ML16340B772 | 22 May 1981 | Character of High Frequency Strong Ground Motion. | Earthquake |
ML16340B998 | 19 August 1981 | Evaluation Findings,Diablo Canyon Nuclear Power Plant Offsite Emergency Response Plans Exercise. | |
ML16340C121 | 25 November 1981 | Semimonthly Status Rept Diablo Canyon Seismic Review Program,811112-23. | |
ML16340C359 | 26 February 1982 | Progress Rept of Seismic Svc-Related Contracts Prior to June 1978, Project 105-4,Progress Rept 8 for Work Period 820213-26 | Boric Acid |
ML16341B427 | 3 October 1980 | Nonproprietary Version of Low Power Turbine Disc Info. | |
ML16341B995 | 25 July 1983 | Rev 2 to Verification of Pressure,Temp,Humidity & Submergence Environs Used for Safety-Related Equipment Spec Outside Containment for Auxiliary Feedwater Sys & Control Room Ventilation..., Interim Technical Rept 14 | |
ML17251A481 | 28 February 1989 | Ultrasonic Indication Sizing Technique Development. Related Info Encl | Hydrostatic |
ML17279A191 | 7 April 1987 | Comparision of Electrical Design of Wye Pattern Globe Valve Actuator W/Ball Valve,Hanford 2 & River Bend Design. Five Oversize Drawings Encl | |
ML17347A797 | 16 June 1988 | Seismic Hazard Data Prepared for Resolution of USI A-46. | Earthquake |
ML17347A798 | 16 June 1988 | Radiological Data Prepared for Resolution of USI A-46. | Safe Shutdown Earthquake Earthquake Backfit |
ML17347B462 | 31 December 1989 | App a to USI A-46 & Generic Ltr 87-02. | Safe Shutdown Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Earthquake Backfit |
ML18008A031 | 31 July 1989 | NTH-TR-01 Decrease in Heat Removal by Secondary Sys. | Safe Shutdown Rod Drop Event |
ML18092B497 | 3 April 1987 | S-C-E500-NSE-0675-R-1, Justification for Operation of All Three Units at Artificial Island at Increased Power During Hope Creek-Keeney Line Outage. | |
ML18093A179 | 19 June 1987 | Installation of Trip-A-Unit Protection Scheme Suppl Info Salem & Hope Creek Generating Stations. | |
ML18094A355 | 30 April 1989 | Assessment of Impacts of Salem & Hope Creek Generating Stations on Kemps Ridley (Lepidochelys Kempi) & Loggerhead (Carretta Caretta) Sea Turtles. | Safe Shutdown Earthquake |
ML18130A395 | 10 November 1983 | VEPCO North Anna Power Station & Surry Power Station Compliance W/10CFR50.49(b)(2). | |
ML18139B819 | 31 March 1982 | Nine-Month Response to NRC Ltr Dtd 801220 on Control of Heavy Loads for VEPCO North Anna Units 1 & 2. | Control of Heavy Loads |
ML18139B925 | 30 June 1982 | PWR Safety & Relief Valve Adequacy Rept for North Anna Units 1 & 2. | Loop seal Stroke time |
ML18139C010 | 31 August 1982 | PWR Safety & Relief Valve Test Program,Porv Block Valve Adequacy Rept for Vepco,North Anna Unit 1 & Unit 2. | Stroke time Control of Heavy Loads |
ML18139C291 | 30 April 1982 | Evaluation of Online Boron Analyzers, Final Rept | Boric Acid High Radiation Area Grab sample |
ML18141A468 | 20 January 1984 | Safety Parameter Display Sys SAR for NUREG-0696 Computer Project,North Anna & Surry Nuclear Power Stations. | Boric Acid Shutdown Margin Reactor Vessel Water Level Fuel cladding |
ML18151A135 | 28 August 1987 | Rev 1 to SPDS SAR for VEPCO NUREG-0696 Computer Project, North Anna & Surry Nuclear Power Stations. | Fuel cladding |
ML19256A796 | 4 May 1976 | Specifications,Tests, & Installation of Wires & Cables for the Diablo Canyon Nuclear Power Project, IEEE Rept F 76-430-9.Describes Process of Selecting Wires & Cables & Criteria for Fire & Environ Tests | |
ML19264C782 | 27 February 1982 | Design Verification Program,Seismic Svc Related Contracts Prior to June 1978, Revision 1,Phase I | Safe Shutdown Boric Acid Earthquake |
