IR 05000225/2003005

From kanterella
Jump to navigation Jump to search
Confirms Plans to Conduct Plant Operations & Surveillance Insp at Site on 850225-0305.Insp Team Listed
ML20132C707
Person / Time
Site: Crystal River, San Onofre, Rensselaer Polytechnic Institute  Duke Energy icon.png
Issue date: 02/13/1985
From: Partlow J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20132C709 List:
References
FOIA-85-425 NUDOCS 8502200180
Download: ML20132C707 (2)


Text

.

.

FEB 13 W Docket No. 50 362

.

MEMORANDUM FOR:

Dennis F. Kirsch, Acting Director Division of Reactor Safety and Projects, Region V FROM:

James G. Partlow, Director Division of Inspection Programs Office of Inspection and Enforcement SUBJECT:

PLANT OPERATIONS AND SURVEILLANCE PROGRAM INSPECTIONS BY IE PERSONNEL - SAN ONOFRE UNIT 3 This memorandum confims our plans to conduct an inspection at the San Onofre plant site. The inspection will be perfonned during February 25 - March 5, 1985. An exit meeting is planned for the afternoon of March 5,1985.

The inspection team will be:

kame Badge No.

Social Security Number

  • Leonard J. Callan A-3052 458-72-8770 Dennis J. Sullivan, Jr.

A-3304 550-42-0201 Scott A. McNeil (to be provided later)

216-72-2715 James T. Conway A-3075 517-44-8204

  • Team Leader

-

The tentative plan is to perfom portions of IE Manual Inspection Procedures 71707, " Operational Safety Verification;" 42700, " Plant Procedures;" 61700,

" Surveillance Procedures and Records;" 61725, " Surveillance Testing and Calibration Program;" and 61726. " Monthly Surveillance Observation" during the inspection.

-

-

-

JnM4 4 ! r.s.. J@

James G. Partlow, Director Division of Inspection Programs Office of Inspection and Enforcement

.

Distribution:

DC5 016, ORPS reading DQASIP reading, J. G. Partlow, IE i

D. J. Sullivan, Jr.. IE, 5. A. McNeil IE

'

J. T. Conway, IE, R. W. Cooper, IE P. F. McKee, IE, L. J. Callan, IE R. Vollmer, IE, J. M. Taylor, IE

  • For previous concurrences see attached ORC ORPS: DIP:IE ORrs: DIP:!E ORPB: DIP:IE DID:D P.IE

{

  • DJ5ul Rvan:Mw
  • LJCallan
  • PFMcKee JGPartlow 02/12/85

02/12/85 02/12/85

@ av/6/f4 x4 02(/85 J

,

i

>

_

-

.

l FEB 1319EE Docket No. 50 362

.

MEMORANDUM FOR:

Denn.s F. Kirsch, Acting Director Division of Reactor Safety and Projects, Region V FROM:

James G. Partlow, Director Division of Inspection Programs Office of Inspection and Enforcutent SUBJECT:

PLANY OPERATIONS AND SURVEILLANCE PROGRAM INSPECTIONS BY IE PERSONNEL - SAN ONOFRE UNIT 3

,

l This nemorandum confims our plans to conduct an inspection at the San Onofre plant site. The inspection will be perfonned during February 25 - March 5, 1985. An exit roeting is planned for the af ternoon of March 5,1985.

The inspection team will be:

l Narre Badge No.

Social Security hu:rber

  • Leonard J. Callan A-3052 458-72-8770 Dennis J. Sulliven, Jr.

A-3304 550-42-0201 Scott A. McNeil (to be provided later)

216-72-2715 James T. Conway A-3075 517-44-8204

  • Team Leader

-

The tentative plan is to perform portions of IE Manual Inspection Procedures 71707, " Operational Safety Verification;" 42700, " Plant Procedures;" 61700,

" Surveillance Procedures and Records;" 61725 " Surveillance Testing and Calibration Program;" and 61726, " Monthly Surveillance Observation" during the inspection.

'

-

-

w o 4. : u...,,,,

James G. Partlow, Director Division of Inspection Programs Office of Inspection and Enforcement Distribution:

DC5 015, ORPS reading DQASIP reading, J, G, Partlow, IE D. J. Sullivan, Jr., IE, 5. A. McNeil, II J. T. Conway, IE, R. W. Cooper, IE P. F. McKee, IE, L. J. Callan IE

,

R. Vollmer, IE, J. M. Taylor, IE

  • For previous concurrences see attached ORC

ORPS: DIP:IE ORPB: DIP:lE ORPB: DIP:IE DID:D P.IE

  • DJSullivan:jj
  • LJCallan
  • PFMcKee JGPartlow 02/12/PA \\

/12/85 02/12/85 02(/85

,

>

o, c

y

_