T January 16, 1997 1

MEMORANDUM T0:

File FROM:

L. Raghavan, Project Manager d

~

);

Project Directorate II-3 ~

i Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation i

SUBJECT:

CRYSTAL RIVER NUCLEAR GENERATING PLANT UNIT 3 -SPECIAL REPORT -

SEISMIC MONITORING INSTRUMENTATION (TAC N0. M96482) f By letter dated August 28, 1996, Florida Power Corporation (FPC) i submitted a 30-day Special Report No. 96-03 and informed the NRC staff of its plan to abandon two peak seismic monitoring instruments.

Per attached note from R. Rothman, Geosciences Branch to L. Raghavan, Project Manager, the FPC's l

plan is found acceptable.

ihis completes our effort under TAC M96482 and the j

TAC is closed.

j 1

9 j

Docket No. 50-302

Attachment:

As stated a

4 Distribution:

CR3 R/F 4

f hman j

Docket file l

DOCUMENT NAME:

G:\\ CRYSTAL \\96482.LTR i

To rGceive a copy of this document, indicate in the box:

"C" - Copy without attachment / enclosure "E" - Copy with attachment / enclosure "N" - No copy,

3 j l PDII-3/LA lC PDil 3/D

,l IEI OR M

l OFFICE PDII 3/PM NAME LRaghavan W BClayton A/tA/

FHebdon W' h_

DATE 1/lb/97 1/15/97 1/1G/97

  1. /97 j

OFFICIAL RECORD COPY 210062 t

C)FOI i

9701210433 970116 PDR ADOCK 05000302 4

]

P PDR

.i

4

~

January 6, 1997 NOTE TO:

L. Raghavan, Project Manager Project Directorate II-3 Division of Reactor Projects I/II FROM:

R. Rothman, Chief Geosciences Section Civil Engineering and Geosciences Branch Division of Engineering

SUBJECT:

REVIEW OF FLORIDA POWER CORPORATION SPECIAL REPORT NO. 96-03 Plant Name:

Crystal River Unit 3 Licensee:

Florida Power Corporation TAC No.:

M96482 I have reviewed the Florida Power Corporation (FPC) Special Report No. 96-03,

" Seismic Monitoring Instrumentation Inoperable For Greater Than 30 Days," for Crystal River Unit 3 as you requested.

In Special Report No. 96-03 FPC indicates that it plans to abandon two peak recording accelerographs (SI-4-MEI and SI-5-MEI) in place using the 10CFR50.59 process. This is appropriate, since there does not seem to be an unreviewed safety question involved.

Attachnent