ML091110318
ML091110318 | |
Person / Time | |
---|---|
Site: | Perry |
Issue date: | 04/15/2009 |
From: | Bezilla M FirstEnergy Nuclear Operating Co |
To: | Office of Nuclear Reactor Regulation, State of OH, Environmental Protection Agency |
References | |
PY-CEI/OEPA-0505L | |
Download: ML091110318 (9) | |
Text
FENOC Perry Nuclear10 Center Plant PowerRoad PO. Box 97.
FirstEnergyNuclear OperatingCompany Perry, Ohio 44081 April115, 2009 PY-CEI/OEPA-0505L OhibO Environmental Protection Agency Divis'[o'n' of Water Pollution Control Enforcement Section, ES/DMR P.O.r Box 1049 Columbus, Ohio 43216-1049
SUBJECT:
Perry Nuclear Power Plant, March NPDES Discharge Monitoring Report Enclosed are the Perry Nuclear Power Plant, NPDES monthly report forms for the month of March 2009. No violations occurred during this period.
.Ifyou have questions or require additional information, please contact Mr. Randall Killing at (440) 280'-7370.
Sincerely, 4 ./ -
\ /.
Mark B. Bezilla
Enclosures:
A Station Code 004 Report.
B Station Code 094 Report C Station Code 601 Re ort DStation Code 602 Report E Station Code 800 Report cc: NRC Region` Ill NRC Resident Inspector NRR Project Manager NRC Document Control Desk (Docket No. 50-*440)
'- . " ,'[: : .. '.*,';Z"
- 5
Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY: FirstEnergy Perry Nuclear Power Pit PERMIT NUMBER: 3IB00016*ID LOCATION: 10 Center Rd STATION CODE: 004
-North Perry, 44081 MONITORING PERIOD: 2009-03-01 To: 2009-03-31 COUNTY: Lake REPORTING LAB: CCB125 DISTRICT: NEDO ANALYST: Randall Killing NO DISCHARGE INDICATOR:
PARAMETER Water Temperature Flow Rate l-l Zinc, Total Recoverable Copper, Total Recoverable Oxidants, ResidualTotal Chlorine.
RcsidualTotal PARAMETER CODE 00011, -50050 00400 01094 01119 34044 50060 UNITS 4103 4108 6653 4107 4107 4106 4106 FREQUENCY I/Day. 1/Day 2/Week 1/Month I/Month When Disch. When Disch.
SAMPLING TYPE Continuous Continuous Grab -, Grab Grab Grab Grab 2009-03-01 36 67.4 . AH AA 0.05 2009-03-02 36 . 70.7 AH AA 0.05 2009-03-03 37 -68.4 7.98 AH AA 0.05 2009-03-04 37 82.9 AH AA 0.05 2009-03-05 38 75.2 AH AA 0.05 2009-03-06 37 69.0 8.02 8.2 AA 4.0 AH AA 0.05 2009-03-07 41 72.'9 AH AA 0.05 2009-03-08 42 68.0 AH AA 0.05 2009-03-09 41 69.7 AH AA 0.05 2009-03-10 42 65.8 8.12 AH AA 0.05 2009-03-11. 39 66.9 AH AA 0.05 2009-03-12 41 74.8 AH AA 0.05 2009-03-13 39 81.3 8.06 APH AA 0.05 2009-03-14 39 79.2 AH AA 0.05 2009-03-15 40 75.6 AH AA 0.05 2009-03-16 40 77.6 All AA (.II 2009-03-17 40 79.5 8.04 AH AA 0.05 2009-03-18 41 84.1 AH AA 0.05 2009-03-19 42 78.6 AE AA 0.05 2009-03-20 42 80.3 8.15 AH AA 0.05 2009-03-21 42 79.0 AH AA 0.05 2009-03-22 42 79.4 AH AA 0.05 2009-03-23 42 -79.0 All- AA 0.05 2009-03-24 44 80.6 8.13 AH AA 0.05 2009-03-25 441 - 77.3 .'AH AA 0.05 2009-03-26 44 67.2 AH AA 0.05 2009-03-27 44 . 64.6 8.14 AE AA 0.05 2009-03-28 43 62.4 . AH " AA0.05 2009-03-29 44 69.9 AHR AA.005 2009-03-30 48 66.4 AH AA 0.05 2009-03-31 . 47 48.1 8.16 AH AA 0.05 Name/Title of Responsible [certify under tie penalty of law that I have personally examined and am familiar Signature of Date (MMfl/DD/YY)
Official or Authorized with the information submitted herein and based oi my inquiry of those Responsible Official or Representative individuals immediately responsible lor obtaining the intoniation, I believe the Authorized submitted inftrmation is true, accurate and complete. I arn aware that there are Rel re tative significanti penalties for submitting false inlormation, including the possibility of V. . ..... fine and imprisonment.
