ML12111A222

From kanterella
Revision as of 23:16, 28 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

Final Written Examination with Answer Key (401-5 Format) (Folder 2)
ML12111A222
Person / Time
Site: Beaver Valley
Issue date: 04/20/2012
From: Rudolph W
FirstEnergy Nuclear Operating Co
To: David Silk
Operations Branch I
Jackson D
Shared Package
ML113320121 List:
References
TAC U01846
Download: ML12111A222 (100)


Text

Beaver Valley Unit 1 NRC Written Exam (1LOTS) 1. Given the following plant conditions and seqUl:mce of events:

  • The plant is operating at 100% power.
  • Reactor Trip Bypass Breaker (BYB) has been closed. * "B" Train SSPS input error inhibit switch is in the INHIBIT position.
  • All systems function as designed.

Which ONE of the following breakers will receive a trip signal? RTA -(Reactor Trip Breaker RTB -(Reactor Trip Breaker BYA -(Reactor Trip Bypass Breaker BYB -(Reactor Trip Bypass Breaker A. RTAONLY. B. RTA and BYB. C. RTB and BY A. D. RTB and BYB. Answer: B Explanation/Justification: Incorrect.

Train A RTB will open, however, it is not the only breaker which will open. BYB will also open. Correct. Since reactor power is > P-9 (49%), a turbine trip will result in a reactor trip signal to RPS. With Train B SSPS input error inhibit switch in INHIBIT, upon reactor trip, the Train A reactor protection system de-energizes the Train A Reactor trip Breaker and the Train B Bypass breaker UV ceils. BYB is closed to allow testing on the "B" Train. Incorrect.

Train B ATB will not open due to Train B SSPS input error inhibit switch in the INHIBIT position.

BYA will not open. Incorrect.

Train B RTB will not open due to Train B SSPS input error inhibit switch in the INHIBIT position.

BYB will open. Sys# System Category KA Statement 007 Reactor Trip Ability to determine or interpret the following as they apply to a Reactor trip breaker position reactor trip: KIM EA2.03 KIA Importance 4.2 Exam Level RO References provided to Candidate None Technical 1 OM-UB, Rev. 10, pg. 3 1 SQS-1.2 U1 LP PPT, Rev. 5 Issue 1, pg. 7 & 22 1 MSP-l.05-I, Issue 4, Rev. 49, pg. 26 & 29 Question Source: Bank -Vision 8266 Question Cognitive Level: Higher Comprehension or Analysis 10 CFR Part 55 Content: (CFR 41.7/45.5/45.6)

Objective:

Describe the control, protection, and interlock functions for the field components associated with RPS hardware, including automatic functions, setpoints and changes in equipment statLls as applicable.

Beaver Valley Unit 1 NRC Written Exam (1LOT8) 2. Given the following plant conditions: Reactor Power is 85%, steady state, all systems in NSA. Pressurizer (PRZR) pressure control is in its normal configuration. Pressurizer Relief Valve (PCV-1 RC-45SC) inadvertantly lifts and does NOT fully reseat.

  • A4-11, "PRESSURIZER CONTROL PHESSURE LOW", annunciates. PRZR Pressure is 2170 psig and slowly lowering.

How will the PRZR Spray Valves (PCV-1 RC-455A and PCV-1 RC-455B) and PRZR PORV Block Valves (MOV-1 RC-535, 536, 537) respond to these plant conditions, with no operator action? PRZR Spray Valves _ (1) _. PRZR PORV Block Valves _ (2) _. A. (1) remain open remain open B. (1) close (2) remain open C. (1) remain open (2) close D. (1) close (2) close Answer: B Explanation/Justification: Incorrect.

Spray Valves auto close on lowering PRZR pressure versus remain open. If candidate does not understand PZR Pressure scheme, they may have a misconception on how this control works. Correct that block valves will remain open (NSA Correct. A lowering PRZR pressure due to the vapor space leak caused by PORV leakage results in a low pressure alarm when PRZR pressure drops to 2185 psig. This lowering demand signal closes spray valves as shown on technical references.

The PRZR PORV Block valves will remain open due to control switches NSA Normal until the operator takes action to close these valves. Incorrect.

PRZR Spray Valves close on lowering PRZR pressure versus remain open. Plausible that PRZR Block Valves will automatically close when 213 PRZR pressures channels are @ 2185 psig if the control switch was in AUTO versus OPEN since this is the Unit 2 design. Incorrect.

Correct Spray Valve Position.

Plausible that PRZR Block Valves will automatically close when 213 PRZR pressures channels are 2185 psig if the control switch was in AUTO versus OPEN since this is the Unit 2 Sys # System Category KA Statement 008 Pressurizer Vapor Space Accident Knowledge of the interrelationship between the Valves (Relief Valve Stuck Open) pressurizer vapor space accident and the following:

KIM AK2.01 KIA Importance 2.7* Exam Level RO References provided to Candidate Technical Referencesi: 10M-6.4.1F , Rev. 11, pg. 23 & 24 1505-6.4, Rev. 11, pg. HO-54 10M-6.3.C, Issue 4, Rev. 8, Pg. 14 10M-6.4.ABU, Issue 3, Rev. 0, pg. 1 Question Source: Bank -Vision # 82001 (2LOT7 NRC Exam -0#2) Question Cognitive Level: Higher Comprehension or Analysis 10 CFR Part 55 Content: (CFR 41.7 145.7) Objective:

119. Given a specific plant condition, predict the response of the pressurizer and pressure relief system control room indication and control loops, including all automatic functions and changes in equipment status, for either a change in plant condition or for an off normal condition: (Excessive Primary Plant Leakage, RCS voiding, process instrument failure)

Beaver Valley Unit 1 NRC Written Exam (1LOT8) 3. Given the following plant conditions:

A. B. C. D. Unit 1 experienced a Small Break Loss of Coolant Accident (SBLOCA). A manual Reactor Trip and Safety Injection was initiated. RCS pressure is 785 psig and stable. The hottest Loop THot indication is 471 Of and stable. The average of the FIVE hottest CET's is 483 Of and stable. Total Feed Flow is 600 gpm and stable. Pressurizer Level is 15% and stable. Containment Pressure is 5.5 psig and stable. Operators are determining whether conditions are present to allow a transition to ES-1.1 , "SI Termination", from E-O, "Reactor Trip or Safety Injection".

The Unit Supervisor asks the Reactor Operator to determine RCS subcooling using Steam Tables. Which of the following identifies current RCS subcooling.

and whether a transition to ES-1.1 is appropriate? (Reference Provided)

Subcooling is approximately

_ (1) _. and the transition to ES-1.1 (2) _ be made. (1) 35°F (2) shall (1) 470f (2) shall (1) 350f (2) shall NOT (1) 47°F (2) shall NOT Answer: C Explanation/Justification: Incorrect.

Correct subcooling margin @ 3S'F. Incorrect that transition criteria is met. (refer to correct answer explanation) Incorrect.

If the candidate uses Thot as opposed to CET to calculate subcooling, it will come out to 47'F which makes this a plausible however, the transition criteria is still not met based on PRZR level (refer to correct answer Correct. 785 psig equals 800 psia. Saturation temperature for 800 psia is 518.21*F lAW Steam Tables. Subcooling is 3S.21'F. The subcooling criteria>

54'F is NOT met. Since subcooling criteria is NOT met, the RNO requires the use of Attachment 6-A which is provided.

At 785 psig, the 35 F would be met based on adverse criteria, however, the required 38% PRZR level is not met since adverse containment numbers apply due to containment pressure>

5 psig. Based on these numbers, transition critElfia is NOT met and a transition to ES-1.1 shall NOT occur. It is reasonable that the candidate know SI termination criteria from memory, so therefore this criteria is NOT provided.

KIA is met because subcooling and heat sink are the tie between a SBLOCA and the S/Gs and also relate to SI termination criteria. Incorrect.

Incorrect subcooling value. Correct that transition shall not be made. (refer to correct answer explanation).

Sys # System Category KA Statement 009 Small Break LOCA Knowledge of the interrelations between the small break LOCA and the following:

S/Gs KIM EK2.03 KIA Importance 3.0 Exam Level RO References provided to SEte1aAmttTahbies (tRSedABOOk)

Technical 10M-53A.1.E-1, Rev. 14, pg. 6, 1 OM-53B.4.E-1 , Rev. 14, pg. 53 Candidate

-ac men -

References:

10M-53B.5.GI-11, Issue 2, Rev. 0, pg. 2 & 5,Steam Tables (Red Book), Question Source: Bank -Vision #82002 (2LOT7 NRC -0#3) Question Cognitive level: Higher -Comprehension or Analysis 10 CFR Part 55 Content: (CFR 41.7/45.7)

Objective:

3S0S-53.2

3. State from memory the basis for SI termination criteria lAW BVPS -EOP Executive Volume. 3S0S-53.3 S. Given a set of plant conditions, locate and apply the proper EOP lAW BVPS -EOP Executive Volume.

Beaver Valley Unit 1 NFIC Written Exam (1LOT8) 4. Given the following plant conditions: A beyond design basis earthquake occurs resulting in a LBLOCA & Station Blackout. The Control Room Team is performing actions contained in ECA-O.O, "Loss of All Emergency 4KV AC Power" to restore power. RCS Subcooling based on Core Exit TC's is 2 of. Core Exit TC's are 735 and slowly FUSING. RVLlS Full Range indication is 38% and slowly DROPPING.

Which ONE of the following describes the status of the Core Cooling Critical Safety Function Status Tree, AND what method will be used to determine their status? A. RED Path; may be determined using IPC. B. ORANGE Path; may be determined using IPC. C. RED Path; must be determined using MCB indications because IPC is unavailable.

D. ORANGE Path; must be determined using MCB indications because IPC is unavailable.

Answer: A Explanation/Justification: Correct. Conditions present indicate a RED CSF Status. (ie; > 719 F and < 40% RVLl8) IPC is available during a station blackout to monitor core cooling status. The IPC is powered by Battery Backed DC-SWBD-3 since normal MCC1-E9 supply is lost due to station blackout. Incorrect.

Incorrect CSF conditions.

Conditions present indicate a RED versus ORANGE CSF Status. Correct IPC status. Incorrect.

Correct C8F Status. It is incorrect that MCB indications must be used although they are available because IPC is still available.

This plausible if the candidate does not know the status of Incorrect.

Incorrect CSF conditions.

It is incorrect that MCB indications must be used although they are available because IPC is still This is plausible if the candidate does not know the status of Sys# System Category KA Statement 011 Large Break LOCA Ability to determine and interpret the following as they Verification of adequate core cooling. apply to a Large Break LOCA: KIM EA2.10 KIA Importance 4.5 Exam Level RO References provided to Technical

References:

10M-53A.1.F-0.2, Issue 1C, Rev. 1, pg 1 lOM-5A.3.C, Rev. 10 pg. 4 & 6 380S-39.1, Rev. 8 PPNT Slides Question Source: New Question Cognitive Level: Higher -Comprehension or Analysis 10 CFR Part 55 Content: (CFR 43.5/45.13) 2. Concerning critical safety function restoration, lAW BVPS EOP Executive Volume, state from memory the following, Objective:

3S0S-53.1 The CFS in order of priority, The priorities of the color-coded end points of the CSFSTs, and the red path summary conditions from EOPs. 3S08-53.3

5. Explain from memory the basis for the decision blocks of each Status Tree, lAW BVP8 EOP Executive Volume.

Beaver Valley Unit 1 NRC Written Exam (1LOT8) 5. Given the following plant conditions: The Unit was operating at 60% when all charging flow was lost. The Control Room Team entered AOP 1 .7.1 , "Loss of Charging Or Letdown". Letdown has been isolated and charging restoration is being investigated. The Reactor Operator reports Pressurizer (PRZR) level is lowering at a rate of 1 % every five (5) minutes. PRZR Level was 4% below reference when letdown was isolated.

If charging flow is NOT restored, which ONE of the following is the LONGEST time that PRZR heater operation can be maintained?

A. 40 minutes B. 85 minutes C. 125 minutes D. 145 minutes Answer:C Explanation/Justification: Incorrect.

Value reflects 22% -14% = (8%) (5) = 40 minutes. Incorrect initial level. Incorrect.

Value reflects 39% -22% = (17) (5) = 85 minutes Incorrect final level Correct. At 60% power, PRZR Level is 60% of full range (0% power 547 F = 22% PRZR Levell 1 00/0 power 578 F = 57 % PRZR Level) Therefore at 60% PRZR level =43%. The stem of the question indicates PRZR Level was 4% less than reference which =39%. PRZR Level cutout automatically occurs when PRZR level reaches 14%. Therefore with level lowering 1 % every 5 minutes, it will take 125 minutes to reach 14%. 125 minutes is the longest time that PRZR heater operation can be maintained based on these plant conditions.

All distractors are plausible based on misconceptions or common errors. Incorrect.

Value reflects 43% -14% = (29%) (5) =145 minutes. Did not subtract 4% below reference level. Sys # System Category KA Statement 022 Loss of Reactor Coolant Ability to determine and interpret the following as they How long PZR level can be maintained within Makeup apply to the Loss of Reactor Coo ant Makeup: limits. KlA# AA2.04 KIA Importance 2.9 Exam Level RO References provided to Technical

References:

None 1 SOS-6.4 PPNT Slide # 56, Rev. 11 10M-52.4.B, Rev. 40, pg 141 & 142 Question Source: New Question Cognitive Level: Higher -Comprehension or Analysis 10 CFR Part 55 Content: (CFR 43.5/45.13) Objective:

20. Given a specific plant condition, predict or describe the response of the Chemical and Volume Control System control room indication and control loops, including all automatic functions and changes in equipment status, for either a change in plant conditions or for an off normal condition (ie. Excessive Primary Plant ICVCS Leakage)

Beaver Valley Unit 1 NRC Written Exam (1LOTS) 6. Given the following plant conditions and seqw9nce of events:

  • The reactor was shutdown from an extended Full Power run at 1200, FOUR days ago.
  • It is currently 1600.
  • RCS Temperature is '1=.
  • RCS Pressure is 235 psig.
  • PRZR Water Level is 22%.
  • A Complete Loss of RHR occurred.
  • All THREE Loops are available for heat removal. Based on the reference provided and stated plant conditions, which ONE of the following is the estimated time to saturation? (Reference Provided)

A. < 1/2 hour B. > 112 hour0.0013 days <br />0.0311 hours <br />1.851852e-4 weeks <br />4.2616e-5 months <br /> and < 1 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. C. > 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> but < 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. D. > 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> but < 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />. Answer: 0 Explanation/Justification: Incorrect.

Plausible if the candidate uses Attachment 5 as referenced by step 11 of AOP 1.10.1. Incorrect.

Plausible if the candidate uses Attachment 4 time to boiling from 100 F. Incorrect.

Plausible if the candidate incorrectly calculates H/U rate, improperly applies the curves, or makes a mathematical error. Correct. Using Attachment 3 of AOP 1.10.1 and steam tables, the candidate will determine that Tsat for 235 psig (250 psia) is 401 F. Present RCS temperature is 180 F. Time since shutdown is 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />. Using Altachment 7, the current H/U rate is 1.5 F/min. 221 F/1.5 F/min = 147.3 minutes. Sys # Category KA Statement 025 Loss of RHR Knowledge of the operational implications of the following Loss of RHRS during all modes of concepts as they apply to Loss of Residual Heat Removal System: operations.

KIM AK1.01 KIA Importance 3.9 Exam Level RO References provided to Technical i

References:

Steam Tables Steam Tables 10M-53C.4.1.10.1 10M-53C.4.1.1 0.1, Rev. 12 Question Source: New Question Cognitive Level: Higher _ Comprehension or Analysis 10 CFR Part 55 Content: (CFR: 41.8/41.10

/45.3) Objective:

1 SQS-53C.l

6. Given a set of conditions, apply the correct AOP.

Beaver Valley Unit 1 NRC Written Exam (1LOT8) 7. Given the following plant conditions: The plant is operating at 100% power with all systems in NSA. [FI-1CC-107A], "RCP 1A Thermal Barrier Flow" has increased to 55 GPM and continues to slowly RISE. [U-1CC-100], "CCR Surge Tank Level" is slowly DROPPING.

Which ONE of the following is the cause of these conditions AND what automatic action will occur if these trends continue?

The cause of these conditions is a __ (1) AND with no operator action the _ (2) A. (1) 1 A RCP Thermal Barrier Leak (2) 1 A RCP thermal barrier outlet isolation valve will CLOSE. B. (1) CCR Leak downstream of 1 A RCP Thermal Barrier (2) 1 A RCP thermal barrier outlet isolation valve will CLOSE. C. (1) 1A RCP Thermal Barrier Leak (2) inlet and outlet containment isolation valves for 1 A RCP will CLOSE. D. (1) CCR Leak downstream of 1A RCP Thermal Barrier (2) inlet and outlet containment isolation valves for 1 A RCP will CLOSE. Answer: B Explanation/Justification: Incorrect.

Plausible that 1A RCP thermal barrier could be leaking based on increasing FI-1CC-107A flow, however, the candidate must differentiate out leakage from the system versus in leakage based on CCR Surge Tank level change. Correct that a high flow condition at 58 gpm will close the 1 A RCP thermal barrier outlet valve. Correct. Increasing flow on FI-1CC-107A combined with a dropping CCA Surge Tank level is indicative of a leak downstream of 1A RCP thermal barrier. TV-1CC-107A will auto close when CCR Flow as sensed by FT-1 CC-107A increases to 58 GPM. Dropping 8urge Tank level is an entry condition for Loss of CCR AOP. The KIA is met because the candidate must have knowledge that Loss of CCR AOP entry conditions have been met and they must be able to monitor the impact on an Rep which is a CCR heat load monitored in the control room. They must have specific knowledge of the operational impact based on stated parameters in the stem of the question. Incorrect.

Refer to discussion in A. Incorrect that the inlet and outlet CI valves close on this condition.

They close on CIA only. Incorrect.

Correct condition.

Incorrect auto action (refer to above discussion)

Sys# System Category KA 026 Loss of Component Cooling Water Ability to operate and/or monitor the following as they Loads on the CCWS in the control apply to the Loss of Component Cooling Water: KIM AAl.02 KIA Importance 3.2 IExam Level RO References provided to Candidate None Technical 1808-15.1, Rev. 11 PPNT Slides

References:

1 OM-53C.4.1.15.1, Rev. 4, Pg. 1, 2, & 4 10M-15.1.E, Rev. 4, Pg. 5 & 8 10M-15.1.D, Issue 4, Rev. 1, Pg. 5 Question Source: New Question Cognitive Level: Higher Comprehension or Analysis 10 CFR Part 55 Content: (CFR 41.8/41.10/45.3)

17. Given in-leakage or out-leakage to/from the CCR system, describe all the means by which the leakage can be Objective:

1 S08-15.1 detected.

Beaver Valley Unit 1 NRC Written Exam (1LOT8) 8. Given the following plant conditions and sequ1ence of events:

  • The Plant is operating at 50% power. Control rods are in MANUAL. Pressurizer (PRZR) 2A & 2B Backup Heaters are in the ON position.
  • The Pressurizer (PRZR) Master pressure controller output failed AS IS.
  • A secondary load rejection (step load decrease of 10%) occurs. No operator action is taken. Based on these plant conditions, what will be the impact of the secondary load rejection on PRZR Spray Valve [PCV-1 RC-455A] position AND the two groups of energized PRZR Backup Heaters [2A & 2B]? PCV-1 RC-455A wililNITIALLY _ (1) _ AND energized PRZR heaters will_ (2) A. (1) open (2) de-energize B. (1) open (2) remain energized C. (1) remain as is (2) de-energize D. (1) remain as is (2) remain energized Answer: D ExplanatiOn/Justification: Incorrect.

Incorrect spray valve response.

Plausible if candidate does nDt recognize the impact of the Master pressure Controlier failure. heaters will remain energized.

Plausible if the candidate believes PRZFlievel drops to 14% which cuts off PRZR heaters by Incorrect.

Incorrect spray valve response.

Correct PRZR Backup Heater response. Incorrect.

Correct spray valve response.

PRZR heaters will remain energized.

Plausible because PRZR heaters are designed to turn off increasing PRZR Correct. A load rejection results in an increase in RCS temperature. (PI.ant will not trip due to reactor power level) The Tavg increase will cause an expansion of water into the PRZR (Insurge) compressing the vapor space which in turn will increase PRZR pressure.

On increasing PRZR pressure, the Master Pressurizer Control System is designed to open the Spray Valves to lower PRZR pressure back to NOP (2235 psig). However, since the Master Pressure Controller has failed as is, it will not respond to the changing system parameters and therefore will not reposition Spray Valves open. Backup PRZR heaters 2A & 2B will remain energized because they are energized on and the master pressure controller has failed at a setpoint which will not cause them to turn off regardless of what happens to PRZR pressure follOwing the transient.

Sys # System category KA Statement Pressurizer Pressure Knowledge of the operational implications of the following Expansion of liquids as temperature Control System Malfunction concepts as they apply to Pressurizer pressure Control increases.

Malfunctions:

KIM AK1.02 KIA Importance 2.8 Exam Level RO References provided to Technical

References:

10M-6.1.C, Rev. 7, pg.23 & 24 lOM-6.4.1F , Rev. 11, pg. 12 & 23 1505-6.4, Rev. 11, Issue 1, pg HO 18 & 74 & 75 Question Source: New Question Cognitive Leve): Higher -Comprehension or Analysis 10 CFR Part 55 Content: (CFR (41.8/41.10/45.3)

Objective:

19. Given a specific plant condition, predict the response of the PRZR and Pressure Relief System control room indication and control loops, including all automatic functions and changes in equipment status, for either a change in plant conditions or for an off-normal condition (ie: Process instrument failure).

027 Beaver Valley Unit 1 NRC Written Exam (1 LOTS) 9. Given the following plant conditions: The Unit has been operating at 100% power for 345 days. A VALID high pressurizer pressure reactor trip signal is received and the reactor DOES NOT automatically trip, and it CANNOT be tripped manually from the control room. The Control Room Team is performing FR-S.1, "Response to Nuclear Power Generation -A lWS" actions. For these conditions, WHAT is the basis for tripping the turbine? Turbine trip ____________

.___ A. removes a large source of positive reactivity addition.

B. prevents the main feed pumps from tripping on low suction pressure.

C. provides an additional reactor trip signal to the reactor protection system. D. maintains the emergency core cooling system within its design capability. A Explanation/Justification: Correct. lAW the bases for step 1 and 5 of FR-S.l. The turbine removes a potential RCS cooldown which would add positive reactivity from negative Incorrect Tripping the turbine should improve the feed pump suction However, this is not the basis for tripping the turbine during an ATWS event. Tripping the turbine also conserves SG water inventory.

In the event of a loss of feed induced ATWS conserving water inventory is a primary purpose for tripping the turbine. The candidate may link the loss of feed to the low suction pressure trip on the main feed pumps. Incorrect.

The candidate wifl need to understand the fundamentals of a negative MTC in order to arrive at the correct answer. The Turbine trip will send an additional Rx trip signal to RPS. However, this is not the basis "or tripping the turbine during an A TWS event. Incorrect.

This is the basis for tripping the reactor versus the turbine. The reactor trip is verified to ensure that only heat being added to the RCS is from decay heat and RCP heat. Sys System Category KA Statement Anticipated Transient Knowledge of the reasons for the following responses as Actions contained in EOP for A TWS. Without Scram (A TWS) they apply to the A TWS: KiA# EK3.12 KiA Importance 4.4 Exam Level RO References provided to Candidate None Technical lOM-53A.1.FR-S.1, Issue lC, Rev. 5, pg. 2 & 4 1 OM-53BA.FR-S.1, Issue 1 C, Rev. 5, pg. 57 & 62 Question Source: Bank -Vision # 82007 (2LOT7 NRC Exam -0#8) Question Cognitive Level: Lower -Memory or 10 CFR Part 55 Content: (CFR 41.5/41.10/45.6/45.13) Objective:

3S0S-53.3 State from memory the basis and sequence of major action steps of each EOP lAW BVPS-EOP Executive Volume.

Beaver Valley Unit 1 NRC Written Exam (1LOTS) During power operation, Steam Generator (S/G) Tube leakage was detected and estimated at 100 gpm when RCS pressure was 2200 psig and S/G pressure was 800 psig. Which ONE of the following is the approximatl3 current leak rate if RCS pressure is 1350 psig and S/G pressure is 1000 psig? (Assume break size has NOT changed) S/G Tube leak rate _____ decreases to approximately 25 gpm. decreases to approximately 50 gpm. decreases to approximately 75 gpm. remains equal to initial leak rate of 100 gpm. Answer: B Explanation/Justification: Incorrect.

Plausible if candidate misunderstands fundamentals and/or miscalculates. Correct. The leak rate corresponds to the square root of the differential pressure.

2200 -800 1350 Square root = 37/1350 -1000 350 Square root = 18. Therefore the leak rate drops by about half. (ie: 18/37 .486) Incorrect.

Plausible if candidate misunderstands fundamentals and/or miscalculates. Incorrect.

Plausible if candidate misunderstands fundamentals and/or miscalculates.

Sys # System Category KA Statement 038 Steam Generator Tube Rupture Knowledge of the operational implications of the Leak rate vs. pressure drop. following concepts as they apply to the SGTR: KI A# EK 1.02 KIA Importance 3.2 Exam Level RO References provided to Candidate Technical

References:

GO-GPF.T6 , Rev. 2 Question Source: New Question Cognitive 10 CFR Part 55 Content: Higher -Comprehension or (CFR: 41.8/41.10/45.3)

Objective:

GO-GPF.T6

27. Describe different type of fluid measuring devices.

Beaver Valley Unit 1 NRC Written Exam (1LOT8) 11. Given the following plant conditions:

  • The Unit is operating at Full Power with all systems in NSA.
  • A Large Steam Line Break occurs outside containment in the turbine building.
  • All systems function as designed.
  • No operator action occurs. Which ONE of the following describes the status of the following components?

1 FW-P-1A ("A" Main Feedwater HYV-1FW-100B (1B S/G Main FW CNMT Isol FCV-1 FW-499 (1C S/G FW Bypass FCV-1 FW-478 (1A S/G Main FW Reg 1FW-P-1A HYV-1FW-100B A. RUNNING OPEN B. RUNNING CLOSED C. STOPPED CLOSED D. STOPPED CLOSED Answer: D Explanation/Justification:

FCV-1 FW-499 OPEN CLOSED CLOSED CLOSED FCV-1FW-478 CLOSED CLOSED OPEN CLOSED A. Incorrect.

This configuration reflects a partial FWI which occurs on a reactor trip with 2 of 3 Tavg signals < 554 F. B. Incorrect.

MFP trips on Full FWI. C. Incorrect.

MFRV closes on a Full FWI. D. Correct. This is the correct configuration for a Full FWI which has occurred due to initiation of SI on low steam line pressure as a result of the SLB. Sys # System Category KA Statement 040 Steam Line Rupture Ability to operate and 1 or monitor the following as they Feedwater isolation.

Excessive Heat Transfer apply to the Steam Line Rupture: Kf A# AA 1.02 Kf A Importance 4.5 Exam level RD References provided to Candidate None Technical 1 DM-24.1.D, Rev. 5, pg. 7 1 DM-53A.1.1-C, Issue 1 C, Rev. 1, pg 3 Unit 1 ECCS Setpoints Question Source: New Question Cognitive level: Lower -Memory or Fundamental 10 CFR Part 55 Content: (CFR: 41.7/45.5/45.6)

Objective:

1

16. Given a specific plant condition, predict the response of the Main Feedwater, Dedicated Auxiliary Feedwater System, Auxiliary Feedwater System or SGWLC System control room indication and control loops, including all automatic functions and changes in eqUipment status for either a change in plant condition or off normal condition.

Beaver Valley Unit 1 NRC Written Exam (1LOTS) 12. Given the following plant conditions and sequence of events: The Unit is operating at 75% power with all systems in NSA. "A" Heater Drain Pump is operating and "8" is in standby. One Main Feedwater Pump has tripped. SG 1A NR levels are ALL indicating 23% and lowering. SG 18 NR levels are ALL indicating 22% and lowering. SG 1 C NR levels are ALL indicating 21 % and lowering. Pressurizer pressure is indicating 2310 psig and rising on all protection pressure channels.

In accordance with AOP-1.24.1 "Loss of Main Feedwater", which ONE of the following actions is required?

A. Reduce Turbine Load to s 50% power. 8. Manually start the "8" Heater Drain Pump. C. Manually start the Dedicated Auxiliary Feedwater Pump [1 FW-P-4]. D. Manually trip the Reactor and enter E-O, "Reactor Trip or Safety Injection".

Answer: 0 Explanation/Justification: Incorrect.

Incorrect action for these plant conditions.

Plausible action as specified in Step 3 of AOP 1.24.1. Incorrect.

Incorrect action for these plant conditions.

Plausible action as specified in Step 4 of AOP 1.24.1. Incorrect.

Incorrect action but plausible because it is an action in FR-H.1 and was previously referenced as an action in AOP 1.24.1. Correct. AOP-l.24.1 requires action to trip the reactor if one MFP is lost> 70% power. Sys# System Category KA Statement 054 Loss of Main Feedwater NlA Ability to interpret control room indications to verify status and operation of a system, and understand how operator actions and directives affect plant and system conditions.

KlA# 2.2.44 KIA Importance 4.2 Exam level RO References provided to candidate None Technical

References:

1 OM-53C.4.1.24. 1 , Rev. 7, pg. 2 Question Source: Question Cognitive level: Higher -Comprehension or Analysis 10 CFR Part 55 Content: (CFR: 41.5/43.5/45.12Objective:

1 SQS-53C.1

6. Given a set of conditions, apply the Beaver Valley Unit 1 NRC Written Exam (1LOTS) ECA -0.0, "Loss of All Emergency 4KV AC Power" requires personnel be dispatched to locally isolate Rep seal injection.

