Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML16340B77222 May 1981Character of High Frequency Strong Ground Motion.Earthquake
ML16340B99819 August 1981Evaluation Findings,Diablo Canyon Nuclear Power Plant Offsite Emergency Response Plans Exercise.
ML16340C12125 November 1981Semimonthly Status Rept Diablo Canyon Seismic Review Program,811112-23.
ML16340C35926 February 1982Progress Rept of Seismic Svc-Related Contracts Prior to June 1978, Project 105-4,Progress Rept 8 for Work Period 820213-26Boric Acid
ML16341B4273 October 1980Nonproprietary Version of Low Power Turbine Disc Info.
ML16341B99525 July 1983Rev 2 to Verification of Pressure,Temp,Humidity & Submergence Environs Used for Safety-Related Equipment Spec Outside Containment for Auxiliary Feedwater Sys & Control Room Ventilation..., Interim Technical Rept 14
ML17251A48128 February 1989Ultrasonic Indication Sizing Technique Development. Related Info EnclHydrostatic
ML17279A1917 April 1987Comparision of Electrical Design of Wye Pattern Globe Valve Actuator W/Ball Valve,Hanford 2 & River Bend Design. Five Oversize Drawings Encl
ML17347A79716 June 1988Seismic Hazard Data Prepared for Resolution of USI A-46.Earthquake
ML17347A79816 June 1988Radiological Data Prepared for Resolution of USI A-46.Safe Shutdown Earthquake
Earthquake
Backfit
ML17347B46231 December 1989App a to USI A-46 & Generic Ltr 87-02.Safe Shutdown
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Earthquake
Backfit
ML18008A03131 July 1989NTH-TR-01 Decrease in Heat Removal by Secondary Sys.Safe Shutdown
Rod Drop Event
ML18092B4973 April 1987S-C-E500-NSE-0675-R-1, Justification for Operation of All Three Units at Artificial Island at Increased Power During Hope Creek-Keeney Line Outage.
ML18093A17919 June 1987Installation of Trip-A-Unit Protection Scheme Suppl Info Salem & Hope Creek Generating Stations.
ML18094A35530 April 1989Assessment of Impacts of Salem & Hope Creek Generating Stations on Kemps Ridley (Lepidochelys Kempi) & Loggerhead (Carretta Caretta) Sea Turtles.Safe Shutdown
Earthquake
ML18130A39510 November 1983VEPCO North Anna Power Station & Surry Power Station Compliance W/10CFR50.49(b)(2).
ML18139B81931 March 1982Nine-Month Response to NRC Ltr Dtd 801220 on Control of Heavy Loads for VEPCO North Anna Units 1 & 2.Control of Heavy Loads
ML18139B92530 June 1982PWR Safety & Relief Valve Adequacy Rept for North Anna Units 1 & 2.Loop seal
Stroke time
ML18139C01031 August 1982PWR Safety & Relief Valve Test Program,Porv Block Valve Adequacy Rept for Vepco,North Anna Unit 1 & Unit 2.Stroke time
Control of Heavy Loads
ML18139C29130 April 1982Evaluation of Online Boron Analyzers, Final ReptBoric Acid
High Radiation Area
Grab sample
ML18141A46820 January 1984Safety Parameter Display Sys SAR for NUREG-0696 Computer Project,North Anna & Surry Nuclear Power Stations.Boric Acid
Shutdown Margin
Reactor Vessel Water Level
Fuel cladding
ML18151A13528 August 1987Rev 1 to SPDS SAR for VEPCO NUREG-0696 Computer Project, North Anna & Surry Nuclear Power Stations.Fuel cladding
ML19256A7964 May 1976Specifications,Tests, & Installation of Wires & Cables for the Diablo Canyon Nuclear Power Project, IEEE Rept F 76-430-9.Describes Process of Selecting Wires & Cables & Criteria for Fire & Environ Tests
ML19264C78227 February 1982Design Verification Program,Seismic Svc Related Contracts Prior to June 1978, Revision 1,Phase ISafe Shutdown
Boric Acid
Earthquake
ML19327B40131 July 1989Safety Evaluation for Byron/Braidwood Stations Units 1 & 2 Transition to Westinghouse 17 X 17 Vantage 5 Fuel.