When completed mail this report to: EDMR. Administrator, EDMI{ Administrator. , UH, V
Page]
Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY: FirstEnergy Perry Nuclear Power Pit PERMIT NUMBER: 31BOO016*ID LOCATION: 10 Center Rd STATION CODE: 004 North Perry, 44081 MONITORING PERIOD: 2009-03-01 To: 2009-03-31 COUNTY: Lake REPORTING LAB: CCB 125 DISTRICT: NEDO ANALYST: Randall Killing NO DISCHARGE INDICATOR:
PARAMETER Chlorination/Brornination Duration PARAMETER CODECODE 78739 UNITS 6655 FREQUENCY When Disch.
SAMPLING TYPE Total 2009-03-01 30 2009-03-02 30
- 2009-03-03 60 2009-03-04 60' 2009-03-05 60 2009-03-06 60 2009-03-07 30 2009-03-08 30 2009-03-09 30 2009-03-16 60 2009-03-11 30 2009-03-12 30 2009-03-13 60 2009-03-14 60 2009-03-15 30 2009-03-16 60 2009-03-17 60 2009-03-18 60 2009-03-19 60 2009-03-20 30 2009-03-21 60 2009-03-22. 30 2009-03 -23 60 2009-03-24 60 2009-03-25 60 2009-03-26 30 2009-03-27 30 2009-03-28 30 2009-03-29 30 2009-03-30 30 2009-03-31 30 Name/Title of Responsible 1certify under the penalty of law that I have-personally examined and am lnmiliar Signamturc of Date IM/DD/V')
Official or Authorized with the informatioysubmiitted herein based oi iy ynd of those Ilesponsible Official or Representative individuals immediately responsible tor Obtaining the information, I believe the Authorized submitted information is true. accirate and complete. aln aware v that there are Represelwitive VP L.,dear*
VP c., ' significant penalties for subn~itting false intormation, including the possibility of fine and imprisonmernt. .¢- .,jj..,-
Page 2' When completed mail this report to: EDMR Administrator, EDMI( Administrator,,, OH,
/
Ohio EPA - DailyDischarge Monitoring Report - Form 4500 FACILITY: FirstEnergy Perry Nuclear Power Pit PERMIT NUMBER: 31B00016*ID LOCATION: 10 Center Rd STATION CODE: 094 North Perry, 44081 MONITORING PERIOD : 2009-03-01 To: 2009-03-31 COUNTY: Lake REPORTING LAB:
DISTRICT: NEDO ANALYST:
NO DISCHARGE INDICATOR: AL PARAMETER PRMTR Waterlow Temperature FlwRt Rate pHHRecoverableZinc, Total Copper, Total Oxidants, Total Chlorine, Total Recoverable Residual. Residual PARAMETER CODE 00011 50050 00400 01094 01119 34044 50060 UNITS 4103 4108 6653 4107 4107 4106 '4106
.FREQUENCY 1/Day I/Day 2/Week 1/Month 1/Month When Disch. When Disch.
SAMPLING TYPE Continuous Continuous Grab Grab Grab Grab Grab 2009-03-01 2009-03-02 2009-03-03 2009-03-04 2009-03-05 2009-03-06 2009-03-07 2009-03-08 2009-03-09 2009-03-10 2009-03-11 2009-03-12 2009-03-13 2009-03-14 2009-03-15 2009-03-16 2009-03-17' 2009-03-18 2009-03-19 2009-03-20 2009-03-21 2009-03-22 2009-03-23 2009-03-24 2009-03-25 2009-03-261.
2009-03-27 2009-03-28 2009-03-29 2009-03-30 2009-03-31 Name/Title of Responsible Icertify trderthe penalty0flaw that I have personally examined and am Im iijar Signature of Date (NIM/DD/Y)
Official or Authorized with the information Submied herein and based on my inquiry of those " Responsible Offlicial or Representative individuals immediately responsible fr obtaining the inlnnation, I believe the Authorized submitted infrmation is true, accurate and complete. I am aware that there are Represen ativ
- significant penalties tor submitting false information, including the possibility of NPq~ erfine and imprisonment. ' =/- 1 ý When completed mail this report to: EDMR Administrator, EDMR Administrator.. OH, Page3
Ohio EPA - Daily Discharge Monitoring Report - Fornm 4500 FACILITY: FirstEnergy Perry Nuclear Powver Pit PERMIT NUMBER: 3IB00016*ID '
LOCATION: 10Center Rd STATION CODE: 094 North Perry, 44081 MONITORING PERIOD: 2009-03-01 To: 2009-03-31 COUNTY: Lake REPORTING LAB:
DISTRICT: NEDO ANALYST; NO DISCHARGE INDICATOR: AL ChlorinationlBromination PARAMETER Duration PARAMETER 78739 CODE 787_9 UNITS 6655 _
FREQUENCY When Disch.
