LER 94-008-00:on 940613,B Safety Injection Pump Was Declared Inoperable During Monthly Surveillance Test.Caused by Broken Motor Rotor Bar.B SI Pump Motor Rotor Bars Were Replaced & B SI Pump Motor Was reassembled.W/940713 Ltr
ML17263A730
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/13/1994
From: MARTIN J T, MECREDY R C
ROCHESTER GAS & ELECTRIC CORP.
To: JOHNSON A R
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LER-94-008, LER-94-8, NUDOCS 9407200011
Download: ML17263A730 (10)


Text

IR.ZuR.zavCCELERATED RIDSPROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM(RIDS)ACCESSION NBR:9407200011 DOC.DATE:

94/07/13NOTARIZED:

NODOCKETFACIL:50-244 RobertEmmetGinna,Nuclear Plant,Unit1,Rochester G05000244AUTH.NAMEAUTHORAFFILIATION MARTIN,J.T.

Rochester Gas&ElectricCorp.MECREDY,R.C.

Rochester Gas&ElectricCorp.RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.

DocumentControlBranch(Document ControlDesk)

SUBJECT:

LER94-008-00:on 940613,"B" safetyinjection pumpwasdeclaredinoperable duringmonthlysurveillance test.Causedbybrokenmotorrotorbar."B"SIpumpmotorrotorbarswerereplaced&"B"SIpumpmotorwasreassembled.W/940713 ltr.DISTRIBUTION CODE:IE22TCOPIESRECEIVED:LTR JENCL(SIZE:TITLE:50.73/50.9 LicenseeEventReport(LER),IncidentRpt,etc.NOTES:License Expdatei'naccordance with10CFR2,2.109(9/19/72)

.05000244RECIPIENT IDCODE/NAME PD1-3PDINTERNAL:

AEOD/DSP/TPAB NRR/DE/EELB NRR/DORS/OEAB NRR/DRCH/HXCB NRR/DRSS/PRPB NRRDSSA/SRXB 02RGB.ILE01EXTERNAL:

EG&GBRYCE,J.H NRCPDRNSICPOOREIWCOPXESLTTRENCL111111111122111111221111RECIPIENT IDCODE/NAME JOHNSON,A AEOD/ROAB/DSP NRR/DE/EMEB NRR/DRCH/HHFB NRR/DRCH/HOLB NRR/DSSA/SPLB NRR/PMAS/XRCB-E RES/DSIR/EIB LSTLOBBYWARDNSICMURPHY,G.A NUDOCSFULLTXTCOPIESLTTRENCL11221111111.11111111111~8g>gqsj9tQ/NOTETOALL"RIDS"RECIPIENTS:

PLEASEHELPUSTOREDUCEKVASTE!CONTACTTHEDOCUMENTCONTROLDESK,ROOMPl-37(EXT.504-2083)TOELIMINATE YOURNAMEFROMDISTRIBUTION LISTSFORDOCUMENTS YOUDON'TNEEDlFULLTEXTCONVERSION REQUIREDTOTALNUMBEROFCOPIESREQUIRED:

LTTR26ENCL26 fROCHESTER GASANDELECTRICCORPORATION o89EASTAVENUE,ROCHESTER N.K14649-0001 ionk5kkkkROBERTC.MECREDYV<<ePie>iden<

CinnaNuaeacRkoduedon TELEPHOkE AAEACODE7165462700July13,1994U.S.NuclearRegulatory Commission DocumentControlDeskAttn:AllenR.JohnsonProjectDirectorate I-3Washington, D.C.20555

Subject:

LER94-008,"B"SIPumpDeclaredInoperable DuetoBrokenMotorRotorBar,CausesCompletion ofaPlantShutdownRequiredbyTechnical Specifications R.E.GinnaNuclearPowerPlantDocketNo.50-244Inaccordance with10CFR50.73,LicenseeEventReportSystem,item(a)(2)(i)(A),whichrequiresareportof,"Thecompletion ofanynuclearplantshutdownrequiredbytheplant'sTechnical Specifications",

theattachedLicenseeEventReportLER94-008isherebysubmitted.