What is the reason for this isolation? To prevent water hammer and potential seal injection line failure. To prevent potential RCP seal damage when a charging pump is restarted. To reduce the possibility of radioactive release to the. Auxiliary Building. To prevent steam formation in Component Cooling System due to overheating in the thermal barrier. Answer: B Explanation/Justification: Incorrect.

Plausible that water hammer and seal injection line failure could occur, however, not the background document reason for isolation. Correct. According to ECA-O.O background document, isolating RCP seal injection lines prepare the plant for recovery while protecting the RCPs from seal and shaft damage that may occur when a charging pump is started as part of recovery.

With RCP seal injection lines isolated, a charging pump can be started in the normal charging mode without concern for cold seal injection flow thermally shocking the RCPs. Incorrect.

This is the reason for isolating seal return versus injection. Incorrect.

This is the reason for isolating CCR return flow. Sys# System Category KA Statement 055 Station Blackout Knowledge of the reasons for the following responses as Actions contained in EOP for loss of offsite they apply to the Station Blackout:

and onsite power. KIM EK3.02 KIA Importance 4.3 Exam Level RO References provided to Technical

References:

10M*53A.1.ECA-O.O,lssue lC, Rev. 9, pg. 9 10M-53B.4.ECA-O.O, Issue lC, Rev. ,pg. 87 & 88 Question Source: Bank -Vision # 17 Question Cognitive Level: Lower _ Memory or Fundamental 10 CFR Part 55 Content: (CFR: 41.5/41.10/45.6/45.13) Objective:

3. State from memory the basis and sequence for the major actions steps of each EOP procedure, lAW BVPS EOP Executive Volume.

Beaver Valley Unit 1 NRC Written Exam (1LOT8) 14. Given the following plant conditions: A Loss of ALL AC Power occurred requiring the crew to enter ECA-O.O, "Loss Of All Emergency 4KV AC Power". An Emergency Diesel Generator (EDG) was returned to service in Step # 7 PRIOR to taking control switches to PULL-TO-LOCK in Step #12, and power was subsequently restored to ONE (1) 4KV Emergency Bus. Which ONE of the following describes when the EDG will sequence loads onto the bus AND the reason for this sequencing?

The last load powered by the EDG completes sequencing

__ (1) __after initiating signal. The reason for sequential loading of the EDG is to (2) __ A. (1) 0 -30 seconds (2) prevent the emergency bus from becoming inoperable.

B. (1) 0 -30 seconds (2) prevent damage to reactor coolant pump seal package. C. (1) 31-60 seconds (2) prevent the emergency bus from becoming inoperable.

D. (1) 31 -60 seconds (2) prevent damage to reactor coolant pump seal package. Answer: C ExplanatiOn/Justification: Incorrect.

Improper time. Correct reason. Incorrect.

Improper time. Improper reason. Reason is plausible since ECA-O.O background focuses heavily on protection of RCP seal packages. Correct. According to TS 3.S.1 bases and 1 OST -36.3 (4) all EDG loads are sequenced onto the EDG within 60 seconds. The reason for this timing is to recover the unit or maintain it in a safe condition.

T.S. 3.8.1 !bases furthermore states the reason for EDG load sequencing is to protect the EDG from overload and that improper loading sequence may cause the emergency bus to become inoperable. (ie: EDG overload would result in a loss of the associated emergency bus). No SIS is present so therefore the charging pump output breaker did not shut at time O. Incorrect.

Correct time. Incorrect reason. Reason is plausible since ECA-O.O background focuses heavily on protection of RCP seal packages.

Sys# System Category KA Statement 056' Loss of Offsite Power Knowledge of reasons for the following responses as they Order and time to initiation of power for the apply to a Loss of Offsite Power: load sequencer.

KlA# AK3.01 KIA Importance 3.5 Exam Level RO References provided to Technical

References:

10M-53A.1.ECA-0.0, Issue 1C, Rev. 8, pg.3, 4, & 6 10ST-36.3 (4), Rev. 28, pg. 73 & 75 TS 3.S.1 Bases, Rev. 0, pg. 83.8.1-1 & 2 Question Source: Bank Vision # 82012 (2L0T7 NRC 0#12) Question Cognitive Level: Lower Memory or Fundamental 10 CFR Part 55 Content: (CFR 41.5, 41.10/45.6/45.13) Objective:

3. State from memory the basis and sequence for the major action steps of each EOP procedure, lAW BVPS-EOP Executive Volume.

Beaver Valley Unit 1 NRC Written Exam (1LOT8) 15. The plant is operating at 60% power when the following alarms are received: [A9-100], 125VDC BATTERY CHGR 1 FAILURE [A9-98], 125VDC BUS 1 VOLTAGE LOW Several minutes after the alarms are received: The plant continues to operate at 60% power. 125 VDC BUS 1 Voltage indicates approximately 124 VDC and is slowly DROPPING. Station Battery Charger Breaker [BAT-CHG1-1A]

has been verified closed and 480V MCC1-E9 is energized. No operator actions have yet occurred.

For the given indications, which ONE of the following describes the 125VDC BUS 1 status? Battery Charger 1-1 A has failed. Station Battery #1 is supplying 125VDC Bus 1. Station Battery #1 has failed. Battery Charger 1-1 A is supplying 125VDC Bus 1. Station Battery #1 and Battery Charger 1-1A have failed. 125 VDC Bus 1 is degraded. Station Battery #1 and Battery Charger 1-1 A are operating normally.

Station Battery is supplying 125 VDC Bus 1 . Answer: A Explanation/Justification: Correct. When a battery charger is lost, the station battery will automatically supply power to the loads on the effected bus. A9-100 and A9-98 are entry conditions for Loss of DC Power AOP. Incorrect.

If battery charger 1 were supplying the normal bus loads, 125VDC Bus 1 voltage would indicate between 127.8V and 135V. Incorrect.

Would have resulted in a loss of control power to EDG No.1 and 4160 V Bus 1 AE. Also the plant would no longer be operating at 60% power. Incorrect.

If Battery Charger 1 and Station Battery are operating normally, the alarms would not have been received.

It is correct that the battery is supplying the Sys # System Category KA Statement 058 Loss of DC Power N/A Ability to diagnose and recognize trends in an accurate and timely manner utilizing the appropriate control room reference material.

KlA# 2.4.47 KIA Importance 4.2 Exam RO level References provided to Candidate Technical

References:

10M-39.4.AAI, Rev. 6, pg. 2 10M-39.4.AAJ, Issue 3, Rev. 3, pg. 1 10M-39.4.A, Rev. 8, Pg. 2-5 3S08-39.1 Unit 1 PPT Slide Question Source: Bank -Vision # 45879 Question Cognitive Level: Higher _ Comprehension or Analysis 10 CFR Part 55 Content: (CFR: 41.10/43.5/45.12) Objective:

3808-39.1

20. Given a change in plant conditions due 10 system/component failure, analyze 125VDC distribution system to determine what failure has occurred.

Beaver Valley Unit 1 NRC Written Exam (lLOT8) 16. Given the following plant conditions and sequence of events:

  • The Unit is operating at 20% power. * "B" Main Feedwater Pump is running.
  • A normal plant shutdown is in progress due to inoperability of No.1 EDG. * "B" RPRW pump was just taken to Pull-to-Lock due to excessive seal leakage reported in the intake structure cubicle. An "A" 4KV Bus electrical fault occurred resulting in the following breakers tripping OPEN: o Main Generator Exciter Breaker o Both Main Generator Output Breakers o 4KV Bus "A" Feeder Breakers from USST and SSST. Based on these plant conditions, which of the following procedures have valid required entry conditions within three (3) minutes after the Bus "A" fault occurred? (assume all systems function as designed)
1. E-O, "Reactor Trip or Safety Injection".
2. AOP 1.26.1, "Turbine and Generator Trip". 3. AOP 1.36.2, "Loss of 4KV Emergency Bus". 4. AOP 1.30.2, "River Water/Normal Intake Structure Loss". A. 1 ONLY. B. 3 &4 ONLY. C. 1, 2, 3, &4. D. 2,3, & 4 ONLY. Answer: D Explanation/Justification: Incorrect.

The candidate must recognize that a Loss of the "A" RCP (Bus 1A) will NOT result in a reactor trip since the reactor is < P-8 (30%). Also the stem of the question notes that "S" MFP is running to dispel a challenge that a loss of main feedwater occurred due to a loss of the "B" MFP. This is a plausible distractor and would be a correct choice if the reactor were:> 30% power. A reactor trip is NOT required for these conditions since none has occurred and no valid entry conditions have been met. Incorrect.

Both choices are correct. however. AOP 1.26.1 will also have valid entry conditions (refer to correct answer). Plausible because candidate may either not recognize a turbine trip occurred or may think it is not applicable since we are < p-g (49% reactor Incorrect.

Incorrect that E-O is required. (refer to correct answer and A distractor explanations for why other choices are correct). Correct. A Loss of 1 AE Bus will occur with No.1 EDG on clearance and a loss of offsite power source available to 4160 Bus A. With no power to the AE Bus entry conditions will be met for AOP 1.36.2. Since a turbine trip will occur due the nature of the electrical fault which opened both main generator breakers and exciter output breakers entry conditions for AOP 1.26.1 are met. Since the "B" RW pump was placed in PTL and a Loss of the AE Bus occurred, there is no power to the "A" Train River Water Pump which results in a Loss of River (Service)

Water. Entry conditions for AOP 1.30.2 are met. Entry conditions to procedures are RO level knowl13dge.

Furthermore the majority of the referenced procedures have immediate operator actions which are also required RO knowledge.

Sys# System Category KA Statement 062 Loss of Nuclear Service Water NlA Ability to recognize abnormal indications for system operating parameters that are entry conditions for emergency and abnormal operating procedures.

KIM KIA Importance Exam Level RO 4.5 References provided to Candidate Technic,al

References:

10M-53Co4.1.36.2, Rev. 8. pg. 1 None lOM-53Co4.1.26.1, Rev. 19, pg. 1 10M-53Co4.1.30.2.

Rev. 8. pg. 1 Question Source: New Question Cognitive Level: Higher-Comprehension or Analysis 10 CFR Part 55 Content: (CFR: 41.10/43.2/45.6) 1 SOS-53C.1

1. State all immediate operator actions associated with the AOPs. 3S0S-53.3
6. Given a set of conditions.

locate and apply the proper EOPs lAW BVPS-EOP Executive Volume.

Beaver Valley Unit 1 NRC Written Exam (1LOT8) 17. Given the following plant conditions: The plant is operating at 95% power with all systems in NSA. Turbine Controls is selected to 1 st Stag Ie IN. Valve Position Limiter is set 5% above Governor Valve Position. DLC System Operations Control Center reports that disturbances have resulted in degraded grid frequency and voltage. The Control Room Team has entered ,L\OP %.35.1, "Degraded Grid". Given these conditions, which ONE of the following describes the relationship degraded grid 'frequency/voltage and reactor As grid frequency/voltage continues to drop, mactor power will __ (1) __An automatic reactor trip will occur if 2/3 Reactor Coolant Pump (RCP) 4KV Bus drop to __ (2) __A. (1) increase (2) 57.5 Hz B. (1) increase (2) 58.5 Hz C. (1) be unaffected (2) 57.5 Hz D. (1) be unaffected (2) 58.5 Hz Answer: A Explanation/Justification: Correct. Step 6 of AOP AOP Y2.35.1 requires reactor power maintained at <1= 100% and directs a power reduction if power> 100%. As grid frequency/voltage drops, the power requirement increases which will result in increasing reactor power. An automatic reactor trip will occur if 2/3 RCP 4KV Bus frequencies drop to 57.5 Hz. With the Main Turbine in 1 st Stage IN, as grid frequency drops, the increased steam demand will result in a drop in 1st stage pressure which will open governor valves to compensate for the load increase.

This in turn will drop RCS Temperature adding positive reactivity which will increase reactor power. Incorrect.

Incorrect automatic reactor trip value. Correct reactor power *iffect on decreasing frequency/voltage. Incorrect.

Incorrect that reactor power will be unaffected.

Correct automatic reactor trip value. Incorrect.

Incorrect that reactor power will be unaffected.

Incorrect automatic reactor trip value. Sys # System Category KA Statement Generator Voltage and Knowledge of the interrelations tJ,3tween Generator Reactor power Electric Grid Disturbances Voltage and Electric Grid Disturbances and the following:

KIM AK2.06 KIA Importance 3.9 Exam Level RO References provided to Candidate None Technical

References:

1/20M-53C.4A.35.1, Rev. 7, pg. 1-4 GOGPF.C5 PPNT Slides, Rev 1, Issue 2 Question Source: New Question Cognitive Level: Higher -Comprehension or Analysis 10 CFR Part 55 Content: (CFR: 41.4 / 41.5/ 41.7/41.10

/ 45.8) Objective:

1 SQS-53C.1

5. Discuss the general flow path of each procedure including the importance of step sequencing, where applicable.

077 Beaver Valley Unit 1 NRC Written Exam (1LOT8) 18. Given the following plant conditions:

  • A Loss of Coolant Accident (LOCA) outside containment occurred.
  • The crew is executing procedure steps of ECA-1.2, "LOCA Outside Containment".

What system AND parameter will be used in ECA-1.2 to interpret whether break isolation has occurred? PARAMETER A. Safety RCS Pressure B. Chemical and Volume Control RCS Pressure C. Safety Spent Fuel Pool Area Radiation Level D. Chemical and Volume Control Spent Fuel Pool Area Radiation Level Answer: A Explanation/Justification: Correct. ECA-1.2 checks only the Low Head Safety Injection flowpath for proper valve alignment and also to determine if the source has been isolated.

RCS Pressure is used as the determining parameter to ensure the break is isolated.

The operating behavior characteristics of the facility is that a potential exists for RWST inventory to be lost to the Aux Building for a LOCA that occurs outside containment in the LHSI system piping. Incorrect.

CVCS is a plausible system since it interconnects with the RCS and extends outside containment.

RCS pressure is the Incorrect.

Correct system. ECA-1.2 does check Aux Bldg and Safeguanjs Area radiation monitors which makes radiation levels a plausible distractor.

Spent Fuel area radiation level is monitored independently of PAB and Safeguards radiation monitors. Incorrect.

Incorrect system and parameter.

Distractor provides a good balance between other distractors and correct answer. Sys # System Category KA Statement W/E04 LOCA Outside Containment Ability to operate and lor monitor the following as they Operating behavior characteristics of the apply to the (LOCA Outside Containment) facility.

KIA#. EA1.2 KIA Importance 3.6 Exam Level RO References provided to Technical

References:

lOM-53A.1.ECA-1.2, Issue 1C, Rev. 1, pg. 3 1 OM-53B.4.ECA-1.2, Issue 1 C, Rev. 1, pg. 5 & 6 Question Source: Bank Vision # 82016 (2LOT7 NRC -0#16) Question Cognitive Level: Lower _ Memory or Fundamental 10 CFR Part 55 Content: (CFR41.7 145,.51 45.6) Objective:

3SQS-53.5

7. Apply the actions to isolate a loss of coolant outside of containment.

Beaver Valley Unit 1 NRC Written Exam (1LOTS) 19. Given the following plant conditions and sequence of events:

  • The Unit is at 100% power with all systlsms NSA. Pressurizer Level AUTO/MAN Control1E3r fails as is.
  • The plant is then reduced to 50% pow*:r at 3%/min.
  • Assume NO operator action is taken, related to the failure. Which ONE of the following describes how Charging Flow AND Programmed PRZR Level will indicate at 50% as compared to 100% power? [FI-1CH-122], Charging Flow will

[LR-1 RC-459], PROGRAM PRZR Level will be A. (1) lower (2) lower B. (1) the same (2) higher C. (1) the same (2) lower D. (1) the same (2) the same Answer: C Explanation/Justification: Incorrect.

These indications are indicative of L T -1 RC-459 failed in the as is position. Incorrect.

These indications are indicative of plausible candidate misconceptions related to actual vs. programmed PRZR level and Correct. If the PRZR Level controller fails as is and a load reduction occurred, then the input to FCV-1CH-122 will not change. Therefore 122 indicated flow will remain the same. Since a power reduction results in a Tavg decrease, then Program Level as indicated on LR-RC459 will drop to correlate with the PRZR Level Program. Program level is impacted by power reduction not the failure of LC-459G. Incorrect.

Correct that charging flow will remain the same. If the candidate does not understand the implication of power reduction and associated Tavg decrease, it is plausible that actual versus program PRZR would remain the same since charging flow has not changed. Sys# System Category KA Statement 028 Pressurizer Level Malfunction Knowledge of the interrelations between the Pressurizer Sensors and detectors.

Level Control Malfunctions and the following:

KiA# AK2.02 KiA Importance 2.6 Exam Level RO References provided to Technical

References:

None lOM-S.4.1F , Rev. 11, pg. 12 808-6.4 PPNT, Rev. 11, Pg 58 Question Source: New QUestion Cognitive 10 CFR Part 55 Content: Higher -Comprehension or (CFR: 41.7/45.7)

Objective:

180S-S.4 19. Given a specific plant condition, predict the response of the pressurizer and pressure relief system control room indication and control loops, including all automatic functions and changes in equipment status, for either a change in plant condition or for an off normal condition: (Process Instrument Failure).

lS0S-7.1 19. Given a specific plant condition, predict the response of the Chemical and Volume Control system control room indication and control loops, including all automatic functions and changes in eqUipment status, for either a change in plant condition or for an off normal condition: (Process Instrument Failure)

Beaver Valley Unit 1 NRC Written Exam (1LOT8) 20. Given the following plant conditions: The Unit is operating at 70% power when air leakage into the condenser resulted in a rising condenser backpressure. The Control Room Team is performing actions of AOP-1.26.2, "Loss of Condenser Vacuum". Concurrently, a load reduction is initiated at a rate of 5%/min in accordance with 1.51.1, "Unplanned Power Reduction". Five minutes after the load reduction was commenced, condenser backpressure has risen to 5.5 IN HG-ABS. Ten minutes after the load reduction was commenced, condenser backpressure has risen to 6 IN HG-ABS and continues to slowly rise. Which ONE of the following will be the REQUIRED action according to AOP-1.26.2, "Loss of Condenser Vacuum"? (Reference Provided) Immediately trip the reactor and go to E-O, "Reactor Trip or Safety Injection". Trip the reactor if condenser vacuum approaches C-9 setpoint and go to E-O, "Reactor Trip or Safety Injection". Immediately trip the turbine and go to AOP 1.26.1, "Turbine and Generator Trip". Trip the turbine if condenser vacuum approaches C-9 setpoint and go to AOP 1.26.1, "Turbine and Generator Trip". Answer: C Explanation/Justification: Incorrect.

This is a correct action if condenser vacuum remains >5.5 IN HG-ABS for more than five minutes and reactor power is > P-9, however, reactor power is < P-9 (490/0). After five minutes of load reduction reactor power is 45%. Incorrect.

This is a correct action referenced in AOP 1.26.2 if reactor power is > 10"/0, however, C-9 (lOIN HG-ABS) is not being approached at 6 in hg-abs and other trip criteria have been exceeded. Correct. According to AOP-l.2S.2, a turbine trip and entry into AOP 1.26.1 is required if reactor power is < P-9 (49%) and backpressure is > 5.5 IN HG-ABS for > 5 minutes and cannot be restored.

Initial reactor power was 70%. After 5 minutes of load reduction 5o/oimin, reactor power was lowered 45% which is < P-9 and> 270 MWE (-439 MWE). The reference is provided to comply with the KIA execute procedures steps and to ensure the question is at the RO level of knowledge.

This is not a direct lookup question because it application of reactor power and MWE calculations to derive the correct answer. Also it requires the candidate to apply continuous action Incorrect.

This is an incorrect action, however, balances out the distracter plausibility.

S1$ # System Category KA Statement 051 Loss of Condenser Vacuum NlA Ability to interpret and execute procedure steps. KIM 2.1.20 KIA Importance 4.6 Exam Level RO References provided to Candidate 1 OM-53C.4.1.26.2 (Pg 1-6 ONLy) Technical 1 OM-53C.4.1.26.2, Rev. 3, pg. 2 10M-26.4.AAC, Rev. 8, pg. 2 &3 Question Source: Modified Bank (1 LOT5 NRC 0#50) Question Cognitive Level: Higher _ Comprehension or Analysis 10 CFR Part 55 Content: (CFR: 41.10/43.5/45.12) 3S0S-53.5

27. Apply the actions for Loss of Condenser Vacuum. 1 SOS-53C.1
6. Given a set of conditions, apply the correct AOP.

Beaver Valley Unit 1 NRC Written Exam (1LOTS) 21. Given the following plant conditions and sequence of events:

  • The Unit is operating at 100% Power with all systems in NSA. Chemistry reports High RCS Activity to the Control Room.
  • A LOCA occurs and E-O, "Reactor Trip or Safety Injection" actions are in progress.

o A4-71 , "RADIATION MONITORING HIGH" o A4-72, "RADIATION MONITORING HIGH-HIGH"

  • The BOP is requested to determine if Adverse Containment radiation conditions exist. Which ONE of the following Radiation Monitor indications will be used by the BOP to determine Adverse Containment Radiation conditions?

A. RIS-1 RM-201, "Reactor Containment High Range Area Monitor".

B. RIS-1 RM-204, "Incore Instrument Transfer Device Area Monitor".

C. RIS-1CH-101A, "Reactor Coolant Letdown High Range Monitor".

D. RIS-1 RM-219A, "Containment High Range An3a Monitor".

Answer: D Explanation/Justification: Incorrect.

RM*1 RM*201 functions to provide local and control room indication of reactor containment area activity.

RM*1 RM*201 is an Ion Chamber detector and is more accurate at the mid to high radiation levels. The log scale for this meter is .1 to 1 E7 mr/hr. This falls short of the 1 E5 r/hr dose necessary to detect adverse containment conditions due to the limitations of its detector.

PlaUSible because it is used in AOP 1.S.S. Incorrect.

RM*1 RM*204 functions to provide local and control room indiGation of increased radiation levels during accident conditions, RM*1 RM* 204 is a Geiger*Muelier detector which functions to detect gamma radiation.

The log scale for this meter is .1 to 1 E4 mr/hr. This falls short of the 1 ES rlhr dose necessary to detect adverse containment conditions due to the limitations of its detector.

Plausible because it is used in AOP 1.S.S. Incorrect.

RM*1CH*101A functions to provide local and control room indication of RCS letdown line high activity.

RM*1CH*1 01A is a scintillation detector.

The meter indications range from 10 t01 ES CPM. This monitor although plausible because it is used in AOP 1.S.S is to indicating CPM versus containment radiation so therefore will not be used to determine adverse containment radiation Correct. RM*1 RM*219A functions to provide area monitoring of the containment for accident monitoring and provides alarms and indications the control room. The range of its ion chamber detector is 1 to 1 E7 R/hr which makes it ideal for monitoring containment radiation Sys# System Category KA Statement 061 ARM System Alarms Knowledge of the operational implications of the following concepts as Detector limitations they apply to Area Radiation Monitoring (ARM) System Alarms: KIM AK.01 KIA Importance 2.S IExam Level RO References provided to None Technical

References:

1 OM*S3C.4.1.6.6, Rev. 4, pg. 1*2 Candidate 10M*43.1 E, Rev. S, pg. 4, 10, 11, & 20 1 SQ8-43.1 , Rev. 13, pg 4,6,7,15-17 10M-43.4.AAB, Issue 4, Rev. 1, Pg 1 & 2 10M*43.4.AAC, Issue 4, Rev. 1, Pg 1 & 2 Question Source: New Question Cognitive level: Lower -Memory or Fundamental 10 CFR Part 55 Content: (CFR: 41.8/41.10/45.3)

Objective:

1. Describe the function of the Radiation Monitoring systems and the associated major components as documented in Chapter 43 of the Unit 1 Operating Manual.

Beaver Valley Unit 1 NRC Written Exam (1LOT8) 22. Given the following plant conditions:

  • The Unit is operating at 100% Power with all systems in NSA.
  • A serious fire in the East Cable Vault is confirmed.
  • Assume all automatic fire suppression systems function as designed.

Based on these plant conditions, which OJ\IE of the following describes the impact on Fire Brigade personnel?

The major concern to Fire Brigade personnel entering the East Cable Vault is (1) due to (2) used to automatically extinguish the fire in this area. A. (1) asphyxiation from displacement of oxygen (2) Halon and C02 B. (1) flooding and subsequent electrocution (2) C02 and Water C. (1) asphyxiation from displacement of oxygen (2) C02 ONLY D. (1) flooding and subsequent electrocution (2) Water ONLY Answer: C Explanation/Justification: Incorrect.

Correct that asphyxiation is a major concern. Incorrect that halon is used in this space (refer to COfrect answer). Incorrect.

Water is not used in the East Cable Vault as part of any autornatic suppression fire fighting systems and therefore flooding is not a major concern. Correct. The candidate must know that C02 is the fire fighting agent uSl3d in the East Cable Vault to automatically distinguish fires. Water or Halon are NOT used in this area. The operational implications of a serious fire in the East Cable Vault is that CO2 is a major concern when entering this space due to the safety hazards it may cause (ie: cardiac arrest or nervous system effects). Incorrect.

Water is not used in the East Cable Vault as part of any autornatic suppression fire fighting systems and therefore flooding is not a major concern. Plausible that water is used as a fire extinguishing agent and flooding would then become a concern. S18 # System Category KA Statement 067 Plant Fire On-site Knowledge of the operational implications of the following Fire fighting concepts as they apply to Plant Fire on site: KIM AK1.02 KIA Importance 3.1 Exam Level RO References provided to Technical

References:

None 10M-33.4.AAP, Rev. 2, pg. 2 & 3 10M-56BA.H, Rev. 20, pg 2 Question Source: New Question Cognitive 10 CFR Part 55 Content: Lower Memory or (CFR: 41.8/41.10

/45.3) Objective:

4. Given a change in plant conditions, describe the response of the fire protection system field indication and control loops, including all automatic functions and changes in equipment status. 11. Given a fire protection system alarm condition and using the ARP, determine the appropriate alarm response, including automatic and operator actions in the control room.

Beaver Valley Unit 1 NRC Written Exam (1LOTS) 23. Given the following plant conditions: A major uncontrolled fire in the Control Room has resulted in control room evacuation. The Control Room Team is implementing 10M-S6C, "Alternate Safe Shutdown from Outside the Control Room". What is the reason for system alignment and maintaining Pressurizer Level during cooldown to Cold Shutdown according to 10M-S6C series procedures?

System alignment to maintain Pressurizer Level between 20% -70% will be to _____ A. maintain RCS inventory ONLY. B. maintain RCS inventory AND shutdown margin. C. ensure auto letdown isolation does not occur ONLY. D. ensure auto letdown isolation does not occur AND to maintain shutdown margin. Answer: B Explanation/Justification: Incorrect.

It is plausible and partially correct that PRZR level is maintained to maintain RCS inventory.

SID margin is also maintained by using a charging pump taking suction from the RWST during these plant conditions lAW 10M-S6GA.B. Correct. A charging pump is used for both maintaining RCS inventory as well as providing borated water from the RWST after realignment to help maintain adequate SID margin. PRZR heaters are not related to maintaining PRZR level but rather RCS pressure control so therefore are not included as part of answering the KIA. According to 10M*S6CA.B, PRZR Level is maintained 20% to 70%. This is a higher cognitive question because the intent and methodology of 10M-56CA.AlB must be known and is specific to evaluating this set of plant conditions. Incorrect.

Plausible that PRZR is maintained>

14% to ensure UD isolation does not occur, however, the overall purpose of this procedure is perform safe shutdown without the letdown system. Letdown isolation is time critical and manually occurs prior to control room evacuation.

Procedurally it is allowable to initiate head vent letdown if required which has no auto letdown isolation features. Incorrect.

Incorrect that PRZR level is maintained to ensure auto UD iscllation does not o(:cur. Correct that PRZR level is maintained using charging pump aligned to the RWST for SID margin Sys# System Category KA Statement 068 Control Room Evacuation Knowledge of the reasons for the following responses as Maintenance of PZR level, using charging they apply to the Control Room Evacuation:

pumps and heaters. KIM AK3.10 KIA Importance 3.9 I::xam Level AO References provided to Technical

References:

10M-56C.4.A, Rev. 9, pg. A2-AS None 10M-56C.4.B, Rev. 42, Pg. 3 & 10-14 Question Source: New Question Cognitive Level: Higher Comprehension or Analysis 10 CFR Part 55 Content: (CFR: 41.S/41.10

/ 45.6/45.13) Objective:

13. Describe the actions for control room inaccessibility.
1. Describe the function of Alternate Safe Shutdown from Outside the Control Room and the associated major components as documented in Operating Manual Chapter 10M-56C.

Beaver Valley Unit 1 NRC Written Exam (1LOT8) 24. Given the following plant conditions and seqw:mce of events: The Plant was operating at 100% power with all systems in NSA. A Main Steam Line Break occurred inside containment. All systems functioned as designed. The Control Room Team is now performing actions of FR-P.1, "Response to Imminent Pressurized Thermal Shock Condition". They have determined an Res Temperature Soak is required.

Which ONE of the following component/system actions is allowed to be performed during the soak period while FR-P.1 is being implemented?

A. Energize Pressurizer Heaters. B. Place Auxiliary Spray in service. C. Place RHR in service with flow through MOV-1 RH-758. D. Raise NR S/G water levels to 70% and secure AFW pumps. Answer: B Explanation/Justification: Incorrect.

Energizing PRZR heaters will raise RCS pressure which is not allowed during soak. Correct. During RCS soak, FR*P.1 directs that cooldown in the RCS will not occur until temperature has been stable for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. RCS pressure is not to be raised during this period of time. Actions of other procedures may be performed provided that actions do not cooldown or raise pressure until the soak has been completed.

Placing Aux Spray in service will lower RCS pressure which is allowable. Incorrect.

