IR 05000225/2003005 | 13 February 1985 | Confirms Plans to Conduct Plant Operations & Surveillance Insp at Site on 850225-0305.Insp Team Listed | |
IR 05000302/1995022 | 16 January 1996 | Discusses Violations of Procedures Re Makeup Tank Pressure at Plant.Submits Excerpts from Draft Insp Rept 50-302/95-22 | |
ML19319D150 | 28 April 1978 | Field Change Authorization to Implement Reactor Trip on Loss of Feedwater Pump or Upon Turbine Trip | |
ML20054J024 | 17 June 1982 | Notification of 820720 Meeting W/B&W Owners Group in Bethesda,Md to Discuss Small Break Model Verification Program | |
ML20054K413 | 28 June 1982 | Notification of 820715 Meeting W/Util & Region 2 in Bethesda,Md to Discuss Implementation of Generic Item B-24 on Venting & Purging Containment While at Full Power & Effect of LOCA | |
ML20056G116 | 26 August 1993 | Notification of 930909 Meeting W/Util in Rockville,Md to Discuss Util Rept on Steam Generator Tube Exam & Plans for Operation & Further Insp | |
ML20056G600 | 17 August 1993 | Discusses Review of Rev 2, Electrical Design Criteria, Electrical Circuit Physical Separation & Cable Tray Loading, for Plant | |
ML20057C297 | 13 September 1993 | Notification of Significant Licensee Meeting W/Util on 930921 in Atlanta,Ga to Discuss Plant self-assessment | |
ML20057E176 | 1 October 1993 | Discusses Review of Licensee plant-specific Procedure for Resolution of GI A-46 & Informs That Resolution of GI for Facility Will Subsume Any Response to Licensee | |
ML20057G347 | 19 October 1993 | Notification of 931028 Meeting W/Util in Rockville,Md to Discuss Cable Separation Criteria at CR-3 | |
ML20058F789 | 23 October 1990 | Notification of 901031 Enforcement Conference W/Licensee in Atlanta,Ga Re Breach of Containment Integrity | |
ML20058J547 | 2 November 1993 | Notification of Significant Licensee Meeting W/Util on 931122 Re Enforcement Conference to Discuss Case of Employment Discrimination | |
ML20059G545 | 12 January 1994 | Notification of Significant Licensee Meeting W/Util on 940118 in Atlanta,Ga to Conduct Enforcement Conference on EOPs (Revised Date) | |
ML20059L774 | 10 November 1993 | Notification of 931116 Meeting W/Util in Rockville,Md to Discuss Improved TS | |
ML20062G360 | 12 December 1978 | Notification of Forthcoming Meeting on 781219 W/Util to Discuss Content & Schedule of Submittals Re Pwr Increase to Be Proposed | |
ML20062G987 | 24 January 1979 | Notification of Cancellation of 790202 Meeting W/Util to Discuss Reactor Coolant Flow Sensing Lines Mods | |
ML20125B845 | 4 December 1992 | Notification of 921214-17 Meeting W/Util in Crystal River, Fl to Discuss STS Implementation at Plant | |
ML20125C645 | 23 October 1979 | Notifies of 791025 Meeting W/Utils to Discuss Probabilities Assessment of Station Blackout at Facilities & to Establish Recommended Approach for Applicability to All Affected Plants | |
ML20126L227 | 1 May 1981 | Forwards Summary of 810429 Meeting W/Pwr Owners Group Re Thermal Shock to Reactor Vessels | |
ML20127B800 | 13 March 1991 | Discusses Recently Completed Evaluation to Determine Appropriate Course of Action for Licensees to Take Following Inadvertent Containment Spray Event.Licensee Should Perform Immediate Assessment & Develop Action Plan | Boric Acid Missed surveillance Operational leakage |
ML20127C041 | 8 January 1993 | Notification of 930112 Meeting W/B&W Owners Group in Clearwater Beach,Fl to Discuss Generic Program Plan for License Renewal Initiative | License Renewal |
ML20127F306 | 18 June 1985 | Forwards Tabular Summary of Key Results from Regional Survey of plant-specific Info Re Potential for Uncontrolled Radiation Exposures in PWR Cavities,Per Jg Partlow 850315 Request.No Further Generic Action Needed | High Radiation Area |
ML20127H578 | 17 June 1985 | Notification of 850620 Meeting W/Util in Bethesda,Md to Discuss Licensing & Regional Issues Per Encl Agenda | |
ML20127K651 | 12 January 1993 | Notification of 930122 Meeting W/Util at Region II Ofc,To Discuss Presentation on Operations Enhancement | |
ML20127N368 | 14 May 1985 | Notification of 850517 Meeting W/Util & B&W in Bethesda,Md to Discuss Use of Lynx T Computer Code in Reload Rept | |
ML20128L781 | 9 October 1996 | Confirms 961002 Telcon W/Representative from Plant,Unit 3 Re Licensee 960725 Response to NRC Request for Info on GL-95-03 | |
ML20133C657 | 30 July 1985 | Provides Results of Initial Review of Survey of Licensee Responses to Steam Binding in Auxiliary Feedwater Sys.Issue Addressed in IE Info Notices & INPO Significant Event Repts & Significant Operating Experience Repts | |