Thiseventhasinnowayaffectedthepublic'shealthandsafety.Verytrulyyours,RobertC.Mecredyxc:U.S.NuclearRegulatory Commission RegionI475Allendale RoadKingofPrussia,PA19406GinnaSeniorResidentInspector eZrAZan&-i~~A94072000ii 9407i3PDRADDCK05000244PDR NRCFORH366(5-92)U.S.NUCLEARREGULATORY COMHISSION APPROVEDBYOMBNO.3150-0104 EXPIRES5/31/95LICENSEEEVENTREPORT(LER)(Seereverseforrequirednunberofdigits/characters foreachblock)ESTIMATED BURDENPERRESPONSETOCOHPLYWITHTHISINFORMATION COLLECTION REOUEST:50.0HRS.FORWARDCOHMENTSREGARDING BURDENESTIHATETOTHEIHFORMATION ANDRECORDSHANAGEHENT BRANCH(MNBB7714),U.S.NUCLEARREGULATORY COMHISSION, WASHINGTON, DC20555000'I,ANDTOTHEPAPERWORK REDUCTION PROJECT(31500104),OFFICEOFMAHAGEMENT ANDBUDGETWASHINGTON DC20503.FAcILITYHAHE(1)R.E~GinnaNuclearPowerPlantDOCKETNUHBER(2)05000244PAGE(3)1OF8TITLE(4)<>SlPumpDeclaredInoperable DuetoBrokenMotorRotorBar,CausesCompletion ofaPlantShutdownRequiredbyTechnical Specification EVENTDATE5LERNUMBER6REPORTDATE7OTHERFACILITIES INVOLVED8HONTH06DAYYEAR1394YEAR94SEOUENTIAL NUHBER--008--REVISIOHNUMBER00MONTH07DAYYEAR1394FACILITYHAMEFACILITYNAMEDOCKETNUHBERDOCKETNUMBEROPERATING M(NE(9)NTHISREPORTISSUBHITTED PURSUANT20.402(b) 20.405(c) 50.73(a)(2)(iv) 73.7'l(b)

TOTHEREQUIREMENTS OF10CFR:Checkoneormore11P(NERLEVEL(10)09720.405(a)(1)(i)20'05(a)(1)(ii) 20.405(a)(1)(iii) 20.405(a)(1)(iv) 20.405(a)(1)(v) 50.36(c)(1)50.36(c)(2) 50.73(a)(2)(i) 50.73(a)(2)(ii) 50.73(a)(2)(iii)

LICENSEECONTACTFORTHISLER1250.73(a)(2)(v) 50.73(a)(2)(vii) 50.73(a)(2)(viii)(A) 50.73(a)(2)(viii)(B) 50.73(a)(2)(x) 73.71(c)OTHER(SpecifyinAbstractbelowandinText,NRCForm366AHAMEJohnT.St.Martin-Director, Operating Experience TELEPHONE NUMBER(IncludeAreaCode)(315)524.4446CNIPLETEONELINEFOREACHCOMPONENT FAILUREDESCRIBED INTHISREPORT13CAUSESYSTEHCOHPONENT HANUFACTURER REPORTABLE TONPRDSCAUSESYSTEHCOMPONENT HANUFACTURER REPORTABLE TONPRDSBQMOW120SUPPLEMENTAL REPORTEXPECTED14YES(Ifyes,conpieteEXPECTEDSUBMISSION DATE).XHOEXPECTEDSUBHISSIOHDATE(15)HONTHDAYYEARABSTRACT(Limitto1400spaces,i.e.,approximately 15single-spaced typewritten tines)(16)OnJune10,1994,atapproximately 1349EDST,withtheplantatapproximately 97%steadystatepower,the"B"safetyinjection pumpwasdeclaredinoperable duringperformance ofthemonthlysurveillance test.OnJune13,1994,atapproximately 1614EDST,thereactorwasplacedinthehotshutdowncondition tocomplywithGinnaTechnical Specifications forsafetyinjection pumpoperability requirements.

