Proposed TS 3/4.9.7 Re Control of Loads Moving Over Spent Fuel Pool During Spent Fuel Reracking Project,Per NUREG-0612
ML17329A646
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/26/1992
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17329A645 List:
References
RTR-NUREG-0612, RTR-NUREG-612 AEP:NRC-1146D, NUDOCS 9210300116
Download: ML17329A646 (14)


Text

ATTACHMENT 1TOAEP'NRC'1146D EXISTINGTECHNICAL SPECIFICATIONS PAGESMARKEDTOREFLECTPROPOSEDCHANGES92i0300iib 921026PDRADOCK05000315PPDR vP'LC

'ocketNo.315Page4of6Amendment No,312.C(4)ThelicensemayProceedwithandisrequiredtocomplethmodifications identified inTable1oftheFireProtection SafetyEvaluation Report,fortheDonaldC.CookNuclearPlantdatedJune4,1979.Thesemodifications shallbecompleted inaccozdance withthedatescontained inTable1ofthatSERoxSupplements thereto.Administrative controlsforfireprotection asdescribed inthelicensee's submittals datedJanuary31,1977andOctober27,1977shallbeimplemented andmaintained.

Amendment No.118,136(5)SentFuelPoolStoraeThelicenseeisauthoridtostoreD.C.Cook,Unit1andUnit2fuelassemblies neworirradiated inanycombination uptoatotaloffuelassemblies inthesharedspentfuelpoolattheDonaldC.CookNuclearPlantsub)ecttothefollowing conditions:

~1Fuelstonedinthespentfuelpoolshallnothaveap'oNWaAenrichment greaterthan4.95XUranium-235.

'1Amend<.ent No.122*2.D(6)DeletedbyAmendment 80.PhysicalProtection Thelicenseeshallfullyimplement andmaintainineffectallpz'ovisions oftheCommission-approved physicalsecurity; guardtrainingandqualification, andsafeguards contingency plansincluding amendments madepursuanttoprovisions oftheMiscellaneous Amendments andSearchRequirements revisions to10CFR.73.55 (51FR27817and27822)andtotheauthority of10CFR50.90and10CFR50'4(p).Theplans,whichcontainSafeguards Information protected under10CFR73.21,areentitled:

"DonaldC.CookNuclearPlantSecurityPlan,"wi:hrevisions submitted thxoughJuly21,1988;"DonaldC.CookNuclearPlantTrainingandQualification Plan,"withrevisions submitted throughDecember18,1986;and"DonaldC.CookNucleaz'lant Safeguards Contingency Plan,"withrevisions submitted thz'oughJune10,1988.Changesmadeinaccordance with10CFR73.55shallbeimplemented inaccordance withtheschedulesetforththerein.H (7)Theprovisions ofSpecification 3/4.9.7arenotapplicable forloadsbeingmovedoverthepoolforthedurationofthespent.fuelpoolreracking project.Controlofloadsmovingoverthespentfuelpoolduringthespentfuelpoolreracking projectshallcomplywiththecriteriaofNUREG-0612~

"Controls ofHeavyLoadsatNuclearPowerPlants."Administrative controlsshallbeinplacetopreventanyloadnotriggedincompliance withthecriteriaofNUREG-0612 frompassingoverthespentfuelpoolwiththecraneinterlocks, requiredbyT/S3/4.9.7,disengaged..

4' DocketNo.316Page6of11Amendment No.104,121(q)DeletedbyAmendmenr 2.(r)DeletedbyAmendment 68(s)SentFuelPoolStoraeThelicenseeisauthorized tosreD.C.Cook,Unit1andUnit2fuelassemblies, neorirradiated inanycombination, uptoatotaloffuelassemblies inthesharedspentfuelpool*ttheDonaldC.CookNuclearPlantsubjecttothefollowing conditions:

floYYilFuelstoredinthespentfuelpoolshallnothaveap'nrichment greaterthan4.95XUranium-235.

  • Amendment 3deletedParagraph (s),Amendment 13addedanewParagraph (s).(t)DeletedbyAmendment 63.2.C.(7)'Secondary MaterChemistry Monitorin ProramThelicenseeshallimplement asecondary waterchemistry monitoring programtoinhibitsteamgenerator tubedegradation.

