Discusses SECY-85-208 Re Incident Investigation Program. Occasions in Which Headquarters Personnel Have Augmented Regional Ofc in Investigation Listed
ML20137L660
Person / Time
Site: Calvert Cliffs, Summer, Crystal River, Vogtle, Waterford, Rancho Seco, 05000000
Issue date: 09/09/1985
From: Jordan E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Heltemes C
NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD)
References
NUDOCS 8509120446
Download: ML20137L660 (4)


Text

- = .

,8 *,, UNITED STATES y'y g NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555

$ j

%J ,o$

5d 99 N55 MEMORANDUM FOR: C. J. Heltemes, Jr., Director ,

Office for Analysis and Evaluation of Operational Data FROM: Edward L. Jordan, Director Division of Emergency Preparedness and Engineering Response /

Office of Inspection and Enforcement

SUBJECT:

INCIDENT INVESTIGATION PROGRAM

REFERENCE:

SECY-85-208, Incident Investigation Program, June 10, 1985 Tt. referenced SECY-85-208 directs that one part of the Incident Investigation Pr 2 gram will be a regional-based investigation for events of lesser signifi-O M e in which headquarters technical experts will augment the regional response.

T5ere have been four occasions during the last four months in which headquarters personnel have augmented the regional office in an investigation.

Tt:se are:

Waterford 3 waterhammer event of May 8, 1985. Vernon Hodge, IE, visited the Waterford 3 Plant.on May 20-23, 1985 and investigated this event.

4 This trip'is reported in a memorandum from Dr. Hodge to Dennis Allison, dated June 20, 1985.

Jalvert Clif fs Unit 1 emergency diesel generator interpolar connector sr failures cf May 14, 1985. Vince Thomas, IE, visited the Calvert Ceiffs site on June 25 to evaluate generic aspects of this problem.

Ir Formation gathered on this site visit was used in the preparation of IE Information Notice 85-68, " Diesel Generator Failure at Calvert Cliffs Nu lear Station Unit 1," of August 14, 1985. -

- Rana o Seco RCS vent line break of June 23, 1985. Howard Wong, IE, visited the Rancho Seco Plant on July 1-3 and investigated this event.

This trip is reported in the Rancho Seco resident inspector's report No. En-19 of August 22, 1985.

85091204% J50909 PDR G A E K t)S000302 PDR

C. J. Heltemes, Jr. -

Containment tendon anchor inspection at Summer 1, Crystal River 3 and

.r the Vogtle Plant._ Robert Shewmaker is currently on a trip to these plants to review the tendon surveillance programs. This trip is in response to the earlier tendon failures experienced at the Farley Plant.

tirisinal Sir d sy, b Q Jetbn i Edward L. Jordan, Director Division of Emergency Preparedness and Engineering Response Office of Inspection and Enforcement U

r D 5fribution:

H)CS BGrimes EAB R/F JAxelrad I

DEPER R/F HVollmer ELJordan ERossi SASchwartz HBailey JPartlow

  • SEE PREVIOUS CONCURRENCES
  • EAB:DEPER:IE *EAB:DEPER DD:DEPER:IE R:IE HABailey:mj CERossi' SASchwartz L rdan 8/ /83 8/ /85 9/ /85 9/ /85

MEMORANDUM FOR: C. J. Hel temes , Jr. , Di rector Office for Analysis and Evaluation of Operational Data FROM: Edward L.' Jordan, Director Division of Emergency Preparedness and Engineering Response Office of Inspection and Enforcement

SUBJECT:

INCIDENT INVESTIGATION PROGRAM

REFERENCE:

SECY-85-208, Incident Investigation Program, June 10, 1985 The referenced SECY-85-208 directs that one part of the Incident Investigation Program will be a regional-based investigation for events of lesser signifi-cance in which headquarters technical experts will augment the regional 4

response.

There have been three occasions during the last three months in which

-headquarters personnel have augmented the regional office in an investigation.

N

\

These are: \

\

- Waterford 3 waterhammer ehent of May 8, 1985. Vernon Hodge, IE, visited the Waterford 3 Plant on May g20-23, 1983 and investigated this event.

This trip is reported in a memorandum from Dr. Hodge to Dennis Allison,

\

dated June 20, 1985. g

\

Rancho Seco RCS vent line break of June 23, 1985. Howard Wong, IE, visited the Rancho Seco Plant on July 1-3 and investigated this event.

^

This trip is reported in the Rancho \Seco resident inspector's report No. 85-19 of August 22, 1985. \

\

Containment Tendon Anchor Inspection atxSummer 1, Crystal River 3 and the Vogtle Plant. Robert Shewmaker is c'urrently on a trip to these plants to review the tendon surveillance programs. This trip is in response to the earlier tendon failures experienced at \the Farley Plant.

r L Jordan Director Divisio of Emergency Pr eparedness and gineering Response Offic of Inspection and Enforcement Distribution:

DCS BGrimes

'EAB R/F JAxelrad i DEPER.R/F HVo11mer )

ELJordan ERossi SASchwartz HBailey JPartlow

  • SEE PREVIOUS CONCURRENCES ,
  • EAB:DEPER:IE *EAB:DEPER DD:DEPER:IE - D:DEPER:IE HABailey:mj CERossi SASchwartz ,R rdan 8/ /83 .,

8/ /85 8/ /85 8/3tV85 1 i L -

MEMORANDUM FOR: C. J. Heltemes, Jr. , Director Office for Analysis and Evaluation of Operational Data FROM: . Edward L. Jordan, Director Division of Emergency Preparedness

-and Engineering Response Office of Inspection and Enforcement

SUBJECT:

INCIDENT INVESTIGATION PROGRAM

REFERENCE:

SECY-85-208, Incident Investigation Program, June 10, 1985 The referenced SECY-85-208 directs that one part of the Incident Investigatior.

Program will be a regional-based investigation for events of lesser signifi-cance in which headquarters technical experts will augment the regional response.

There have been three occasions during the last three months in which headquarters personnel have augmented the regional office in an investigation.

These are: ' '

Waterford 3 waterhammer event of May 8, 1985. Vernon Hodge, IE visited  ;

the Waterford 3 Plant on May 20-23,N 1983 and investigated this event.

This trip is reported in a memorandum from Dr. Hodge to Dennis Allison, l dated June 20, 1985. f Rancho Seco RCS vent line break of June 23, 1985. Howard Wong, IE, visited the Rancho Seco Plant on July 1-3 and investigated this event.

This trip is reported in the Rancho Seco resident inspector's report No. 85-19 of August 22, 1985.

Containment Tendon Anchor Inspection at Summer 1, Crystal River 3 and the Vogtle Plant. Robert Shewmaker is currently on a trip to these plants to review the tendon surveillance programs. This trip is in response to ,

the earlier tendon failures experienced at the Farley Plant.

s Edward L. Jordan, Director Division of Emergency, Preparedness and Engineering Response Office of Inspection and Enforcement Distribution: \