2006/03/22-GALL AMP: XI.M1, ASME Section XI Inservice Inspection, Subsections Iwb, Iwc, and Iwd (Audit Worksheet, GALL Report AMP)
ML060950271
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 03/22/2006
From: Morgan M
NRC/NRR/ADRO/DLR/RLRC
To:
Office of Nuclear Reactor Regulation
morgan M NRR/NRC/DLR/RLRC, 415-2232
Shared Package
ML060950189 List: ... further results
References
%dam200611, TAC MC9668
Download: ML060950271 (5)


Text

XI.M1 ASME Section XI Inservice Inspection, Subsections IWD, IWC, And IWD 1 AUDIT W ORKSHEET GALL R EPORT AMP PLANT: ______________________________

LRA AMP: __________________________

R EVIEWER: ______________________

GALL AMP: XI.M1, ASME Section XI Inservice Inspection, Subsections IWB, IWC, and IWD DATE: __________________________

Program Element Auditable GALL Criteria Documentation of Audit Finding Program Description A. Title 10 of the Code of Federal Regulations, 10 CFR 50.55a, imposes the inservice inspection (ISI) requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code,Section XI, for Class 1, 2, and 3 pressure-retaining components and their integral attachments in light-water cooled power plants. Inspection, repair, and replacement of these components are covered in Subsections IWB, IWC, and IWD, respectively, in the 2001 edition including the 2002 and 2003 Addenda. The program generally includes periodic visual, surface, and/or volumetric examination and leakage test of all Class 1, 2, and 3 pressure-retaining components and their integral attachments. The ASME Section XI inservice inspection program in accordance with Subsections IWB, IWC, or IWD has been shown to be generally effective in managing aging effects in Class 1, 2, or 3 components and their integral attachments in light-water cooled power plants. However, in certain cases, the ASME inservice inspection program is to be augmented to manage effects of aging for license renewal and is so identified in the GALL Report Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment: 1. Scope of Program A. The ASME Section XI program provides the requirements for ISI, repair, and replacement. The components within the scope of the program are specified in Subsections IWB-1100, IWC-1100, and IWD-1100 for Class 1, 2, and 3 components, Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

XI.M1 ASME Section XI Inservice Inspection, Subsections IWD, IWC, And IWD 2 Program Element Auditable GALL Criteria Documentation of Audit Finding respectively, and include all pressure-retaining components and their integral attachments in light-water cooled power plants. The components described in Subsections IWB-1220, IWC-1220, and IWD-1220 are exempt from the examination requirements of Subsections IWB-2500, IWC-2500, and IWD-2500. Comment 2. Preventive Actions A. Operation within the limits prescribed in the Technical Specifications. Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment: 3. Parameters Monitored/ Inspected A. The ASME Section XI ISI program detects degradation of components by using the examination and inspection requirements specified in ASME Section XI Tables IWB-2500-1, IWC-2500-1, or IWD-2500-1, respectively, for Class 1, 2, or 3 components. Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment: 4. Detection of Aging Effects A. The extent and schedule of the inspection and test techniques prescribed by the program are designed to maintain structural integrity and ensure that aging effects will be discovered and repaired before the loss of intended function of the component. Inspection can reveal cracking, loss of material due to corrosion, leakage of coolant and indications of degradation due to wear or stress relaxation, such as verification of clearances, settings, physical displacements, loose or missing parts, debris, wear, erosion, or loss of integrity at bolted or welded connections. Components are examined and tested as specified in Tables IWB-2500-1, IWC-2500-1, and IWD-2500-1, respectively, for Class 1, 2, and 3 components.

The tables specify the extent and schedule of the inspection and examination methods for the components of the pressure-retaining boundaries. Alternative approved methods that meet the requirements of IWA-2240 are also specified in these tables. Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment:

XI.M1 ASME Section XI Inservice Inspection, Subsections IWD, IWC, And IWD 3 Program Element Auditable GALL Criteria Documentation of Audit Finding See the GALL Report, AMP XI.M1, ASME Section XI Inservice Inspection, Subsections IWB, IWC, and IWD, for more information. " B. Class 1 Components, Table IWB-2500-1.

See the GALL Report, AMP XI.M1, ASME Section XI Inservice Inspection, Subsections IWB, IWC, and IWD, for more information. Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment: " C. Class 2 Components, Table IWC-2500-1.

See the GALL Report, AMP XI.M1, ASME Section XI Inservice Inspection, Subsections IWB, IWC, and IWD, for more information. Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment: " D. Class 3 Components, Table IWD-2500-1.

