Notification of 851210 Meeting W/Util in Bethesda,Md to Discuss 851122-23 Events & Reliability of Auxiliary Feedwater & EFIC Sys.List of Attendees Provided.Agenda Encl
ML20138A034
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/05/1985
From: Silver H
Office of Nuclear Reactor Regulation
To: Harold Denton, Eisenhut D, Lyons J
NRC
References
NUDOCS 8512110520
Download: ML20138A034 (4)


Text

.: . December 5,1985

~ ^

Docket No. 50-302 MEMORANDUM FOR: H. Denton J. Knight A. Thadani D. Eisenhut G. Lainas H. Berkow J. Lyons T. Speis W. Travers H. Thompson B. Sheron C. Grimes F. Miraglia W. Russell W. Johnston R. Bernero' G. Holahan C. Thomas T. Novak G. Edison 0. Parr F. Schroeder R. Weller W. Regan ,

D. Crutchfield G. Knighton D. Vassallo l THRU: John F. Stolz, Director,_PWR Project Directorate #6, PWR-B FROM: Harley Silver, Project Manager, PWR Project Directorate #6, PWR-B

SUBJECT:

DAILY HIGHLIGHT - MEETING NOTICE, FLORIDA POWER CORPORATION ON CRYSTAL RIVER UNIT 3 Time & Date: 1:00pm Tuesday, December 10, 1985 Location: Room P-422 Bethesda, Maryland

Purpose:

(1) Assure understanding of events of November 22, 1985 and November 23,1985 at CR-3; (2) Discuss problems and .

solutions arising from these and related events, and (3)Tb Discuss lessons learned with respect to reliability of'the AFW and EFIC systems at CR-3. See attachment for specific '

items.

Requested

Participants:

NRC-FMiraglia, FSchroeder, DCrutchfield, GEdison, RWeller, McCracken, JStolz, BMozafari, WPaulson, OParr, JWermiel, RKendall, AThadani, TStetke, VPanciera, DShun, MGoodman LICENSEE-MHoward, PMcKee, GBoldt, GWestafer, KWilson, PIwachow, RWydell, FSullivan Orignat abted hr Harley Silver, Projecc Manager PWR Project Directorate #6 Division of PWR Licensing-B cc: See next page P -

HS y r;cr 12/g/85-8512110520 851205 gDR ADOCK0500g2 u

-i ITEMS TO BE ADDRESSED AT 12/10/85 CR-3 MEETING

1. .

Describe transients of 11/22/85 and 11/23/85.

2. - Operator understanding of interaction between MFW startup and low load

-valves.

.3. Operator understanding of EFIC logic (e.g., need to reset EFIC to close

-AFW pump steam admission valve).

-4. Securing AFW after initiation

a. Did operators assure themselves that AFW was not required prior to securing pumps?

b.

-Would EFIC/AFW have controlled the 11/22 transient? Should AFW have been secured so quickly, or at all? Do plant procedures cover this action?

If AFW should be secured, should it be done by tripping pumps or by manipulating the control valves?

5. Root cause of PORV problem.
6. Root cause of-spurious opening of AFW steam admission valve after reactor trip. Can we be certain this valve is operable?
7. Expected overshoot of OTSG 1evel on AFW fill.
8. EFIC transmitter sensitivity.
9. Extent of documentation of post-trip review.

10.

Criteria for inter-disciplinary post-trip review (G.L. 83-28, Item 1.1).

11.

Extent of consideration of items 1-8 in restart decision.

12. Information availability to NRC and post-trip review.
13. Should MFW startup valve have been repaired earlier? Before restart?
14. Should PORV have been repaired prior to restart?

15.

Effect on AFW reliability of review of recent transients involving EFIC ^

and AFW systems.

aacog "

.. ,g

. o,, UNITED STATES ,

NUCLEAR REGULATORY COMMISSION

E WASHINGTON, D. C. 20555 s

% a.... p December 5,1985 Docket No. 50-302 l

. l MEMORANDUM FOR: 4. Denton J. Knight A. Thadani D. Eisenhut G. Lainas H. Berkow j J. Lyons T. Speis W. Travers H. Thompson B. Sheron C. Grimes F. Miraglia W. Russell W. Johnston 1 R. Bernero G. Holahan C. Thomas T. Novak G. Edison 0. Parr F. Schroeder R. Weller W. Regan D. Crutchfield. G. Knighton D. Vassallo THRU: John F.'Stolz, Director, PWR Project Directorate #6, PWR-B FROM: Harley Silver, Project Manager, PWR Project Directorate #6, PWR-B

SUBJECT:

DAILY HIGHLIGHT - MEETING NOTICE, FLORIDA POWER CORPORATION ON CRYSTAL RIVER UNIT 3 Time & Date: 1:00pm Tuesday, December 10, 1985 Location: Room P-422 Bethesda, Maryland

Purpose:

(1) Assure = understanding of events of November 22, 1985 and November 23,1985 at CR-3; (2) Discuss problems and solutions arising from these and related events, and (3)

Discuss lessons learned with respect to reliability of the AFW and EFIC systems at CR-3. See attachment for specific items.

Requested

Participants:

NRC-FMiraglia, FSchroeder, DCrutchfield, GEdison, RWeller, ERccracken, JStolz, BMozafari, WPaulson, OParr, JWermiel, 1 RKendall, AThadani, TStetke, VPanciera, DShun, MGoodman - '

LICENSEE-MHoward, PMcKee, GBoldt, GWestafer, KWilson, PIwachow, RWydell, FSul"ivan Harley ver, Project ager PWR Pr ect Directorate #6 i Division of PWR Licensing-B '

cc: See next page

. . - _ - . - . . .~ .- _;- ._:..- . .

. , *\

oc s. o MEETING

SUMMARY

DISTRIBUTION Licensee: Florida Power Corporation

  • Copies also sent to those people on service (cc) list for subject plant (s).
  • Docke*!Filef

'NRC PDR'

  • L PDR PBD-6 Rdg

.GHolahan Project Manager .HSilver

-OELD EJordan BGrimes JPartlow (Emergency Pre'paredness only) 1 Receptionist ACRS-10 CMiles MSchaaf Resident Inspector Regional Administrator-Region II NRC Participants-FMiraglia FSchroeder DCrutchfield GEdison RWeller CMcCracken JStolz BMozafari WPaulson OParr JWermiel RKendall AThadani TStetka VPanciera