Placing RHR in service and allowing flow through MOV-1 RH-758 will result in an ReS cooldown which is not allowed during soak. Incorrect.

Feeding S/Gs will result in ReS cooldown which is not allowed during soak. Sys# System Category KA Statement W/E08 RCS Overcooling

-PTS Ability to operate and / or monitor the following as Components and functions of control and safety they apply to the (Pressurized Thermal Shock): systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

KiAl KiA Importance Exam Level EA1.1 3.8 RO References provided to Candidate None Technical 10M-53A.1.FR-P.1, Issue 1C, Rev. 7, pg. 17 Referelnces:

10M-53B.4.FR-P.1, Issue 1e, Rev. 7, pg. 50 Question Source: Bank Vision # 12985 Question Cognitive Level: Higher -Comprehension or Analysis 10 CFR Part 55 Content: (CFR: 41.7/ 45.51 45.6) Objective:

3S0S-53.3

2. Describe from memory the overall purpose of each procedure, lAW BVPS-EOP Executive Volume. 3. State from memory the basis and sequence for the major actions steps of each EOP, lAW BVPS*EOP Executive Volume.

Beaver Valley Unit 1 NRC Written Exam (1LOTS) 25. Given the following plant conditions: The Control Room Team has just transitioned to ES-0.3. "Natural Circulation Cooldown With Steam Void in Vessel (With RVLlS)" due to increased cooldown rate. Pressurizer and Steamline Safety Injection (SI) signals are blocked. RCS temperature is 500 Of. Letdown is in service. Due to mis-operation of PRZR heaters, RCS pressure has risen to 2025 psig. Which ONE of the following is the minimum required action(s) to restore PRZR pressure to 1800 psig? Use _ (1) _ PRZR Spray to reduce PRZR pressure to (2) A. (1) Normal (2) 1800 psig B. (1) Auxiliary (2) 1800 psig C. (1) Normal 1950 psig. block PRZR &51 signals, then reduce pressure to 1800 psig D. (1) Auxiliary 1950 psig, block PRZR & 51 signals, then reduce pressure to 1800 psig Answer: D Explanation/Justification: Incorrect.

Normal spray is unavailable since RCPs are secured in ES-0.3. SI would initiate if PRZR pressure were reduced directly to 1800 psig. Incorrect.

Correct that auxiliary spray is used to depressurize.

SI would initiate if PRZR pressure were reduced directly to 1800 psig. Incorrect.

Normal spray is unavailable since RCPs are secured in ES-0.3. The reblocking sequence is correct. Correct. SI is blocked in ES-0.2 and a cooldown rate of < 25 F/hr is established in ES-0.2. Since the cooldown rate is exceeded, the potential for head void formation exists and transition to ES-0.3 is required.

The caution from ES-0.2 still applies upon transition to ES-0.3. The SI system is designed to automatically unblock if PRZR pressure increases above 2000 psig (P-11). A subsequent drop in RCS pressure below the SI setpoint 1845 psig before manually reblocking the SI signal will result in an SI which is undesirable in ES-0.3. Sys# System Category KA Statement W/E10 Natural Circulation with Knowledge of the interrelations between the (Natural Components and functions of control and safety Steam Void in Vessel Circulation with Steam Void in VessEll withlwithout systems, including instrumentation, signals, withlwithout RVUS RVUS) and the following:

interlocks, failure modes, and automatic and manual features.

Kf A# EK2.1 Kf A Importance 3.3 Exam Level RO References provided to Candidate None Technical

References:

1 OM-S3A.1.

ES-O.2, Issue 1 C, Rev. 11, pg. 8 &9 1 OM-S3BA. ES-O.2, Issue 1 C, Rev. 11, pg. 26 10M-53A.l.ES-O.3, Issue 1C, Rev. 10, pg. 3 10M-11.1.D, Issue 4, Rev. 1, Pg. 1 Question Source: Bank -Vision # 8906 Question Cognitive Level: Higher -Comprehension or Analysis 10 CFR Part 55 Content: (CFR: 41.7 I 45.7) Objective:

3S0S-53.3

3. State from memory the basis and sequence of major action steps of each EOP, lAW BVPS-EOP Executive Volume. 4. Explain from memory the basis of all cautions and notes, lAW BVPS-EOP Executive Volume.

Beaver Valley Unit 1 NBC Written Exam (1LOTS) 26. Given the following plant conditions: Unit 1 has experienced a Loss of Coolant Accident (LOCA). Containment pressure initially peaked at 47 psig.

  • While monitoring Critical Safety Functions, containment pressure is currently 15 psig. NO Quench Spray Pumps are operating. Containment Sump Level has been slowly rising and is currently 65 inches. Based on these conditions, which ONE of the following identifies the status of the Containment Critical Safety Function (CSF) Status Tree? A RED path condition CURRENTLY (1) __exist for __ (2) __. A. (1) does (2) containment pressure ONLY. B. (1) does (2) containment sump level ONLY. C. (1) does (2) containment pressure AND containment sump level. D. (1) does NOT (2) either containment pressure OR containment sump level. Answer: D ExplanationfJustification: Incorrect.

An orange versus red path exist for containment pressure based on no quench spray pumps running and containment pressure > psig. It is plausible that a candidate may select this choice based on exceeding 45 psig which is a red path condition, however, the CSFST only if pressure is < 45 Incorrect.

Incorrect that a red path exists. Containment sump level would need to be> 81 inches and this would be an orange path condition. Incorrect.

No red path condition exists for either a containment high pressure or level condition.

Plausible if candidate does not determine plant conditions or know from memory CSFST Red paths which are required RO knowledge at Correct. According to Containment CSFST (F-O.5), no red path condition exists for either a containment high pressure or level Validators had misconceptions that the Red path is not applicable when RCS pressure is < 45 psig even though it had previously exceeded threshold.

Containment pressure is > 11 psig and with no Ouench Spray pumps this is an Orange path versus red path Sys# System Category KA Statement W/E14 High Containment Pressure Ability to determine and interpret the following as they Facility conditions and selection of appropriate apply to the (High Containment Pressure):

procedures during abnormal and emergency conditions.

KlAI EA2.1 KIA Importance 3.3 Exam Level RO References provided to Technical

References:

None 10M-53A.1.F-O.5, Issue 1 C, Rev. 2 pg. 1 Question Source: New Question Cognitive Level: Higher -Comprehension or Analysis 10 CFR Part 55 Content: (CFR: 43.5/ 45.13) Objective:

3S0S-53.3

5. Explain from memory the basis for the decision blocks of each Status Tree, lAW BVPS-EOP Executive Volume. 2. Concerning critical safety function restoration, lAW BVPS EOP Executive Volume, state from memory the following, 3S0S-53.1 The CFS in order of priority, The priorities of the color-coded end points of the CSFSTs, and the red path summary conditions from EOPs.

Beaver Valley Unit 1 NBC Written Exam (1LOTS) 27. Given the following plant conditions: A Large Break LOCA occurred. An ORANGE path has developed on the Containment CSF Status Tree due to an abnormal rise in containment sump level. The Control Room Team transitions to FR-Z.2, "Response to Containment Flooding".

Which ONE of the following describes the source of the abnormally high containment sump level and desired outcome of this procedure?

The source of the abnormally high containment sump level is (1) The desired operating outcome of this procedure is to (2) __A. (1) Safety Injection (2) isolate the source of leakage. B. (1) Safety Injection and Component Cooling Water (2) verify containment isolation and heat removal. C. (1) River Water (2) isolate the source of leakage. D. (1) River Water and Component Cooling Water (2) verify containment isolation and heat removal. Answer: C Explanation/Justification: Incorrect.

High containment sump water level greater than the design flood level provides an indication that water volumes other than represented by the emergency stored water sources have been introduced into the containment sump (ie: RWST, SI Accumulators and Correct desired outcome (refer to correct answer Incorrect.

Incorrect sources. Incorrect desired operating outcome, although plausible since this is the correct outcome of FR-Z.1 versus FR-Z.2. Correct. Fire protection or River Water penetrate containment and could provide large flow rates to components inside the containment and major break or leak in one of those lines could introduce large quantities of water into the sump. The first action in FR-Z.2 is to try to identify source of water which is causing containment flooding and isolate Incorrect.

Correct sources. Incorrect desired outcome. Sys # System Category KA Statement W/E15 Containment Flooding Ability to operate and/or monitor the following as they Desired operating results during abnormal and apply to the (Containment Flooding):

emergency situations.

KlA# EA1.3 KIA Importance 2.8 Exam Level RO References provided to Candidate Technical

References:

10M-53B.4.FR-Z.2, Issue 1C, Rev. 2, pg 1 -3 Question Source: Modified Bank -Vision # 16783 Question Cognitive Level: Lower -Memory or Fundamental 10 CFR Part 55 Content: (CFR: 41.71 45.4/45.6)

Objective:

3. State from memory the basis and sequence for the major action steps of each EOP procedure, lAW BVPS EOP Executive Volume.

Beaver Valley Unit 1 NRC Written Exam (lLOTS) 28. Given the following plant conditions and seqwmce of events: A Load reduction is in progress at 1 % per minute. Reactor power is 22% and preparations are being made to take the turbine off-line.

  • The Main Feed Regulating Bypass Valves have been transferred to AUTO.
  • The 1 B Reactor Coolant Pump (RCP) unexpectedly trips. No operator actions have been taken and the plant responds as designed.

Which ONE of the following will be the INITIAL effects of the RCP shutdown? 1 B S/G Steam Flow will 1 B S/G Pressure will A. (1) decrease (2) decrease B. (1) increase (2) decrease C. (1) decrease (2) increase D. (1) increase (2) remain the same Answer: A Explanation/Justification:

(1 ) (2) __ Correct. A loss of a single RCP below p-a will NOT result in a reactor trip. The immediate effects of the tripped RCP in the effected loop is a decrease in steam flow (other two loops pick up flow). SIG pressure will drop since loop Tavg is lower. Incorrect.

Correct steam pressure response.

Opposite Steam Flow Response.

Steam flow will drop in effected loop but will increase in unaffected loops. Incorrect.

Correct that steam flow decreases.

S/G pressure drops versus increases. Incorrect.

All parameter responses are incorrect.

Plausible if the candidate does not understand RCP trip effects on these parameters.

515# System Category 003 Reactor Coolant Knowledge of the operational implications of the following Pump concepts as they apply to the RepS: KlA# K5.04 KIA Importance 3.2 Exam Level None References provided to Technical

References:

Question Source: New KA Effects of RCP shutdown on secondary such as steam pressure, steam flow, and feed RO G03ATA 3.2 U1 PPNT Abnormal Transients, Rev. 3 Question Cognitive Level: Higher -Comprehension or Analysis 10 CFR Part 55 Content: (CFR: 41.4/45.7)

19. Given a specific plant condition, predict the response of the RCP and system control room indications and control Objective:

1 SOS-6.3 loops, including all automatic functions and changes in equipment status, for either a change in plant condition or for an off normal condition.

Beaver Valley Unit 1 NRC Written Exam (1LOT8) 29. Given the following plant conditions:

  • The Unit is operating at Full power with all systems in NSA.
  • A Loss of Vital Bus I occurs. Which ONE of the following identifies how a Loss of Vital Bus I will impact the specified CVCS components from the control room? [FCV-1CH-122], "Chg Flow to Regen HX Inlet Control Valve" will __ The CVCS Blender will __ A. (1) CLOSE (2) be affected B. (1) CLOSE. (2) NOT be affected C. (1) remain OPEN (2) be affected D. (1) remain OPEN (2) NOT be affected Answer: C Explanation/Justification: Incorrect.

FCV*1CH-122 is affected by a 125VDC Bus 1 loss not a Loss of Vital Bus I, so therefore will not close. Correct that the blender Incorrect.

FCV-1CH-122 is affected by a 125VOC Bus 1 loss not a Loss of Vital Bus I, so therefore will not close. Incorrect the blender is affected. Correct. FCV-1 CH-122 will not be impacted from the MCB, so therefore remains in its open position The Loss of Vital Bus I does impact control of this valve from the SOP but not the control room. The Blender is rendered OOS by the loss of Vital Bus Incorrect.

Correct FCV-1 CH-122 will remain open. The blender will be OOS and therefore is affected by this control power loss. Sys# System Category KA Statement 004 Chemical and Volume Control Knowledge of bus power supplies to the following:

Control instrumentation.

KlA# K2.06 KIA Importance 2.6 Exam Level RO References provided to Candidate Technical

References:

1 OM-53.4.1.38.1 A, Rev. 3, pg. 12 & 13 Question Source: New Question Cognitive Level: Higher -Comprehension or Analysis 10 CFR Part 55 Content: (CFR: 41.7) ObJective:

4. Identify the power supplies for the componlmts identified on the NSA system flow path drawing which are powered from the class 1 E electrical distribution system.

Beaver Valley Unit 1 NRC Written Exam (lLOT8) 30. Given the following plant conditions:

  • The Unit is in Mode 4, cooling down for refueling. Residual Heat Removal (RHR) Pump "A" and Heat Exchanger (HX) are in service. [MOV-1 RH-605], RHR HX BYPASS FCV is in AUTO maintaining 4000 gpm. [MOV-1 RH-758], RHR HX FCV is throttled from 50 % to 60% OPEN. No other operator adjustments are made and all systems function as designed.

Which ONE of the following describes the effect on RHR temperature and RHR flow (3) three minutes after [MOV-1 RH-758] is throttled OPEN? [TR-1 RH-604], "RHR LOOP RETURN TEMP (Green Pen)" will be __ (1) __[FI-1 RH-605], "RHR FLOW" will be _ A. (1) HIGHER (2) LOWER B. (1) LOWER (2) HIGHER C. (1) LOWER (2) THE SAME D. (1) HIGHER (2) THE SAME Answer: C Explanation/Justification: Incorrect.

Incorrect opposite effect on RHR temperature.

Plausible that less system flow would cause higher temperatures if the candidate has misconception of system Incorrect.

Correct effect on RHR temperature.

Plausible that more system flow would cause lower temperatures if the candidate has misconception of system Correct. If MOV-1RH-758 is opened, more flow will be directed through the RHR HX. MOV-1RH-605 in automatic will close to maintain flowrate at 4000 gpm. The effect on RHR temperature is a lower temperature due to more flow through the HX and less flow through the FCV. As a general practice BVPS does not use nitrogen any longer for maintaining a blanket in the PRZR and it is not used in the RHR Incorrect.

Correct RHR flow effect. Plausible that if the candidate has system misconceptions that they might believe that this adjustment cause temperature is increase.

This is opposite of the correct Sys # System Category KA Statement Residual Heat Removal Ability to manually operate and/or monitor in the control room: RHR Temperature, PZR heaters and flow, and nitrogen.

KJM A4.03 KJA Importance 2.8 Exam Level RO References provided to Candidate Technical

References:

10M-l0.t.C, Issue 4, Rev. 0, pg. 3 lOM-l0.J.D, Rev. 1, pg. 2 OP Manual Fig. No.1 0-1, Rev. 14 Question Source: New Question Cognitive Level: Higher -Comprehension or AnalysiS 10 CFR Part 55 Content: (CFR: 41.7/45.5 to 45.8) Objective:

1 SOS-1 18. Given a specific plant condition, predict the response of RHR system control room indication and control loops, including all automatic functions and changes in equipment status, for either a change in plant condition or for an off normal condition.

005 Beaver Valley Unit 1 NAtC Written Exam (1LOT8) 31. Given the following plant conditions and sequence of events:

  • The Unit is operating at 100% power with all systems in NSA.
  • A Large Break LOCA occurs and all equipment functions as designed except: o Low Head Safety Injection Pump [1 SI-P-1 AJ trips on overcurrent.

o MOV-1 SI-863B, "1 B LHSI to CHG Pumps Sup Vlv." fails to reposition.

Which ONE of the following describes how these failures impact ECCS performance?

BEFORE transfer to cold leg recirculation there will be ... (1) _ Low Head SI flow. AFTER transfer to cold leg recirculation there will be Low Head SI flow available to _ (2) A. (1) 6000 gpm (2) NO High Head SI pump. B. (1) 6000 gpm (2) ONE High Head SI pump. C. (1) 3000 gpm (2) NO High Head SI pump. D. (1) 3000 gpm (2) ONE High Head SI pump. Answer: C explanation/Justification: Incorrect.

Incorrect that there is 6000 gpm flow. Plausible because this is the flow for two Low Head 81 pumps. Correct that only one HH81 pump receives flow. Incorrect.

Incorrect flow. Incorrect that only one HHSI pump receives flow, although plausible, if flowpath is not understood. Correct. A loss of a Loss of "A" LHSI pump will reduce the capacity of LHSI flow on a L8LOCA by half. Each pump is rated at 3000 gpm, so therefore with only the "8" LHSI pump running there is 3000 gpm flow. The candidate must also know how ECCS realigns on transfer to Cold Leg Recirculation as well as the specific impact of MOV-181-8638 not repositioning.

If MOV-1 SI-8638 does not reposition, then 81-P-1B will not have a discharge flowpath to either High Head 81 Pump suction. Incorrect.

Correct flow. Incorrect that there will be flow to one high head SI pump, if flowpath is not understood.

Sys # System Category KA Statement 006 Emergency Core Cooling Knowledge of the effect of a loss or malfunction on the Pumps following will have on the ECCS: KI A# KS.13 KIA Importance 2.8 Exam Level RO References provided to Candidate None 'Technical

References:

10M-11.1.C, Rev. 2, pg. 5 & 6 18QS*11.1 PPT Slide 23 & 27 Question Source: New QUestion Cognitive 10 CFR Part 55 Content: Higher -Comprehension or (CFR: 41.7/45.7)

Objective:

1

21. Given a change in plant conditions due to a system or component failure, analyze the 81 system to determine what failure occurred.

Beaver Valley Unit 1 NRC Written Exam (1LOT8) 32. Given the following plant conditions:

  • RCS pressure is 1925 psig and slowly LOWERING.
  • "A" Charging Pump [1CH-P-1A]

is RUNNING. * "B" Charging Pump [1 CH-P-1 B] is in STANDBY.

  • Charging flow is offscale HIGH.
  • Letdown is isolated.
  • RCS temperature is 545 of and STABL.E.
  • PRZR Level is 10% and LOWERING.

Which ONE of the following actions is procedurally required?

A. Initiate SI and continue in ES-0.1, "Reactor Trip Response".

B. Initiate SI and return to E-O, "Reactor Trip or Safety Injection".

C. Start SI pumps as required to maintain PRZR level and return to E-O. D. Start SI pumps as required to maintain PRZR level and continue in ES-0.1. Answer: B Explanation/Justification: Incorrect.

Correct action but incorrect procedure.

The candidate must understand that to be in ES-O.l a prerequisite is that no 51 has occurred. Correct. PRZR level is lowering and with charging maximized and letdown isolated the candidate must deduce that PRZR level cannot maintained PRZR level> 4%. Procedurally this requires SI actuation and entry into E-O. The RO candidate must recognize these conditions are abnormal and EOP E-O entry is required. Incorrect.

Would only start HH51 pumps as needed if the crew was in a reduction or SI termination sequence.

Since it has not been initiated this action is inappropriate.

Correct procedure transition to E-O. Incorrect.

Plausible that another charging pump (High Head SI Pump) is started to maintain PRZR level, however, not procedurally correct letdown is isolated and charging flow is Sys# System Category KA Statement 006 Emergency Core Cooling N/A Ability to recognize abnormal indications for system operating parameters that are entry level conditions for emergency and abnormal operating procedures.

KlAtt 2.4.4 KIA Importance 4.5 Exam Level RO References provided to Candidate None Technical

References:

1OM-53A.1.ES-0.l, Issue lC, Rev. 8, pg. 4 (back) 1OM-538.4.ES-0.l, Issue lC, Rev. 8, pg. 3 Question Source: Bank -Vision # 45646 Question Cognitive Level: Higher -Comprehension or Analysis 10 CFR Part 55 Content: (CFR: 41.10/43.2/45.6)

Objective:

3S0S-53.3

6. Given a set of conditions, locate and apply the proper EOP, lAW BVPS*EOP Executive Volume.

Beaver Valley Unit 1 NRC Written Exam (1l0T8) 33. Given the following plant conditions:

  • The Unit is operating at 100% Power with all systems in NSA.
  • The reactor automatically tripped on Low PRZR pressure. PI-1 RC-472, "Pressurizer Relief Tank Pressure" indicates 35 psig.
  • The RO suspects a PORV inadvertently opened and is now stuck OPEN. Which ONE of the following indications will confirm if a PORV is stuck partially OPEN? The PORV relief line temperature stabilized at PRZR Safety Relief line temperatures (2) __A. (1) 260 OF (2) are slowly RISING. B. (1) 281°F (2) are slowly RISING. C. (1) 260 OF (2) indicate ambient and are STABLE. D. (1) 281 Of (2) indicate ambient and are STABLE. Answer: B Explanation/Justification: Incorrect.

Incorrect value. 260 F is approximately the saturation temperature for 35 psia. Plausible if the candidate does not properly apply steam tables. Correct safety relief line Correct. 281 F is the saturation temperature corresponding to 50 psia (35 psig) PRT pressure.

Safety Relief lines share a common discharge line to the PRTwith the PORVs so therefore will also be rising. Incorrect.

Incorrect value as previously explained.

Incorrect safety relief line temperature trend (refer to correct answer) Plausible if the candidate does not know the system flowpath and design. Incorrect.

Correct value. Incorrect safety relief line temperature trend (mfer to correct answer) Sys # System Category KA Statement 007 Pressurizer Relief/Quench Tank Ability to manually operate and/or monitor in the Recognition of leaking PORV/code safety control room: KlA# A4.10 KIA Importance 3.6 Exam Level RO References provided to candidate Steam Tables Technical Steam Tables Op Manual Figure 6*2 Question Source: Bank -Vision # 45680 Question Cognitive Level: Higher Comprehension or Analysis 10 CFR Part 55 Content: (CFR: 41.7/45.5 to 45.8) Objective:

1 20. Given a change in plant conditions due to system or component failure. analyze the PRZR and PRZR Relief System to determine what failure has occurred.

Beaver Valley Unit 1 NRC Written Exam (1l0T8) 34. Given the following plant conditions:

A. B. C. D.

  • Unit 1 is operating at full power with all systems in NSA. * [1 CC-P-1 Al, "A" CCR Pump is operating.
  • An inadvertent Safety Injection (SI) occurs that results in a plant trip.
  • All systems function as designed.

Which ONE of the following describes the status of the following CCR components?

[1 CC-P-1 Al, "A" CCR Pump will be __ (1) [TV-1CC-133-2], "Sample Clrs CCR Outlet Isol Vlv" will ___ (1) TRIPPED (2) CLOSED (1) RUNNING (2) CLOSED (1) TRIPPED (2) OPEN (1) RUNNING (2) OPEN Answer: B Explanation/Justification: Incorrect.

Correct that TV*1CC*133*2 is closed. Incorrect status of "AM CCR pump. This would be the condition of the pump if CIB were to occur. Correct. "AU CCR pump will remain running on an SI signal. An inadvertent 81 signal will result in a CIA signal. TV*1CC*133*2 will close on a CIA signal. Incorrect.

Incorrect status of both"N CCR pump and TV*1CC*133*2.

These are the exact opposite of the correct status. Incorrect.

Correct status of "A" CCR pump. Incorrect status of TV* 1 CC**133*2.

Plausible if the candidate does not know 81 signal auto actions. Sys# System category KA Statement DOS Component Cooling Water Ability to monitor automatic operation of the CCW8, Automatic actions associated with the CCWS that including:

KlA# A3.0S KIA Importance 3.6 References provided to Candidate None Question Source: New occur as a result of a safety injection signal. Exam Level RO Technical UFSAR Fig. 7.2*1, Sh. S, Rev. 13 1 OM*l.5.BA , Rev. 15, pg. 2 & 4 1 OM*53A.l.1*B, Issue 1 C, Rev. 1, pg 7 1808*15.1, Rev. 11 PPNT Slides Question Cognitive Level: Lower -Memory or Fundamental 10 CFR Part 55 Content: (CFR: 41.7 /45.5) Objective:

1 SOS*15.1 15. Given a CIA signal, breakdown how the CCA System valve, pump, flow and/or electrical configuration will change as a result of the Signal.

Beaver Valley Unit 1 NRC Written Exam (1LOTS) 35. Given the following plant conditions:

  • The Unit is at 100% power with all systems in NSA. Reactor Coolant System (RCS) Pressure is 2235 psig and STABLE. RCS Temperature is 578 Of and STABLE. PT-1 RC-444, "Pressurizer Control Channel", fails LOW. With no operator action, which ONE of the following describes the effect on the PRZR pressure control system, ONE (1) minute following the failure? A. TWO PRZR PORVs will be OPEN. B. ONE PRZR PORV and BOTH PRZR Spray Valves will be OPEN. C. PRZR B/U heaters will be ON and BOTH PRZR Spray Valves will be CLOSED. D. PRZR B/U heaters and BOTH PRZR Spray Valves will remain in their NSA positions.

Answer: C Explanation/Justification: Incorrect.

These indications are indicative of PT-1 RC-445 failing in the high direction.

Also, Actual PRZR pressure will rise due to PRZR heaters being energized without spray flow. With no operator action it is plausible that PORV's will open however, they will not open one minute following this failure. Incorrect.

These indications are indicative of PT-1 RC-444 failing in the high direction.

Atthough one PORV will not lift within one minute, with operator action, one PORV will eventually lift to relieve PRZR pressure.

It is not correct that the spray valves will Correct. The result of PT-1 RC-444 failing low is BOTH PRZR spray valves will be closed and PRZR heaters will be ON. Incorrect.

These indications are indicative of PT-l RC-445 failing in the low direction as opposed to PT-1 RC-444. Sys # System Category KA Statement 010 Pressurizer Pressure Knowledge of the effect of a loss or malfunction of the Pressure detection systems. Control System (PZR PCS) following will have on PZR PCS: KIM KG.Ol KIA Importance 2.7 Exam Level RO References provided to Candidate 'rechnical

References:

10M-6.4.IF , Rev. 10, pg. 16-19 & 23 Question Source: Modified Bank -Vision # 82037 (2L0T7 NRC 0#37') Question Cognitive Level: Higher _ Comprehension or Analysis 10 CFR Part 55 Content: Objective:

1 20. Given a change in plant conditions due to a system or component failure, analyze the Pressurizer and Pressurizer Relief System to determine what failure has occurred.

Beaver Valley Unit 1 NRC Written Exam (1LOT8) 36. Given the following plant conditions: The plant was operating at full power when a Steam Generator Tube Rupture occurred. The Control Room Team is implementing E-3, "Steam Generator Tube Rupture". The RCS has been cooled to 500 Of in preparation for equalizing RCS pressure with the ruptured S/G pressure. The US directs you to depressurize the RCS while maintaining a minimum of 20 of subcooling.

At the current RCS temperature, which ONE of the following is (1) the LOWEST RCS pressure can be lowered without violating the 20 of subcooling requirement AND (2) potential consequences of reaching 0 of subcooling?

A. (1) -798 psig (2) unreliable PRZR level indication ONLY. B. (1) -827 psig (2) unreliable PRZR level indication ONLY. C. (1) -798 psig (2) unreliable PRZR level indication AND delayed SI termination.

D. (1) -827 psig (2) unreliable PRZR level indication AND delayed SI Answer: C Explanation/Justification: Incorrect.

Correct RCS pressure value (refer to correct answer explanation).

Unreliable PRZR level indication is not the only potential operational implication iaw background document if RCS subcooling requirement is violated. Incorrect.

Plausible if candidate mistakenly adds 14.7 psi to the saturation pressure.

Potential operational implication is not complete. Correct. Saturation pressure for 520 "F is 812.53 psia minus 14.7 psi =797.83 psig. The PZR PCS is used to lower RCS pressure (ie: spray valve and PORV is opened). The operational implication of not properly using steam tables is potential violation of procedure guidance which could result in unreliable PRZR level indication and delayed SI termination due to RCS voiding which could occur. Incorrect.

Incorrect value. Correct operational implications.

Sys# System Category KA Statement 010 Pressurizer Pressure Knowledge of the operational implications of the follOWing Determination of condition of fluid in PZR, Control System (PZR PCS) concepts as they apply to the PZR PCS: using steam tables. KIM K5.01 KIA Importance 3.5 Exam Level RO References provided to Candidate Steam Tables Technical

References:

Steam Tables 10M*53A.1.E-3.

Issue lC, Rev. 14, pg 10, 16-17 lOM-53A.1.6-A, Issue lC, Rev. 0. pg 1 lOM-53B.4.E-3.

Issue 1C. Rev. 14, pg. 89 & 90 Question Source: New Question Cognitive Level: Higher Comprehension or Analysis 10 CFR Part 55 Content: (CFR: 41.5/45.7)

Objective:

13. State from memory how significant RCS voiding may occur and how this can be mitigated, lAW BVPS EOP Executive Volume.

Beaver Valley Unit 1 NRC Written Exam (1LOTS) 37. Given the following plant conditions and sequence of events:

  • The Unit is operating at 25% power. Rod Control is in Manual. PT-1 RC-456, "Channel II PRZR Pressure" has failed. ALL actions of 10M-6.4.1F, "Instrument Failure Procedure" have been completed. A malfunction of the Channel III OTilT Bistable occurs causing it to trip. Based on these plant conditions, which ONE of the following describes the effect on the Reactor Protection System (RPS)? RPS Bistable Channel II (LOOP 2 O.T. RX TRIP) white status light will be (1) and a reactor trip __ (2) __ occur. A. (1) ON (2) will NOT B. (1) OFF (2) will C. (1) ON (2) will D. (1) OFF (2) will NOT Answer: C Explanation/Justification: Incorrect.

Correct Channell!

bi-stable lamps status. Incorrect reactor status. Refer to correct answer explanation. Incorrect.