SAMPLING TYPE Total 2009-03-01 2009-03-02 2009-03-03 2009-03-04 2009-03-05 2009-03-06 2009-03-07 2009-03-08 2009-03-09 2009-03-10 2009-03-11 2009-03-12 2009-03-13 2009-03-14 2009-03-15 2009-03-16 -
2009-03-17 2009-03-18
.2009-03-19 2009-03-20 2009-03-21 2009-03-22 2009-03-23 2009-03-24 2009-03-25 2009-03-26 2009-03-27 2009-03-28 2009-03-29 2009-03-30 2009-03-31 Name/Title of Responsible Icertify Under the penalty of law that I have personally examined and am familiar Signature of Date.(MM/DD/YY)
Official or Authorized . with the information submitted herein and based My ifquirry of those Responsible Official or Representative individuals immediately responsible fr obtaining the infnration, I believe the. Authorized submitted information is true, accurate and complete. I am aware that there are Rep esentative significant penalties for SUbmitting, false i ntornation, including the possibility of rj ? (*0, fine and imprisonment.
Whn omleedmilths.epr.t: Amnitrto,
.D.. .DM. dmnitrto, O,.ag4
...
When completed mail this report to: EDMR Administrator, EDMR Administrator, _ OH, Pag-
Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY: FirstEnergy Perry Nuclear Power Pit PERMIT NUMBER: 31B00016*ID LOCATION: 10 Center Rd STATION CODE: 601 North Perry, 44081 MONITORING PERIOD: 2009-03-01 To: 2009-03-31 COUNTY: Lake REPORTING LAB:
DISTRICT: NEDO ANALYST:
NO DISCHARGE INDICATOR: AL PARAMETER Flow Rate pH " Total Suspended Oil and Grease, P TwSolids Total PARAMETER CODE 50050 00400 00530 00550 UNITS 4108 6653 4106 4106 FREQUENCY Continuous 1 / 2 Weeks 1/ 2 Weeks 1 / 2 Weeks SAMPLING TYPE- 24hr Total Grab Grab Grab 2009-03-01 2009-03-02 2009-03-03 2009-03-04 2009-03-05 2009-03-06 2009-03-07 2009-03-08 2009-03-09 2009-03-10 2009-03-11 2009-03-12 2009-03-13 2009-03-14 2009-03-15 2009-03-16 2009-03-17 2009-03-18 2009-03-19 2009-03-20 2009-03-21 2009-03-22 2009-03-23 2009M03-24 2009-03-25 2009-03-26 2009-03-27 2009-03-28 2009-03-29 2009-03-30 2009-03-31 Name/Title of Responsible I certify under the penalty of law that I have personally examined and am familiar Signature of Date (MM/DD/YY)
Official or Authorized with the infonnation subited hereinand based on inquir Ofoythose Responsible Official or Representative individuals immediately responsible frobtainingthe infnnation, I believe the Authorized submitted information is tre, accurateand complete. lai aware that there are " Represeptitive VP~~uclectr significant penalties tor submitting talse iniormation, including the possibility of fine and imprisonment.,) 6V'!o When completed mail this report to: EDMR Administrator, EDMR Administrator... OH, Page'5-
Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY: FirstEnergy Perry Nuclear Power Pit PERMIT NUMBER: 3IB00016*ID LOCATION: 10 Center Rd STATION CODE: 602 North Perry, 44081 MONITORING PERIOD : 2009-03-01 To: 2009-03-31 COUNTY: Lake REPORTING LAB:
DISTRICT: NEDO ANALYST:
NO DISCHARGE INDICATORi AL PARAMETER Flow Rate pH Total Suspended Oil and Grease, Iron, Total Copper, Total Solids Total Recoverable Recoverable PARAMETER CODE 50050 00400 00530
- 00550 00980 01119 UNITS 4108 6653 4106 4106 4107 4107 FREQUENCY Continuous 1/ 2 Weeks I/2 Weeks 1 2 Weeks Il/ 2 Weeks I /2 Weeks SAMPLING TYPE 24hr Total Grab 24hr Composite Grab 241ir Composite 24hr Composite 2009-03-01 2009-03-02 2009-03-03.