ML20133D993 | 30 July 1985 | Notification of 850805 Meeting W/Util & B&W in Bethesda,Md to Discuss Proposed Exemption to GDC 4 for Reactor Coolant Pump Supports.Draft Agenda Encl | Exemption Request |
ML20133G035 | 8 October 1985 | Notification of 851024 Meeting W/Util & Science Applications Intl Corp in Bethesda,Md to Discuss NRC Concerns Re Dcrdr Summary Rept.Agenda Encl | |
ML20133G063 | 4 October 1985 | Notification of 851031 Meeting W/Util & B&W in Bethesda,Md to Discuss NRC Concerns Re Review of GDC 4 Exemption Request for Reactor Coolant Pump Restraints | Exemption Request |
ML20133K987 | 16 January 1997 | Discusses Util Which Submitted 30 Day Special Rept 96-03 & Informed NRC of Plan to Abandon Two Peak Seismic Monitoring Instruments.Subj Plan Found to Be Acceptable | |
ML20134H521 | 7 February 1997 | Notification of Meeting W/Fpc on 970218 in Rockville,Md to Discuss & Review Status of Licensing Activities & Actions | |
ML20135E199 | 4 March 1997 | Notification of Meeting on 970318 W/Util in Rockville,Md to Discuss Licensing & Design Basis Issues Re High Pressure Injection & Small Break Loss of Coolant Accidents | |
ML20136B289 | 4 November 1985 | Notification of 851118 Meeting W/Util,B&W & Science Applications Intl Corp in Bethesda,Md to Discuss Auxiliary Feedwater Reliability & Related Staff Activities | Probabilistic Risk Assessment Overspeed trip |
ML20136C103 | 6 March 1997 | Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR | |
ML20137A139 | 13 March 1997 | Requests That Pp Number 73 Be Removed,Destroyed & Replaced W/Encl Corrected Pp Number 73 to Physical Security Plan.Page Withheld | |
ML20137C364 | 30 December 1985 | Forwards,For Info & action,AEOD/C504, Case Study Rept on Loss of Safety Sys Function Events. Results of Study Should Be Transmitted to Industry by Ie.Nrr Review of Qualifications Development Programs Recommended | |
ML20137D574 | 25 March 1997 | Forwards Order Prohibiting Involvement in NRC-licensed Activities (Effective Immediately) for Transmittal to Ofc of Fr.W/O Encl | |
ML20137L660 | 9 September 1985 | Discusses SECY-85-208 Re Incident Investigation Program. Occasions in Which Headquarters Personnel Have Augmented Regional Ofc in Investigation Listed | |
ML20137R952 | 22 March 1995 | Informs That Plant Performance Review of Listed Plants Was Held on 950316 | Fitness for Duty Enforcement Discretion Coatings Backfit |
ML20137V278 | 15 April 1997 | Notification of 970423 Meeting W/Florida Power Corp in Rockville,Md to Discuss Status of Licensing Activities & Actions | |
ML20138A034 | 5 December 1985 | Notification of 851210 Meeting W/Util in Bethesda,Md to Discuss 851122-23 Events & Reliability of Auxiliary Feedwater & EFIC Sys.List of Attendees Provided.Agenda Encl | |
ML20141C576 | 23 June 1997 | Notification of 970722 Meeting W/Florida Power Corp in Rockville,Md to Discuss Licensee Progress Toward Readiness for Restart & Addressing Issues Specified in Confirmatory Action Ltr 2-97-01 | |
ML20141H469 | 21 May 1997 | Notification of 970611 Meeting W/Florida Power Corp in Rockville,Md to Discuss Licensee Findings Related to 10CFR50,App R Design Basis Issues | |
ML20141K389 | 9 January 1986 | Summary of Operating Reactor Events Meeting 86-01 on 860106 Re Events Occurring Since 851223 Meeting.Attendee List, Events,Significant Elements of Events & Completion Dates for Assignments Encl | |
ML20147C335 | 27 January 1997 | Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 960322-29 | Boric Acid Shutdown Margin Loop seal Packing leak High Radiation Area Offsite Dose Calculation Manual Anticipated operational occurrence Post Accident Monitoring Hydrostatic Power Operated Valves Power change Siren Overspeed trip Loss of condenser vacuum |
ML20148C085 | 7 May 1997 | Provides NRR Concurrence to Extend SALP Evaluation Period for Plant Facility Until Six Months After Restart of Unit from Current Extended Shutdown | |
ML20148C093 | 17 April 1997 | Requests Concurrence in Adjusting SALP Period for Plant Facility Until Six Months After Restart of Unit | |
ML20148J734 | 13 June 1997 | Notifies of 970624 Meeting W/Util in Rockville,Md to Discuss Licensee Proposed License Amend for Addressing Emergency Diesel Upgrade,Emergency Feedwater,High Pressure Injection Sys & Small Break LOCA Design Basis Issues | |
ML20148P600 | 24 December 1980 | Discusses Followup Study Re Degradation of Internal Appurtenances in LWR Piping During Normal Plant Operation & Potential Effects When Degraded Appurtenances Are Subj to Accident Loads.Recommends Review of Recurrent Problems |