ML20135E199

From kanterella
Jump to navigation Jump to search
Notification of Meeting on 970318 W/Util in Rockville,Md to Discuss Licensing & Design Basis Issues Re High Pressure Injection & Small Break Loss of Coolant Accidents
ML20135E199
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/04/1997
From: Raghavan L
NRC (Affiliation Not Assigned)
To: Hebdon F
NRC (Affiliation Not Assigned)
References
NUDOCS 9703060351
Download: ML20135E199 (4)


Text

.. .

March 4, 1997 HEMORANDUM TO: Frederick J. Hebdon, Director Project Directorate II-3 Division of Reactor Projects - I/II FROM: L. Raghavan, Project Manager Project Directorate 11-3 Division of Reacto' #rojects - I/II

SUBJECT:

MEETING WITH FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 DATE & TIME: March 18, 1997 10:00 AM LOCATION: USNRC, One White Flint North 11555 Rockville Pike Rockville, Maryland Room 0-6B11 PURPOSE: To discuss licensing and design basis issues relating to high pressure injection and small break loss of coolant accidents. See agenda attached. ,

  • PARTICIPANTS: NRC FPC J. Lyons 'J. Holding M. Chatterton D. Kunesailler F. Orr B. Gutherman et al G. Hubbard i W. Lefave '

D. Thatcher N. Saba J. Jaudon F. Hebdon I L. Raghavan  !

Docket No. 50-302 l

Attachment:

Meeting Agenda NfdCfM DER B 30PY l cc w/ attachment: See next page 1 CONTACT: L. Raghavan, NRR, PDII-3 l 301-415-1471

  • Meetings between NRC technical staff and applicants or licensees are open for [}

l i

interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff ppy)I/ l Policy," 59 Federal Reaister 48344, 9/20/94.

Document Name: G:\ CRYSTAL \970318.N0T Office PM:PDII-3 LA:PDII-3 / PD:PDII-3 Name LRaghavan @ BClayho48/ FHebdon b Date 03\1\97 03\'bhh 03/9/97 Copy [Yh/No

'~

[e2/No ies)No CICIAL RECORD COPY  !

9703060351 970304 PDR ADOCK 05000302  ;

P_ PDR

t Florida Power Corporation CRYSTAL RIVER UNIT N0. 3 GENERATING PLANT cc:

Mr. R. Alexander Glenn Senior Resident Inspector Corporate Counsel Crystal River Unit 3 Florida Power Corporation U.S. Nuclear Regulatory Commission MAC-A5A 6745 N. Tallahassee Road P.O. Box 14042 Crystal River, Florida 34428 St. Petersburg, Florida 33733-4042 Regional Administrator, Region II Mr. Bruce J. Hickle, Director U.S. Nuclear Regulatory Commission Nuclear Plant Operations (NA2C) 101 Marietta Street NW., Suite 2900 Florida Power Corporation Atlanta, Georgia 30323 I Cryst::.1 River Energy Complex 15760 W. Power Line Street Mr. John P. Cowan Crystal River, Florida 34428-6708 Vice President - Nuclear Production  ;

(SA2C) {

Mr. Robert B. Borsum Florida Power Corporation 1 B&W Nuclear Technologies Crystal River Energy Complex 1 1700 Rockville Pike, Suite 525 15760 W. Power Line Street Rockville, Maryland 20852 Crystal River, Florida 34428-6708 Mr. Bill Passetti Mr. Roy A. Anderson Office of Radiation Control Senior Vice President, i Department of Health and Nuclear Operations '

Rehabilitative Services Florida Power Corporation 1317 Winewood Blvd. ATTN: Manager, Nuclear Licensing Tallahassee, Florida 32399-0700 , Crystal River Energy Complex (SA2A) 15760 W. Power Line Street Attorney General Crystal River, Florida 34428-6708 Department of Legal Affairs The Capitol Mr. Kerry Landis Tallahassee, Florida 32304 U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W. Suite 2900 Mr. Joe Myers, Director Atlanta, Georgia 30323-0199 Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Chairman Board of County Commissioners Citrus County 110 North Apopka Avenue Iverness, Florida 34450-4245 Mr. David F. Kunsemiller, Director Nuclear Operations Site Support (SA2A)

Florida Power Corporation Crystal River Energy Complex 15760 W. Power Line Street Crystal River, Florida 34428-6708

],-

e l I i i AGENDA CRYSTAL RIVER 3 - MARCH 18, 1997 MEETING i

! HIGH PRESSURE INJECTION AND SMALL BREAK LOCA ISSUES !

i l 1. SINGLE FAILURE FLOW PATHS i LOCA ANALYSIS i HPI ISOLATION CRITERIA i EFW FLOW / INVENTORY i EFW OTSG COOLING TIME l EDG CAPACITY / LOAD MANAGEMENT

) 2. SAFETY ASSESSMENT i

i j 3. SBLOCA ANALYSIS l

i

4. UNREVIEWED SAFETY QUESTIONS

! 4 l 5. FPC'S RESTART PLAN '

6. PLANT MODIFICATIONS /SIGNIFICANT PLANT CHANGE l 7. SCHEDULE AND

SUMMARY

~

l I

__ _ _ - ~ . - . _ _ . _ . . . . . . - _ _ _ _ - _ . _ _ . ._ __ _..._ _ . . - ,

,. m ,

a

~

I DISTRIBUTION FOR MEETING NOTICE DATED FEBRUARY 26. 1997:

i i E-Mail S. Collins /F. Miraglia (SLC1,FJM)

R. Zimmerman (RPZ)
S. Varga (SAV,RCN)

D. Ross (SAM)

OPA (OPA)

, J. Lyons (JEL)

! M. Chatterton (MSCI) i F. Orr (FRO)

C. Grimes (CSG)

G. Hubbard (GTH)

W. Lefave (WTL1)

D. Thatcher (DFT) l N. Saba (DFT) i J. Jaudon (JPJ)

. F. Hebdon (FJH) 1 L. Raghavan (LXRI)

{ B. Clayton (BAC2)

J. Johnson, RII (JPJ)

! G. Tracy (GMT)

! K. Clark (KMC2), Region II PMNS (Meeting Announcement Coordinator)

~

Hard Coov i

Docket File

'PUBLIC-i Crystal River Rog.

OGC

ACRS
Receptionist- (0WFN and TWFN) l l