Theunderlying causeoftheshutdownwasinoperability ofthe"B"safetyinjection pump,duetoabrokenmotorrotorbar.ThiseventisNUREG-1022CauseCode(B),"Design,Manufacturing, Construction/Installation."

Corrective actiontoprecluderepetition isoutlinedinSectionV(B).NRCFORM366(5-92)

NRCFORM366A(5.92)U.S.NUCLEARREGULATORY COMMISSION LICENSEEEVENTREPORT(LER)TEXTCONTXNUATION APPROVEDBYOMBNO.3150-0104 EXP'IRES5/31/95ESTIMATED BURDENPERRESPONSETOCOMPLYWITHTHISINFORMATION COLLECTIOH REQUEST:50.0MRS.FORNARDCOMMENTSREGARDIHG BURDEHESTIMATETOTHEINFORMATIOH ANDRECORDSMANAGEMENT BRANCH(MNBB7714),U.S.NUCLEARREGULATORY COMMISSION, WASHINGTON, DC20555-0001 ANDTOTHEPAPERWORK REDUCTION PROJECT(31/0-0104),

OFFICEOFMANAGEMENT AHDBUDGETUASHINGTOH DC20503.FACILITYNAME1R.E.GinnaNuclearPowerPlantDOCKETNUMBER205000244LERNUMBER6SEQUENTIAL 94--008--REVISIOH00PAGE32OF8TEXT(Ifmorespaceisrequired, useadditional copiesofNRCForm366A)(17)PRE-EVENT PLANTCONDITIONS OnJune10,1994,theplantwasatapproximately 97%steadystatereactorpower.ResultsandTestpersonnel wereperforming the,monthlysurveillance testofthesafetyinjection (SI)pumps,inaccordance withsurveillance testprocedure PT-2.1M,"SafetyInjection SystemMonthlyTest."Testingofthe"A"SXpumphadjustbeencompleted withsatisfactory results,andtestingofthe"B"SIpumpwasinitiated.

Atapproximately 1349EDST,the"B"SIpumpwasstartedforthemonthlytest.Whenthemotorwasstarted,afewsparkswerenotedcomingfromthemotor.(Asthemotorcameuptospeed,thesparksstopped.)

ControlRoomoperators wereimmediately notifiedofthesparkingcondition, andpromptlydeenergized the"B"SIpumpmotor.The"B"SIpumpwasthendeclaredinoperable.

Thedeclaration ofinoperability placedtheplantintoaTechnical Specification (TS)LimitingCondition forOperation (LCO)forTS3.3.1.4.Theactionstatement ofTS3.3.1.4allowsoneSIpumptobeinoperable forupto72hours.Ifthepumpisnotoperableafter72hours,thereactorshallbeplacedinhotshutdownwithinthefollowing 6hoursandbelowareactorcoolantsystem(RCS)temperature of350degreesFwithinanadditional 6hours.Immediate corrective maintenance wasinitiated.

The"B"SIpumpmotorwasdisassembled andinspected.

Initialvisualinspection byplantandengineering personnel identified thatseveralrotorbarsshowedcrackindications, andonebarappearedtobefullycrackedandbroken.Therotorwaspackagedandshippedoffsiteforrepairs.XI.DESCRIPTION OFEVENTA.DATESANDAPPROXIMATE TIMESOFMAJOROCCURRENCES:

oJune10,1994,1349EDST:The"B"SIpumpisdeclaredinoperable.

oJune13,1994,1115EDST:Commenced areactorshutdowntohotshutdown, anddeclaredanUnusualEvent.NRCFORM366A(5-92)