Correct reactor trip status. Incorrect Channel II Bi-stable lamp status. Correct. Si-stable lights will be ON when Channell!

bi-stables are tripped in accordance with 1 MSP-6.13-1.

Since all actions of 1 OM-S.4.IF are completed.

then the required TS actions to trip bistables for PT -1 RC-45'6 have occurred.

These actions trip the OT 11 T trip for Channell!.

A subsequent failure of Channel III OTl1Twili result in a 213 satisfied reactor trip logic and resultant reactor trip generated by RPS. These are design features related to the trip logic of 0_ Incorrect.

Incorrect bi-stable light status. I ncorrect reactor Sys # System Category 012 Reactor Protection Knowledge of RPS design featum(s) andlor interlock{s) which provide for the following:

KJM K4.01 KJA Importance 3.7 IExam Level References provided to Candidate Technical

References:

Question Source: New KA Trip logic when one channel OOC or in 10M-6.4.1F. Rev. 11. pg. 21 & 1 MSP-S.13-1.

Issue 4. Rev. 12, pg. 4, 6 & UFSAR Figure 7.2-1. Sh. 5, Rev. Question Cognitive 10 CFR Part 55 Content: Higher Comprehension or (CFR:41.7)

Objective:

10. Given a specific plant condition, predict or describe the response of the RPS trip logics and ESF actuation signal control room indication and control loops, induding all automatic functions and changes in equipment status, for either a change in plant conditions or for an off-normal condition.

Beaver Valley Unit 1 NRC Written Exam (1LOT8) Which ONE of the following is a designed DIF1IECT automatic start signal to [1 FW-P-2], Steam Driven Auxiliary Feedwater Pump? Containment Isolation "A" (CIA). Auto trip of the last running Main Feedwater Pump. 1/3 SIG NR level detectors LO-LO on 2/3 Steam Generators. 2/3 SIG NR level detectors LO-LO on 1/3 Steam Generators.

Answer: 0 Explanation/Justification:

A. Incorrect.

Both electric and steam driven AFW pumps start on an SI signal. SI will actuate CIA however, this is not a direct signal. B. Incorrect.

This is an auto start for the electric AFW pumps. C. Incorrect.

The electric AFW pumps start on 213 10*10 NR levels from 213 S/Gs. D. Correct. According to references 1 FW*P*2 starts on a 21310*10 SIG level signals from a single S/G. Sys # System Category KA Statement 013 Engineered Safety Features Knowledge of the physical connections and/or cause effect AFW System. Actuation relationships between ESFAS and the following systems:

KIM K1.07 KIA Importance 4.1 Exam Level RO References provided to Candidate None Technical

References:

lOM*24.1.D, Rev. 5, pg. 3 & 4 UFSAR Figure 7.2-1, Sh. 7 & 14 1 SOS*24.1, Rev. 17, PPNT Slides Question Source: Bank Vision # 10281 Question Cognitive Level: Lower -Memory or Fundamental 10 CFR Part 55 Content: (CFR: 41.2 to 41.9 145.7 to 45.8) Objective:

8. Describe the control, protection and interlock functions of the control room components associated with the RP8 trip logics and E8FAS actuation signals, including automatic functions, setpoint and changes in equipment status.

Beaver Valley Unit 1 NRC Written Exam (1LOT8) 39. Given the following plant conditions:

  • The Unit is operating at Full Power with all systems in I\JSA. * [1VS-F-1AJ, "CNMT Air 1A Recirc Fan" is running. * [1VS-F-1B], "CNMT Air 1B Recirc Fan" is secured for maintenance.
  • [1 VS-F-1 C], "CNMT Air 1 C Recirc Fan" is running. * [1 VS-F-2C], "CRDM Shroud Fan" is to "B" Train.
  • A Loss of Bus 1 P1 occurs.
  • No operator action has occurred and all systems function as designed.

Which ONE of the following describes the CURRENT status of [1 VS-F-1 NC] Containment Air Recirculation Fans? [1

£1VS-F-1CJ A. RUNNING B. NOT RUNNING C. NOT RUNNING NOT RUNNING D. NOT RUNNING RUNNING Answer: B Explanation/Justification: Incorrect.

Correct that 1 VS-F-1A is running. however. 1VS-F-1 C is tripped. Plausible because 1 VS-F-1 C can be selected to either power supply. Correct. 1VS-F-1A is powered from Bus 1 N1. 1VS-F-1B is powered from Bus 1 P1 and 1VS-F*1C can be powered from either 1 N1 or 1P1. In the stated plant conditions 1VS-F-1C is running. Since 1VS-F-1A is being supplied from 1 N1. NSA would dictate that 1VS-F-1C would be aligned to the 1 P1 bus to allow train separation.

If 1 P1 is lost then 1VS-F-1A will be the only running containment air recirc fan. To further clarify NSA. the question stem states that 1VS-F-2C is aligned to the B Train. Procedurally, 1VS-F-1C is aligned to the same Bus as 1VS-F-2C to ensure train separation. Incorrect.

Correct that 1VS-F-1 C is not running. Incorrect that 1 VS-F-1 A. is not running. Incorrect.

Opposite of the correct fan status. Sys # System Category KA Statement 022 Containment Cooling Knowledge of bus power supplies to the following:

Containment cooling fans. KJA# K2.01 KIA Importance 3.0 Exam Level RO References provided to Technical

References:

10M-44C.3.C, Rev. 5, pg. 4 -6 None 1 SQS-44C.1 PPNT. Rev. 9. Issue 2 Slides 1 SOS-44C.1.

Rev. 9, Pg. 18 -19 Question Source: New Question Cognitive Level: Higher Comprehension or Analysis 10 CFR Part 55 Content: (CFR: 41.7) Objective:

1

3. Identify the power supplies for the components identified on the Normal System Arrangement System flowpath drawing which are powered from the class 1 E electrical distribution system.

Beaver Valley Unit 1 NRC Written Exam (1 LOTS) 40. Given the following plant conditions:

  • A LOCA has occurred.
  • The Control Room Team is performing Step 5 of E-O, "Reactor Trip or Safety Injection". RCS pressure is 300 psig and slowly DROPPING.
  • Containment pressure is 16 psig. RWST level is 37 feet and slowly DROPPING.
  • The RO reports NEITHER Quench Spray (QS) pump has started.
  • All other systems function as designed.

Which ONE of the following describes the impact of BOTH Quench Spray pumps NOT running AND what action is required?

With no operator action containment pressure will be trending _ (1) _. lAW NOP-OP-1002, "Conduct of Operations" the required actions are to _ (2) _. A. (1) upward because no containment Quench Spray or Recirculation pumps are running. (2) obtain SRO approval and then start BOTH QS pumps. B. (1) downward because Inside Recirculation Spray pumps are running ONL V. (2) obtain SRO approval and then start BOTH QS pumps. C. (1) upward because no containment Quench Spray or Recirculation pumps are running. (2) start BOTH QS pumps and then inform SRO of the failures.

D. (1) downward because Inside AND Outside Rlecirculation Spray pumps are running. (2) start BOTH QS pumps and then inform SRO of the failures.

Answer: C Explanation/Justification: Incorrect.

Part 1 is correct. Part 2 is incorrect. (refer to correct answer explanation). Incorrect.

Part 1 incorrect, Plausible if the candidate does not know the auto start setpoin! (recently changed at BVPS such that they used to start after a time delay shortly after CIB actuation).

Part 2 is incorrect. Correct. With no operator action, containment pressure will continue to rise due to energy from LOCA being added to the containment with no heat sink. Recirc Spray pumps will not start until RWST level drops to 2'1.5 feet. Management expectations (operator fundamentals) lAW OP-1002 are that if an ESF component did not auto start as designed a manual attempt to start the component will be made by the operator.

This action does not require SRO approval prior to attempting a start of the CIS pumps after immediate operator actions are completed at Step 4 E-O. Incorrect.

Part 1 incorrect, Plausible if the candidate does not know the auto start setpoints or start logics (recently changed at BVPS such they used to start after a time delay shortly after CIB actuation).

Part 2 is Sys # System Category KA Statement Containment Spray Ability to (a) predict the impacts of the following malfunctions or operations on the CSS; Failure of spray pump and (b) based on these predictions, use procedures to correct, contrOl. or mitigate the consequences of those malfunctions or operations:

KIM A2.04 KIA Importance 3.9 Exam Level RO References provided None Technical

References:

lOM-53A.1.E-O.lssue 1C, Rev. 11, pg. 7, to NOP-OP-1002, Rev. 5, pg. 43 BVBP-OPS-0024, Rev. 3, Pg. 4 1 OM-53A.1.1-E, Issue 1 C, Rev. 3, pg. 2. 5 & 6 lOM-53A.1.1-K, Issue 1C, Rev. 4, pg. 5 Question Source: Question Cognitive Level: Higher Comprehension or Analysis 10 CFR Part 55 Content: (CFR: 41.5/43.5/45.3/45.13Objective:

3S0S-53.3

4. Explain from memory. the basis for all cautions and notes, lAW BVPS-EOP Executive 6. Given a set of conditions, locate and apply the proper EOP lAW BVPS-EOP Executive Volume. 026 Beaver Valley Unit 1 NIRC Written Exam (1LOTS) 41. Given the following plant conditions:
  • The plant is in Mode 1 @ 100% power with all systems in NSA. Which ONE of the following conditions or events (considered individually) will require Technical Specification action(s) to be performed within one hour or less? A. RWST borated water temperature drops to 50 OF. B. One Containment Pressure Transmitter fails to zero. C. RWST borated water volume drops to 425,000 gallons. D. BOTH Train "A" -Phase B (CIB) manual pushbuttons are declared inoperable.

Answer: C Explanation/Justification: Incorrect.

TS 3.5.4 Surveillance requires RWST borated water temperature to be <:45 F and S 65 F. therefore there is no TS LCO entry for this distractor.

The RWST is the suction source to the Quench Spray System and this surveillance can affect Incorrect.

TS 3.3.2 Condition D &E apply. This was a recently changecl TS and requires a 72 action statement. Correct. TS 3.5.4 Condition B states that if RWST is inoperable for reasons other than boron concentration or temperature (Condition A), then a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> action statement is applicable.

SR 3.5.4.2 requires Unit 1 RWST level to be greater than or equal to 430,500 gallons. If this surveillance is not met then TS LCO actions apply. RO's are required to know S 1hour TS LCO's from memory. TS bases states that during accident conditions, the RWST provides a source of borated water to both the ECCS AND Cluench Spray Pumps. TS 3.6.6 does not have an LCO for two inoperable Quench Spray Pumps requiring LCO 3.0.3 entry which has the same Leo time as TS 3.5.4 allowing 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to restore the undesirable condition (Insufficient Cb Volume for iodine removal during LOCA accident assumptions) prior to commencing plant SID. Therefore the KIA tie is the RSWT as a suction source to the Quench Spray System. Incorrect.

TS 3.3.2 Condition B applies. This is a 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> action statement.

Sys# System Category KA 026 Containment Spray NIA Knowledge of less than or equal to one hour technical speCifications for a KiA# 2.2.39 KiA Importance Exam RO Level References provided to Candidate None Technical BVPS Units 1 & 2 TS 3.5.4, Amend 2781161, pg. 3.5.4-1 & 2 BVPS Units 1 &2 TS 3.3.2, Amend 2821166, pg. 3.3.2-1 & 10 BVPS Units 1 &2 TS 3.3.2 Amend 2821166 pg. 3.3.2-2 & 8-11 Question Source: Modified Bank -Vision # Question Cognitive Level: 10 CFR Part 55 Lower -Memory or (CFR: 41.7141.10 143.2/45.13) Objective:

24. For a given set of plant conditions, from memory determine if the condition meets the criteria for entry into a one hour or less action statement in accordance with technical specifications.

Beaver Valley Unit 1 NRC Written Exam (1LOTS) 42. Given the following plant conditions:

  • The Plant is in Mode 3. Main Condenser Steam Dumps are being used to cooldown to Mode 5. RCS temperature is 450 of and slowly DROPPING. RCS pressure is 670 psig and STABLE.
  • All Systems are in normal alignment for these conditions.

For these conditions, which ONE of the following will cause an automatic Main Steam Line Isolation (MSLI)? A. Low Steam Line Pressure ONL V. B. High Steam Line Pressure Rate ONL V. C. Low Steam Line Pressure AND Containment Hi-Hi Pressure (8 psig). D. High Steam Line Pressure Rate AND Containment Hi-Hi Pressure (8 psig). Answer: 0 explanation/Justification: Incorrect.

This signal is blocked below P-ll and is no longer action based on stated plant conditions. Incorrect.

Partially correct. Hi-Hi containment pressure signal is always active. Incorrect.

low steam line pressure is incorrect.

Hi-Hi Containment pressure is correct. Correct. A MSlI isolates the reactor building from the containment by closing the MSIV's and other isolation valves. MSlI signals are active as follows: Below P-11 << 2000 psig) Low Steam Line Pressure is blocked and High Steam Une Pressure Rate is manually inserted.

The Hi-Hi containment pressure signal is always active. At BVPS we do not use the terminology reactor building isolation, however, we do use terms such as Containment Isolation, Main Steam Line Isolation.

To hit the KIA for BVPS the question focuses on the Main Steam Isolation signal which isolates Main Steam from inside our containment building to outside areas such as the Turbine Building (Main Steam/Aux Steam) and Primary Auxiliary Building (Auxiliary Steam only which is no longer used in the PAB ). Sys # System Category KA Statement 039 Main and Reheat Steam Knowledge of MRSS design features(s) and/or Reactor Building Isolation interlock(s) which provide for the following:

KIM K4.07 KIA Importance 3.4 Exam Level RO References provided to Candidate None Technical BVPS UFSAR Figure 7.2-1 SH 6-8 1 SOS-21.1 PPNT, Rev. 15 Question Source: Bank-Vision # 81815 (1 LOT7 NRC 0#15) Question Cognitive Level: Higher -Comprehension or Analysis 10 CFR Pal155 Content: (CFR: 41.7) Objective:

1

12. Given a specific plant condition, predict the response of the Main Steam Supply System control room indications and control loops, including all automatic functions and changes in equipment status, for either a change in plant conditions or for an off normal condition.

Beaver Valley Unit 1 NRC Written Exam (1LOT8) 43. Given the following plant conditions and sequence of events:

  • A Loss of Offsite power coincident with a turbine trip occurs. Bus 1 DF has an overcurrent lockout.
  • All systems function as designed.

With no operator action, which ONE of the following describes the response of the Auxiliary Feedwater (AFW) System? A total AFW flow of approximately

__ (1) __ GPM will be provided to ALL Steam Generators through the __ (2) __ A. (1) 350 (2) "A" Header ONLY. B. (1) 700 (2) "B" Header ONLY. C. (1) 700 (2) "A" Header ONLY. D. (1) 900 (2) "A" AND "B" Headers. Answer: C explanation/Justification: Incorrect.

Incorrect capacity.

Correct header. Plausible if the candidate cloes not know the capacities or misunderstands the initial plant conditions.

One validator chose this distractor based on confusing the AFW pump capacities. Incorrect.

Correct capacity.

Incorrect header. Plausible if the candidate believes NSA is to the "S" header or believes the impact of 1 FW*P-3A realignment of 1 FW-P-2 to the "S" Correct. A loss of offsite power coincident with a turbine trip results in a reactor trip and subsequent loss of both MFW pumps. The EDGs are designed to start on a loss of power to AE and DF bus which will power both electric AFW pumps. In the stated conditions, with an overcurrent condition on the DF bus, 1 FW-P-3B will not have power. Since 1 FW-P-:3A is already OOS, only 1 FW-P-2 (Turbine Driven AFW pump) will start to provide 700 gpm AFW flow. The AFW system is designed to feed all three S/G based on NSA alignment requirements.

NSA has 1FW-P-2 aligned to the "An Header. Incorrect.

Correct capacity.

If the candidate does not know the capacities or understand the impact based on initial plant conditions, then it plausible that AFW flow would be provided through the "A" header by 1 FW-P-2 and the "8" header by 1 FW-3B. In this case the total flow will 900 gpm based on limiting orifices which limit flow to 300 gpm per S/G. Incorrect because 1 FW-P-3B has no Sys # System Category KA Statement 059 Main Feedwater Knowledge of the effect that a loss or malfunction of the AFW System. MFW system will have on the following:

KIM K3.02 KIA Importance 3.6 Exam Level RO References provided to Candidate Technical

References:

1 OM-24.1.B, Rev.2, pg. 2 150S-24.1, Rev. 17 PPNT slide. Question Source: New Question Cognitive 10 CFR Part 55 Content: Higher -Comprehension or (CFR: 41.7/45.6)

Objective:

1

12. List the nominal values of the control room operating parameters associated with the Main Feedwater, Dedicated Auxiliary Feedwater, Auxiliary Feedwater System and Steam Generator Water Level Control System.

Beaver Valley Unit 1 NRC Written Exam (1LOTS) 44. Given the following plant conditions: The Unit is operating at 100% power. 10ST-24.2, "Motor Driven Auxiliary Pump Test [1 FW-P-3A]" is being performed. [FCV-1 FW-103A], "A" Motor Driven Auxiliary Pump Recirculation Valve" remote position verification is to be performed as part of this OST. [1 FW-37], "1 FW-P-3A Discharge to "A" Header" Valve" has been isolated.

Which ONE of the following describes

[FCV-1 FW-103A] position shortly after placing the control switch for [1 FW-P-3A] to START? [FCV-1 FW-1 03A] will be __ (1) __ because (2)_ A. (1) OPEN (2) discharge flow is below setpoint.

B. (1) CLOSED (2) discharge flow is above setpoint C. (1) OPEN (2) suction flow is below setpoint.

D. (1) CLOSED (2) suction flow is above setpoint Answer: C Explanation/Justification: Incorrect.

Correct position.

Incorrect system design. (refer to correct answer explanation) Incorrect.

Incorrect position.

Incorrect system design. (refer to correct answer explanation) Correct. FCV-1 FW-1 03A is designed to open upon AFW pump start to ensure sufficient recirc flow for pump COOling. The recirc valve senses suction flow <<145 gpm) and opens to ensure:> 145 gpm is flowing through the pump. In NSA the discharge valve is not shut, The recirc valve will open upon pump start and upon sensing sufficient suction flow will close. In this scenario the OST checks recirc valve operation by positioning FW-37 shut. Therefore there is no flowpath directly to the 8/Gs and the recirc valve will open to recirc water back to 1WT-TK-10, ensuring:>

145 recirc flow for pump cooling. All distractors are plausible if the candidate does not have knowledge of system design and plant configuration changes. This is higher cognitive because the candidate must analyze the modified NSA plant conditions and apply these condiitons to the design of the AFW system recirculation valves. Incorrect.

Incorrect position.

Correct system design. (refer to correct answer explanation)

Sys # System Category KA Statement Auxiliary/Emergency Feedwater Knowledge of AFW design features(s) and/or AFW Recirculation.

interlock(s) which provide for the following:

KlAI K4.08 KIA Importance 2.7 Exam Level RO References provided to Candidate Technical

References:

1 OM-24.1.C, Rev. 5, pg. 9, 108T-24.2, Rev. 42, pg. 17 OP Manual Fig. 24-2, Rev. 13 1808-24.1, Rev. 17 PPNT Slides 1OM-24.4.AAD, Rev. 5, Pg. 2 Question Source: New Question Cognitive Level: Higher -Comprehension or Analysis 10 CFR Part 55 Content: (CFR: 41.7) Objective:

1

4. Describe the control, protection and interlock functions for the field components associated with the AFW system, including automatic functions, setpoints, and changes in equipment status as applicable.

061 Beaver Valley Unit 1 NRC Written Exam (1LOT8) 45. Given the following plant conditions: The Unit is operating at 100% power. 1 OST-36.1, "Diesel Generator No.1 Monthly Test" is in progress. Emergency Diesel Generator (EDG) No. 1 is paralleled to the grid, carrying about 50% load. A grid disturbance causes frequency to drop very slightly. Grid Voltage remains constant.

Which ONE of the following describes the respqnse of EDG No.1 AND what is the significance of operating the EDG above 2850 KW for extended periods of time? The response of EDG No.1 is that _ (1) AND the potential consequence of operating this EDG > 2850 KW is excessive

__ (2)_. A. (1) KW output RISES and KVAR output is STABLE. (2) mechanical stress on the EDG engine B. (1) KW output RISES and KV AR output is STABLE. (2) accumulation of combustion and lubricating products in the exhaust system C. (1) KW output and KVAR output RISES. (2) mechanical stress on the EDG engine D. (1) KW output and KVAR output RISES. (2) accumulation of combustion and products in the exhaust system Answer: A Explanation/Justification: Correct. If frequency drops, the EDG will attempt to increase speed, which will pick up real load. TS Surveillance 3.8.1.3 bases states that the load band (2340 TO 2600 KW) which is more restrictive than the rated load in 1OST-36.1 (2850 KW) is to avoid routine overloading of the DG. Routine overloading may result in more frequent teardown inspections in accordance with vendor recommendations for DG OPERABILITY. Incorrect.

Correct EDG response.

Incorrect consequence.

The reason for significance of EDG loading is for ensuring loading is maintained

>50% for an hour when operating the EDG at low loads for extended periods of time. This limit is plausible in that it is more associated with operating the EDG at low loads and could be confused by the candidate. Incorrect.

Incorrect EDG response.

KVAR output will remain essentially constant if grid voltage is constant.

If it did change it would change in the opposite direction of KW. Significance of operating above rated limit is correct as explained above. D. Incorrect.

Incorrect EDG response.

Reason for load limit is incorrect as explained above. Sys # System Category 062 AC Electrical Distribution Ability to predict and/or monitor changes in parameters System (to prevent exceeding limits) associated with operating the AC distribution system controls including:

KiA# A1.01 KiA Importance 3.4 Exam Level References provided to Candidate 'Technical

References:

Question Source: Modified Bank -Vision # 45778 KA Statement Significance of DIG load limits RO GP Electrical Theory, Rev. 2, pg. 114-135 10ST-36.1, Rev. 53, PG. 5 & 6 TS 3.8.1 Amend. 278/161, Pg. 5 TS 3.8.1, Rev. 13, Pg. 17 Question Cognitive Level: Higher -Comprehension or Analysis 10 CFR Part 55 Content: (CFR 41.5/45.5)

Objective: 12. Given a specific plant condition, predict the response of the 4KV Distribution System control room indication control loops, 36.1 including all automatic functions and changes in eqlJipment status, for either a change in plant condition or for an off-normal condition.

Beaver Valley Unit 1 NRC Written Exam (1LOT8) 46. Given the following plant conditions: A Loss of ALL AC Power occurred. The Control Room Team is performing actions of ECA-O.O, "Loss of All Emergency AC Power". Hydrogen has been vented from the Main Unit and [1 LO-M-14], "Air Side Seal Oil Backup Pump", has been secured. Which ONE of the following describes the design capacity of the Class 1 E batteries, and the effect of stopping (1 LO-M-14] while performing ECA-O.O? The Class 1 E battery design capacity is __ The effect of stopping [1 LO-M-14] while performing ECA-O.O is __ (2) __A. (1) 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> (2) a reduction in the battery discharge rate. B. (1) 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> (2) an extension of battery life up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> C. (1) 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> (2) a reduction in the battery discharge rate. D. {1} 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> (2) an extension of battery life up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Answer: A Explanation/Justification: Correct. The Class 1 E station batteries are designed for two hour operation.

The reason for stopping 1 LO-M-14 is ECA-O.O is to help reduce DC loading on the station batteries.

less load on the battery equates to a lowered discharge rate. Validators demonstrated regarding battery design Incorrect.

Correct time. Incorrect plausible effect Incorrect.

Incorrect time. This is a plausible time since it is the design at other plants. Correct effect. Incorrect.

Incorrect time. Incorrect effect. Sys # System Category KA Statement 063 DC Electrical Distribution Ability to predict and/or monitor changes in parameters associated Battery capacity as it is effected by with operating the DC electrical system controls including:

discharge rate. KlA# A1.01 KIA Importance 2.5 Exam Level RO References provided to Candidate None Technical 1 OM-39.1.B, Rev. 1 , pg. 4 3505-39.1, Rev. 8, pg. 3 10M-53B.4.ECA-O.O, Issue lC, Rev.9, pg 115 Question Source: Modified Bank (2011 Ginna SRO Retake #14) Question Cognitive Level: lower _ Memory or Fundamental 10 CFR Part 55 Content: (CFR: 41.5/45.5)

Objective:

10. Given a 125 VDC Distribution System configuration, and without reference materials describe the 125 VDC Distribution System field response to the following malfunctions, including automatic functions and changes in equipment status: Loss of AC Power, Loss of Station Battery, Loss of DC Power. 16. Describe the battery capacity as it is effected by discharge rate.

Beaver Valley Unit 1 NRC Written Exam (1LOT8) 47. Given the following plant conditions:

  • The plant is operating at 100% power with all systems NSA.
  • A Loss of 125VDC Bus 2 occurs.
  • The Control Room Team entered AOP 1.39.1B. "Loss of 125VDC Bus 2".
  • All systems function as designed and no operator action has occurred.

According to AOP 1.39.1 B, which ONE of the following describes the plant status? REACTOR TRIP A. WILL AUTO OCCUR B. WILL AUTO OCCUR C. WILL NOT AUTO OCCUR D. WILL NOT AUTO OCCUR Answer: B Explanation/Justification:

MAIN STEAMLINE ISOLATION CANNOT AUTO OCCUR CAN AUTO OCCUR CAN AUTO OCCUR CANNOT AUTO OCCUR Incorrect.

Incorrect that a MSLI cannot occur. Plausible because it is partially true that B train MSLI cannot occur since DC Bus 2 power is required however, A Train is still available for MSLI. (refer to correct answer explanation) Correct. Main Feedwater Regulating valves fail closed on a Loss of 125VDC Bus 2, so therefore at 100% power it will take about 30 seconds as validated on the simulator before a Lo-Lo S/G Water Level Reactor Trip automatically occurs. MSLI valves require DC power to close. Since only the B Train of power was lost, the A Train (DC Bus 1) is still available Sl) therefore MSLI can still auto occur if valid plant conditions warrant. Step 3 of AOP 1.39.1 B states to verify a reactor trip has occurred.

The candidate cannot challenge that a reactor trip will not auto occur regardless of time because it will occur. Incorrect.

Reactor trip will occur. Plausible if the candidate does not know the status of MFRVs. Correct that MSLI can occur. Also plausible if the candidate does not know the automatic actions of AOP 1.39.1 B. Incorrect.

Reactor trip will occur. Plausible if the candidate does not know the status of MFRVs. MSLI can occur as previously explained. plausible if the candidate does not know the automatic actions of AOP '1.39.1 Sys# System Category KA Statement 063 DC Electrical Distribution N/A Knowledge of abnormal condition procedures.

KlA# KIA Importance Exam Level 2.4.11 4.0 RO References provided to Candidate None Technica.l

References:

1 OM-53C.4.2.39.1 B, Rev. 3, pg 1, 2, & 11 Question Source: New Question Cognitive Level: Higher -Comprehension or Analysis 10 CFR Part 55 Content: (CFR: 41.10/43.5/45.13) Objective:

3SQS-18. Given a 125 VDC Distribution configuration, and without reference material, describe the 125 VDC distribution system control room response to the following malfunctions, including automatic functions and changes in equipment status: Loss of DC Bus Beaver Valley Unit 1 NRC Written Exam (1LOTS) 48. Given the following plant conditions and sequence of events: The Unit suffered a Loss of Off-Site Power. Both Emergency Diesel Generators (EDGs) are supplying emergency busses. Grid stability is confirmed and the Operations Manager has granted permission to return to the grid. The Control Room Team is performing 10M-36.4.Q, "Transferring Emergency Busses 1 AE and 1 OF From Emergency Feed to Normal Feed", beginning with Bus 1 AE. EDG 1-1 is synchronized to the grid and 4KV Bus 1 AE to 1 A ACB '1 E7 is closed. Upon breaker closure, the following annunciator sequence occurs: A8-107, "4160V EMERG BUS 1AE ACB-1 E7 OVERCURRENT TRIP" received. A8-106, "4160V EMERGENCY BUS 1 AE ACB-1 E7 AUTO TRIP" received. o ' A8-107, "4160V EMERG BUS 1AE ACB-1 E7 OVERCURRENT TRIP" clears. Which ONE of the following describes the impact on EDG 1-1? EDG 1-1 will ____cooling water available.

A. trip with B. trip without C. continue to run with D. continue to run without AnswerC Explanation/Justification: Incorrect.

EDG 1-1 does not trip but remains running. Plausible that the EDG would trip on an overcurrent condition, however, protection in scenario is provided by ACB 1 E7. Correct that cooling is still Incorrect.

EDG 1-1 does not trip but remains running. Plausible that the EDG would trip on an overcurrent condition, however, protection in scenario is provided by ACB 1 E7. Also incorrect that cooling water is not Correct. For the given conditions, EDG 1-1 is running paralleled to the grid. An overcurrent condition was caused by the closure of ACB1 E7 results in ACB 1 A 10 & 1 E7 automatically opening. Upon ACB-1 E7 opening, the overcurrent condition clears which is indicative of the being downstream of ACB 1 E7. The EDG will continue to run with cooling. ACB E-9 is unaffected and even if it did open, EDG cooling would maintained from the other train since RW is cross connected at the CCR HX's. It is not RO knowledge to select procedures so therefore only first part of the higher cognitive KIA was Incorrect.

Correct that EDG 1-1 remains running, incorrect that it is running without cooling. Plausible if the candidate believes the overcurrent trip opens ACB 1 E-9 and does not recognize or understand the RW system configuration. (common misconception based on prior plant configuration).