See the GALL Report, AMP XI.M1, ASME Section XI Inservice Inspection, Subsections IWB, IWC, and IWD, for more information. Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment:

XI.M1 ASME Section XI Inservice Inspection, Subsections IWD, IWC, And IWD 4 Program Element Auditable GALL Criteria Documentation of Audit Finding 5. Monitoring and Trending A. For Class 1, 2, or 3 components, the inspection schedule of IWB-2400, IWC-2400, or IWD-2400, respectively, and the extent and frequency of IWB-2500-1, IWC-2500-1, or IWD-2500-1, respectively, provides for timely detection of degradation. The sequence of component examinations established during the first inspection interval is repeated during each successive inspection interval, to the extent practical. Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment: " B. If flaw conditions or relevant conditions of degradation are evaluated in accordance with IWB-3100, IWC-3100, or IWD-3100, and the component is qualified as acceptable for continued service, the areas containing such flaw indications and relevant conditions are reexamined during the next three inspection periods of IWB-2110 for Class 1 components, IWC-2410 for Class 2 components, and IWD-2410 for Class 3 components. Examinations that reveal indications that exceed the acceptance standards described below are extended to include additional examinations in accordance with IWB-2430, IWC-2430, or IWD-2430 (1995 edition) for Class 1, 2, or, 3 components, respectively. Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment: 6. Acceptance Criteria A. Any indication or relevant conditions of degradation detected are evaluated in accordance with IWB-3000, IWC-3000, or IWD-3000, for Class 1, 2, or 3 components, respectively. Examination results are evaluated in accordance with IWB-3100, IWC-3100, or IWD-3100 by comparing the results with the acceptance standards of IWB-3400 and IWB3500, or IWC-3400 and IWC-3500, or IWD3400 and IWD3500, respectively for Class 1 or Class 2 and 3 components. Flaws that exceed the size of allowable flaws, as defined in IWB-3500, IWC-3500, or IWD3500, are evaluated by using the analytical procedures of IWB-3600, IWC-3600, or IWD-3600, respectively, for Class 1 or Class 2, and 3 components. Flaws that exceed the size of allowable flaws, as defined in IWB-3500 or IWC-3500, are evaluated by using the analytical procedures of IWB-3600 or IWC-3600, respectively, for Class 1 or Class 2 and 3 Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment:

XI.M1 ASME Section XI Inservice Inspection, Subsections IWD, IWC, And IWD 5 Program Element Auditable GALL Criteria Documentation of Audit Finding components. Approved BWRVIP-14, BWRVIP-59, and BWRVIP-60 documents provide guidelines for evaluation of crack growth in stainless steels, nickel alloys, and low-alloy steels, respectively. 7. Corrective Actions A. For Class 1, 2, and 3, respectively, repair is performed in conformance with IWB-4000, IWC-4000, and IWD-4000, and replacement according to IWB-7000, IWC-7000, and IWD-7000. Approved BWRVIP-44 and BWRVIP-45 documents, respectively, provide guidelines for weld repair of nickel alloys and for weldability of irradiated structural components. As discussed in the appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable to address the corrective actions. Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment: 8.

Confirmation Process A. Site quality assurance (QA) procedures, review and approval processes, and administrative controls are implemented in accordance with the requirements of 10 CFR Part 50, Appendix B. As discussed in the appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable to address the confirmation process and administrative controls. Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment: 9.

Administrative Controls A. See Item 8, above. Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment: 10. Operating Experience A. Because the ASME Code is a consensus document that has been widely used over a long period, it has been shown to be generally effective in managing aging effects in Class 1, 2, and 3 components and their integral attachments in light-water cooled power plants (see Chapter I of the GALL Report, Vol. 2).

Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment:

XI.M1 ASME Section XI Inservice Inspection, Subsections IWD, IWC, And IWD 6 Program Element Auditable GALL Criteria Documentation of Audit Finding See the GALL Report, AMP XI.M1, ASME Section XI Inservice Inspection, Subsections IWB, IWC, and IWD, for more information.

XI.M1 ASME Section XI Inservice Inspection, Subsections IWD, IWC, And IWD 7 EXCEPTIONS Item Number Program Elements LRA Exception Description Basis for Accepting Exception Documents Reviewed (Identifier, Para.# and/or Page #) 1. 2. -

ENHANCEMENTS Item Number Program Elements LRA Enhancement Description Basis for Accepting Enhancement Documents Reviewed (Identifier, Para.# and/or Page #) 1. 2. -

DOCUMENT REVIEWED D URING A UDIT Document Number Identifier (number) Title Revision and/or Date 1. 2. 3. 4. -.