NRCFORH366A(5-92)U.S.NUCLEARREGULATORY COMMISSION LICENSEEEVENTREPORT(LER)TEXTCONTINUATION APPROVEDBYOHBHO.3150-0104 EXPIRES5/31/95ESTIHATED BURDENPERRESPONSETOCOMPLYWITHTHISINFORHATION COLLECTION REOUEST:50.0HRS.FORWARDCOHHENTSREGARDING BURDENESTIHATETOTHEINFORMATION ANDRECORDSMANAGEMENT BRANCH(HNBB7714),U.S.NUCLEARREGULATORY COMMISSION, WASHINGTON, DC20555-0001, ANDTOTHEPAPERWORK REDUCTION PROJECT(3150-0104),

OFFICEOFHANAGEHEHT ANDBUDGETWASHINGTON DC20503.FACILITYHAHE1R.E.GinnaNuclearPowerPlantDOCKETNUMBER205000244LERNUHBER6YEARSEOUEHTIAL 94--008--REVISIOH00PAGE33OF8TEXT(Ifmorespaceisrequired, useadditional copiesofNRCForm366A)(17)o0June13,1994,1614EDST:Thereactorisinthehotshutdowncondition, withallcontrolrodsinsertedandbothreactortripbreakersopen.Eventdateandtime.June13,1994,1614EDST:Discovery dateandtime.oJune13,1994,2157EDST:TheplantisbelowRCStemperature of350degreesF.oJune13,1994,2159EDST:UnusualEventterminated.

B.EVENT:OnthemorningofJune13,1994,the"B"SIpumpmotorrotorwasatanoffsitemotorrepairfacility.

Detailedinspections performed attheoffsitefacilityconfirmed thatone(1)barwasbroken,andtwo(2)otherbarswerecracked.(Thisbrokenbarwasthecauseofthesparkingobservedduringmotorstart.)Repairswerenotabletobecompleted withinthenextseveralhoursonJune13,norwasaqualified sparerotorlocatedbythistime.TheAllowable OutageTime(AOT)ofTS3.3.1.4requiredthereactortobeinhotshutdownbefore1949EDSTonJune13,1994,andbelowaRCStemperature of350degreesFbefore0149EDSTonJune14.Plantmanagement directedthatthereactorbeshutdownandcooleddownwithintheAOToftheTSLCO.OnJune13,1994,atapproximately 1115EDST,withthereactoratapproximately 97sosteadystatereactorpower,theShiftSupervisor declaredanUnusualEvent,asrequiredbytheGinnaStationNuclearEmergency ResponsePlanandprocedure EPIP-1.0, "GinnaStationEventEvaluation andClassification."

Thiswasbasedoninitiating condition "LossofEngineered SafetyFeatures",

forthespecificsituation of"initiation ofaplantshutdownrequiredbyTechSpecsduetolossofEngineered SafetyFeatureforECCS".Atthistime,theShiftSupervisor directedtheControlRoomoperators toinitiatetheshutdownandcooldowntomeettheLCOofTS3.3.1.4.NRCFORM366A(5.92)

NRCFORH366A(5-92)U.S.NUCLEARREGULATORY COHHISSIOH LICENSEEEVENTREPORT(LER)TEXTCONTINUATION APPROVEDBYOMBNO.3150-0104 EXPIRES5/31/95ESTIMATED BURDENPERRESPONSETOCOHPLYWITHTHISINFORMATION COLLECTION REQUEST:50'HRS.FORWARDCOMMENTSREGARDING BURDENESTIMATETOTHEINFORHATION ANDRECORDSMANAGEMENT BRANCH(MNBB7714),U.S.NUCLEARREGULATORY COMHISSIONi WASHINGTON, DC20555-0001 ANDTOTHEPAPERWORK REDUCTIOH PROJECT(31(00104),OFFICEOFMANAGEMENT ANDBUDGETWASHINGTON DC20503.FACILITYNAME1R.E.GinnaNuclearPowerPlantDOCKETNUHBER205000244LERNUMBER6'YEARSEQUENTIALM94--008--REVISION00PAGE34OF8TEXT(Ifmorespaceisrequired, useadditional copiesofNRCForm366A)(1/)Theshutdownandsubsequent cooldownwereperformed inaccordance withnormaloperating procedures 0-2.1,"NormalShutdowntoHotShutdown" and0-2.2,"PlantShutdownfromHotShutdowntoColdCondition."