2009-03-04 2009-03-05 2009-03-06 2009-03-07 2009-03-08 2009-03-09 2009-03-10 2009-03-11 2009-03-12 2009-03-13 2009-03-14 2009-03-15 2009-03-16 2009-03-17 2009-03-18 2009'03-19 2009-03-20 2009-03-21 2009-03-22 2009-03-23 2009-03-24 2009-03-25 2009-03-26.
2009-03-27 2009-03-28 2009-03-29 2009-03-30 2009-03-31 Name/Title of Responsible I certify under the penai1, of iaw that I have personally examined and am familiar Signature of Date (*MM/DD/YY)
Official or Authorized with the information sr bined heciein and based On Iy inquiry of those Responsible Official or Representative individuals immediately dr responsible obtaining the insniation, I believe the Authorized subimitted infrmation is true accrate and complete. I am aware that there are Represenlative
\jP *0* '" significant penalties for sUbmittingfialse information, including the possibility offo-fine and imprisonmnent. .
Page 6 When completed mail this report to: EDMK Administrator, EULVIkM Administrator,,, OH,
/
Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY: FirstEnergy Perry Nuclear Power Pit PERMIT NUMBER: 3IB00016*ID
.LOCATION:, 10 Center Rd STATION CODE: 800 North Perry, 44081 MONITORING PERIOD: 2009-03-01 To: 2009-03-31 COUNTY: Lake REPORTING LAB: CCB 125 DISTRICT: NEDO ANALYST: Randall Killing..
NO DISCHARGE INDICATOR:
PARAMETER Water Zinc, Total Copper, Total Temperature Recoverable Recoverable PARAMETER CODE 00011 01094 .01119 UNITS 4103 4107 4107 FREQUENCY 1/Day 1/Month 1/Month SAMPLING TYPE Continuous Grab Grab 2009-03-01 32 2009-03-02 32 2009-03-03 32 2009-03-04 .32 2009-03-05 32 2009-03-06 32 7,5 AA 4.0 2009-03-07 34 2009-03-08 34 2009-03-09 34 2009-03-10 35 2009-03-11 34 2009-03-12 37 2009-03-13 35 2009-03-14 35 2009-03-15 35 2009-03-16 36 2009-03-17 37 2009-03-18 37 2009-03-19 38 2009-03-20 39 2009-03-21 38 2009-03-22 38 2009-03-23 38-2009-03-24 40 2009-03-25 40 2009-03-26 40 2009-03-27 41 2009-03-28 39 2009-03-29 40 2009-03-30 41 2009-03-31 41
- m....-.--
Pal/ itle of Responib$1le I certify Ulnder tihe penalty or law that I hlave personally examined and am familiar Signature of Dlate (li¢llll/DD1/"Y)
Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the infomiation, I believe the Authorized sutbmitted information is true, accurate and complete. I am awvare that there are Repx;eseqntatiyis Significant penalties for submitting false information, ilcluding the possibility of '/
Whn.cmpeedmj and imprAdisomnitraor EDMRjAdiitrtr, ftisnepr OHag When completed mail this report to: EDMR Administrator, EDMR Administrator... OH, J Pago*
Ohio EPA - Daily-Discharge Monitoring Report - Form 4500 FACILITY: FirstEnergy Perry Nuclear Power Pit PERMIT NUMBER: 3IB00016*ID LOCATION: 10 Center Rd . MONITORING PERIOD: 2009-03-01 To: 2009-03-31 North Perry, 44081 PARAMETER COMMENTS:
Station Code Parameter Name Parameter Code Date Unit Comment 004 Oxidants, Total Residual 34044 2009-03-01 4106 NO bromination event this date 004 Oxidants, Total Residual 34044 2009-03-02 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-03-03 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-03-04 4106 No bromination event this date 004. Oxidants, Total Residual .34044 2009-03-05 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-03-06 4106 No bromnination event this date 004 Oxidants, Total Residual 34044 2009-03-07 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-03-08 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-03-09 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-03-10 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-03-1l 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-03-12 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-03-13 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-03-14 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-03-15 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-03-16 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-03-17 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-03-18 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-03-19 4106 No bromination event this date 004 Oxidants, Total Residual 34044. 2009-03-19 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-03-20 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-03-21 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-03-22 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-03-23 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-03-24 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-03-25 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-03-26 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-03-27 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-03-28 4106 No bromination event this date 004 Oxidants ,Total Residual 34044 2009-03-29 -4106 Nobromination event this date 004 Oxidants, Total Residual 34044 2009-03-30 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-03-31 4106 No bromination event this date