ML20057C297
| ML20057C297 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 09/13/1993 |
| From: | Landis K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NUDOCS 9309280189 | |
| Download: ML20057C297 (2) | |
Text
-r:
SEP 131993 NOTICE OF SIGNIFICANT MEETING Name of Licensee:
Florida Power Corporation Name of Facilities: Crystal River 3 Docket Number:
50-302 Date and Time of Meeting:
September 21, 1993, at 10:00 a.m.
Location of Meeting:
NRC Region II Office, Atlanta, GA Purpose of Meeting:
Licensee presentation on Crystal River 3 self-assessment NRC Attendees:
t S. D. Ebneter, Regional Administrator, Region II (RII) t L. A. Reyes, Deputy Regional Administrator, RII E. W. Merschoff, Director, Division of Reactor Projects (DRP), RII J. P. Stohr, Director, Division of Radiation Safety and Safeguards (DRSS), RII J. P. Jaudon, Deputy Director, Division of Reactor Safety (DRS), RII M. V. Sinkule, Chief, Reactor Projects Branch 2, DRP, RII C. A. Julian, Chief, Engineering Branch, DRS, RII K. D. Landis, Chief, Reactor Projects Section 2B (RP2B), DRP, RII P. Holmes-Ray, Senior Resident Inspector, Crystal River R. P. Schin, Project Engineer, RP2B, DRP, RII H. N. Berkow, Director, Project Directorate 11-2, DRP-I/II, Office of Nuclear Reactor Regulation (NRR)
H. Silver, Project Manager, Project Directorate II-2, DRP-I/II, NRR t
Licensee Attendees:
l P. M. Beard, Jr., Senior Vice President, Nuclear Operations P. R. Tanguay, Director, Nuclear Operations Engineering and Projects R. C. Widell, Director, Nuclear Operations Site Support W. M. Marshall, Manager, Nuclear Plant Operations
{
R. W. Davis, Manager, Nuclear Plant Maintenance J. H. Terry, Manager, Nuclear Plant Systems Engineering S. G. Johnson, Manager, Nuclear Chemistry and Radiation Protection 9309280189 9n913 DR ADOCK 05000302 C
- 3,
/
J L/
d r"* ~ f EUt
i SEP 131993 Notice of Significant Meeting 2
NOTE: Attendance by NRC personnel at this meeting should be made known by 4:00 p.m., September 17, 1993, via telephone call to R. P. Schin, (404) 331-5561.
Approved by:
1 K.D.~LXndis, Chief Reactor Projects Section 2B Division of Reactor Projects l
Distribution:
T. E. Murley, Director, Office of Nuclear Reactor Regulation (NRR)
J. H. Sniezek, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research J. G. Partlow, Associate Director for Projects, NRR H. L. Thompson, Jr., Deputy Executive Director for Nuclear Materials Safety, Safeguards and Operations Support S. A. Varga, Director, Division of Reactor Projects I/II, NRR
~
H. N. Berkow, Director, Project Directorate II-2, NRR H. Silver, Project Manager, Crystal River L. R. Plisco, Regional Coordinator, EDO J
bec:
S. D. Ebneter P. Holmes-Ray, SRI, Crystal River L. A. Reyes R. Butcher, SRI, Crystal River j
A. F. Gibson A. R. Long i
J. P. Stohr R. J. Maley E. W. Merschoff G. R. Jenkins J. R. Johnson K. M. Clark M. V. Sinkule All NRC Attendees l
K. D. Landis Docket File R. P. Schin l
RII:DRP RII:DRP RII:DRP RII:DRP RII:DRS RII:DRSS tW 5 M
[
hg y
RSchin Klandis MSinkule schoff AGi n
JStoir 9/4/93 9/ 9 /93 9/q/93 A
/93 9A/93 9/6/93 RII:0RA t
CCu' CE' vans 9/p/93 l
- -...