Theshutdownproceeded inanormalmanner,andthereactorwasplacedinthehotshutdowncondition atapproximately 1614EDST,withallcontrolrodsinsertedandbothreactortripbreakersopen.TheRCSwascooleddownbelow350degreesFatapproximately 2157EDSTonJune13,1994.WiththeRCSbelowatemperature of350degreesF,theplantwasinastablecondition withnoTSLCOactionstatements ineffectfortheSIpumps.At.approximately 2159EDST,theUnusualEventwasterminated inaccordance withemergency planimplementing procedures.

C.INOPERABLE STRUCTURES, COMPONENTS, ORSYSTEMSTHATCONTRIBUTED TOTHEEVENT:The<<B"SIpumpwasinoperable fromapproximately 1349EDSTonJune10,1994,untilapproximately 1518EDSTonJune15,1994.D.OTHERSYSTEMSORSECONDARY FUNCTIONS AFFECTED:

NoneE.METHODOFDISCOVERY:

Thecompletion oftheplantshutdown(theevent)waspreplanned andself-evident.

Theneedforthereactortobeinhotshutdownbefore1949EDSTonJune13,1994,wasrecognized onJune10.OnJune13,itwasknownthatrepairswouldnotbecompleted withintheAOTofTS3.3.1.4.Thiswasthebasisforinitiating areactorshutdownatapproximately 1115EDSTonJune13.Thecompletion oftheshutdownatapproximately 1614EDST,requiredbyTS,isreportable totheNRC.NRCFORM366A(5-92)

NRCFORH366A(5-92)U.S.NUCLEARREGULATORY COHHISSIOH LICENSEEEVENTREPORT(LER)TEXTCONTINUATION APPROVEDBYOHBHO.3150-0104 EXPIRES5/31/95ESTIMATED BURDEHPERRESPONSETOCOHPLYWITHTHISINFORMATION COLLECTION REOUEST:5D.ONRS.FORWARDCOHHENTSREGARDING BURDENESTIHATETOTHEINFORHATION ANDRECORDSHANAGEHENT BRANCH(HNBB7714),U.S.NUCLEARREGULATORY COHHISSION,

'WASHINGTON, DC20555-0001 ANDTOTHEPAPERWORK REDUCTION PROJECT(31400104),OFFICEOFHANAGEHEHT ANDBUDGET'WASHIHGTON DC20503.FACILITYNAHE1R.E.GinnaNuclearPowerPlantDOCKETNUHBER2YEAR0500024494--008--00LERNUHBER6SEOUENTIAL REVISIONPAGE35OF8TEXT(Ifmorespaceisrequired, useadditional copiesofHRCForm366A)(17)F.OPERATORACTION:TheControlRoomoperators immediately securedthe"B"SIpumpbydeenergizing thepumpmotoronJune10,anddeclaredthepumpinoperable.

OnJune13,anUnusualEventwasdeclared.

TheControlRoomoperators shut,downandcooleddowntheplantinaccordance withnormaloperating procedures.

TheControlRoomoperators'notified theNRCoftheinitiation ofthereactorshutdownanddeclaration oftheUnusualEventatapproximately 1151EDSTonJune13,asrequiredby10CFR50.72(a)(1)(i)and50.72(b)(1)(i)(A).Allappropriate agencieswerenotifiedofthedeclaration oftheUnusualEvent.TheControlRoomoperators notifiedtheNRCandallappropriate agenciesafterthetermination oftheUnusualEvent.G.SAFETYSYSTEMRESPONSES:

NoneIII.CAUSEOFEVENTA.IMMEDIATE CAUSE:Theimmediate causeofthereactorshutdownwastheneedtomeettheTSLCOofTS3.3.1.4foroneSIpumpinoperable.