Sys# System Category KA Statement 064 Emergency Ability to (a) predict the impacts of the followin!)

malfunctions or operations on the Consequences of opening/closing Diesel Generator ED/G system; and (b) based on those predictions, use procedures to correct, breaker between buses (\I AR8, out control, or mitigate the consequences of those malfunctions or operations:

of phase, voltage) KIM A2.08 KIA Importance 2.7 Exam Level RO References provided to Candidate None Technical

References:

3S08-36.1, Rev. 8 PPNT 8lide, lOM-36.4.0, Rev. 10, pg. 2 -4 lOM-36.4.ADB, Rev. 2, pg. 2 10M-36.4.ADA, Issue 3, Rev. 0, Pg. 1 10M-36.1.E, Rev. 2, pg. 29-31 10M-30.2, Rell. 16 PPNT Slide Question Source: New Question Cognitive Level: Higher -Comprehension or Analysis 10 CFR Part 55 Content: (CFR: 41.5/43.51 45.3/45.13) Objective:

13. Given an EDG configuration and without referenced material, describe the EDG control room response to the following actuation signals, including automalic functions and changes in equipment status as applicable:

81 or Bus UV.

Beaver Valley Unit 1 NRC Written Exam (1LOT8) 49. Given the following plant conditions: The Unit is operating at 100% power with all systems in NSA. 1DA-P-13A, "Aux Feedwater Pump Sump Pump" is pumping down 1DA-TK-2, "Collection Sump Tank". RM-'I DA-1 00, "Aux Feedwater Pumps Drain" process detector fails upscale HIGH. All systems function as designed.

Which ONE of the following describes how this failure will affect the Auxiliary Feedwater Pumps drain effluent release pathway? The Auxiliary Feedwater Pump Drain discharge flowpath will be automatically

___ A. terminated due to 1 DA-P-13A tripping.

B. repositioned directly to the tunnel sump. C. repositioned to the turbine plant oil separator.

D. repositioned directly to the low level drain tank. Answer: B Explanation/Justification: Incorrect.

1DA-P-13A will automatically stop anytime there is a radiation monitor low failure which makes this highly plausible. Correct. If RM-1OA-100 fails high it will result in TV-1DA-105A, Aux FeE!d PP's Leakoffto Tunnel Sump opening and TV-10A-105B, Aux Feed PP's leakoff to Oily Drains closing. This prevents any effluent release of radioactivity to a normally non-contaminated system. Incorrect.

This is the normal lineup for this system. If the candidate confuses NSA lineup, then this is a plausible choice. Opposite of actual effect. Incorrect.

This is the normal discharge fiowpath for all potentially radioactive drains except the aux feedwater pump drains making this a incorrect Sys# System Category KA Statement 073 Process Radiation Monitoring Knowledge of the effect that a loss or malfunction of the PRM system will Radioactive effluent releases, have on the following:

KlA# KIA Importance Exam Level K3.01 RO References provided to Candidate None Technical 10M-41D,1.B, Issue 4, Rev, 0, Pg. 2 10M-43.4.ACN, Issue 4, Rev. 0, Pg. 2 Op Manual Fig. No. 410-2 & 43-3 Question Source: New Question Cognitive 10 CFR Part 55 Content: Lower -Memory or (CFR: 41.7 I 45.6) 7. Given a specific plant condition, predict the, response of the radiation monitoring system control room indication and control loops, including all automatic and changes in equipment status, for either a change in plant condition or for an off normal condition, Objective:

15Q5-43.1 Beaver Valley Unit 1 NAtC Written Exam (1LOT8) 50. Given the following plant conditions: The plant is operating at 100% power with all systems in NSA. Reactor Plant River Water Pump [1 WR-P-1 A] is operating. Reactor Plant River Water Pump [1WR-P-*1 8] is in standby. The following control room indications occur: A1-59, "INTAKE STRUCT RIVER WATER PP DISCH LINE A PRESS LOW" is received. [PI-1 RW-113A], "CCR HEAT EX RIVER WATER PRESS "A" HEADER" lowest observed reading is 26 psig and continues to SLOWLY DROP. [PI-1 RW-1138], "CCR HEAT EX RIVER WATER PRESS "8" HEADER" lowest observed reading is 38 psig and continues to SLOWLY DROP. Assume all systems function as design1ed and no operator action has yet been taken. Which ONE of the following describes the CUIRRENT status of [1WR-P-1 8] AND which Abnormal Operating Procedure (AOP) will be entered to mitigate the consequences of this event? [1 WR-P-1 8] will _ (1) AOP _ (2) _ will be entered to mitigate this A. (1) be running (2) 1.51.1, "Unplanned Power Reduction" 8. (1) be running (2) 1.30.2, "River Water/Normal Intake Structure Loss". C. (1) NOT be running (2) 1.51.1, "Unplanned Power Reduction" D. (1) NOT be running (2) 1.30.2, "River Water/Normal Intake Structure Loss". Answer: D Explanation/Justification: Incorrect.

Incorrect that 1WR-P-1 B is running (refer to correct answer explanation)

Incorrect procedure, although plausible that a plant SID would occur. The ARP directs entry into AOP-1.30.2 which directs a plant trip if River Water and Aux River Water pumps cannot be started. Incorrect.

Incorrect that 1WR-P-1 B is running (refer to correct answer explanation)

Correct procedure. Incorrect.

Correct pump status. Incorrect procedure.

Prior to attempting a plant shutdown an attempt to restore header pressure procedurally occur and at the stated RW pressure it is more prudent to restore pressure versus plant Correct. The standby RW Pump will auto start when PT-1 RW-113A senses 20 psig, so therefore is not running based on stated plant The Annunciator received is related to intake structure low pressure whiich is indicative of a header leak or loss of the "A" pump. It is more based on pressure indications that a leak has occurred and requires entry into AOP 1.30.2 per Sys System Category KA Statement 076 Service Ability to (a) predict the impacts of the following malfunctions or operations on the SWS system; and (b) based on Loss of SWS Water those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations:

KIM A2.01 KIA Importance 3.5 Exam Level RO References provided None Technical

References:

  • IOM-30.4.AAC, Rev. 3, pg. 2 to
  • IOM-430.4.AAA, Issue 3, Rev. 2, Pg. 1 10M-30.1.D, Issue 4, Rev.3,pg.5, WM-30.1.E, Rev. 10, pg.5, Question Source: Question Cognitive Level: Higher -Comprehension or Analysis 10 CFR Part 55 Content: (CFR: 41.5/ 43.5/45.3/45.13Objective:

1 SQS-30.2 5. Given a change in plant conditions, describei the response of the RPRW system field indication and control including all automatic functions and changes in plant equipment.

Beaver Valley Unit 1 NR:e Written Exam (1LOTS) 51. Given the following plant conditions: The Plant was operating at 100% power with all systems in NSA when a Reactor Trip and Safety Injection occurred. "A" Steam Generator faulted inside containment causing Containment Pressure to peak at 25 psig and is currently DROPPING. All systems have functioned as designE!d and no operator actions have occurred.

Which ONE of the following describes the position of the River Water System components listed below? [MOV-1RW-103A-D]

=1N1B Header RPRWto Recirc Spray HX Isol [MOV-1 RW-114NB]

=CCR HX RW Series Isol [MOV-1RW-103A-DJ

[MOV-1 RW-114A1BJ A. OPEN B. CLOSED C. OPEN D. CLOSED Answer: B Explanation/Justification: Incorrect.

Correct position for RSS HX. Incorrect position for CCR HX. Correct. When containment pressure is > 11 psig a CIB signal is generated which isolates the cooling to CCR HX's and lines up cooling emergency heat loads (RSS Incorrect.

This would be the position if CIS had not occurred. Incorrect.

Incorrect position for RSS HX. Correct position for CCR HX. Sys# System Category KA Statement 076 Service Water Ability to manually operate and/or monitor in the control room: Emergency heat loads. KlA# A4.04 KIA Importance 3.5 IExam level RO References provided to Candidate None 'Technical

References:

10M-53A.l.l-K, Rev. 4, pg. 5 1 OM-53A.1.1-E.

Issue 1 C, Rev. 3, pg. 4 & 5 Question Source: New Question Cognitive Level: Higher -Comprehension or Analysis 10 CFR Part 55 Content: (CFR: 41.7/45.5 to 45.8) Objective:

15. Given a Reactor Plant River Water System configuration and without referenced material, describe the RPRW System control room response to the follOwing off normal conditions.

including automatic functions and changes in equipment status as applicable:

Safety Injection.

Containment Isolation Signal, Phase B (CIB, EDG start.

Beaver Valley Unit 1 NAtC Written Exam (1LOT8) Which ONE of the following describes how [TV-1 SA-1 05], "Station Air Header Trip Valve" performs its system function?

[TV-1 SA-1 05] closes to isolate __ (1) __ on lowering air Upon restoration of system air pressure setpoint, [TV-1 SA-1 05] will __ (2) __(1) instrument air from station air (2) automatically reopen. (1) instrument air from containment air (2) automatically reopen. (1) instrument air from station air (2) be closed and must be manually reopened. (1) instrument air from containment air (2) be closed and must be manually reopened.

Answer: C Explanation/Justification: Incorrect.

Correct system interface.

Incorrect that valve auto reopens (n3fer to correct answer explanation) Incorrect.

Incorrect system interface, TV-1IA-400 is the interface valve between containment and station instrument air. Incorrect that valve auto reopens (refer to correct answer explanation) Correct. TV-1SA-1 05 will auto close on lowering instrument air preSSUrE!

as sensed on PS-1SA-105

@ 95 psig. This valve functions to isolate station air from instrument air. The valve is designed to not auto reopen and must be manually reopened when station air pressure is restored to NOP. Incorrect.

Incorrect system interface.

Correct valve cause-effect relationship.

Sys# System Category KA Statement 078 Instrument Air Knowledge of the physical connections and10r cause-effect Service Air. relationships between lAS and the following systems: KIM K1.02 KIA Importance 2.7 Exam Level RO References provided to Candidate None Technical

References:

1 OM-34.1.D, Issue 4, Rev. 0, pg. 5 1 SOS-34.1, Rev. 14, PPNT Slide HO-1 Question Source: New Question Cognitive 10 CFR Part 55 Content: Lower Memory or Fundamental (CFR: 41.2 to 41.9/ 45.7 to 45.8) Objective:

1

3. Describe the control, protection and interlocl<

functions for the field components associated with the Compressed Air System, including automatic functions, setpoints and changes in equipment status as applicable.

Beaver Valley Unit 1 NRC Written Exam (1LOTS) 53. Given the following plant conditions and sequence of events: The Unit is operating at 100% power with all systems in NSA. The following control room annunciators are received: [A6-100], "STA INSTR AIR RCVR TANK PRESS LOW". [A6-109], "STA INSTR AIR RCVR TANK DISCH PRESS LOW". [PI-1IA-106], "INSTR AIR HEADER" Pressure Indicator is reading 98 psig and is slowly DROPPING. [PI-1IA-106B], "INSTRAIR RCVR" Pressure Indicator is reading 98 psig and is slowly DROPPING. All systems function as designed.

Based on these air pressure readings what will be the status of [TV-1SA-105], "Station Air Header Trip Valve" AND ['I IA-C-4] , Diesel Driven Air Compressor?

[TV-1SA-105], "Station Air Header Trip Valve" will be __ (1) __. [1 IA-C-4] , Diesel Driven Air Compressor will A. (1) OPEN (2) be RUNNING B. (1) CLOSED (2) be RUNNING C. (1) OPEN (2) NOT be RUNNING D. (1) CLOSED (2) NOT be RUNNING Answer: C Explanation/J ustification:

(2) __Incorrect.

Correct TV-1 SA-1 05 status. Incorrect 1IA-C-4 status (refer to correct answer explanation). Incorrect.

Incorrect TV-1SA-105 status. Incorrect 1IA-C-4 status (refer to correct answer explanation). Correct. TV-1SA-105 closes at 95 psig. Based on control board pressure gauge readings TV-1SA-105 will be open. The Diesel Driven Air Compressor starts at 93 psig and is therefore not yet running based on pressure slated plant conditions.

The TV-1SA-1 05 knowledge tested in this question relates to the IA pressure at which setpoint the valve closes. This is different knowledge than that tested in the previous question (Q # 52) which acknowledges that the valve closes. however focuses on the valve function and operation of the valve. Each knowledge specifically addresses the knowledge required to meet the KiA. D. Incorrect.

Incorrect pressure indicator.

Correct 1IA-C-4 status (refer to correct answer explanation).

Sys# System Category 078 Instrument Air Ability to manually oper ate and/ol' monitor in the control room: KiA# A4.0i KiA Importance 3.1 Exam Level References provided to Technical

References:

None Question Source: New KA Statement Pressure gauges. RO lOM-53C.4.1.34.1, Rev. 16. pg. 4-5 lOM-34.4.AAI.

Rev. 7 pg. 2 & 5 lOM-34.4.AAD.

Rev. 2. pg. 2 & 3 1SQS-34.1.

Rev. 14. PPNTSIideH0-1 Question Cognitive Level: Lower Memory or Fundamental 10 CFR Part 55 Content: (CFR: 41.7/45.5 to 45.8) Objective:

4. Given a change in plant conditions.

describe the response of the Compressed Air System field indication and control loops. including all automatic functions and changes in equipment status.

Beaver Valley Unit 1 NBC Written Exam (1LOT8) 54. Given the following plant conditions:

  • The Plant is in Mode 1 at 100% power. Containment Integrity is being analyzed.

Which ONE of the following containment conditions and/or malfunctions results in a one hour or less technical specification required action? A. A single Quench Spray Train is inoperable.

B. One containment isolation valve is inoperable.

C. Containment Average Air Temperature is 109 of. D. One containment air lock interlock mechanism is inoperable.

Answer: D Explanation/Justification: Incorrect.

Per TS 3.6,6, Two as trains shall be operable.

The TS action to restore one inoperable as train is 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Incorrect.

Per TS 3.6.3, in Mode 1 Each containment isolation valve shall be operable.

The TS action for this condition is to isolate the penetration within 4 Incorrect.

Per TS 3.6.5, In Mode 1 Containment Average Air temperature is to be maintained

< 108 F. The TS action to restore temperature within limit is 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. Correct. Per TS 3.6.2, Two air locks shall be operable.

With one airlock with a containment Air lock mechanism inoperable, the required action to verify an operable door is closed in the effected air lock is 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Per T8 3.6.1 basis for an operable containment, the isolation devices for the penetrations in the containment boundary are a part of the containment leak tight barrier. (ie; required for containment integrity)

Misconceptions were demonstrated by validators.

Sys# System Category KA Statement 103 Containment Knowledge of the effect that a loss or malfunction of the Loss of containment integrity under normal conditions.

containment system will have on the following:

KlA# K3.02 KIA Importance 3.8 Exam Level RO References provided to Candidate None Technical

References:

TS 3.6.5, Amend 280/164, pg. 3.6.5-1 TS 3.6.3, Amend 278/161, pg 3.6.3 -1 & 2 TS 3.6.2, Amend 278/161, pg. 3.6.2 -2 TS 3.6.6, Amend 278/161, pg. 3.6.6 -1 TS 3.6.1 8ases, Rev. 0, pg. 83.6.1 -1 Question Source: New Question Cognitive 10 CFR Part 55 Content: Lower -Memory or (CFR: 4117/45.6)

Objective:

5. From memory and for a given set of plant conditions, determine if the condition meets the criteria for entry into a one hour or less action statement in accordance with technical specifications.

Beaver Valley Unit 1 NRC Written Exam (1LOT8) Which ONE of the following describes the results of the following actions? (Assume all systems function as designed and no other operator action occurs) Depressing the Train "A" CIA manual actuation pushbutton will result in (1) Depressing a single Train "B" CIB manual actuation pushbutton will result in _ (2) (1) ALL CIA valves CLOSING (2) ALL CIB valves CLOSING (1) ALL CIA valves CLOSING (2) ALL CIB valves REMAINING AS IS (1 ) ONLY CIA valves in ONE Train CLOSING. (2) ALL CIB valves REMAINING AS IS (1 ) ONLY CIA valves in ONE Train CLOSING. (2) ALL CIB valves CLOSING Answer: B Explanation/Justification: Incorrect.

Correct CIA response.

CIB valves do not automatically reposition.

2/2 pushbuttons are required to initiate CIB train specific. Correct. There are two CIA pushbuttons. (one for each train) Either pushbutton will automatically isolate both trains therefore all CIA valves will close. There are two pushbuttons for each CIB train. Since only one pushbutton was depressed, no CIB valves reposition (2/2 logic required). Incorrect.

Incorrect CIA position.

Plausible if candidate believes that the push buttons are train specific.

Correct CIS response. Incorrect.

Incorrect CIA position.

Plausible if candidate believes that the pushbuttons are train specific.

Incorrect CIB response.

Plausible candidate does not know the logic (ie: they believe the logic is Y2 versus Sys # System category KA Statement 103 Containment Ability to monitor automatic operation of the containment system, including:

Containment isolation.

KlA# A3.01 KIA Importance 3.9 Exam Level RO References provided to Candidate None Technical

References:

USFAR Fig. 7.2-1, Rev. 22 3SQS-1.1 PPNT Slides 91, 93, 95 & 96 Question Source: New Question Cognitive 10 CFR Part 55 Content: Lower -Memory or (CFR: 41.7/45.5)

ObJective:

8. Describe the control, protection and interlock functions for the control room components associated with the RPS and ESFAS signals, including automatic functions, setpoints and changes in equipment status as applicable.

Beaver Valley Unit 1 NRC Written Exam (1LOT8) 56. Given the following plant conditions: A Manual Daily Heat Balance was performed during operation at 90% power. The feedwater temperature inputs usedl for the calorimetric were erroneously 10°F LOWER than actual feedwater temperature. Power Range Nuclear Instrumentation (NI) was adjusted in accordance with 54.4.C1-3, "Daily Heat Balance" using Venturi Feedwater Flow Indication.

Which ONE of the following describes the effect of this adjustment?

Indicated power is now __ (1) __than actual Power Range NI was set __ (2) __A. (1) LESS (2) conservatively B. (1) LESS (2) NON-conservatively C. (1) MORE (2) conservatively D. (1) MORE (2) NON-conservatively Answer: C ExplanatiOn/Justification: Incorrect.

Incorrect indicated power. Correct power range setting. Incorrect.

Opposite effect. Plausible if candidate has misconceptions of heat balance inputs and calculations. Correct. With a lower than actual feedwater input into Attachment A, the SG Power calculated in step 12 will be lower than actual. This in turn makes step 13 (RCS Output) a higher number which in turn makes step14 (Net Reactor Power) a higher number. Therefore indicated power as calculated by heat balance is higher than actual. When NI adjustments are made they will reduce power so that they are set more conservatively. Incorrect.

Correct indicated power. Incorrect power range setting. Sys # System Category KA Statement 015 Nuclear Instrumentation Knowledge of the operational implications of the following Factors affecting accuracy and reliability of concepts as they apply to the NIS: calorimetric calibrations.

KIA#-K5.04 KIA Importance 2.6 Exam Level RO References provided to Candidate None Technical

References:

10M-54.4.Cl-3, Rev. 29, pg. 3, 20 &21 3SQS-2.1, Rev. 8 PPNT Slides 125 -128 Question Source: New Question Cognitive 10 CFR Part 55 Content: Higher -Comprehension or (CFR: 41.5/45.7)

Objective:

3SQS-3.1 11. Explain how and why the NIS power range channels are adjusted based on calorimetric data.

Beaver Valley Unit 1 NBC Written Exam (1LOT8) 57. Given the following plant conditions: A small fire occurred in the Control Room. The Operating Crew is performing actions of AOP 1.33.1 A, "Control Room Inaccessibility". The RO and SM have manned the EmHrgency Shutdown Panel (SOP) and are transferring control of equipment.

Which ONE of the following describes parameters that are DIRECTLY available to be read at the SOP in order to perform AOP 1.33.1 A actions? Wide Range Steam Generator Water Level Charging and Letdown Flow Auxilliary Feedwater Flow Subcooling Margin A. 1 &3 ONLY. B. 2 &4 ONLY. C. 2 & 3 ONLY. O. 1,3, &,4 ONLY. Answer: A Explanation/Justification: Correct. AOP 1.33.1 A & BVPS Unit 1 UFSAR reference the parameters (channel values) that can be read at the SDP outside the control room. By design these are NNIS values which are necessary for safe SID of the plant. From the parameters listed only Wide Range S/G Water Level & AFW Flow can be read atthe SDP. Incorrect.

Plausible that charging and letdown flow are controlled at the SDP because Charging Pumps and Letdown Valve control is transferred to the SDP. Also plausible that subcooling is monitored, however, there are separate indicators for PRZR Pressure and RCS Temperature.

Subcooling Margin can be derived but not directly.

Some operators mal' believe that only NR S/G water level can be monitored at the SDP and rule this choice out as a result. Incorrect.

AFW Flow is correct but charging and letdown flow is incorrect. Incorrect.

Correct that WR S/G water level and AFW Flow can be monitored, however, as discussed above Subcooling Margin cannot be directly obtained at the SDP. Sys # System Category KA 016 Non-nuclear Instrumentation Knowledge of the NNIS design feature(s) and/or Reading of NNIS channel values outside control interlock(s) which provide for the following:

KlA# K4.01 KIA Importance 2.8 Exam Level RO References provided to Candidate None Technical

References:

1 OM-53C.4.1.33.1 A, Rev. 12, Pg. 9-11 & 14 BVPS UFSAR Unit 1, Rev. 21, Table 7.4-1 BVPS UFSAR Unit 1 , Rev.19, Pg 7.8-1 Question Source: New Question Cognitive 10 CFR Part 55 Content: Lower -Memory or (CFR: 41.7) Objective:

3S0S-53.5

13. Describe the actions for control room inaccessibility.

Beaver Valley Unit 1 NBC Written Exam (1LOT8) Which ONE of the following describes the displayed control room indication for a Core Exit Thermocouple (CET) for an open AND shorted circuit? (consider each separately)

As compared to a NON-effected CET, a CET detector with an open circuit will read As compared to a NON-effected CET, a CET detector with a shorted circuit will read _ (1) LOWER (2) LOWER (1) HIGHER (2) HIGHER (1) LOWER (2) THE SAME (1) THE SAME (2) THE SAME Answer: A Explanation/Justification: Correct. A failed CET sensor due to a shorted circuit or an open circuit will both result in the control room indication failing low. Incorrect.

OppoSite failure effect. Plausible if the candidate does not know the failure mechanism. Incorrect.

Correct for open circuit. Incorrect for shorted circuit. Plausible for adverse containment conditions. Incorrect.

This would be the effect if due to adverse containment.

The candidate may confuse the purpose of reference junction boxes which are designed to compensate for adverse containment conditions during accidents.

Sys # System Category KA Statement 017 In-Core Temperature Knowledge of the effect of a loss or malfunction of the ITM Sensors and detectors.

Monitor System (ITM) system components:

KlA# KS.01 KIA Importance 2.7 Exam Level RO References provided to Candidate None Technical

References:

3S05-3.1, Rev. 5. pg. 16 & 17 3SOS-3.1 PPNT Slides Question Source: New Question Cognitive 10 CFR Part 55 Content: Lower -Memory or (CFR: 41.7/45.7)

Objective:

3S0S-3.1 10. Describe the response of thermocouple readouts for open and short circuits.

Beaver Valley Unit 1 NRC Written Exam (1LOT8) 59. Given the following plant conditions: The Plant is in Mode 5 cooling down via Residual Heat Removal (RHR) System. Containment Purge is established to thl3 Ventilation Vent. A common mode failure results in a complete Loss of RHR and the Control Room Team enters AOP 1.10.1, "Loss of RHR Capability". Radiation levels are increasing on Ventilation Vent Monitor [RM-VS-1 09]. [RM-VS-1 04A AND B] are Out of Service (OOS). If Radiation Levels continue to increase above! the High alarm setpoint for [RM-VS-109J, which ONE of the following Containment Purge responses will occur to mitigate the implications of this accident, if any? Containment Evacuation Alarm automatically sounds. CNMT Purge Supply and Exhaust Fans AUTO STOP. [1 VS-HV-5 & F-5] CNMT Isolation Purge Supply and Exhaust Dampers AUTO CLOSE. [1 VS-D-5-3A

& 5A] A. 1 AND 2 ONLY. B. 2 AND 3 Ot\lL Y. C. 1 , 2, AND 3. D. No AUTO actions will occur. Answer: D Explanation/Justification: Incorrect.

Correct that #2 occurs, however, #1 will occur from RM-1 VS-11 048 ONLY. Plausible because during fuel movement when fuel is longer irradiated, the auto closure of these dampers are defeated.

Incorrect because RM-1 VS-1 04A is Incorrect.

If RM-1 VS-1 04A was not out of service, 1 VS-HV-S, CNMT Purge Supply Fan and 1 VS-F-S CNMT Purge Exhaust Fan both will 1 VS-D-S-3A and 1 VS-D-S-SA will both close to isolate the CNMT from Incorrect.

Containment Evacuation alarm is actuated from RM-1 VS-1 048 ONLY which is OOS. Correct. No automatic actions occur from RM-1 VS-1 09. The procedure requires the operating crew to monitor for increased radiation consider manual isolation if a high radiation condition exists. This is operationally relevant to the way 8VPS is currently operated.

These serve to help mitigate the effects of a high radiation condition.

Mitigation strategy is strictly "manual action". All of the distractors are based original plant design of RM-1 VS-1 04A and 8 radiation Sys# System Category KA Statement 029 Containment Purge N/A Knowledge of low power/shutdown implications in accident (e.g., loss of coolant accident or loss of residual heat removal) mitigation strategies.

KIM KIA Importance Exam Level 2.4.9 3.8 RO References provided to Candidate Technical

References:

10M-44C.4.A, Rev. 21, Pg. S None 1 SQS-44C.1, Rev. 9, PPNT Slide #41 10M-43.4.AEG, Rev. 4 pg. 2 & 3 1OM-43.4.AEH, Rev. 4, pg. 2 & 3 Question Source: New Question Cognitive Level: Lower -Memory or Fundamental 10 CFR Part 55 Content: (CFR: 41.10/ 43.S/ 4S.13) Objective:

1 Describe the control, protection and interlock functions for the control room components associated with the containment ventilation system, including automatic functions, setpoints and changes in equipment status as applicable:

Hi-Hi Radiation.

Beaver Valley Unit 1 NRC Written Exam (1LOTS) 60. Given the following plant conditions:

  • Unit 1 is at 55% power with all systems in normal alignment for this power level.
  • A Loss of Auto Stop Oil pressure occurs resulting in a Turbine Trip.
  • All systems respond as designed.

Which ONE of the following describes the trending of primary plant parameters (ReS temperature and pressure) ten seconds after the turbine trips? Res temperature will be __ (1) __ReS pressure will be (2) __A. (1) increasing (2) increasing B. (1) increasing (2) decreasing

e. (1) decreasing (2) increasing D. (1) decreasing (2) decreasing Answer: D Explanation/Justification:

Incorrect temperature and pressure.

These are indicative of a loss of load without a reactor trip. Incorrect.

Incorrect temperature response.

Correct pressure response.

These are indicative of a loss of load and also a open PORV. Incorrect.

Correct temperature response.

Incorrect pressure response.

These are indicative of a reactor trip with failure of steam dumps. Correct. Since the reactor is> P-9 (49%) a turbine trip results in a reactor trip. A reactor trip will result in an initial drop in RCS temperature since steam dumps will open to maintain RCS temperature at 547 F. The RCS cooldown results in a loss of fluid in the PRZR which in turn drops RCS pressure initially until steam dumps close and PRZR heaters can compensate for the cooldown.

Sys# System Category KA Statement 045 Main Turbine Generator Ability to predict and/or monitor changes in parameters Expected response of the primary plant (to prevent exceeding design limits) associated with MT/G parameters (temperature and pressure) system controls including:

following T/G trip. KlAn A 1.05 KIA Importance 3.8 Exam Level RO References provided to Technical

References:

3S0S-1.1 (Unit 1) Rev. 7 PPNT Slide 121 & 122 Unit 1 Protection Permissives GO-3ATA-3.2, Rev. 3, PPNT slide # 10, 13, 15 Question Source: New Question Cognitive Level: Higher -Comprehension or Analysis 10 CFR Part 55 Content: (CFR: 41.5/45.5)

Objective:

1. Predict and analyze the plant response (Tavg, reactor power, net reactivity, pressurizer pressure, pressurizer level, steam generator pressure, steam generator level and steam flow to the following transients:

Reactor trip from 100% power.

Beaver Valley Unit 1 NRC Written Exam (1LOT8) 61. Given the following plant conditions: The plant is operating at 100 % power with all systems in NSA. A 10 gpm Steam Generator Tube Leak occurs. A Hi-Hi Radiation signal is confirmed on RIS-1SV-100, "Condenser Air All systems function as designed.

With no operator action, which ONE of the following describes the plant/component response to this set of plant conditions?

[TV-1 SV-1 OOA], Condenser Air Ejector to Containment Trip Valve [TV-1 SV-1 OOB], Condenser Air Ejector to Gaseous Waste Trip Valve A. (1) OPENS (2) CLOSES B. (1) CLOSES (2) OPENS C. (1) REMAINS OPEN (2) REMAINS CLOSED D. (1) REMAINS CLOSED (2) REMAINS OPEN Answer: A Explanation/Justification: Correct. If a Hi-Hi radiation level is reached (stated in question stem), then TV-1SV-100A opens and TV-1SV-100B closes to reposition air ejector off gas from the gaseous waste system to the containment.

This design in unique to Unit 1. Incorrect.

This is opposite of the expected response. Incorrect.

This is plausible if the candidate is not familiar with NSA and believes the Hi signal already caused the alignment to occur. D. Incorrect.

