Indications C/TI-122H Failed Low.Caused by Power Supply Failure Due to Blown Fuse.Ge/Mac Power Supply Model GR700 Replaced & Sys Returned to Normal | /03L-0 on 790625:during Normal Operation,Hot Leg Temp Indications C/TI-122H Failed Low.Caused by Power Supply Failure Due to Blown Fuse.Ge/Mac Power Supply Model GR700 Replaced & Sys Returned to Normal | | | 05000285/LER-1979-013, Forwards LER 79-013/03L-0 | Forwards LER 79-013/03L-0 | | | 05000285/LER-1979-014, Forwards LER 79-014/01T-0 | Forwards LER 79-014/01T-0 | | | 05000285/LER-1979-014-01, /01T-0 on 790515:ASCO Solenoid Valves Lacked Sufficient Environ Qualification Data.Caused by Inadequate Specs During Design & Installation Period.Valves Will Be Replaced Following 1980 Refueling Outage | /01T-0 on 790515:ASCO Solenoid Valves Lacked Sufficient Environ Qualification Data.Caused by Inadequate Specs During Design & Installation Period.Valves Will Be Replaced Following 1980 Refueling Outage | | | 05000285/LER-1979-015, Forwards LER 79-015/01T-0 | Forwards LER 79-015/01T-0 | | | 05000285/LER-1979-015-01, /01T-0 on 790511:seismic Support Appeared Inadequate for Component Cooling Water piping-to-containment Cooling & Filtering Unit VA-3A.Analyses Indicated That Clamping piping-to-cooling Unit Will Provide Needed Support | /01T-0 on 790511:seismic Support Appeared Inadequate for Component Cooling Water piping-to-containment Cooling & Filtering Unit VA-3A.Analyses Indicated That Clamping piping-to-cooling Unit Will Provide Needed Support | | | 05000285/LER-1979-016-01, /01T-0 on 790517:testing on First Removed Irradiated Surveillance Capsule Showed Higher than Predicted Nil Ductility Transition Temp New Pressure.Temp Limitation Curves Have Been Developed | /01T-0 on 790517:testing on First Removed Irradiated Surveillance Capsule Showed Higher than Predicted Nil Ductility Transition Temp New Pressure.Temp Limitation Curves Have Been Developed | | | 05000285/LER-1979-016, Forwards LER 79-016/01T-0 | Forwards LER 79-016/01T-0 | | | 05000285/LER-1979-017-03, /03L-0 on 790724:during Normal Operation,D Channel Wide Range Nuclear Instrumentation Failed W/Complete Loss of Power.Caused by Blown Main Power Fuses.Fuses Replaced & Instrumentation Placed in Svc | /03L-0 on 790724:during Normal Operation,D Channel Wide Range Nuclear Instrumentation Failed W/Complete Loss of Power.Caused by Blown Main Power Fuses.Fuses Replaced & Instrumentation Placed in Svc | | | 05000285/LER-1979-017, Forwards LER 79-017/03L-0 | Forwards LER 79-017/03L-0 | | | 05000285/LER-1979-018, Forwards LER 79-018/03L-0 | Forwards LER 79-018/03L-0 | | | 05000285/LER-1979-018-03, /03L-0 on 790724:steam Generator a Pressure Indicator Ccontroller for C Channel Would Not Reset.Caused by Failure of Sigma Meter Integrally Installed Trip Setpoint.Trip Circuit Replaced & Meter Calibr | /03L-0 on 790724:steam Generator a Pressure Indicator Ccontroller for C Channel Would Not Reset.Caused by Failure of Sigma Meter Integrally Installed Trip Setpoint.Trip Circuit Replaced & Meter Calibr | | | 05000285/LER-1979-019-03, /03L-0:on 791005,during Normal Rotation of Component Cooling Water Heat Exchangers,Inlet Valve Would Not Operate from Control Room Remote Switch.Caused by Failed Plastic Piston Assembly in Actuator.Assembly Replaced | /03L-0:on 791005,during Normal Rotation of Component Cooling Water Heat Exchangers,Inlet Valve Would Not Operate from Control Room Remote Switch.Caused by Failed Plastic Piston Assembly in Actuator.Assembly Replaced | | | 05000285/LER-1979-020, Forwards LER 79-020/03L-0 | Forwards LER 79-020/03L-0 | | | 05000285/LER-1979-020-03, /03L-0:on 791031,during Insps of Accessible Piping,Eight Snubbers on Safety Injection Sys Piping Found Inoperable.Caused by Improper Installation of Anchor Bolts. Base Plate Redesigned & Anchor Bolts Reinstalled | /03L-0:on 791031,during Insps of Accessible Piping,Eight Snubbers on Safety Injection Sys Piping Found Inoperable.Caused by Improper Installation of Anchor Bolts. Base Plate Redesigned & Anchor Bolts Reinstalled | | | 05000285/LER-1979-021-21, /21L-0:on 791106,during Insp Required by IE Bulletin 79-14 Re safety-related Piping Sys,Discrepancies Found Between Design Documents & as-built Configuration of Seismic Restraints.Caused by Probable QC Installation Error | /21L-0:on 791106,during Insp Required by IE Bulletin 79-14 Re safety-related Piping Sys,Discrepancies Found Between Design Documents & as-built Configuration of Seismic Restraints.Caused by Probable QC Installation Error | | | 05000285/LER-1979-021, Forwards LER 79-021/21L-0 | Forwards LER 79-021/21L-0 | |
|