ML20148C085
| ML20148C085 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 05/07/1997 |
| From: | Collins S NRC (Affiliation Not Assigned) |
| To: | Reyes L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20148C089 | List: |
| References | |
| NUDOCS 9705150055 | |
| Download: ML20148C085 (1) | |
Text
_ _ _..
hD 0h i
May 7, 1997 i
i i
MEMORANDUM T0:
Luis A. Reyes, Regional Administrator, Region II FROM:
Samuel J. Collins, Director DMk Office of Nuclear Reactor Regulation SamuelJ.005ns i
SUBJECT:
EXTENSION OF CRYSTAL RIVER SALP The purpose of this memorandum is to provide NRR concurrence to extend i.
the SALP evaluation period for the Crystal River facility until six months after the restart of the unit from the current extended shutdown.
Your
' justification (attached) was consistent with the guidance in NRC Management Directive 8.6.
Attachment:
As stated Distribution:
(YT #0970058)
Central Files PIPB R/F LJCallan HLThompson SJCollins FJMiraglia RPZimmerman TTMartin MMSlosson SCVarga g
JWRoe j
gg g hhh i
DOCUMENT NAME: G:\\SECY2\\SALPMEMO. HUP
/
To receive e copy of this document, indicate in the box: "C" = Copy without enclosures "E" = Copy w' e losures "N* = No copy 0FFICE PIPB: DISP M l E PIPB:DISPs l E - DISP;fLQ l h/ JD:N/tA )
l l
NAME DLGamberon N RWBorchardWA FPGil M pie
'-&SJddllins DATE 05/0 7 /97 05/1/97 W 05/ m /97
/g05/ J /97 0FFICIAL RECORD COPY 9705150055 970507 PDR ADOCK 05000302 G
,