ML19327B401 | 31 July 1989 | Safety Evaluation for Byron/Braidwood Stations Units 1 & 2 Transition to Westinghouse 17 X 17 Vantage 5 Fuel. | |
ML19331B546 | 12 June 1980 | Dynamic Analysis of El Centro Steam Station Unit 4 for Imperial Valley Earthquake, Draft Rept | Earthquake |
ML20004B685 | 22 May 1981 | Scaling Laws for Large Earthquakes - Consequences for Physical Models. | Earthquake |
ML20005G421 | 28 February 1989 | Reactor Vessel Heatup & Cooldown Limit Curves for Normal Operation. | Hydrostatic |
ML20023A935 | 24 September 1982 | Independent Design Verification Program,Semimonthly Rept,IDVP-SM-Sept 1982 | Boric Acid |
ML20023D146 | 27 August 1982 | Rev 0 to Assessment of Stitch Weld Strength in HVAC Ductwork Const,Lasalle County Station Units 1 & 2. | |
ML20023D213 | 25 August 1982 | Rev 1 to LaSalle County Station Technical Proposal, Including Scope of Work,Work Plan to Accomplish Independent HVAC Review,Organization Chart & Resumes of Personnel Assigned to Project.List of Matl Specs for HVAC Const Encl | Coatings Nondestructive Examination Liquid penetrant Scaffolding |
ML20023E221 | 15 March 1983 | Priority Concerns of Licensed Nuclear Operators at TMI & Oyster Creek & Suggested Action Steps, Final Rept | |
ML20023E223 | 28 February 1983 | Review of Current & Projected Expenditures & Manpower Utilization for Gpu Nuclear Corp. | |
ML20024B306 | 30 April 1983 | Determining Portion of Regulatory Burden on Indian Point 3 Capital & O&M Expenditures 1976 - 1986:10-Yr Cost Projection Also Included. | Hydrostatic Probabilistic Risk Assessment |
ML20024D083 | 25 July 1983 | Rev 2 to Verification of Instrument & Control Design of Control Room Ventilation & Pressurization Sys, Interim Technical Rept 28 | |
ML20028D958 | 13 December 1982 | Verification of Fire Protection Provided for Auxiliary Feedwater Sys,Control Room Ventilation & Pressurization Sys, Safety-Related Portion of 4,160 Volt Electric Sys, Interim Technical Rept 18,Rev 0 | Safe Shutdown Boric Acid Earthquake Turbine Missile |
ML20028F728 | 8 August 1977 | Control Complex Bldg High Strength Bolting Operation Insp & Testing Checkoff Sheet | |
ML20039G253 | 31 August 1981 | Emergency Plan Evaluation Rept on Diablo Canyon Nuclear Power Plant,Pg&E Emergency Plan Dtd Aug 1981. | |
ML20040D776 | 15 January 1982 | 180-Day Rept in Response to IE Bulletin 80-11 for Dresden Nuclear Power Station,Units 2 & 3. | |
ML20040D780 | 15 January 1982 | 180-Day Rept in Response to IE Bulletin 80-11 for Quad Cities Nuclear Power Station,Units 1 & 2. | |
ML20040H493 | 4 February 1982 | Vent Stack Reanalysis Rept. | |
ML20041E351 | 31 January 1981 | Evaluation of Jm Farley Nuclear Plant. | Coatings |
ML20041E352 | 31 January 1981 | Evaluation of El Hatch Nuclear Plant. | Packing leak |
ML20041F269 | 12 March 1982 | Licensing Review Group II Position Papers, Vol IV | Safe Shutdown |
ML20042C128 | 24 March 1982 | BWR Control Rod Drive Sys Vessel Inventory Makeup Rate Aspects of NUREG-0619. | Safe Shutdown Reactor Vessel Water Level Fire Barrier Earthquake |
ML20052A254 | 8 April 1982 | Public Version of Emergency Operations Facility. | |
ML20052F247 | 6 July 1980 | Draft Revision 1 to Rept & Safety Evaluation of Browns Ferry Unit 3 Partial Scram Failure of 800628. | Loop seal Half scram Hydrostatic Scram Discharge Volume |
ML20053D396 | 28 May 1982 | Verification Program, Semimonthly Rept 14 | Boric Acid |
ML20054D854 | 30 April 1982 | Paleomagnetic Investigation of Pre-Missoula Gravels,Pasco Basin & Vicinity,Wa. | |
ML20054F070 | 30 April 1982 | Bryon/Braidwood Stations - Units 1 & 2,Inadequate Core Cooling Detection Sys Summary Status Rept | Safe Shutdown Fuel cladding |