The"B"SIpumphadbeendeclaredinoperable atapproximately 1349EDSTonJune10,1994,andtheAOTofTS3.3.1.4requiredthat,withoneSIpumpinoperable, thereactorbeplacedinhotshutdownbefore1949EDSTonJune13,1994.B.INTERMEDIATE CAUSE:NTheintermediate causeofthe"B"SIpumpbeingdeclaredinoperable wasduetosparkscomingfromthemotorduringmotorstarting.

HRCFORH366A(5-92)

NRCFORM366A(5-92)U.S.NUCLEARREGULATORY COMMISSION LZCENSEEEVENTREPORT(LER)TEXTCONTINUATION APPROVEDBYOMBNO.3150-0104 EXPIRES5/31/95ESTIMATED BURDENPERRESPONSETOCOMPLYWITHTHISINFORMATION COLLECTION REQUEST:50.0HRS.FORWARDCOMMENTSREGARDING BURDENESTIMA'IE TOTHEINFORMATION ANDRECORDSMANAGEMENT BRANCH(MNBB7714),U.S.HUCLEARREGULATORY COMMISSIOH, WASHIHGTON, DC20555-0001 ANDTOTHEPAPERWORK REDUCTION PROJECT(3140.0104),

OFFICEOFMANAGEMENT ANDBUDGETWASHINGTON DC20503.FACILITYNAME1R.E.GinnaNuclearPowerPlantDOCKETNUMBER20500024494--008--00LERNUMBER6YEARSEQUENTIAL REVISIONPAGE36OF8TEXT(Ifmorespaceisrequired, useadditional copiesofNRCForm366A)(17)C.ROOTCAUSE:Theunderlying causeofthesparkscomingfromthemotorofthe"B"SZpumpwasdetermined tobeabrokenmotorrotorbar.Thecrackingthatleadstobrokenbarsisduetofatiguecausedbythenumberofstresscyclesimposedontherotorbars.Theprincipal contributor tostresscyclesinthemotorrotor(squirrel cage)isthemagneticstressesexperienced duringmotorstarting.

Thefrequency ofmotorstartscouldsignificantly reducetheexpectedservicelifeofthemotorrotors.ThiseventisNUREG-1022 CauseCode(B),"Design,Manufacturing, Construction/Znstallationu.

IV.ANALYSISOFEVENTThiseventisreportable inaccordance with10CFR50.73,LicenseeEventReportSystem,item(a)(2)(i)(A),whichrequiresareportof,"Thecompletion ofanynuclearplantshutdownrequiredbytheplant'sTechnical Specifications."

Anassessment wasperformed considering boththesafetyconsequences andimplications ofthisevent.withthefollowing resultsandconclusions:

oTherewerenooperational orsafetyconsequences orimplications attributed tothe"B"SIpumpmotorrotorsparkingbecausepumpmotorfailuredidnotoccur.Znaddition, thesparkingdidnotcontinueafterthestartofthepump.The"B"SIpumpmotorwasimmediately deenergized andthepumpwasdeclaredinoperable.

oTheplantcontinued tooperateinaccordance withtheLCOofTS3.3.1.4forthenext72hours.Thecrackedrotorbarwasnotrepairable withinthis72hourAOT,sothereactorwasplacedinhotshutdownwithinthefollowing 6hoursandbelowaRCStemperature of350degreesFwithinanadditional 6hoursperTS.Thereactorwasoperatedwithintherequirements oftheTSatalltimes.HRCFORM366A(5-92)

HRCFORH366A(5-92)U.S.NUCLEARREGULATORY COMMISSION LICENSEEEVENTREPORT(LER)TEXTCONTINUATION APPROVEDBYOMBNO.3150-0104 EXPIRES5/31/95ESTIMATED BURDENPERRESPONSETOCOMPLYWITHTHISINFORMATION COLLECTIOH REQUEST:50.0HRS.FORWARDCOMHENTSREGARDING BURDENESTIHATETOTHEINFORMATION ANDRECORDSMANAGEMENT BRANCH(HNBB7714),U.S.NUCLEARREGULATORY COMMISSION,

