Response to Regulatory Issue Summary (RIS) 2009-11, Preparation and Scheduling of Operator Licensing Examinations
ML092310141
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 08/13/2009
From: Hochevar A
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS 2009-11
Download: ML092310141 (2)


Text

\ SOUTHERN CALIFORNIA EDISON An EDISON INTERNATIONAL"'

Company August 13, 2009 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

Docket Nos. 50-361 and 50-362 Response to Regulatory Issue Summary (RIS) 2009-11 San Onofre Nuclear Generating Station, Units 2 and 3

Reference:

RIS 2009-11, "Preparation and Scheduling of Operator Licensing Examinations," dated July 16, 2009 Gentlemen:

This letter provides the Southern California Edison (SCE) response to U. S. Nuclear Regulatory Commission Regulatory Issue Summary 2009-11, "Preparation and Scheduling of Operator Licensing Examinations," dated July 16, 2009.The schedule shown on NRC Form 536, "Operator Licensing Examination Data," is enclosed and provides SCE's best estimate to meet our operator licensing needs through calendar year 2013.If you have any questions, please feel free to contact me or Mr. Geoffrey Cook at (949) 368-9008.Sincerely, Albert R. Hochevar Station Manager

Enclosure:

As Stated cc: E. E. Collins, Regional Administrator, NRC Region IV R. E. Lantz, Chief, Operations Branch, NRC Region IV R. Hall, NRC Project Manager, San Onofre Units 2 and 3 G. G. Warnick, NRC Senior Resident Inspector, San Onofre Units 2 and 3 P. O. Box 128 A)'D San Clemente, CA 92674-0128 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations.

Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet EXAMINATION DATA e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION San Onofre Nuclear Generating Station, Units 2 and 3 Region IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 CY2011 CY2012 CY2013 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2010 CY2011 CY2012 CY2013 NUMBER OF REACTOR 12 12 10 10 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 5 6 6 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 4 3 4 4 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0 0 0 0 PROPOSED DATES 10/18/10 10/17/11 10/22/12 10/21/13 PRIMARY DATE 10/18/10 10/17/11 10/22/12 10/21/13 ALTERNATE DATE 10/25/10 10/24/11 10/29/12 10/28/13 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED Cy 2010 Cy 2011 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 38 38 NRC FORM 536 (10-2008)PRINTED ON RECYCLED PAPER