This would be the response for a Hi signal versus Hi-Hi signal. Sys # System Category 055 Condenser Air Removal Knowledge of the physical connections and/or cause-effect relationship between the CARS and the following systems: KIM K1.06 KIA Importance 2.6 Exam level References provided to Technical

References:

None Question Source: Modified Bank -Vision # 464 KA Statement PRM system. RO lOM-26.1.B, Rev. 11, pg. 34, 35, & 43 Op Man Fig. 26-6, Rev. 15 Question Cognitive level: Lower _ Memory or Fundamental 10 CFR Part 55 Content: (CFR: 41.2to 41.9/45.7 to 45.8) Objective:

12. Given a Main Turbine, Main Condenser, Condenser Air Removal system and MSR configuration and without referenced material; describe the Main Turbine, Main Condenser, Condenser Air Removal system and MSR control room response to the following actuation signals, including automatic functions and changes in equipment status as applicable:

Air Ejector Air Discharge Hi-Hi Radiation.

Beaver Valley Unit 1 NRC Written Exam (1LOT8) 62. Given the following plant conditions: The Unit is at 100% Power with all systems in NSA. A liquid waste release 'from [1 BR-TK-413], "B Coolant Recovery Tank" is in progress using [1 BR-P-2B], "Evaporator Feed Pump". [RM-1 LW-104], "Liquid Waste Effluent Monitor has generated a HIGH-HIGH radiation signal. Which ONE of the following describes the resulting position/status of the following Liquid Waste system components?

[1 BR-P-2B], "Evaporator Feed [TV-1 LW-1 05], "Liquid Waste Effluent Trip [FCV-1 LW-1 04-2], "Liquid Waste Effluent High Range Flow Control [1 ITV-1 LW-105J [FCV-1 LW-1 04-21 A. STOPPED OPEN B. RUNNING CLOSED C. STOPPED OPEN D. RUNNING CLOSED Answer: D Explanation/Justification: Incorrect.

Evaporator Feed Pump continues to run. The Hi-Hi radiation signal does not trip the pump. Both TV*1 LW*105 and receive a close incorrect.

Correct that Evaporator Feed Pump continues to run and FCV*1 LW-1 04-2 closes. TV*1 LW-1 05 also receives a close signal on Incorrect.

Evaporator Feed Pump continues to run. The Hi-Hi radiation signal does not trip the pump. TY-1LW*105 does isolate. FCY*1LW*l 04*2 also isolates. Correct. On a Hi-Hi radiation signal from RM-1LW-l04, a signal is generated which isolates liquid waste by closing TV*' LW-105 and 104-2. The Evaporator Feed Pump continues to Sys # System Category KA Statement 068 Liquid Radwaste Ability to monitor automatic operation of the Liquid Radwaste system including:

Automatic isolation.

KlA# A3.02 KIA Importance 3.6 IExam Level RO References provided to Candidate 'Technical

References:

10M*17.1.D, Issue 4, Rev. 1, pg. 13 & 14 Question Source: Bank Vision # 45676 Question Cognitive level: Lower Memory or Fundamental 10 CFR Part 55 Content: (CFR: 41.71 45.5) Objective:

5. Given a Liquid Waste Disposal System configuration and without reference material, describe the Liquid Waste Disposal System field response to the following off-normal conditions, including automatic functions and changes in equipment status: High-High Radiation.

Beaver Valley Unit 1 NRC Written Exam (1LOT8) 63. Given the following plant conditions and sequence of events: [1 GW-TK-1A], "Gaseous Waste Decay Tank" is being batch discharged to the atmosphere lAW 10M-19.4.E, "Decay Tank Discharge". The National Weather Service informs the Control Room that a Tornado Watch has been issued for Beaver County due to favorable conditions for tornado formation. The Control Room Team enters AOP %.75.1, "Acts of Nature -Tornado or High Wind Conditions".

Which ONE of the following actions regarding

[1 GW-TK-1 A] discharge is required, if any? A. No action is required.

B. Suspend the discharge.

C. Increase dilution flowrate.

D. Reduce gas discharge flowrate.

Answer: B Explanation/Justification: Incorrect.

Opposite of the correct answer. Plausible if the candidate does not recognize the impact of meteorological changes. Correct. Discharge must be secured lAW AOP V2.75.1. Incorrect.

Plausible action that discharge will continue by increasing dilution, however, not procedurally correct. Incorrect.

Plausible action that discharge will continue by reducing the glas discharge flowrate, however, not procedurally correct. Sys # System Category KA Statement 071 Waste Gas Disposal Ability to (a) predict the impacts of the following malfunctions or operations on the Meteorological changes. Waste Gas Disposal System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations:

KIM A2.08 KIA Importance 2.5 Exam Level RO References provided to Candidate Technical

References:

1S0S-19.1, Rev. 15 PPNTSlide 10M-19.4.E, Rev. 10, pg. 2 1/20M-53C.4A.75.1, Rev. 14, pg. 1 & 6 Question Source: New Question Cognitive Level: Lower -Memory or Fundamental 10 CFR Part 55 Content: (CFR: 41.5/43.5/

45.3/ 45.13) Objective:

1

23. For a given set of plant conditions, determine if the condition meets the criteria for entry into a less than or equal to one hour statement is accordance with the Licensed Requirements Manual and Off Site Dose Manual.

Beaver Valley Unit 1 NRC Written Exam (1LOT8) 64. Given the following plant conditions: The plant was operating at Full Power with all systems in NSA. A Loss of Offsite Power occurred fallowing a design basis earthquake. The Control Room Team is performing actions of E-O, "Reactor Trip or Safety Injection". Emergency Diesel Generator

  1. 1 has failed to start. All other systems function as designed.

Which ONE of the following describes the status of power to [1WR-P-9A

& 9B], "Auxiliary River Water Pumps"? [1WR-P-9A]

has __ [1 WR-P-9BJ has _ (2) A. (1) power (2) power B. (1) no power (2) power C. (1) power (2) no power D. (1) no power no power Answer: B Explanation/Justification: Incorrect.

Incorrect that 1WR-P-9A has power (refer to correct answer explanation)

Correct 1WR-P-9B status. Correct. 1WR-9A is normally powered from Bus 1AE. Since there is no offsite power and EOG 1-1 failed to start, 1WR-9A has no power. 9B is powered from Bus 1 OF. Since all other systems functioned as designed, EOG 1-2 started and is supplying Bus 1 OF so therefore 1WA-P-9B does have power. Incorrect.

Incorrect that 1WR-P-9A has power (refer to correct answer explanation)

Incorrect 1WR-P-9B status. Plausible if the candidate does not understand integrated plant status and power supplies. Incorrect.

Correct that 1WR-P-9A has power. Incorrect 1WR-P-9B status Sys# System Category KA Statement Circulating Water Knowledge of bus power supplies to the following:

Emergency/essential SWS pumps KIM K2.03 KIA Importance 2.6 Exam Level AO References provided to Candidate Technical

References:

10M-30.3.C, Rev. 17, pg. 10 & 11 QUestion Source: New Question Cognitive Level: Higher -Comprehension or Analysis 10 CFR Part 55 Content: (CFR: 41.7) Objective:

3. Identify the power supplies for the components identified on the NSA system ftow-path drawing which are powered from the class 1 E electrical distribution system. 075 Beaver Valley Unit 1 NRC Written Exam (1LOTS) 65. Given the following plant conditions: The plant is at full power with all systems in NSA. A fire is reported in the Turbine Building. Fire Main pressure is 110 psig and slowly LOWERING. No action has been taken by the Control Room Team and all systems function as designed.

If Fire Main pressure continues to drop which fire pump will start first AND what will be the control room indication that it has started? [1 FP-P-1], "Motor Driven Fire Pump" starts __ (1) _ [1 FP-P-2], "Engine Driven Fire Pump". The control room indication(s) that [1 FP-P-1] started is (are) by __ (2) A. (1) BEFORE (2) annunciator ONLY. B. (1) AFTER (2) annunciator ONLY. C. (1) BEFORE (2) annunciator, RED indicating light, and amp-meter.

D. (1) AFTER (2) annunciator, RED indicating light, and amp-meter.

Answer: C Explanation/Justification: Incorrect.

Correct sequence.

Partial indication (refer to correct answer explanation). Incorrect.

Incorrect sequence.

Partial indication (refer to correct answer explanation). Correct. Upon lowering fire main water pressure 1 FP-P-1 will auto start first @ 105 psig followed by 1 FP-P-2 @ 95 psig. Both pumps have an annunciator in the control room which informs the operator that a pump start has occurred.

Only 1 FP-P-1 has indicating lights and an amp-meter.

The candidate may not know the pump start sequence or BSP indications which makes al/ distractors plausible. Incorrect.

Incorrect sequence.

Correct indications.

Sys # System Category KA Statement 086 Fire Protection Ability to manually operate and/or monitor in the control room. Fire water pumps. KlA# A4.01 KIA Importance 3.3 Exam Level RO References provided to candidate None Technical 3S0S-33.1, Rev. 7, PPNT Slide # 64 1 OM-33.1.B, Issue 4, Rev. 3, pg. 1 1 OM-33.1.D, Issue 4, Rev. 3, pg. 1 10M-33.4.ACL, Rev. 1, pg. 2 Question Source: New Question Cognitive Level: 10 CFR Part 55 Content: Lower -Memory or (CFR:4117

/45.5 to 45.8) Objective:

8. Given a specific plant condition, predict the r,esponse of the Fire Protection System control room indication and control loops, including all automatic functions and changes in equipment status, for either a change in plant condition or for an off normal event.

Beaver Valley Unit 1 NRC Written Exam (1LOT8) 66. Given the following plant conditions: The Unit was operating at Full Power with all systems in NSA. A LOCA occurred and the Control Room Team transitioned to E-1, "Loss of Reactor or Secondary Coolant".

The following plant conditions exist: oRCS pressure is 520 psig and slowly DROPPING.

o Core Exit Thermocouple Temperatures are 472 OF and slowly DROPPING.

oRCS loop cold leg temperatures are 290 OF and slowly DROPPING.

o S/G pressures are 800 psig and slowly DROPPING.

oRCS Ll T is indicating UPSCALE. RCP's are NOT running. Based on these conditions, which ONE of the following identifies the source(s}

of SI flow providing core cooling, AND what is the status of natural circulation?

A. High Head SI flow ONLY; Natural Circulation is occurring.

B. High Head SI flow ONLY; Natural Circulation is NOT occurring.

C. High Head AND Low Head SI flow; Natural Circulation is occurring.

D. High Head AND Low Head SI flow; Natural Circulation is NOT occurring.

Answer: B Explanation/Justification: Incorrect.

Correct SI flow but incorrect natural circulation conclusion (refer to correct answer explanation) Correct. With RCS pressure at 520 psig. the High Head 81 pumps will be supplying SI flow for core cooling only. The shutoff head for the Low Head 81 pumps is about 178 psig so therefore will not be providing flow. Natural circulation is not occurring.

Decreasing CETCs, Tcold and upscale AT are all indicative of natural circulation making it plausible that natural circulation is occurring.

However the candidate must recognize that there is a disconnect between S/G pressures and cold leg temperatures.

Saturation temperature for S/G pressures at 800 psig is 520 F. Tcold is well below this temperature implying the cold down is more indicative of SI flow. Break flow is the primary removal mechanism and based on saturation temperature for S/G pressure although some reflux boiling may occur. conditions for natural circulation are not present. Both ES-1.1 & 1.2 reference Attachment 2-G for verification of natural circulation flow in the LOCA series procedures making this question operational relevant Incorrect.

Incorrect that Low Head 81 flow is occurring and incorrect natural circulation conclusion (refer to correct answer explanation) Incorrect.

Incorrect that Low Head 81 flow is occurring but correct natural circulation conclusion (refer to correct answer explanation).

Sys# System category KA Statement N/A N/A Conduct of Operations Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation.

KIM 2.1.7 KIA Importance 4.4 Exam Level RO References provided to Candidate Steam Tables Technical

References:

10M-53A.1.2-G, Issue 1 C, Rev. 1, Pg. 2 1808-11.1, Rev. 13, Pg. 15,40, & 41 10M-53A.1.E8-1.2, Issue 1C, Rev. 15, pg. 12 10M-53A.1.ES-1.1.lssue ie, Rev. 10, Pg. 13 Question Source: New Question Cognitive Level: Higher -Comprehension or Analysis 10 CFR Part 55 Content: (CFR: 41.51 43.5 I 45.12145.13)

Objective:

3S0S-53.2 11 State from memory five conditions which indicate that natural circulation is occurring, lAW BVPS EOP Executive Volume.1808-11.1

17. List the nominal value of the control room operating parameters associated with Safety Injection.

Beaver Valley Unit 1 NRC Written Exam (1LOT8) Which ONE of the following describes the system or component status for a value displayed in Reverse Video RED on the Safety Parameter Display System (SPDS)? Used to denote static or reference material. Used to denote dynamic or important information. Indicates SPDS display values have exceeded their process alarm limits. Indicates a data quality other than good and may need further evaluation.

Answer: C ExplanationfJustification:

A. Incorrect.

This condition would be noted by a cyan background color. B. Incorrect.

This condition would be noted by a green background color. C. Correct. A RED background color indicates SPDS display values have exceeded their limits. D. Incorrect.

This condition would be noted by a yellow background color. Sys# System Category KA Statement NfA N/A Conduct of Operations Ability to use plant computers to evaluate system or component status. KIM 2.1.19 KIA Importance 3.9 Exam Level RO References provided to Candidate 'Technical

References:

10M-5C.1.D, Issue 4, Rev. 1, pg. 1 Question Source: New Question Cognitive Level: Lower -Memory or Fundamental 10 CFR Part 55 Content: (CFR: 41.10 145.12) Objective:

1 SQS-5C.1 1. Obtain requested information from the SPDS in accordance with the unit specific worksheet.

Beaver Valley Unit 1 NRC Written Exam (1LOT8) 68. Given the following plant conditions: The Reactor Operator (RO) pages the Primary Auxiliary Building Operator (NLO) and directs him to close [1 AC-238], "Chilled Water Return from Unit [1 VS-AC-11 B]" and check closed [1 AC-240], "Supply Header Vent". Which ONE of the following is a BVPS expectation for this phone communication between the RO and NLO, according to 1/20M-48, "Conduct of Operations"?

A. A verbatim repeat back must be used. B. No action will take place until three-part communication is complete.

C. Use of phonetic alphabet is required if three-part communication is NOT used. D. Multiple actions may be part of the communication as long as repeat backs are used. Answer: B Explanation/Justification: Incorrect.

Repeat backs may be paraphrased. Correct. According to 1/20M-48, Operational orders 8HALL be repeated back to ensure the order is properly understood.

Repeat backs are not required for communications which do not direct an action to be performed.

In this case the RO gives the field operator an operational order and therefore a repeat back is required.

This is a station priority for HIT training and has been a focus OE area for BVP8. Incorrect.

Phonetic alphabet should always be used particularly if confusion is possible. Incorrect.

Multiple actions should not be contained in communications where control or coordination exists. If it is necessary to give complex multiple action orders, they should be written down or a copy of the procedure should be Sys# System Category KA Statement N/A N/A Conduct of Operations Knowledge of the stations requirements for verbal communications when implementing procedures.

KIM KIA Importance Exam Level RO 2.1.38 3.7 References provided to Candidate None Technical

References:

1/20M*48.1.D, Rev. 6 pg. 5 8 Question Source: Bank -Vision # 1682 Question Cognitive Level: Lower _ Memory or Fundamental 10 CFR Part 55 Content: (CFR: 41.10/ 45.13) Objective:

3808*48.1

7. From memory. describe the shift rules of practice including:

communication.

Beaver Valley Unit 1 NRC Written Exam (1LOTS) 69. Given the following plant conditions and sequence of events:

  • A Reactor Startup is in progress following a forced outage.
  • The RO has just completed taking critical data and is directed to raise power to 4%.
  • The RO establishes a positive startup rate and releases the IN-HOLD-OUT switch. Rods continue to step outward as indicated on group step counters and IRPI. Which ONE of the following describes the required immediate action AND consequence if operator action is The immediate required action is to _ (1) __The consequence of inaction is that reactor power will increase to _ (2) before being automatically terminated by the Reactor Protection System __ (3) __A. (1) place Control Rod Group Selector to Bank D position and insert control rods to zero steps. (2) 20% (3) Intermediate Range Rod Stop Signal. B. (1) manually trip the reactor. (2) 25% (3) Power Range Reactor Trip Signal. C. (1) place Control Rod Group Selector to Bank D position and insert control rods to zero steps. (2) 25% (3) Intermediate Range Reactor Trip Signal. D. (1) manually trip the reactor. (2) 30% (3) Power Range Reactor Trip Signal. Answer: B Explanation/Justification: Incorrect.

Inserting control rods is a correct action if criticality is achieved early or outside expected rod height lAW 10M-50.4.4.D.

Since there is an intermediate rod stop at 20%, this is a plausible distractor.

Also AOP 1.1.3 RNO directs the operator to place the rod group selector to Manual. Since the rods are already in manual, the candidate may confuse actions and think taking the control switch to a position other than manual is a correct action. Correct. The candidate must interpret indications provided and recognize an uncontrolled rod withdrawal is in progress and then apply immediate action and systems knowledge to demonstrate understanding of operator actions and impact on system conditions if these actions are not taken. Step 1 of AOP 1.1.3 (RCCA Control bank Inappropriate Continuous Movement) checks for load rejection.

Since the turbine is not yet in service, the RNO Immediate Action is applicable.

Since rods are already in MANUAL and a continuous rod withdrawal is occurring based on symptoms provided, the RO shall trip the reactor. A reactor trip will automatically occur in this scenario when 214 power range channels are above 25% because the low power trip was not manually blocked above P-10 (10%) because no operator action is taken. Incorrect.

Incorrect action as discussed.

It is correct that a reactor trip 'Will occur at 25% based on intermediate current equivalent neutron flux. Incorrect.

Correct action. Incorrect low power range setpoint.

Plausible if candidate confused with P-8 setpoint (3WI,,). Sys# System Category KA NIA NlA Equipment Control Ability to interpret control room indications to verify the status and operation of a and understand how operator actions and directives affect plant and system conditions.

KIM 2.2.44 KIA Importance 4.2 Exam Level RO References provided to candidate None Technical

References:

10M-53C.4.1.1.3, Rev. 11, pg. 1 & 2 BVPS Unit 1 & 2TS 3.3.1, Amend 278/261, Pg. 12 10M-1.5.B.3, Rev. 12, Pg. 2 10M-50.4.D, Rev. 53, Pg. 35 & 36 Question Source: Question Cognitive Level: Higher -Comprehension or Analysis 10 CFR Part 55 Content: (CFR 41.5/43.5/45.12ObJective:

3S0S-53.3

14. Apply the actions for a rod position Beaver Valley Unit 1 NRC Written Exam (1LOT8) 70. Given the following plant conditions: The Shift Manager (SM) has determined that an Annunciator alarm should be disabled. The corresponding knife switch for this alarm has been repositioned OPEN. Which ONE of the following is required by NOIP-OP-1 014, "Plant Status Control" to track this inoperable alarm? Write a l\Jotification for the condition that required the Annunciator alarm to be disabled. Post a Maintenance Deficiency sticker on the alarm window. Create and hang an Operations information Tag/label or Caution Tag on annunciator window and on the opened slide link/knife switch stating what alarm was removed from service. A. 1 ONLY. B. 1 & 2 ONLY. C. 2.L3 ONLY. D. 1,2, & 3. Answer: D Explanation/Justification: Incorrect.

Only partially correct. Incorrect.

Only partially correct. Incorrect.

Only partially correct. Correct. According to NOP*OP*1 014 all of these choices are required.

All distractors are plausible if candidate does not know procedural required actions. Sys# System Category KA Statement N/A N/A Equipment Control of the process to track inoperable alarms. KlA# 2.2.43 KIA Importance 3.0 Exam Level RO References provided to Candidate None Technical

References:

NOp*Op*1014, Rev. 1, pg. 24 & 25 Question Source: New Question Cognitive Level: Lower -Memory or Fundamental 10 CFR Part 55 Content: (CFR: 41.10/43.5/

45.13)

Beaver Valley Unit 1 NRC Written Exam (1LOT8) According to NOP-OP-4202, "Declared Pregnant Workers" and NOP-OP-4201, "Routine External Exposure Monitoring", which ONE of the following Beaver Valley Occupational Dose Limits are required? (Assume no extensions or planned special exposures)

The Embryo/Fetus Dose Equivalent (EFDE) Limit for a Declared Pregnant Worker over entire gestation period is _ The Site Administrative Control Level Dose Limit (TEDE) for an individual working at the Nuclear Facility is _ (1) 100 mr/term (2) 2000 mr/year (1) 500 mr/term (2) 1000 mr/year (1) 100 mr/term (2) 1000 rnr/year (1) 500 mr/term (2) 2000 mr/year Answer: B Explanation/Justification: Incorrect.

Incorrect but plausible DPW limit. The DPW is limited to 100 mr/month but may have up to 500 mr for the entire term or gestation period. The Annual Administrative Limit for an individual working at a nuclear facility is incorrect because it reflects a BVPS Administrative Limit where extensions are involved.

The stem of the question specifically excludes extensions or planned special exposures. Correct. According to NOP-OP-4201 Attachment B. when a worker declares pregnancy.

she will have an administrative level of 500 mr for the term of pregnancy.

This ensures the dose to the unborn child is minimized.

The federal limit is also 500 mrem for the pregnancy period or term. NOP-OP-4101 refers the reader to NOP-OP-4202 which defines a declared pregnant worker and specifies the occupational dose limit for the entire period of declared pregnancy is 500 mrem (100 mrem/month)

NOP-OP-4101 states on Attachment A that BVPS Administrative Control Limit for TEDE is 1000 mr/year. Incorrect.

Incorrect DPW value but plausible as described above. Correct BVPS Administrative Control Limit for TEDE. Incorrect.

Correct value for DPW. Incorrect value for BVPS Administrative Control Limit for TEDE. however plausible because it reflects the initial annual ACL limit for TEDE when dealing with extensions.

Sys# System Category KA Statement N/A N/A Radiation Control Knowledge of the radiation exposure limits under normal or emergency conditions.

KlA# KIA Importance Exam Level 2.3.4 RO References provided to Candidate None Technical

References:

NOP-OP-4201.

Rev. 1. pg. 3, 11 & 14 NOP-OP-4202.

Rev. O. pg. 3 & 4 Question Source: New Question Cognitive Level: Lower -Memory or Fundamental 10 CFR Part 55 Content: (CFR: 41.12 I 43.4/45.10)

Beaver Valley Unit 1 NRC Written Exam (1LOT8) Refer to the attached photograph of the LIQUID WASTE EFFLUENT monitor control module. The High-High setpoint will be displayed on the meter when the high-high pushbutton is depressed concurrent with what other action? A. The c.s. pushbutton is depressed.

8. The rotary switch is placed in the cal. position.

C. The rotary switch is placed in the h.v. position.

D. The rotary switch is placed in the oper. position Answer: B Explanation/Justification: Incorrect.

The c.s (check source) pushbutton when pushed will unshield a source and provide a meter deflection to ensure the meter is properly functioning.

This is more plausible than the fourth position (off) on the rotary cal switch but not correct . Correct. Placing the switch in the cal position will allow the high radiation and high-high radiation alarm setpoints to be displayed when respective high or high*high pushbutton is Incorrect.

This position will not cause the setpoint to be displayed.

Plausible since it is one of the four positions. Incorrect.

This position will not cause the setpoint to be displayed.

Plausible since it is one of the four positions.

Sys# System Category KA Statement NlA N/A Radiation Control Ability to use radiation monitoring systems. such as fixed radiation monitors and alarms, portable survey instruments, personal monitoring equipment, etc. KIM 2.3.5 KIA Importance 2.9 Exam level RO References provided to Candidate Technical

References:

10M-43.4.C, Rev. 4, pg. 5 Question Source: Modified Bank -Vision # Question Cognitive level: 10 CFR Part 55 Lower Memory or Fundamental (CFR: 41.11/41.12/43.4/45.9)

Objective:

1. Describe the function of the Radiation Monitoring Systems and associated major components as documented in Chapter 43 of the Unit 1 Operating Manual.

Beaver Valley Unit 1 NRC Written Exam (1LOT8) 73. Given the following plant conditions:

  • You are directed to post a clearance in the Primary Auxiliary Building (PAB).
  • This task requires entry into an Area where General Radiation Levels are 110 mr/hr. In addition to reviewing your approved RWP and radiological conditions, which of the item(s} will be required prior to entry into this area lAW NOP-OP-4101 AND NOP-OP-41 (NOP-OP-41 07, "Radiation Work (NOP-OP-41 01, "Access Controls for Controlled (Note this is NOT an all inclusive 1 TLD and a Direct Reading Dosimeter.
2. TLD and an Alarming Direct Reading Dosimeter with appropriate augmentation.
3. Self Briefing documented on NOP-OP-41 07-05, "RA Request/Briefing Form". 4. A Trip Ticket that has been initialed by a Radiation Protection Technician.

A. 1 ONLY. B. 1 &3 ONLY. C. 2 &4 ONLY. D. 2,3, & 4 ONLY. Answer: C Explanation/Justification: Incorrect.

Incorrect since this is a HRA. Plausible and correct for RA entry. (refer to correct answer explanation). Incorrect.

Incorrect because NOP*OP*4107 does not allow self briefing for entry into a HRA since it is considered higher risk. Plausible if candidate does not recognize this is a HRA does not know the Access Control & Briefing requirements. (refer to correct answer Correct. NOP*OP*4101 defines a HRA an accessible area in which radiation levels could result in an individual receiving a deep-dose equivalent in excess of 100 mr/hr at a distance of 30 cm or more from any surface that the radiation penetrates.

The candidate must recognize that they are entering a HRA versus RA and then differentiate the briefing and access requirements in order to comply with RWP requirements.

NOP*OP*4107, "Radiation Work Permit" requires radiation protection briefings to ensure compliance with RWP requirements when entering HRAs. For entry into radiation areas considered to be low risk, operators are allowed to self brief and do not need formal briefings.

According to NOP*OP*41 01 , For entry into a HRA, a trip ticket and dose alarm augmentation device are required.

This is a higher level question because it goes beyond simple recall and requires comprehension of the operationally relevant task to be performed. Incorrect.

Incorrect because NOP*OP*4107 allows self briefing for entry into low risk areas ONLY. Since this is a HRA it is considered higher risk. Plausible if the candidate recognizes this is a HRA but does not know the RWP briefing requirements. (refer to correct answer explanation).

Sys# System Category KA Statement NlA NlA Radiation Control Ability to comply with radiation work permit requirements during normal or abnormal conditions.

KIM 2.3.7 KIA Importance 3.5 Exam Level RO References provided to Candidate None Technical

References:

NOP-OP*4101, Rev. 5, pg. 3*6, 9 & 17. NOP*OP*41 07, Rev. 8, Pg.14& 15 Question Source: New Question Cognitive Level: Higher-Comprehension or Analysis 10 CFR Part 55 Content: (CFR: 41.12/45.10) Objective:

3SSG*Admin

16. Describe the controls for maintaining personnel exposures ALARA in accordance with NOP-OP*4107, Radiation Work Permit (RWP).

Beaver Valley Unit 1 NRC Written Exam (1LOTS) 74. Given the following plant conditions: A serious fire in the cable spreading room has been reported. The Shift Manager determines actions of 10M-56C, "Alternate Safe Shutdown From Outside the Control Room" are necessary. The SM directs the RO to perform actions of 10M-56.C.4.C, "NCO Procedure".

Which ONE of the following is a Reactor Operator (RO) action performed outside the Control Room? The RO will __ (1) __ Station Air Compressor(s) to ensure __ (2) __. A. (1) start (2) spurious fire induced operation of AOV's is prevented.

B. (1) start (2) positive control of AOVs required for Appendix R Safe SID. C. (1) stop (2) spurious fire induced operation of AOV's is prevented.

D. (1) stop (2) positive control of AOVs required for Appendix R Safe SID. Answer: C Explanation/Justification: Incorrect.

The Station Air Compressors are secured not started. Correct operational effect (refer to correct answer) Incorrect.

The Station Air Compressors are secured not started. Plausible reason to maintain air except station air is not relied upon for shutdown of the Correct. Station air compressors are secured lAW 10M-56C.4.C, Attachment 2 NCO Procedure (Licensed Operation for BVPS) The reason this alignment according to 1 OM-56C.4.A which is to prevent spurious fire induced operation of AOVs. (Stopping Air Compressors valves by failing them Incorrect.

Correct that station air compressors are secured. The operational effect is plausible since it does provide positive control, these valves are not relied upon for safe shutdown of the Sys# System Category KA Statement N/A NlA Emergency Procedures I Plan Knowledge of RO tasks performed outside the main control room during an emergency and the resultant operational effects. KlA# KIA Importance Exam l.evel 2.4.34 4.2 RO References provided to Candidate None Technical

References:

10M-56C.4.A, Rev. 9, pg. A2, A3, & A6 lOM-56C.4.C, Rev. 35, pg.13 Question Source: New Question Cognitive Level: Lower -Memory or Fundamental 10 CFR Part 55 Content: (CFR: 41.1 0 143.5 I 45.13) Objective:

1

1. Describe the function of Alternate Safe Shutdown from Outside the Control Room and the associated major components as documented in Operating Manual Chapter 10M-56C.

Beaver Valley Unit 1 NRC Written Exam (1LOTS) 75. Given the following plant conditions:

  • The Unit is operating at 80% with all systems NSA.
  • The Rod Control Selector Switch is in AUTOMATIC.
  • Control Bank "0" begins to step in continuously.
  • A4-116, "ROD CONTROL BANK 0 LOW" is received.
  • Turbine load is stable. Which ONE of the following will be the next required immediate operator action? A. Emergency borate. B. Manually trip the reactor. C. Place the Control Rod Group Selector Switch in MANUAL. O. Place the Control Rod Group Selector Switch in Bank "0" position.

Answer: C Explanation/Justification: Incorrect.

Incorrect but plausible action since the Bank D RIL annunciator has been received and the required action is to borate. This is not next required immediate required Incorrect.

