T January 16, 1997 1
MEMORANDUM T0:
File FROM:
L. Raghavan, Project Manager d
~
);
Project Directorate II-3 ~
i Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation i
SUBJECT:
CRYSTAL RIVER NUCLEAR GENERATING PLANT UNIT 3 -SPECIAL REPORT -
SEISMIC MONITORING INSTRUMENTATION (TAC N0. M96482) f By letter dated August 28, 1996, Florida Power Corporation (FPC) i submitted a 30-day Special Report No. 96-03 and informed the NRC staff of its plan to abandon two peak seismic monitoring instruments.
Per attached note from R. Rothman, Geosciences Branch to L. Raghavan, Project Manager, the FPC's l
plan is found acceptable.
ihis completes our effort under TAC M96482 and the j
TAC is closed.
j 1
9 j
Docket No. 50-302
Attachment:
As stated a
4 Distribution:
CR3 R/F 4
f hman j
Docket file l
DOCUMENT NAME:
G:\\ CRYSTAL \\96482.LTR i
To rGceive a copy of this document, indicate in the box:
"C" - Copy without attachment / enclosure "E" - Copy with attachment / enclosure "N" - No copy,
3 j l PDII-3/LA lC PDil 3/D
,l IEI OR M
l OFFICE PDII 3/PM NAME LRaghavan W BClayton A/tA/
FHebdon W' h_
DATE 1/lb/97 1/15/97 1/1G/97
- /97 j
OFFICIAL RECORD COPY 210062 t
C)FOI i
9701210433 970116 PDR ADOCK 05000302 4
]
P PDR
.i
4
~
January 6, 1997 NOTE TO:
L. Raghavan, Project Manager Project Directorate II-3 Division of Reactor Projects I/II FROM:
R. Rothman, Chief Geosciences Section Civil Engineering and Geosciences Branch Division of Engineering
SUBJECT:
REVIEW OF FLORIDA POWER CORPORATION SPECIAL REPORT NO. 96-03 Plant Name:
Crystal River Unit 3 Licensee:
Florida Power Corporation TAC No.:
M96482 I have reviewed the Florida Power Corporation (FPC) Special Report No. 96-03,
" Seismic Monitoring Instrumentation Inoperable For Greater Than 30 Days," for Crystal River Unit 3 as you requested.
In Special Report No. 96-03 FPC indicates that it plans to abandon two peak recording accelerographs (SI-4-MEI and SI-5-MEI) in place using the 10CFR50.59 process. This is appropriate, since there does not seem to be an unreviewed safety question involved.
Attachnent