Thisprogramshallbedescribed inthes"ationchemistry manualandshallinclude:1.Identification ofasamplingscheduleforthecriticalparameters andcontrolpointsfortheseparameters; 3.Identification oftheprocedures usedtomeasurethevaluesofthecriticalparameters; Identification ofprocesssamplingpoints;Amendment No.1S4.Procedure fortherecording andmanagement ofdata;5.Procedures definingcorrective actionsforoffcontrolpointchemistry conditions; and6.Aprocedure identifying (a)theauthori"y responsible fortheinterpretation ofthedata,and(b)thesequenceandtimingofadministrative eventsrequiredtoinitiatecorrective actions.

DocketNo.316Page7of11D.PhysicalProtection Amendment No.109Thelicenseeshallfullyimplement andmaintainineffectallprovisions oftheCommission-approved physicalsecurity, guardtrainingandqualification, andsafeguards contingency plansincluding amendments madepursuanttoprovisions oftheMiscellaneous Amendments andSearchRequirements revisions to10CFR73.55(51FR27817and27822)andtotheauthority of10CFR50,90and10CFR50.54(p).

Theplans,whichcontainSafeguards Information protected under10CFR73.21,areentitled:

"DonaldC.CookNuclearPlantSecurityPlan,"withrevisions submitted throughJuly21,1988;"DonaldC.CookNuclearPlantTrainingandQualification Plan,"withrevisions submitted throughDecember19,1986;and"DonaldC.CookNuclearPlantSafeguards Contingency Plan,"withrevisions submitted throughJune10,1988.Changesmadeinaccordance with10CFR73.55shallbeimplemented inaccordance withtheschedulesetforththerein.E.DeletedbyAmendment 63.F.DeletedbyAmendment 6.Q.Amendment No.34SstemInteriThelicenseeshallimplement aprogramtoreduceleakagefromsystemsoutsidecontainment thatwouldorcouldcontainhighlyradioactive fluidsduringaserioustransient oraccidenttoaslowaspractical levels.Thisprogramshallincludethefollowing:

1.Provisions establishing preventive maintenance andperiodicvisualinspection requirements, and2.Integrated leaktestrequir'ements foreachsystematafrequency nottoexceedrefueling cycleintervals.

(u)Theprovisions ofSpecification 3/4.9.7arenotapplicable forloadsbeingmovedoverthepoolforthedurationofthespentfuelpoolreracking project.Controlofloadsmovingoverthespentfuelpoolduringthespentfuelpoolreracking pro]ectshallcomplywiththecriteriaofNUREG-.0612>"Controls ofHeavyLoadsatNuclearPowerPlants."Administrative controlsshallbeinplacetopreventanyloadnotriggedincompliance withthecriteriaofNUREG-0612 frompassingoverthespentfuelpoolwiththecraneinterlocks requiredbyT/S3/4.9.7,disengaged.

ATTACHMENT 2TOAEP:NRC:1146D PROPOSEDREVISEDTECHNICAL SPECIFICATION PAGES

'ocketNo.315Page4of6Amendment No~312.C(4)Thelicenseemayproceedwithandisrequiredtocompletethemodifications identified inTable1oftheFireProtection SafetyEvaluation ReportfortheDonaldC.CookNuclearPlantdatedJune4,1979.Thesemodifications shallbecompleted inaccordance withthedatescontained inTable1ofthatSERorSupplements thereto.Administrative controlsforfireprotection asdescribed inthelicensee's submittals datedJanuary31,1977andOctober27,1977shallbeimplemented andmaintained.

(5)SentFuelPoolStoraeAmendment No.118,136Thelicenseeisauthorized tostoreD.C.Cook,Unit1andUnit2fuelassemblies, neworirradiated inanycombination uptoatotalof3613fuelassemblies inthesharedspentfuelpoolattheDonaldC.CookNuclearPlantsubjecttothefollowing conditions:

Fuelstoredinthespentfuelpoolshallnothaveanominalenrichment greaterthan4.95%Uranium-235.

(6)DeletedbyAmendment 80.(7)Theprovisions ofSpecification 3/4.9.7arenotapplicable forloadsbeingmovedoverthepoolforthedurationofthespentfuelpoolreracking project.Controlofloadsmovingoverthespentfuelpoolduringthespentfuelpoolreracking projectshallcomplywiththecriteriaofNUREG-0612 "Controls ofHeavyLoadsatNuclearPowerPlants."Administrative controlsshallbeinplacetopreventanyloadnotriggedincompliance withthecriteriaofNUREG-0612 frompassingoverthespentfuelpoolwiththecraneinterlocks, requiredbyT/S3/4.9.7,disengaged.