The reactor will be tripped as part of the RNO if after placing control rods in manual the rod insertion continues which makes this choice plausible.

However, this is not the first IMA which will be performed and would be an incorrect action. Correct. Symptoms or entry conditions have been met for AOP 1.1.3. Step 1 is an IMA required to be performed from memory. Since turbine load is stable as specified in question stem, the RNO required action is to place control rod group selector switch in MANUAL. Incorrect.

Incorrect but plausible switch position.

Sys# System Category KA Statement N/A NlA Emergency Procedures

/ Plan Ability to perform without reference to procedures those actions that require immediate operation of system components and controls.

KIM 2.4.49 KIA Importance 4.6 Exam Level RO References provided to Candidate Technical

References:

None 10M-53C.4.1.1.3, Rev. 11, pg. 1 & 2 10M-1.4.ABA, Rev. 4, pg. 2 Question Source: Bank Vision # 45697 Question Cognitive Level: Lower -Memory or Fundamental 10 CFR Part 55 Content: (CFR: 41.10/43.21 45.6) Objective:

1 SQS-53C.1

1. State all Immediate Operator Actions associated with AOPs.

(SRO Beaver Valley Unit 1 NRC Written Exam 76. Given the following plant conditions:

  • The Unit is operating at 25% power.
  • Assume no operator action occurs. What will be the steady state value of RCS flow in the 1 A loop AND what is the TS 3.4.4 bases for NOT operating in this condition for greater than 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />? RCS How in the 1 A loop will stop and then revlerse to a value of _ (1) _ of nominal flow. The TS 3.4.4 bases for NOT operating with less than 3 Reps in Mode 1 or 2 is to _ (2) _. (DNB =Departure From Nucleate Boiling) A. (1) 30% (2) preserve assumptions made in the safety analysis for DNB. B. (1) 60% (2) preserve assumptions made in the safety analysis for DNB. C. (1) 30% (2) ensure Safety Limit criteria will be met for postulated accidents.

D. (1) 60% (2) ensure Safety Limit criteria will be met for postulated accidents.

Answer: A Explanation/Justification: Correct. According to UFSAR analyzed partial loss of forced reactor coolant flow, idle loop flow will be about 30% of nominal flow. This accident assumes 100% power and has a conservative number of S/G tubes plugged which will effect head loss. When run on the simulator from 25% power RCS flow in the idle loop is about 20%. TS 3.4.4 bases states that the safety analyses contains various assumptions for the design bases accident initial conditions which includes RCS flow. All safety analyses performed at rated power assume three RCS loops in operation.

The KIA randomly selected is RO in nature. In order to ensure the SRO criteria will be met, a TS bases question is added. Incorrect.

Value is incorrect.

Correct bases. Incorrect.

Correct value. Incorrect bases. This is the bases for TS 3.4.5 (RCS Loops -Mode 3) Incorrect.

Value and bases are incorrect, but balanced for plausibility.

This is the bases for TS 3.4.5 (RCS Loops -Mode 3) Sys # System Category KA Statement 015/017 RCP Malfunctions Ability to determine and interpret the following as they apply to Calculation of expected values of flow in the the Reactor Coolant Pump Malfunctions (Loss of RC Flow) loop with RCP secured. KlA# AA2.07 KIA Importance 2.9 IExam Level SRO References provided to Candidate None Technical BVPS UFSAR Unit 1, Rev. 24/23/20, pg. 14-1*13*15

& Fig. 14.1*13 BVPS Units 1 & 2 TS 3.4.4, Amend. 278/261, pg. 3.4.4*1 BVPS Units 1 & 2 TS 3.4.4 bases Amend. 278/261, pg 3.4.4*1 & 2 Question Source: New Question Cognitive 10 CFR Part 55 Content: Lower -Memory or CFR: 43 (b)(2) Objective:

3SQS-RCS.ITS

2. State the purpose of each RCS specification as described in the applicable safety analyses section of the bases.

(SRO Beaver Valley Unit 1 NRC Written Exam 77. Given the following plant conditions and sequence of events:

  • The Unit is operating at 90% power with all systems in NSA.
  • At 0130 -An Inverter is declared INOPERABLE due to maintenance.
  • At 1200 -A second Inverter is declared INOPERABLE due to failure.
  • At 1230 -The first Inverter is declared OPERABLE.

Which ONE of the following explains whether a completion time extension can be applied to the completion time of required Technical Specification 3.8.7 Action A.1 for the SECOND inoperable Inverter AND justification? (Reference Provided)

The time extension

_ (1) be The justification for this conclusion is because _ A. (1) can (2) separate entry conditions are NOT allowed. B. (1) can NOT (2) separate entry conditions are allowed. C. (1) can (2) SR 3.0.2 can be used to extend the time for inoperable inverters.

D. (1) can NOT (2) SR 3.0.2 can NOT be used to extend the time for inoperable inverters.

Answer: A Explanation/Justification: Correct. TS Use and Application Section 1.3 discuss use of completion times. All of the criteria for use of the completion time extension apply, specifically that the first inverter and second inverter were concurrently inoperable and the second inverter remains inoperable after the first inverter is declared operable.

Also there is no exception that allows separate entry conditions for inverters in TS 3.8.7, so therefore the extension time can be applied. The SRO must determine whether completion time extensions are applicable and explain the bases for the decision. Incorrect.

Incorrect that the extension time cannot be applied. The logic is opposite of the correct answer. Incorrect.

Correct that extension can be applied (refer to correct answer explanation)

Incorrect that SR 3.0.2 can be applied to the inverters since the second inverter failed and was not part of a surveillance.

Therefore the 1.25 extension does not apply. Plausible because does allow an extension of completion times when Incorrect.

Incorrect that the extension cannot be applied. The justification is plausible for the response but nonetheless incorrect.

Sys# System Category KA Statement 057 Loss of Vital AC Inst. Bus N/A Ability to analyze the effect of maintenance activities, such as degraded power sources, on the status of limiting conditions for operations.

KJM 2.2.36 KJA Importance 4.2 Exam Level SRO References provided to candidate TS 1.3 pg. 1.3-1 -11 Technical

References:

TS 1.3 pg. 1.3-1 -11 TS 3.8.7 pg. 3.8.7-1 & 2 TS 3.8.7 pg. 3.8.7-1 & 2 TS 3.8.7 Bases pg. B3.8.7-1 -4 TS 3.8.7 Bases pg. B3.8.7-1 -4 TS 3.0 pg. 3.0-4 Question Source: Bank Vision # 571 01 Question Cognitive Level: Higher -Comprehension or Analysis 10 CFR Part 55 Content: CFR: 43 (b}(2) Objective:

3SQS*ELEC

-4. Given plant conditions that constitute non-compliance with any Electrical Power Systems LCO or Licensing Requirement determine the applicable conditions(s), required actions(s), and associated completion times.

(SRO Beaver Valley Unit 1 NRC Written Exam 78. Given the following plant conditions:

  • The Unit is in Mode 3. * [TV-1IA-400], "Inst Air to Cnmt Isol" is CLOSED for maintenance.
  • [1IA-90], "Bypass Valve for [TV-1IA-400]" is OPEN. * [PI-1IA-10SA], "Ct-.IMT Instrument Air (IA) Header Pressure" is 72 psig and DROPPING.
  • [PI-1IA-10S], "Station Instrument Air HE!ader Pressure" is 92 psig and DROPPING.
  • All systems function as designed.

Based on these indications, which ONE of the following is the location of the air leak AND what will be the reason for [1IA-90] isolation?

The air leak is located (1)

The Unit Supervisor will direct [1IA-90] CLOSED to comply with __ (2) __(Technical Specification

{TS} 3.S.3, "Containment Isolation AOP 1.34.1, Loss of Station Instrument Air" I AOP 1.34.2, "Loss of Containment A. (1) inside (2) AOP 1.34.2 ONLY. B. (1) inside (2) AOP 1.34.2 AND TS 3.S.3. C. (1) outside (2) AOP 1.34.1 ONLY. D. (1) outside (2) AOP 1.34.1 AND TS 3.S.3. Answer: A Explanation/Justification: Correct. The first question is RO knowledge but necessary to meet the KIA. An RO should be able to differentiate between these indications to determine whether an air leak is inside or outside containment.

AOP 1.34.1 step 4 does use this diagnostics to determine procedural flowpath.

The second part of the question is SRO knowledge because it requires the candidate to have knowledge of procedure content and bases for the reason the action is being taken beyond assessment of plant conditions.

AOP 1.34.2 asks whether Station IA is < 95 psig and directs isolation of 1IA*90 if all available station air compressors are running which they would be if functioning as designed.

This is to ensure Containment Air is isolated from Station Air which is being dragged down by the Containment Air sizable air leak. TS 3.6.3 is not the reason for isolation because although the plant is in Mode 3 and CI valves are required to be operable the operator is not closing 11A-90 to comply with TS 3.6.3 because there is no TS bases accident in progress (ie: LOCA or Rod Ejection Accident).

TS 3.6.3 action is applicable but not the reason for directing 11A-90 closure. The competent SRO should know the bases for TS action and must understand the loss of air accident is not the basis. Incorrect.

Correct leak location diagnosis.

Partially correct bases. (refer to correct answer explanation) Incorrect.

Incorrect leak location diagnosis.

Correct bases. (refer to correct answer explanation) Incorrect.

Incorrect leak location diagnosis.

Incorrect bases. (refer to correct answer explanation)

Sys System Category KA Statement Loss of Instrument Air Ability to determine and interpret the following as they Location and isolation of leaks. apply to the Loss of Instrument Air: KlA# AA2.03 KIA Importance 2.9 Exam Level SRO References provided to Candidate None Technical

References:

1 OM-53C.4.1.34.1, Rev. 16, pg. 3 lOM-53C.4.1.34.2, Rev. 9, pg. 2 -4 BVPS Units 1 &2 TS Bases, pg. B 3.6.3-1, 2 &4 Question Source: New Question Cognitive Level: Lower-Memory or Fundamental 10 CFR Part 55 Content: CFR: 43 (b)(2) 13. Given a change in plant conditions due to a system or component failure, analyze the compressed air system to Objective:

1 SOS-34.1 determine what failure occurred. 2. State the purpose of each containment system specification as described in the applicable safety analyses section of CONT-ITS the bases. 065 (SRO Beaver Valley Unit 1 NRC Written Exam 79. Given the following plant conditions and sequence of events:

  • The Unit was operating at 100% power with all systems in NSA.
  • The operating crew is performing E-1, "Loss of Reactor or Secondary Coolant".
  • The STA reports a RED path exists on the Vessel Integrity Status Tree. RCS pressure is 1000 psig and slowly DROPPING.
  • Containment Pressure is 6 psig and slowly RISING. Steam Generator (S/G) pressures are 650 psig and slowly LOWERING.
  • All S/G Narrow Range Levels are < 31 %.
  • All Auxiliary Feedwater pumps have failed to Auto start and cannot be manually started. Which ONE of the following describes the required procedural flowpath AND (FR-H.1 -"Response to Loss of Secondary Heat (FR-P.1 -"Response to Imminent Pressurized Thermal A. Enter FR-P.1 and return to E-1 because RCS re-pressurization in NOT likely. B. Enter FR-H.1 and remain in FR-H.1 because a secondary heat sink is required.

C. Enter FR-H.1 and return to E-1 because a secondary heat sink is NOT required.

D. Enter FR-P.1 and remain in FR-P.1 because reactor vessel integrity needs to be addressed.

Answer: B Explanation/Justification: Incorrect.

Incorrect procedural transition but plausible if the candidate does not recognize the higher priority RED Path in Heat Sink which Incorrect reason but plausible if a LBLOCA existed as identified by RCS pressure being < 275 psig per FR-P.l. Transition back to E-1 would correct if a LBLOCA existed because in this case thermal shock is not a serious Correct. The candidate must recognize that based on plant conditions provided, a RED path exists on both Heat Sink (Adverse containment>

5 psig with all SlG's < 50% NR level and total feedwater flow < 370 gpm) and Integrity status trees (as provided by the STA). The SRO must assess plant conditions.

prioritize and select a procedure to proceed based on EOP rules of usage. The SRO must have knowledge of the administrative procedures that specify hierarchy

& implementation of EOPs. Since FR-H.1 is a higher priority than FR-P.1 than entry in FR-H.1 is appropriate.

The candidate must also recognize that a SBLOCA exists and with RCS pressure greater than SIG pressure a heat sink is required. Incorrect.

Correct that FR-H.1 is entered. Returning to E-1 would be appropriate if a LBLOCA existed as identified by RCS pressure being than SIG pressure, in which case SI will provide heat Incorrect.

Incorrect procedural transition but plausible if the candidate does not recognize the higher priority RED Path in Heat Sink which Correct reason if Integrity were the higher priority in that a SBLOCA and vessel integrity would need to be addressed based on pressure being> 275 psig (ie: break size is not sufficient to guarantee Sys# System Category KA Statement W/EOS Inadequate Heat Ability to determine and interpret the following as they Adherence to appropriate procedures and Loss of Secondary Heat Sink apply to the (Loss of Secondary Heat Sink) operation within the limitations in the facility's license and amendments.

KlA# KIA Importance Exam Level EA2.2 SRO 10M-53A.1.FR-H.l, Issue 1C, Rev. 13, pg. 2 References provided to Candidate Technical

References:

10M-53BA.FR-H.1, Issue 1C. Rev. 13, pg. 47 10M-53A.1.F-O.2, Issue lC, Rev. 3, pg.l 1 OM-53A.1.FR-P.1 , Issue 1C, Rev. 7, pg 2 10M-53B.4.FR-P.1, Issue lC, Rev. 7, pg. 11 1/20M-53B.2,lssue lC, Rev. 7, pg. 8 & 9 Question Source: None Bank -Vision # 45809 Question Cognitive Level: Higher -Comprehension or Analysis 10 CFR Part 55 Content: CFR: 43 (b)(5) Objective:

3. State from memory the basis and sequence for the major action steps of each EOP procedure.

lAW BVPS EOP Executive Volurne.

(SRO Beaver Valley Unit 1 NRC Written Exam 80. Given the following plant conditions: A Large Break LOCA occurred and the Control Room Team has transitioned to ES-1.3, Transfer to Cold Leg Recirculation". They are currently at Step 5, LHSI Pumps -NO SIGNS OF CAVITATION The RO reports amps and flow are osclillating on both Low Head SI pumps. The STA reports that a RED path exists on Heat Sink. Which ONE of the following describes the required procedural action given these (FR-H.1, "Response to Loss of Secondary Heat (ECA-1.1 "Loss of Emergency Coolant A. Immediately transition to FR-H.1, and then return to ES-1.3. B. Immediately transition to FR-H.1, and then transition to ECA-1.1. C. Stop all charging pumps and assess signs of containment sump blockage per ES-1.3. D. Stop all charging pumps and low head safety injection pumps, then transition to ECA.1-1. Answer: C Explanation/Justification: Incorrect.

Plausible since a red path normally would take priority however, FRP's should not be implemented prior to completion of the first steps of Incorrect.

Transition to FRPs is not allowed by note during Steps 1-5. Step 1 checks to ensure containment sump level is > 48 inches. Step checks that a recirculation path is indicated.

If either of these conditions do NOT exist a transition to ECA-l.1 is warranted which makes distractor Correct. The SAO must assess plant conditions and have knowledge of diagnostic steps and decision points in the EOPs which involve transition to event specific sub procedures in order to answer this question.

Specifically, they must recognize that oscillating amps and flow of the LHSI pumps is indicative of LHSI pump cavitation.

Because cavitation exists, they must have knowledge of the RNO action which is to stop charging pumps. An assessment of containment sump blockage must occur prior to transition.

Securing charging pumps prior to transition preserves them from further damage so that they may be available in the long term. The candidate must further understand because they are in step 5 of ES-l.3 that the RED path on heat sink is not to be implemented although contrary to FRP rules of usage. ES-1.3 is an exception to these rules. Incorrect.

Correct that all charging pumps are stopped. Incorrect that LHSI are stopped and a transition to ECA-l.1 occurs, however, since there are several RNO transitions to ECA-1.t in the first 5 steps 0" ES-l.3. Since the crew is at step 5 a transition to ECA-1.t is warranted and will neither mitigate plant conditions nor is it procedurally Sys# System Category KA Statement W/E11 Loss of Emergency Coolant Recirc. N/A Ability to interpret and execute procedure steps. KJAI 2.1.20 KJAlmportance 4.6 Exam SRO Level References provided to Candidate Technical

References:

10M-53A.l.ES-1.3, Issue 1C, Rev. 7, pg. 2 & 4 10M-53B.4.ES-l.3, Issue lC, Rev. 7, pg. 13 lOM-53G.l.SBCRG-1, Rev. 4, pg. 2 Question Source: New Question Cognitive 10 CFR Part 55 Content: Higher Comprehension or CFR: 43 (b)(5) Objective:

3. State from memory the basis and sequence for the major action steps of each EOP procedure, lAW BVPS EOP Executive Volume. 3S0S-53.4
6. Given a set of conditions, locate and apply the EOP lAW BVPS-EOP Executive Volume.

(SRO Beaver Valley Unit 1 NBC Written Exam 81. Given the following plant conditions and sequBnce of events: A Reactor Trip and Safety Injection from 100% power occurred. Main Steam Line Isolation (MSLI) occulrred on the "1 A" S/G ONLY. All S/G pressures are 710 psig and DROPPING. All S/G I'JR Levels are off scale LOW. RCS cold leg C/D rate is 150 of/hr. AFW flow to EACH S/G has been throttled to 50 gpm per S/G. The Control Room Team is performing the actions of ECA-2.1, "Uncontrolled Depressurization of All Steam Generators".

Based on these plant conditions:

(1) What procedure transition is required, iI any? (2) How will AFW flow be addressed?

A. (1) Remain in ECA-2.1. (2) Continue feeding ALL S/Gs at 50 gpm. B. (1) Remain in ECA-2.1. Isolate feed tlow to "*1 B" AND "1 C" S/Gs. C. (1) Transition to FR-H.1, "Response to Secondary Heat Sink". (2) Continue feeding ALL S/Gs at 50 gpm. D. (1) Transition to FR-H.1 , "Response to Secondary Heat Sink". (2) Isolate feed flow to "1 B" AND "1 C" S/Gs. Answer: A Explanation/Justification: Correct. The SRO must evaluate plant conditions based on instrument/parameter interpretation and then make operational judgment to select the correct procedural course of action. The SRO must have knowledge of ECA-2.1 content. In the set of conditions provided, although only the "A" MSIV went shut, all S/G pressures continue to drop which is indicative of a beyond design basis accident (3 faulted S/Gs). Realistically for this scenario to happen all three S/Gs would need to have partially stuck open safety valves on all three S/Gs. In accordance with ECA-2.1, a minimum of 50 gpm must be maintained to each S/G with a narrow ran(le level < 31%. There is also a note that states FR-H.1 should be implemented only if a total feed flow capability of 370 gpm is not available at any time while in ECA-2.1. Incorrect.

Correct procedure.

Incorrect procedural action of how AFW should be addressed.

Isolating feedwater flow to 1 Band 1 C would ECA-2.1 procedural actions. Candidate might believe that since "A" MSIV closure occurred feedwater isolation to the other two S/Gs is Incorrect.

Incorrect procedural transition.

Correct action in accordance with ECA-2.1 versus FR-H.1. Incorrect.

Incorrect procedural transition.

Plausible that transition to FR-H.1 should occur due to < 31 % NR and less than 370 gpm.

action, however plausible since there is a preemptive action to isolate fEledwater flow to a faulted Sys System Category KA Statement Uncontrolled Depressurization N/A Ability to evaluate plant performance and make operational judgments based of all Steam Generators on operating characteristics, reactor behavior, and instrument interpretation.

KIM 2.1.7 KIA Importance 4.7 Exam Level SRO References provided to Technical

References:

None 1 OM-53A.1.ECA-2.1, Issue 1 C, Rev. 12, pg. 3 10M-53A.1.FR-H.1, Issue 1C, Rev.13, pg. 2 Question Source: Bank -Vision # 82081 (2LOT7 NRC 0#81) Question Cognitive Level: Higher -Comprehension or Analysis 10 CFR Part 55 Content: CFR: 43 (b)(5) 4. Explain from memory the basis of all cautions and notes, lAW BVPS-EOP Executive Volume Objective:

3S0S-53.3

6. Given a set of conditions, locate and apply the proper EOP lAW BVPS-EOP Executive Volume.

(SRO Beaver Valley Unit 1 NRC Written Exam 82. Given the following plant conditions and of events:

  • The Unit is at 75% power with all systems in NSA for this power level.
  • The Control Room Team notes that control rods are withdrawing at maximum speed.
  • The RO reports that Reactor Trip Breakers are CLOSED. Reactor Power is 80% and STABLE. Which ONE of the following identifies (1) the procedural required actions to mitigate this event, AND (2) includes the action required if the crew is unable to verify emergency boration flow> 30 gpm in accordance with FR-S.1, "Respons1e to Nuclear Power Generation/ATWS"?

A. (1) Enter FR-S.1 directly, manually trip the turbine, and insert control rods. (2) Manually align Charging Pump suction to HWST. B. (1) Attempt to manually trip the reactor in E-O, if unsuccessful, then transition to FR-S.1. (2) Manually align Charging Pump suction to HWST. C. (1) Enter FR-S.1 directly, manually trip the turbine, and insert control rods. (2) Initiate boration > 30 gpm with the blender in BORATE mode. D. (1) Attempt to manually trip the reactor in E-O, if unsuccessful, then transition to FR-S.1. Initiate boration > 30 gpm with the blender in BORATE mode. Answer: B Explanation/Justification: Incorrect.

Although both E*O and FR-S.1 both have immediate actions with similar intentions (ie: trip the reactorlturbine), FR-S.1 by WOG rules of usage is not a direct entry procedure such as E-O and ECA-O.O. Knowledge of administrative procedures that specify hierarchy implementation is SRO level knowledge.

The second part of the distractor is correct (explained in correct answer) Correct. The SRO must interpret the annunciators and indications provided and deduce that entry conditions of E-O are applicable and by WOG rules of usage E-O must be entered. FR-S.1 is entered only from E-O or from a CSFST. The SRO must also understand FR-S.1 procedural content of sufficient detail to understand what alternative actions are required to ensure the reactor is safely shutdown as directed by FR-S.1. Step 3.e RNO requires the charging pumps aligned to the RWST if 30 gpm emergency boration cannot be established.

This is to ensure adequate negative reactivity insertion. Incorrect.

Incorrect procedure as explained above. Incorrect action. This action is plausible since both ES-0.1 and FR-S.1 specify a 30 boration as an action to insert negative reactivity.

This action however procedurally specifies opening MOV-1CH-350 and starting a boric transfer pump as opposed to using the blender in the borate mode at the same Incorrect.

Correct procedure.

Incorrect action (refer to previous explanations).

Sys # System Category KA Statement 001 Continuous Rod Withdrawal N/A Ability to interpret control room indications to verify the status and operation of a system, and understand how operator actions and directives affect plant and system conditions.

KlA# 2.2.44 KIA Importance 4.4 Exam Le1/el SRO 1/20M-53B.2, Issue 1C, Rev. 7, Pg. 12 & 13' 10M-53A.1.FR-S.1, Issue 1C, Rev. 5, Pg. 2 & 3 10M-53B.4.FR-S.1, Issue 1C, Rev. 5, Pg. 60 10M-2.4.ABC, Rev. 2, Pg. 2 10M-1.4.ABJ, Issue 4, Rev. 0, Pg. 1 Question Source: References provided to Candidate None Technical

References:

Bank -(NAPS 2010 NRC 0#76) Question Cognitive Level: Higher -Comprehension or Analysis 10 CFR Part 55 Content: CFR: 43 (b)(5) Objective:

3S0S-53.3

14. Apply the actions for a rod position malfunction.

(SRO Beaver Valley Unit 1 NRC Written Exam 83. Given the following plant conditions: The Unit experienced a MANUAL Reactor Trip during a reactor startup due to Hi-Hi S/G Water Level in "en Steam Generator. PRZR pressure dropped to 1890 psig and is RISING. Immediate Manual Actions of E-O, "Reactor Trip or Safety Injection" are in progress. The RO reports TWO control rods are indicating 225 steps. All systems function as designed.

What procedure action will be required to ensure adequate shutdown margin? A. Manually actuate SI. B. Commence normal boration.

C. Commence emergency boration.

D. Manually actuate SI and emergency borate. Answer: C Explanation/Justification: Incorrect.

Incorrect that manual SI is required based on plant conditions (SI not required unless RCS pressure < 1845 psig), however, plausible if the SRO makes the decision at Step 4 of E-O that SI is required.

The design of ECCS is to provide core cooling and boration to maintain a safe reactor shutdown condition.

If SI were required this would be a correct answer. Incorrect.

Correct assessment of plant conditions that no SI has occurred or is required, however. ES-0.1 directs an emergency versus boration which is plausible if the SRO does not know procedural Correct. The SRO candidate must assess given plant conditions and determine that no SI injection is required based on stated plant conditions.

Therefore the SRO shall make the decision at Step 4 of E-O to transition to ES-O.1. Step 7 of ES-0.1 verifies all control rods inserted and if directs emergency boration if two or more are not fully inserted.

The SRO must know the content of procedures beyond immediate actions. Incorrect.

Incorrect that manual SI is required and also incorrect since emergency boration is not required.

Plausible if the candidate believes SI is required and the decision to remain in E-O at step 4 is made and that they have ES-0.1 and E-O actions/bases confused.

Sys# System Category KA Statement 005 Inoperable/Stuck Control Rod Ability to determine and interpret the following as they Required actions if more than one rod is stuck apply to the Inoperable I Stuck Control Rod: or inoperable.

K1A# AA2.03 KIA Importance 4.4 Exam Level SRO References provided to Candidate None Technical 1 OM-53B.4.E-0, Issue 1 C, Rev. 11, pg. 1 1 OM-53.A.1.E-O, Issue 1 C, Rev. 11, pg. 4 1 OM-53A.1.ES-0.1 , Issue 1C, Rev. 8, pg. 5 1 OM-53B.4.ES-O.1 , Issue 1C, Rev. 8, pg. 13 Question Source: Bank -Vision 40313 Question Cognitive Level: Higher -Comprehension or Analysis 10 CFR Part 55 Content: CFR: 43 (b)(5) Objective:

3S08-53.4

2. Apply from memory all of the EOP users guide rules of usage as defined in 1/2 OM-53B.2.
3. Given a set of conditions, locate and apply the proper EOP, lAW BVPS-EOP Executive Volume.380S-53.3
3. State from memory the basis and sequencEl for the major action steps of each EOP procedure.

lAW BVPS*EOP Executive Volume.

(SRO Beaver Valley Unit 1 NBC Written Exam 84. Given the following plant conditions: Unit 1 core off-load is in progress. The Control Room receives a report that cable separation has occurred on the upender containing an irradiated fuel assembly from the vertical position. The RO reports that [RIS-1 VS-1 03NB], "Fuel Building Ventilation Exhaust radiation levels are rising and Hi alarms are validated. The Control Room has received A4-71 , "RADIATION MONITORING HIGH" ONLY. No other alarms are present. Have entry conditions been met for the SRO to perform AOP 1.49.1, "Irradiated Fuel Damage" actions AND using the Emergency Plan ProcE!dure provided, does an ALERT classification exist for the present plant conditions? (Excludiing ED Judgment) (Reference Provided)

AOP 1.49.1 entry conditions

__ (1) __ been An ALERT classification

__ (2) __ exist for the stated plant A. (1) have (2) does B. (1) have (2) does NOT C. (1) have NOT (2) does D. (1) have NOT (2) does NOT Answer: B Explanation/Justification: Incorrect.

Correct AOP application.

Incorrect that an ALERT classification exists. The SRO must have good attention to detail to rule out that both 1 and 2 do NOT exist. Although 2 is met, the 1 section needs to have a Hi-Hi rad level on 103NB before the classification criteria is met. Based on present plant conditions, 103NB have a Hi versus Hi-Hi alarm. Correct. Symptoms or entry conditions for AOP-1.49.1 have occurred which confirms the occurrence of a fuel handling incident.

The control room has received a report of possible irradiated fuel damage and A4-71 is in alarm. This knowledge in itself can be considered RO knowledge but is necessary to meet the KIA. The additional E-Plan application is SRO required knowledge. Incorrect.

Incorrect AOP application.

Incorrect E-Plan application Incorrect.

Incorrect AOP application.

Correct E-Plan application Sys # System Category KA Statement Fuel Handling Accident Ability to determine or interpret the following as they apply Occurrence of a fuel handling incident.

to the Fuel Handling Incidents:

KI A# AA2.02 KIA Importance 4.1 Exam Level SRO References provided to Candidate EPP-I-1A BV1 Entire Technical

References:

1 OM-53C.4.1.49.1, Rev. 8, pg. 1 Classification Section EPP-I-1A, BV1, Rev. 13, pg. 42, 43, 46, 52 Question Source: New Question Cognitive 10 CFR Part 55 Content: Higher -Comprehension or CFR: 43 (b)(7) 036 (SRO Beaver Valley Unit 1 NRC Written Exam 85. Given the following plant conditions: The Unit has experienced a beyond design bases LOCA. The Control Room Team is performing FR-C.1, "Response to Inadequate Core Cooling". Attempts to establish safety injection are unsuccessful and S/G depressurization was ineffective. All Reactor Coolant Pumps (RCPs) are secured &seal injection cannot be established. Five Hottest Core Exit Thermocouples are 1225 of and slowly RISING. ALL Narrow Range S/G Water Levels are 20% and slowly DROPPING. Containment Pressure is 9 psig and slowly DROPPING.

Based on these conditions, which ONE of the following describes whether a RCP will be started according to FR-C.1 AND the bases for this action? A. Start an RCP to restore long term core cooling. B. Do NOT start an RCP because seal injection is required.