ML19331B54612 June 1980Dynamic Analysis of El Centro Steam Station Unit 4 for Imperial Valley Earthquake, Draft ReptEarthquake
ML20004B68522 May 1981Scaling Laws for Large Earthquakes - Consequences for Physical Models.Earthquake
ML20005G42128 February 1989Reactor Vessel Heatup & Cooldown Limit Curves for Normal Operation.Hydrostatic
ML20023A93524 September 1982Independent Design Verification Program,Semimonthly Rept,IDVP-SM-Sept 1982Boric Acid
ML20023D14627 August 1982Rev 0 to Assessment of Stitch Weld Strength in HVAC Ductwork Const,Lasalle County Station Units 1 & 2.
ML20023D21325 August 1982Rev 1 to LaSalle County Station Technical Proposal, Including Scope of Work,Work Plan to Accomplish Independent HVAC Review,Organization Chart & Resumes of Personnel Assigned to Project.List of Matl Specs for HVAC Const EnclCoatings
Nondestructive Examination
Liquid penetrant
Scaffolding
ML20023E22115 March 1983Priority Concerns of Licensed Nuclear Operators at TMI & Oyster Creek & Suggested Action Steps, Final Rept
ML20023E22328 February 1983Review of Current & Projected Expenditures & Manpower Utilization for Gpu Nuclear Corp.
ML20024B30630 April 1983Determining Portion of Regulatory Burden on Indian Point 3 Capital & O&M Expenditures 1976 - 1986:10-Yr Cost Projection Also Included.Hydrostatic
Probabilistic Risk Assessment
ML20024D08325 July 1983Rev 2 to Verification of Instrument & Control Design of Control Room Ventilation & Pressurization Sys, Interim Technical Rept 28
ML20028D95813 December 1982Verification of Fire Protection Provided for Auxiliary Feedwater Sys,Control Room Ventilation & Pressurization Sys, Safety-Related Portion of 4,160 Volt Electric Sys, Interim Technical Rept 18,Rev 0Safe Shutdown
Boric Acid
Earthquake
Turbine Missile
ML20028F7288 August 1977Control Complex Bldg High Strength Bolting Operation Insp & Testing Checkoff Sheet
ML20039G25331 August 1981Emergency Plan Evaluation Rept on Diablo Canyon Nuclear Power Plant,Pg&E Emergency Plan Dtd Aug 1981.
ML20040D77615 January 1982180-Day Rept in Response to IE Bulletin 80-11 for Dresden Nuclear Power Station,Units 2 & 3.
ML20040D78015 January 1982180-Day Rept in Response to IE Bulletin 80-11 for Quad Cities Nuclear Power Station,Units 1 & 2.
ML20040H4934 February 1982Vent Stack Reanalysis Rept.
ML20041E35131 January 1981Evaluation of Jm Farley Nuclear Plant.Coatings
ML20041E35231 January 1981Evaluation of El Hatch Nuclear Plant.Packing leak
ML20041F26912 March 1982Licensing Review Group II Position Papers, Vol IVSafe Shutdown
ML20042C12824 March 1982BWR Control Rod Drive Sys Vessel Inventory Makeup Rate Aspects of NUREG-0619.Safe Shutdown
Reactor Vessel Water Level
Fire Barrier
Earthquake
ML20052A2548 April 1982Public Version of Emergency Operations Facility.
ML20052F2476 July 1980Draft Revision 1 to Rept & Safety Evaluation of Browns Ferry Unit 3 Partial Scram Failure of 800628.Loop seal
Half scram
Hydrostatic
Scram Discharge Volume
ML20053D39628 May 1982Verification Program, Semimonthly Rept 14Boric Acid
ML20054D85430 April 1982Paleomagnetic Investigation of Pre-Missoula Gravels,Pasco Basin & Vicinity,Wa.
ML20054F07030 April 1982Bryon/Braidwood Stations - Units 1 & 2,Inadequate Core Cooling Detection Sys Summary Status ReptSafe Shutdown
Fuel cladding