05000285/LER-1980-026-03, /03L-0:on 801030,AB-1 Matrix Relay Failed to Trip Clutch Power Supplies.Caused by Failure of Matrix Circuit to Break Contact.Relay Replaced & Applicable Surveillance Test Performed to Demonstrate Operability

From kanterella
(Redirected from ML19340B863)
Jump to navigation Jump to search
/03L-0:on 801030,AB-1 Matrix Relay Failed to Trip Clutch Power Supplies.Caused by Failure of Matrix Circuit to Break Contact.Relay Replaced & Applicable Surveillance Test Performed to Demonstrate Operability
ML19340B863
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 10/30/1980
From: Core M
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19340B861 List:
References
LER-80-026-03L, LER-80-26-3L, NUDOCS 8011120476
Download: ML19340B863 (4)


LER-1980-026, /03L-0:on 801030,AB-1 Matrix Relay Failed to Trip Clutch Power Supplies.Caused by Failure of Matrix Circuit to Break Contact.Relay Replaced & Applicable Surveillance Test Performed to Demonstrate Operability
Event date:
Report date:
2851980026R03 - NRC Website

text

.

au m (7117 ?

LICENSEE EVENT REPORT CONTROL Block: I I

i i

I l

(PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) lo it i I N l E l F l Q l S l 1 l@l 01010 l o 10 lo 1010 In In In l@ld 11 11 11 !1 l@l l

l@

1 4 9 LICENSEE COOE I4 IS uCENSE NVMBER JS 26 LICENSE TYPE M

$i 6AT 64 ccN T Iolil

$$"C l L l@l 0 ! 5 !010 101218 15 l@l1 10 13 10 18 10 l@l 11 01 al 01 a l n l@

60 61 OCCKET NbV8Em 48 69 EV ENT 0 ATE 24

?S NEPCAT DATE 30 EVENT DESCRIPTION ANO PACBABLE ccNSECUENC55 10 21 l During testing of the matrix logic for the reactor protective system, it was dis-I The m j covered that the AB-1 matrix relay failed to trip the clutch power supplies.

failure resulted in only slight degradation of the system since five of the six l

io,Ai i i,isi; logic units were properly working. The failure resulted in the loss of one of the j

i a i., i i four trip relays in ene of the six assemblies.

l 134: 1I I

I icinii do 7

5 3 E

CE SLSC E COMPCNENT CCCE SL'8C C'E Sb E

la!al i I I A l@ [Ej@ I A l@ l Rl El Ll Al Y I XI@ I G l@ lZ l @

I 7

4 3

?0 11 12 TJ 18 19 20 SE QUENTt AL CCCUAAENCE REPCAT A Evis!CN gg a EVENTvfAM A EPCRT NC.

CODE WPE NC.

@ s g.go 18 !O I l-l 10 12 !6 l 1/l 10131 lL l l-l 101 ai ;;

21 22 23 24 26 27 28 29 M

31 22

  • CORS h 5 B 8

8CR 9.

SLP IE VANLFA AER K N AC CN ON P NT VE Li.j@l F l@

W@

W@

10 10 10 10 l lYl@

l N i@

l Ni@

lCl31415l@

u u

2, 0

.i 2

.2 m

cAuse cascRipTioN ANo ecRRecTive AcTicNs @

tiia;l The AB-1 matrix relay, a C.P. Clare Model HGZX-10ll mercury wetted relay, in the l

i !i; i matrix circuit failed to break contact to trio the clutch cower sucolies. The relay i I was replaced with a new relay and the applicable surveillance test was performed to l

i,,7,

,, i3i l demonstrate operability.

l It is t i I

s0 7

s 2 3I

% PCWER CTn*ER STATUS Cl3 RY OISCOVERY OE3CRIPTICN Ii i 5 l l H l@ l0 l 6 ! 5 l@l NA l

lBl@l Surveillance testina l

'JTiviry ColTENT agLgAgg AMOUNT CF ACTIVITY LOCATICN CF AELEASE l i i s t l Z l @g Os AELEASElZ !@l NA l

l NA l

>EasCNNEt ExPCsOEs NLM8ER TYPE DESCRIPTCN l i l 71 1010101@l Il@l NA l

' PEasC~~EL m a',Es Escai,,0N@

NuoEE.

li h l I 0101 o l@l NA l

7 5 3 11 12 30 7 E OE;;p pT cN l i i a l i Il@l NA l

7 5 3 0

60 M

ig3g g g cmipTICN nniiNi@i i

i i i i i i i i i i i i i :,

NA h of1120 '2 g, M

1 97 x. Core f0242s-my N -ec,...,AReR

. cNe

LER fio.80-026 Omaha Public Pcwer District Fort Calhoun Station Unit tio.1 Docket flo. 05000285 Attachment flo. 1 l

Safety Analysis

The RPS uses a two-aut-of-four logic trip system. To automatically initiate ~ a reactor trip, two trip units in two of the four channels, must be in a tripped condition.

If two trip units are tripped, the matrix logic system will interrupt pcwer to the CEDM clutch assemblies, thereby dropping the control rods into the core.

The AB-1 relay is used as part of a matrix ladder consisting of a set of twenty four contacts. There are six matrix ladders employed in the RPS which provide the required ccmbinations of two-out-of-four trip logic (i.e. A/S, A/C, A/0, B/C, B/D, C/D).

If any set of contacts in the AB matrix ledder opens, relay AB-1, 2, 3 and 4 de-energi:e, opening redundant contacts to the four M relays which supply power to PS 1, 2, 3 and 4, the clutch power supplies.

Opening tne contacts from relays AB-1 o_r_ AB-2 will interrupt pcwer to PS-1 and ?S-3.

Likewise, coening con-tacts from relays AB-3_o_r_ AB-4 will interrupt power to PS-2 and PS-4.

Since'the AB-2 relay, the redundant relay to AB-1 was fully Opera-tional at the time of failure of the AB-1 relay, the AB matrix was operaticnal and would have performed the required function, that is, to trip the clutch power supplies.

I, Ws t

I

+ -. _.. -,.

.n

_ -_=_-.

LER No.80-026 Omaha Public Power District Fort Calhoun Station Unit No.1 i

Docket No. 05000285 i

Attachment No. 2

Corrective Action

J J

The AB-1 matrix relay was removed and replaced with a new relay as required by I.E.Bulletin 80-19.

The matrix was then retested by per-ferming the applicable surveillance test, ST-RPS-ll.

The licensee has ordered a new style relay that will have dry con-tacts and will install the new relays during the 1981 Refueling Outage.

The licensee will continue to perform the increased surveillance as re-quired by I.E.Bulletin 80-19.

t

\\

a i

x h

~

i J

l

e LER No.80-025 Omaha Public Power District Fort Calhoun Station Unit No.1 Docket No. 05000285 Attachment No. 3 Failure Data This is the fourth reportable occurrance of its kind at Fort Calhoun Station Unit No.1.

See LER's80-008, 79-009 and 79-012.

\\

1