ML20058F789
| ML20058F789 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 10/23/1990 |
| From: | Crlenjak R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NUDOCS 9011090131 | |
| Download: ML20058F789 (2) | |
Text
e
}
b h ic M O g e
/
[
n OCT 13192 p0TICEOFSIGNIFICANTMEETING Name of Licensee:
Florida Power Corporation Name of Facility:
Crystal River Unit 3 Docket Numbers:
50-302
[
Date and Time of Meeting: October 31, 1990, at 1:00 p.m.
I Location of Meeting:
NRC Region 11 Office, 29th Floor Conference Room Atlanta, Georgia f
LPurpose of Meeting:
Enforcement Conference - Breach of Containent Integritv NRC' Attendees: 'J. Milhoan, Dep'uty Regional Administrator, Ril c
L. Reyes, Regional Director, Division of Reactor Projects
[
(DRP),Ril L
'A.-Gibson, Director, Division of Reactor Safety (DRS), RII M.; Sinkule, Chief Branch 2, DRP, Ril H. Whitener, Reactor Inspector, DRS, RIl R. Crlenjak,-Chief, Reactor Projects Section 2B, DRP R.,Schin, Project Engineer, DRP P. Holmes-Ray,, Senior Resident Inspector,~ Crystal River, DRP H. Serkow, Director, Project Directorate 11-2, Office of-Nuclear Reactor Regulation (NRR)
H. Silver, Project Manager, NRR-G. Jenkins.-Director, Enforcement and Investigation i
Coordination Staff Licensee Attendees:
P. M. Beard, Senior Vice President, Nuclear Operations
'y G. L. Boldt, Vice President, Nuclear Production i
T. V. Austin,. Principle Nuclear Mechanical Engineer G. H. Halnon, Operations Engineer B. J. Hickle, Director of Quality Programs F. V. Fusick, Manager, Nuclear
. sign: Engineering and Modifications.
H. Koon,. Maintenance Superintendent A
G. H. Williams, Corporate Counsel 4
Approved BY.: Original'sioned by R. V. Crlenjak, Chief 9011090131 901023 Projects Section 2B
{DR ADOCK 0500 q2 Division of Reactor. Projects i
NOTE: ' Attendance by NRC personnel at this NRC/ Licensee meeting should be made-known by 4:00 p.m., October 24, 1990, via telephone call to R. V.
Crlenjak, FTS: 841-5097.
Distribution:
(Seepage 2)-
&C 7
l (D'. ]?
r
r 1
L
- c u
8 -
OCT 2 31990 1
Notice of Significant Meeting 2
Distribution:
J. Taylor, Executive Director for Operations J. Sniozek, Director, Deputy Director, NRR G. Lainas, Assistant director for Region II Reactors, NRR J. Lieberman,. Director, Office of Enforcement i
R. W. Borchardt, Regional Coordinator EDO F
f -
bec: NRC Resident inspector DRP Section Chief Document Control Room All NRC Attendees i
i J
1 t
?
1 i
o R
P Ril:DRP Ril4 '{
twcts R leniak MSinkule GJe'kIs.
10/pD0' 10pj//90 10/g[90 J