'WASHINGTOH, DC205550001ANDTOTHEPAPERWORK REDUCTIOH PROJECT(31/0-0104),

OFFICEOFHANAGEHENT ANDBUDGETWASHINGTON DC20503.FACILITYNAHE1R.E.GinnaNuclearPowerPlantDOCKETHUHBER205000244YEAR94--00800LERNUMBER6SEQUENTIAL REVISIONPAGE37OF8TEXT(Ifmorespaceisrequired, useadditional copiesofNRCForm366A)(17)Basedontheabove,itcanbeconcluded that,thepublic'shealthandsafetywasassuredatalltimes.V.CORRECTIVE ACTIONA.ACTIONTAKENTORETURNAFFECTEDSYSTEMSTOPRE-EVENT NORMALSTATUS:oThe"B"SIpumpmotorrotorbarswerereplacedatanoffsitefacility.

The"B"SIpumpmotorwasreassembled, tested,andreturnedtoservice.oTheissueofmotorrotorbarcrackingwasrecentlydiscussed inWestinghouse Technical BulletinNSD-TB-94-01-RO, "MotorRotorBarCracking",

dated03/17/94.

SomeWestinghouse Life-line Aseriesand.CSPseriesmotorsmayexhibitrotorbarcracking.

ThisWestinghouse Technical Bulletin(WTB)hadbeenassessedaspartoftheGinna-Operational Assessment.

Program,priortothisevent.MotorsinuseatGinna,oftheframesizesofconcernintheWTB,wereidentified andlistedatthetimeoftheassessment.

ThislistofGinnamotorswasreferredto,andvibration analysiswasconducted forselectedmotors.Resultsofthisanalysisindicated that,the"C"SIpumphadpossiblecrackedrotorbars.The"C"SIpumpmotorwasdisassembled andvisuallyinspected.

Novisualevidenceofrotorbarcrackingwasidentified.

The"C"SIpumpmotorwasreassembled, tested,andreturnedtoservice.B.ACTIONTAKENORPLANNEDTOPREVENTRECURRENCE:

ThePredictive Maintenance Programisbeingenhancedtouseimproveddiagnostic vibration analysismethods.Diagnostic testingwillbeperformed periodically totrendformotorinconsistencies, including rotorbarcracking.

NRCFORH366A(5-92)

NRCFORM366A(5-92).U.S.NUCLEARREGULATORY COMMISSION LICENSEEEVENTREPORT(LER)TEXTCONTINUATION APPROVEDBYOMBNO.3150-0104 EXPIRES5/31/95ESTIMATED BURDENPERRESPONSETOCOMPLYWITHTHISINFORMATIOH COLLECTIOH REQUEST:50.0HRS.FORWARDCOMMENTSREGARDING BURDENESTIMATETOTHEINFORMATION ANDRECORDSHANAGEMENT BRANCH(MNBB7714),U.S.NUCLEARREGULATORY COMMISSION, WASHINGTON, DC20555-0001 AHDTOTHEPAPERWORK REDUCTION PROJECT(31400104),OFFICEOFMANAGEMENT ANDBUDGETWASHINGTON DC20503.FACILITYNAME1)R.E.GinnaNuclearPowerPlantDOCKETNUMBER2YEAR0500024494LERNUMBER6SEQUENTIAL

--008REVISION00PAGE38OF8TEXT(Ifmorespaceisrequired, useadditional copiesofNRCForm366A)(17)VI.ADDITIONAL INFORMATION A.FAILEDCOMPONENTS:

Thefailedcomponent istherotorforthe"B"SIpumpmotor.ThismotorisaModelABDP,framesize509US,440VAC,3555RPM,400'amp,350horsepower motor,manufactured byWestinghouse ElectricCorporation.

B.PREVIOUSLERsONSIMILAREVENTS:AsimilarLEReventhistorical searchwasconducted withthefollowing results:Nodocumentation ofsimilarLEReventswiththesamerootcauseatGinnaNuclearPowerPlantcouldbeidentified.

C.SPECIALCOMMENTS:

NoneHRCFORM366A(5-92)