  • 2.DPhsicalProtection Amendment No.122Thelicenseeshallfullyimplement andmaintainineffectallprovisions oftheCommission-approved physicalsecurity, guardtrainingandqualification, andsafeguards contingency plansincluding amendments madepursuanttoprovisions oftheMiscellaneous Amendments andSearchRequirements revisions to10CFR73.55(51FR27817and27822)andtotheauthority of10CFR50.90and10CFR50.54(p).

Theplans,whichcontainSafeguards information protected under10CFR73.21,areentitled:

"DonaldC.CookNuclearPlantSecurityPlan,"withrevisions submitted throughJuly21,1988;"DonaldC.CookNuclearPlantTrainingandQualification Plan,"withrevisions submitted throughDecember18,1986;and"DonaldC.CookNuclearPlantSafeguards Contingency Plan,"withrevisions submitted throughJune10,1988.Changesmadeinaccordance with10CFR73.55shallbeimplemented inaccordance withtheschedulesetforththerein.

DocketNo.316Page6ofll(q)DeletedbyAmendment 2.(r)DeletedbyAmendment 68.(s)SentFuelPoolStoraeAmendment No.104,121Thelicenseeisauthorized tostoreD.C.Cook,Unit1andUnit2fuelassemblies, neworirradiated inanycombination, uptoatotalof3613fuelassemblies inthesharedspentfuelpoolattheDonaldC.CookNuclearPlantsubjecttothefollowing conditions:

Fuelstoredinthespentfuelpoolshallnothaveanominalenrichment greaterthan4.95%Uranium-235.

+Amendment 3deletedParagraph (s),Amendment 13addedanewParagraph (s).(t)DeletedbyAmendment 63.(u)Theprovisions ofSpecification 3/4.9.7arenotapplicable forloadsbeingmovedoverthepoolforthedurationofthespentfuelpoolreracking project.Controlofloadsmovingoverthespentfuelpoolduringthespentfuelpoolreracking projectshallcomplywiththecriteriaofNUREG-0612,"Controls ofHeavyLoadsatNuclearPowerPlants."Administrative controlsshallbeinplacetopreventanyloadnotriggedincompliance withthecriteriaofNUREG-0612 frompassingoverthespentfuelpoolwiththecraneinterlocks, requiredbyT/S3/4.9.7,disengaged.

2.C.(7)SecondarWaterChemistrMonitorin ProramThelicenseeshallimplement asecondary waterchemistry monitoring programtoinhibitsteamgenerator tubedegradation.

Thisprogramshallbedescribed inthestationchemistry manualandshallinclude:1.Identification ofasamplingscheduleforthecriticalparameters andcontrolpointsfortheseparameters; 2.Identification oftheprocedures usedtomeasurethevaluesofthecriticalparameters; 3.Identification ofprocesssamplingpoints;Amendment No.184.Procedure fortherecording andmanagement ofdata; DocketNo~316Page7of115.Procedures definingcorrective actionsforoffcontrolpointchemistry conditions; and6.Aprocedure identifying (a)theauthority responsible fortheinterpretation ofthedata,and(b)thesequenceandtimingofadministrative eventsrequiredtoinitiatecorrective actions.D.PhysicalProtection Amendment No.109Thelicenseeshallfullyimplement andmaintainineffectallprovisions oftheCommission-approved physicalsecurity, guardtrainingandqualification, andsafeguards contingency plansincluding amendments madepursuanttoprovisions oftheMiscellaneous Amendments andSearchRequirements revisions to10CFR73.55(51FR27817and27822)andtotheauthority of10CFR50.90and10CFR50.54(p).

Theplans,whichcontainSafeguards Information protected under10CFR73.21,areentitled:

"DonaldC.CookNuclearPlantSecurityPlan,"withrevisions submitted throughJuly21,1988;"DonaldC.CookNuclearPlantTrainingandQualification Plan,"withrevisions submitted throughDecember19,1986;and"DonaldC.CookNuclearPlantSafeguards Contingency Plan,"withrevisions submitted throughJune10,1988.Changesmadeinaccordance with10CFR73.55shallbeimplemented inaccordance withtheschedulesetforththerein.E.DeletedbyAmendment 63.F.DeletedbyAmendment 6.**Q.Amendment No.34SstemInteritThelicenseeshallimplement aprogramtoreduceleakagefromsystemsoutsidecontainment thatwouldorcouldcontainhighlyradioactive fluidsduringaserioustransient oraccidenttoaslowaspractical levels.Thisprogramshallincludethefollowing:

1.Provisions establishing preventive maintenance andperiodicvisualinspection requirements, and2.Integrated leaktestrequirements foreachsystematafrequency nottoexceedrefueling cycleintervals.