ML20135E199

From kanterella
Jump to navigation Jump to search
Notification of Meeting on 970318 W/Util in Rockville,Md to Discuss Licensing & Design Basis Issues Re High Pressure Injection & Small Break Loss of Coolant Accidents
ML20135E199
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/04/1997
From: Raghavan L
NRC (Affiliation Not Assigned)
To: Hebdon F
NRC (Affiliation Not Assigned)
References
NUDOCS 9703060351
Download: ML20135E199 (4)


Text

..

March 4, 1997 HEMORANDUM TO:

Frederick J. Hebdon, Director Project Directorate II-3 Division of Reactor Projects - I/II FROM:

L. Raghavan, Project Manager Project Directorate 11-3 Division of Reacto' #rojects - I/II

SUBJECT:

MEETING WITH FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 DATE & TIME:

March 18, 1997 10:00 AM LOCATION:

USNRC, One White Flint North 11555 Rockville Pike Rockville, Maryland Room 0-6B11 PURPOSE:

To discuss licensing and design basis issues relating to high pressure injection and small break loss of coolant accidents.

See agenda attached.

  • PARTICIPANTS:

NRC FPC J. Lyons

'J. Holding M. Chatterton D. Kunesailler F. Orr B. Gutherman et al G. Hubbard i

W. Lefave D. Thatcher N. Saba J. Jaudon F. Hebdon L. Raghavan Docket No. 50-302 NfdCfM DER B 30PY

Attachment:

Meeting Agenda cc w/ attachment:

See next page CONTACT:

L. Raghavan, NRR, PDII-3

[}

301-415-1471

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties ppy)I/

to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 59 Federal Reaister 48344, 9/20/94.

Document Name: G:\\ CRYSTAL \\970318.N0T Office PM:PDII-3 LA:PDII-3

/

PD:PDII-3 Name LRaghavan @

BClayho48/

FHebdon b Date 03\\1\\97 03\\'bhh 03/9/97 Copy

[Yh/No

[e2/No ies)No

'~

CICIAL RECORD COPY 9703060351 970304 PDR ADOCK 05000302 P

PDR

t Florida Power Corporation CRYSTAL RIVER UNIT N0. 3 GENERATING PLANT cc:

Mr. R. Alexander Glenn Senior Resident Inspector Corporate Counsel Crystal River Unit 3 Florida Power Corporation U.S. Nuclear Regulatory Commission MAC-A5A 6745 N. Tallahassee Road P.O. Box 14042 Crystal River, Florida 34428 St. Petersburg, Florida 33733-4042 Regional Administrator, Region II Mr. Bruce J. Hickle, Director U.S. Nuclear Regulatory Commission Nuclear Plant Operations (NA2C) 101 Marietta Street NW., Suite 2900 Florida Power Corporation Atlanta, Georgia 30323 Cryst::.1 River Energy Complex 15760 W. Power Line Street Mr. John P. Cowan Crystal River, Florida 34428-6708 Vice President - Nuclear Production (SA2C)

{

Mr. Robert B. Borsum Florida Power Corporation 1

B&W Nuclear Technologies Crystal River Energy Complex 1

1700 Rockville Pike, Suite 525 15760 W. Power Line Street Rockville, Maryland 20852 Crystal River, Florida 34428-6708 Mr. Bill Passetti Mr. Roy A. Anderson Office of Radiation Control Senior Vice President, i

Department of Health and Nuclear Operations Rehabilitative Services Florida Power Corporation 1317 Winewood Blvd.

ATTN: Manager, Nuclear Licensing Tallahassee, Florida 32399-0700 Crystal River Energy Complex (SA2A) 15760 W. Power Line Street Attorney General Crystal River, Florida 34428-6708 Department of Legal Affairs The Capitol Mr. Kerry Landis Tallahassee, Florida 32304 U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W. Suite 2900 Mr. Joe Myers, Director Atlanta, Georgia 30323-0199 Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Chairman Board of County Commissioners Citrus County 110 North Apopka Avenue Iverness, Florida 34450-4245 Mr. David F. Kunsemiller, Director Nuclear Operations Site Support (SA2A)

Florida Power Corporation Crystal River Energy Complex 15760 W. Power Line Street Crystal River, Florida 34428-6708

],-

e I

i i

AGENDA CRYSTAL RIVER 3 - MARCH 18, 1997 MEETING i

HIGH PRESSURE INJECTION AND SMALL BREAK LOCA ISSUES i

l 1.

SINGLE FAILURE FLOW PATHS i

LOCA ANALYSIS HPI ISOLATION CRITERIA i

EFW FLOW / INVENTORY i

EFW OTSG COOLING TIME l

EDG CAPACITY / LOAD MANAGEMENT

)

2.

SAFETY ASSESSMENT i

i j

3.

SBLOCA ANALYSIS l

i 4.

UNREVIEWED SAFETY QUESTIONS 4

l 5.

FPC'S RESTART PLAN 6.

PLANT MODIFICATIONS /SIGNIFICANT PLANT CHANGE l

7.

SCHEDULE AND

SUMMARY

~

l I

~. -. _ _.

,. m a

I

~

DISTRIBUTION FOR MEETING NOTICE DATED FEBRUARY 26. 1997:

i i

E-Mail S. Collins /F. Miraglia (SLC1,FJM)

R. Zimmerman (RPZ)

S. Varga (SAV,RCN)

D. Ross (SAM)

OPA (OPA)

J. Lyons (JEL)

M. Chatterton (MSCI) i F. Orr (FRO)

C. Grimes (CSG)

G. Hubbard (GTH)

W. Lefave (WTL1)

D. Thatcher (DFT) l N. Saba (DFT) i J. Jaudon (JPJ)

F. Hebdon (FJH) 1 L. Raghavan (LXRI)

{

B. Clayton (BAC2)

J. Johnson, RII (JPJ)

G. Tracy (GMT)

K. Clark (KMC2), Region II PMNS (Meeting Announcement Coordinator)

~

Hard Coov i

Docket File

'PUBLIC-i Crystal River Rog.

OGC ACRS Receptionist- (0WFN and TWFN) l