C. Do NOT start an RCP because S/G tube failure could occur. D. Start an RCP to permit circulation of hot gases from the core to the S/Gs. Answer: C Explanation/Justification: Incorrect.

Incorrect action, however, this is one of the ECCS design critmia. A correct bases is to temporarily restore core cooling. Incorrect.

Correct action with incorrect but plausible bases. Normal conditions are desireel.

however, not required in FR-C.1. therefore injection is not Correct. FR-C.1 does not allow an RCP start if adequate S/G water level does not exist (ie; 31% (50%)). The bases for this action is high temperatures would occur leading to possible creep failure of the S/G U-Tubes. This is to protect the S/G tubes from creep rupture. This is SRO only question because the SRO must assess plant conditions and determine the correct course of action for RCP restart. To meet the the SRO must also know the bases for the action taken (knowledge of procedure Incorrect.

Incorrect action, however, this is also a correct bases for starting an RCP. Sys # System Category KA Statement W/E06 Inadequate Core Cooling NlA Knowledge of the speCific bases for EOPs. KIM 2.4.18 KIA Importance 4.0 Exam Level SRO References provided to Candidate None Technical

References:

10M-53A.1.FR-C.l, Issue lC, Rev. 8, Pg 12-13 1 OM-53B.4.FR-C.1, Issue 1 C, Rev 8, Pg. 34-36 Question Source: New Question Cognitive Level: 10 CFR Pal1 55 Content: Higher -Comprehension or CFR: 43 (b)(5) Objective:

3. State from memory the basis and sequence for major action steps of each EOP procedure, lAW BVPS-EOP Executive Volume.3808-53.2
2. 8tate from memory the basis for RCP restart, lAW EOP Executive Volume.

(SRO Beaver Valley Unit 1 NRC Written Exam 86. Given the following plant conditions: The Unit is in Mode 4 with BOTH "A" and "B" Residual Heat Removal (RHR) Pumps and Heat Exchangers (HX) in service. No Reactor Coolant Pumps (RCPs) arE! operating but they are OPERABLE. All NR Steam Generator Levels are 35% and STABLE. All systems are in NSA for the current mode of operation. The Reactor Operator reports MOV-1 RH-700, "RHR Inlet Isolation Valve", has drifted to the FULL CLOSED position and will NOT respond. Which ONE of the following describes the specific impact shortly after MOV-1 RH-700 RHR flow will In accordance with T.S. 3.4.6, "RCS Loops -Mode 4" bases, __ (2) __ RCS Loops A. (1) drop (2) zero (0) B. (1) remain the same (2) zero (0) C. (1) drop (2) three (3) D. (1) remain the same (2) three (3) Answer: C Explanation/Justification: Incorrect.

Correct system response.

Incorrect that zero RCS Loops are ,operable lAW TS 3.4.6 bases. To ensure the candidate does not challenge the fact that RCPs are operable.

it is added to the stem of the question.

This is still highly plausible because they must possess the knowledge that RCS loops are operable based on SIG water level> 15.5% and Reps need not be running. Incorrect.

Incorrect system response.

This reflects system response if MOV-1 RH*758 failed open. Also reflects an accurate configuration if were separate RHR loops. similar to Unit 2 design. Incorrect that zero RCS loops are operable (refer to explanation Correct. If MOV*1 RH-700 fails closed. system flow as indicated by FT-1 RH-605 will drop significantly.

Since no suction from the RCS loop to the RHR pump is available.

the pump will continue to run and recirculate whatever water is left in the RHR loops. In accordance with the TS 3.4.6 bases an OPERABLE RHR loop comprises an operable RHR pump capable of providing forced flow to an operable RHR HX. RCPs and RHR pumps are operable if they are capable of being powered and are able to provide forced flow if required.

Since MOV-1 RH-700 is in the flowpath and not capable of being opened. RHR must be declared INOPERABLE.

An operable ReS loop on the other hand comprises an operable RCS and operable S/G. which has minimum water level specified in SR 3.4.6.2 (>28 %). Therefore RCS Loops are operable.

This question requires the SRO to make an operability determination based on system knowledge and TS bases. 1/20M-48.1.1 requires the SRO to make timely operability determinations in order to control and correct the non conforming condition. Incorrect.

Incorrect system response.

Incorrect that RCS Loops are not operable lAW TS 3.4.6. (refer to correct answer explanation)

Sys# System Category KA Statement Residual Heat Removal Ability to (a) predict the impacts of the following malfunctions or operations on the RHR valve malfunction System (RHRS) RHRS. and (b) based on those predictions.

use procedures to correct. control. or mitigate the consequences of those malfunctions or operations:

KIM A2.04 KIA Importance 2.9 Exam Level SRO References provided to Candidate None Technical

References:

10M-l0.1.C.

Issue 4. Rev. O. Pg. 2 & 3 Op Manual RM-041 0-001

  • Rev. 13 TS 3.4.6 Bases. Rev. 0, Pg. B 3.4.6-2 1/20M-48.1.1.

Rev. 26. Pg. 34 Question Source: New Question Cognitive 10 CFR Part 55 Content: Higher Comprehension or CFR 43(b)(2) Objective:

1 sas-18. Given a specific plant condition.

predict the response of the RHR control room indications and control loops. including all 10.1 automatic functions and changes in equipment status. for either a change in plant condition or for an off-normal condition.

005 (SRO ONLY) Beaver Valley Unit 1 NRC Written Exam (1LOTS) Which ONE of the following will be (1) the number of SI Accumulators required to inject to the core during the blowdown phase of a LOCA to ensure ECCS acceptance criteria of 10 CFR 50.46 are not violated AND (2) what is the Technical Specification bases for maintaining minimum SI accumulator boron concentration? (1) TWO (2) To ensure reactor subcriticality during post LOCA. (1) THREE (2) To ensure reactor subcriticality during post LOCA. (1) TWO (2) To determine cold leg to hot leg switchover time. (1) THREE (2) To determine cold leg to hot leg switchover time. Answer: A Explanation/Justification: Correct. According to TS 3.5.1 Bases background/LCO, The accumulator size, water volume, and nitrogen cover pressure are selected so that two of the three accumulators are sufficient to partially cover the core significant clad melting or zirconium water reaction can occur following a LOCA. One of the three accumulators is assumed to be lost via the RCS break during the blowdown phase of a LBLOCA. The LCO establishes minimum conditions required to ensure accumulators are available to accomplish their core cooling safety function following a LOCA. Three accumulators are required to ensure that 100% of the contents cr'two will reach the core. If less than two accumulators are injected during the blowdown phase of a LOCA, the ECCS acceptance criteria of 10 CFR 50.46 could be violated.

The minimum SI accumulator Cb concentration bases is to assure reactor subcriticality in a post LOCA environment.

This is an SRO level question because the candidate must have knowledge of TS bases and is beyond above the line knowledge. Incorrect.

Incorrect number of accumulators although plausible since the LCO is three accumulators and the candidate may conceive that all three are required to ensure 10 CFR 50.46 criteria is maintained.

Correct minimum Cb bases. Incorrect.

Correct number of accumulators.

Incorrect minimum Cb bases. This is the bases for the maximum Cb allowed. Incorrect.

Incorrect number of accumulators.

Incorrect minimum Cb bases. Sys# System category KA Statement 006 Emergency Core Cooling N/A Knowledge of limiting conditions for operations and safety limits. KiM 2.2.22 KiA Importance 4.7 Exam Level SRO References provided to Candidate None Technical

References:

BVPS Unit 1 & 2 TS 3.5.1, Pgs. B 3.5.1-1-7 Question Source: New Question Cognitive Level: Lower -Memory or Fundamental 10 CFR Part 55 Content: CFR: 43 (b)(2) Objective:

1

27. Describe the design basis for the Safety Injection System and the associated major components as documented in the USFAR.

(SRO Beaver Valley Unit 1 NRC Written Exam 88. Given the following plant conditions and sequence of events: The Unit is operating at 100% power. The crew is performing 10M-15.4.H, "Securing a CCR Pump or Placing The Spare CCR Pump In Service", with the following system status: [1CC-P-1A], Component Cooling Pump is racked in with the control switch in PTL. [1 CC-P-1 B], Component Cooling Pump is running. [1CC-P-1C], Component Cooling Pump is racked onto the "1AE" 4KV Bus in Standby. A Loss of Offsite Power coincident with a reactor trip occurs and all components function as designed except #2 Emergency Diesel Generator fails to start. Which ONE of the following describes the status of CCR system pressure AND Technical Specification (TS) requirement? (assume NO operator action occurred) (Reference Provided)

TWO (2) minutes following the Loss of Offsite Power, [A6-35], "PRI COMP COOL PUMP DISCH PRESS LOW" will_ (1) TS 3.0.3 LCO entry will_ (2)_. A. (1) be LIT (2) be required B. (1) NOT be LIT (2) be required C. (1) be LIT (2) NOT be required D. (1) NOT be LIT (2) NOT be required Answer: C Explanation/Justification: Incorrect.

Correct A6*35 status (refer to correct answer explanation).

Incorrect that TS 3.0.3 action is required.

Plausible because based on stated conditions, there are no CCW pumps running. TS 3.7.7 action for two CCW pumps inoperable is to immediately restore which is applicable in Mode 4 when RHR is required to C/D plant based on Note. The plant is currently in Mode 3 based on reactor trip. This note could be misapplied to mean that since two trains are not available in Mode 3 that TS 3.0.3 is required. Incorrect.

AS-35 is LIT based on no CCR pumps running. Plausible if candidate does not understand that EDG auto loading if two CCR pumps are racked onto the emergency bus. Incorrect plausible TS LCO action (explained above). Correct. AS-35 will be LIT. With no offsite power, the only source of power to emergency busses is from the EDG. Since #2 EDG did not start, the B CCR pump is not running. Since there are two pumps racked onto the AE bus, #1 EDG will not auto sequence on "C" CCR pump and is rendered inoperable.

This knowledge can be considered RO higher cognitive knowledge but is required to meet the KIA statement.

TS application/Bases is SRO knowledge and meets the second part of the KIA. TS bases states that each CCW train is considered operable if it can be started manually.

If"N CCW pump is taken out of PTL the pump will start, therefore LCO 3.0.3 is not required. Incorrect.

Incorrect A6-35 status (explained above). Correct LCO action (explained above). System Category KA Statement Component Ability to (a) predict impacts of the following or operations on the CCWS, and (b) based on those Loss of CCW Cooling predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or Pump Water operations: A2.01 KIA Importance 3.6 Exam Level SRO References provided to Candidate BVPS TS 3.03/3.7.7

& Bases Technical

References:

10M-15.4.H, Rev. 12, Pg. 2 BVPS TS 3.0313.7.7

& Bases 1S0S-15.1, Rev. 11 PPNT Slides Question Source: New Question Cognitive Level: Higher -Comprehension or Analysis 10 CFR Part 55 Content: CFR: 43 (b)(2) Objective:

1 S05-15.21 Describe the CCR pump start/stop logic and control room indications that are inputs to the logic. 1S0S*15.22 Describe the design bases for the CCR system.

(SRO Beaver Valley Unit 1 NRte Written Exam 89. Given the following plant conditions:

  • The Unit is operating at 45% power. * #2 Monthly EDG Surveillance is in progress.

In accordance with 1/20M-48.2.C, "Adherence And Familiarization To Operating which ONE of these VALID annunciators, are you required to direct the Control Room Team address (Assume annunciators are addressed first prior to entering any AOP or A9-11 "DIESEL GEN 2 DIFFERENTIAL" (Purple Border) A7-5 "CONDENSATE PUMP DISCH PRESS LOW" (No Border) A7-6 "STEAM GENERATOR FEED PUMP SUCT PRESS LOW" (Yellow Border) A3-10 "AM SAC TIMER INITIATED PRE-TURBINE TRIP & PRE**AUX FEEDWATER" (Red Border) Answer: 0 Explanation/Justification: Incorrect.

This is a recently implemented change to BVPS control boarc configuration and change to 1/20M-48.2.C.

According to this reference orange and purple bordered annunciators are color coded for Train identification and serve as an operator aid to readily identify conditions that the operator should not attempt a manual start of an EDG. This is a lower priOrity than yellow and red bordered annunciators. Incorrect.

This is a plausible related Main Feedwater annunciator that is a lower priority than the other annunciators presented.

AS annunciators are also no border alarms and are the highest priority.

This further increases the plausibility of a no border annunciator. Incorrect.

This is a plausible Main Feedwater annunciator that is a lower priority than the red bordered annunciators according to 1/20M-48.2.C. Correct. In accordance with 1/20M-48.2.C, Red Border annunciators take priority over yellow. orange, purple or no border annunciators.

with the exception of AS annunciators.

The SRO must have knowledge of administrative procedures that specify hierarchy, implementation, and/or coordination of plant normal, abnormal, and emergency procedures.

Sys# System Category KA Statement 059 Main Feedwater NlA Ability to prioritize and interpret the significance of each annunciator or alarm. KIM 2.4.45 KIA Importance 4.3 Exam Level SRO References provided to Candidate None Technical

References:

1/20M-48.2.C, Rev. 19, pg. 12 -14.25 & 27 WM-4SB.4.AAA, Rev. 5, pg. 2 Question Source: New Question Cognitive Level: Lower -Memory 10 CFR Part 55 Content: CFR: 43 Objective:

3S0S-48.1

9. From memory explain the requirements of adherence to and familiarization with operating
20. From memory, explain all of the Operations Expectations.

(SRO Beaver Valley Unit 1 NRC Written Exam 90. Given the following plant conditions and sequence of events: Unit 1 is at Full Power with all systems in NSA. RM-1VS-107B, "Reactor Building and SLCRS Vent Release Particulate Gas Monitor" power supply fails. The US declares this monitor non-functional and consults V2-0DC-3.03, "ODCM: Controls for RETS and REMP Programs" to determine the impact of this failure, if any. Assume all other Radiation Monitors are functional.

Which ONE of the following actions according to V2-0DC-3.03 will be taken based on the failed power supply, if any? (Reference Provided)

A. Restore non-functional channel within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. B. No action is necessary, elevated discharge can continue.

C. Immediately suspend the release of radioactive gaseous effluents.

D. Take grab samples at least every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and analyze for gross activity.

Answer: B Explanation/Justification: Incorrect.

This is a plausible alternative if the candidate refers to Table a.3-6 and incorrectly applies action 35. Correct. RM-1 VS-1 07B is referenced several places in the ODCM. Table 3.3-6 1 a makes reference to this monitor as a 2nd PMM, so there is no impact on the elevated release because the Primary Instrument is still operable.

Table 4.a-3 shows the required surveillance for this instrument.

Table 3.3-13 3a requires RM-1 VS-l 07B or RM-1 VS-l1 0 ch 5 as the alternate.

Since 1 is the minimum channels operable, Action 29 does not need to be performed.

Action 30a is NlA since a purge from containment is not in progress.

Note that the candidate must understand that in NSA an elevated release from Safeguards is in progress. Incorrect.

Plausible if the candidate misunderstands or incorrectly applies the ODCM, but not correct. Incorrect.

This is a plausible alternative if there were one less than the minimum required channels.

Only one channel is required to be operable per Table 3.3-13, 3a. Sys # System Category KA Statement 073 Process Radiation Monitoring Ability to (a) predict the impacts of the following malfunctions or Erratic or failed power supply. operations on the PRM system; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations:

KJA# A2.01 KJA Importance 2.9 Exam Level SAO References provided to candidate

%..ODC-3.03 , Rev. 11 Technical

References:

%-ODC..3.03, Rev. II, pg. 20, 24, 37, 39, 43, 46 1 SOS-43.1, Rev. 13, PPNT Slide # 2 Question Source: Modified Bank -Vision # 598 Question Cognitive Level: Higher Comprehension or Analysis 10 CFR Part 55 Content: CFR: 43 (b)(2)&(4)

Objective:

1

12. Using a copy of the Technical Specifications, Licensing Requirements Manual, or Offsite Dose Calculation Manual, analyze a given set of plant conditions for compliance with the licensing requirements, including determination of the equipment operability and applicable action statement.

(SRO Beaver Valley Unit 1 NRC Written Exam 91. Given the following plant conditions and sequence of events: A Reactor trip coincident with a Loss ot Offsite Power occurs. Both Trains of RVLlS are NOT functioning, but all other systems functioned as designed. The Control Room Team is performing ES-O.4, "Natural Circulation Cooldown With Steam Void in Vessel (Without RVLlS)". RCS Hot leg temperatures are 450 Of and STABLE. RCS Pressure is 1600 psig and STABLE. Charging and letdown are placed in MANUAL. During depressurization to 800 psig, PRZR Level rapidly rises to 90%. PRZR Heaters are ALL unavailable.

Which ONE of the following describes what required action will be necessary to mitigate the rising PRZR level condition AND impact of PRZR Heaters being unavailable?

The required action in accordance with ES-0.4 to mitigate this condition is to __ (1) __. The impact of PRZR heater unavailability is the inability to (2) __. A. (1) stop the depressurization (2) partially or wholly collapse the Rx Vessel Void. B. (1) maximize letdown (2) prevent a water solid RCS and resultant loss of pressure control. C. (1) maximize letdown (2) partially or wholly collapse the Rx Vessel Void. D. (1) stop the depressurization (2) prevent a water solid RCS and resultant 10:5s of pressure control. Answer: A Correct. Step 8 of ES-0.4 directs depressurization stopped if PRZR level exceeds 90% or if 800 psig is reached. PRZR heaters are necessary in step 9 to raise RCS pressure 100 psig to collapse the reactor vessel void formation.

This is SRO level knowledge based on the need to assess plant conditions and understand how to proceed based on understanding of procedure content. In this situation there is no method to continue in this procedure without PRZR heater control. A procedural do-loop occurs. PRZR heaters are necessary in ES-0.4 for PRZR level control to enhance upper head COOling. Incorrect.

This is a required action and bases in ES-O.3 for high PRZR level where the technique employed for RCS cooldown is different Under normal circumstances, with the RCS subcooled, this would be correct. However, with a void in the vessel the RCS will not water solid. Candidate may mis-interpret high PRZR level as an indication of a "water solid" Incorrect.

Incorrect action. Correct impact. Incorrect.

Correct action. Incorrect impact although partially correct that a loss of pressure control occurs. (refer to distractor B explanation)

Sys # System Category KA Statement Pressurizer Level Control Ability to (a) predict the impacts of the following malfunctions or operations on Loss of PZR heaters. the PZR LCS, and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations:

KlA# A2.05 KIA Imponance 3.7 Exam SRO References provided to Candidate Technical

References:

10M-53A.1.ES-OA, Issue 1 C, Rev. 10, pg. 5 & 6 10M-53B.4.ES-OA, Issue lC, Rev. 10, pg. 18, 20 -23 Question Source: New Question Cognitive Level: Higher -Comprehension or Analysis 10 CFR Pan 55 Content: CFR: 43 (b)(5) Objective:

3S0S-53.3

3. State from memory the basis and sequence for major action steps of each EOP procedure lAW BVPS EOP 011 (SRO Beaver Valley Unit 1 NRC Written Exam The Unit is operating at 40% power with all systems in NSA for this power level and the following plant conditions occur:
  • A4-76, COMPUTER ALARM ROD DEVIATION/SEQ NIS POWER RANGE TILTS is LIT. Individual Rod Position Indication (IRPI) for Control Rod D4 (Bank C) indicates 30 steps.
  • Reactor power indicates 34% and is SLOWLY RISING.
  • RCS Tavg indicates 545°F and is SLO\NL Y DROPPING.
  • The SRO enters AOP 1.1.8, "Rod IRPI system functions as designed.

For these conditions, what will be the status of VB-B Control Rod D4 Rod Bottom Light AND what action is required in accordance with AOP 1.1.8? The VB-B Control Rod D4 Rod Bottom Light will __ (1) __The required action will be to direct a __ (2) __(1) be LIT. (2) turbine load reduction. (1) be LIT. (2) reactor trip. (1) NOT be LIT. (2) turbine load reduction. (1) NOT be LIT. (2) reactor trip. Answer: C Explanation/Justification: Incorrect.

Incorrect RPIS impact. Rod Bottom Light setpoint is < 20 steps. 30 steps was chosen as a distractor because it is close to the setpoint that is used on a reactor startup to detect subsequent dropped rods onc:e CBA is withdrawn above the 35 step rod bottom bypass setpoint.

Correct procedure use. A load reduction is warranted and procedurally driven in AOP 1 :1.8 to stabilize RCS Tavg within 4 F of Tref. Incorrect.

Incorrect RPIS impact. Rod Bottom Light setpoint is < 20 steps. Incorrect procedural action. This action is plausible if Tavg is < 541 F or after load reduction Tavg is not stable (ie: on a declining trend & > 10F below Tret). Correct. The impact of a dropped rod on RPIS is the receipt of a Rod Bottom Light which corresponds to an IRPI position of < 20 steps. Since the rod dropped to 30 steps, the rod bottom light will not be lit. AOP 1.1.8 directs a turbine load reduction if RCS Tavg is not within 4 F of Tref. The candidate must determine that Tref for 34% is about 557 F which means Tavg is 12 F outside the required band. Since these conditions are met, a turbine load reduction is required.

Because the turbine load reduction has been commenced, Tavg will begin to increase and therefore will not be on a declining trend, so therefore a reactor trip is not warranted.

It is required SRO knowledge to understand the content of procedures beyond IMA's. This is relevant BVPS OE. Incorrect.

Correct RPIS impact. Rod Bottom Light setpoint is <20 steps. Incorrect procedural action as discussed above. Sys# System Category KA Statement 014 Rod Position Indication Ability to (a) predict the impacts of the following malfunctions or operations on the Dropped Rod RPIS, and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of thOSE! malfunctions or operations:

KlA# A2.03 KIA Importance 4.1 Exam Level References provided to Candidate None Technical

References:

Question Source: New SRO 1S0S-1.4, Rev. 12, PPNT slides 1S0S-1.4 LP, Rev. 12, pg. 4-6, 26-27 1 OM-1.4.ABH, Rev. 5, pg. 2 1 OM-53C.4.1.1.8, Rev. 3, pg. 1-2 BVPS TS 3.4.2, Amend 278/161 Question Cognitive Level: Higher -Comprehension or Analysis 10 CFR Part 55 Content: CFR: 43 (b)(5) 9. Discuss the IRPI indications following reactor trip, dropped rod, misaligned rod, or loss of electrical power. Objective:

1S0S-1.4 13. Given a set of plant conditions, analyze the ARPI system indications to determine specific failure has occurred.

(SRO Beaver Valley Unit 1 NRC Written Exam (1 93. Given the following plant conditions: The plant is in Mode 6. Fuel Off-Load is in progress. A Fuel Assembly inside the manipulator crane mast is being moved away from the reactor vessel toward the Upender. A6-30, "REFUELING CAVITY LEVEL LOW" is received. A cavity seal ring failure is reported as the cause of this alarm. As Refueling SRO, which ONE of the is the safe position for the fuel assembly in transit according to the Alarm Response ProcHdure?

The fuel assembly in transit will _____ prior to evacuating containment.

A. be placed in an open area inside the core. B. remain inside the mast of the manipulator crane. C. be placed in an upright position in the lifting frame of the upender. D. be placed in a horizontal position in the lifting frame of the upender. Answer: A Explanation/Justification: Correct. Based on the ARP response this is the safest location.

There will be more water keeping the assembly covered longer as this is the lowest point in the refueling cavity. It is an SRO function to provide imml3diate emergency guidance to those situations involving refueling.

This is an SRO question based on refueling floor responsibilities. Incorrect.

Plausible but incorrect.

Suspended from the crane is not the safest location.

It is the quickest option to evacuate from containment. Incorrect.

Plausible but incorrect.

It is safer to place the fuel assembly back into the core leaving it horizontal versus in the upender. Incorrect.

Plausible but incorrect.

This is the safest location if the assembly is already inside the upender. Sys# System Category KA Slatement 034 Fuel Handling Equipment NlA Knowledge of low power/shutdown implications in accidents (e.g., loss of coolant accident or loss of residual heat removal) mitigation strategies.

KIM 2.4.9 KIA Importance 4.2 Exam Level 8RO References provided to Technical

References:

None 10M-20.4.AAP, Rev. 16, pg. 2 -4 1/2RP-l .1, Issue 0, Rev. 22, pg. 8 & 9 Question Source: Bank -Vision # 33264 Question Cognitive Level: Lower -Memory or Fundamental 10 CFR Part 55 Content: CFR: 43 (b)(7) Objective:

Given a Fuel Handling System alarm condition and using the ARP(s), determine the appropriate response, including automatic action and operator actions in the control room.

(SRO Beaver Valley Unit 1 NRC Written Exam 94. Given the following plant conditions:

  • The Unit is operating at 5% power with all systems in NSA, during a plant shutdown.
  • A4-4, PRESSURIZER CONTROL LOW LEVEL is received. LT-1RC-459 is reading 16% and is slowly DROPPING. L T-1 RC-460 is reading 23% and is slowly RISING. L T-1 RC-461 is reading 23% and is slowly RISING. Charging flow is 100 GPM and slowly INCREASING. Charging Flow Controller output is DECREASING.

If NO operator action occurs, will a reactor trip What is the Technical Specification (TS) bases for Pressurizer (PRZR) Level Reactor A PRZR Level Reactor Trip will (1) __According to TS 3.3.1 Basis, a PRZR Level Roactor Trip is provided as a backup for PRZR Pressure (2) Reactor A. (1) occur (2) LOW B. (1) occur HIGH C. (1) NOT occur. LOW D. (1) NOT occur. (2) HIGH Answer: D Explanation/Justification: Incorrect.

Incorrect Reactor trip will NOT occur. Incorrect Bases, although plausible because PRZR does go low before LJD isolates.

There is no Low Level PRZR Level Trip, although a common misconception.

Lowering level equates to lower pressure. (Refer to correct answer explanation.). Incorrect.

Incorrect Reactor trip will NOT occur. Plausible because there, is a valid Hi PRZR level reactor trip which would occur if > P-7 power). Correct TS Bases. (Refer to correct answer Incorrect.

Correct Reactor trip will NOT occur. Incorrect that TS bases. (Refer to correct answer explanation). Correct. The SRO candidate must evaluate PRZR level instrumentation and evaluate plant performance to correctly deduce that LT*' RC*459 failing low. The automatic PRZR level control system is properly responding to this failure by increasing charging flow as the controlling drifts lower. This results in increasing PRZR level on the other two indicating channels.

When the failing PRZR channel LT*' reaches 14% PRZR level, automatic letdown isolation will occur. With no action the PRZR will continue to fill to the high level Because the reactor is at 5% << P*7). a reactor trip on High PRZR level (92%) will NOT occur. There is no low PRZR Level reactor trip.

this question may simplistic.

validators have had misconceptions or missed the fact that the reactor is below P*7 and therefore missed this question.

The basis for the High PRZR Level trip is to provide a backup for the PRZR High Pressure trip. The SRO candidate evaluate plant conditions and must possess the knowledge of TS bases beyond what is required of an RO. The SRO must apply fundamentals per conduct of Sys# System Category KA Statement N/A NIA Conduct of Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation.

KlA# 2.1.7 KIA Importance 4.7 Exam Level SRO References provided to None Technical 10M-6A.ABR, Rev. 5, pg. 2. 10M*6A.IF , Rev. 11. pg. 12

References:

TS 3.3.1, Amend. 278/161, pg. 13, TS Bases B 3.3.1, Rev. 0, Pg B Question Source: Modified Bank -Vision # 1420/82082 (2LOT7 NRC Question Cognitive Level: Higher -Comprehension or Analysis 10 CFR Part 55 Content: CFR 43 Objective:

1 SOS-6.4 20. Given a change in plant conditions due to system or component failure, analyze to determine what (SRO Beaver Valley Unit 1 NRC Written Exam 95. Given the following plant conditions:

  • The plant is operating in Mode 6 with all systems in normal alignment for this Mode. Core Off-Loading activities are in progress and core off-load is half complete. Source Range Channel N31 fails LOW. Source Range Channel N32 remains OPERABLE.

Which ONE of the following activities can be performed WITHOUT violating the Technical Specification required actions for Source Instrumentation?

A. Install a temporary secondary source into a core location.

B. Move a spent fuel assembly from the core to the Spent Fuel Pool. C. Move a spent fuel assembly from the upender to the Spent Fuel Pool. D. Add Hydrogen Peroxide mixed with primary grade water to the refueling cavity for cleanup. Answer: C Explanation/Justification: Incorrect.

Plausible that operationally an alternative source could be installed to replace N31, however, it is not allowed by definition. Incorrect.

Moving a fuel assembly from the core would not be allowable by definition.

Removing the assembly would not be considered placing the assembly in a safe location.

This is plausible however, the safest location would be back into the core as opposed to removal from the core. This is further plausible because some TS such as TS 3.9.4 LCO preclude core onload but do allow core offload to continue. Correct. Both AOP 1.2.1A for SR Channel Malfunction and TS 3.9.2 direct that core alterations are immediately suspended.

Core alterations defined as movement of any fuel, sources, or reactivity components, within the reactor vessel with the vessel head removed and with fuel in vessel. The SRO must have knowiedge of the administrative requirements associated with refueling activities and have knowledge of TS In order to answer this question the SRO must know the definition of Core Alterations and be able to apply this definition to a set of conditions.

The movement of a Spent Fuel Assembly from the upender to the SFP is allowable because it is not within the reactor Incorrect.

Plausible that hydrogen peroxide is added to the water for clarity and cleanliness.

However, the addition of primary grade water into the RCS would violate the second part of TS 3.9.2 since primary grade water could reduce boron concentration and is not allowed. Sys# System Category KA Statement N/A N/A Conduct of Operations Knowledge of procedures and limitations involved in core alterations.

KiA# 2.1.36 KiA Importance 4.1 Exam Level SRO References provided to Candidate None Technical 10M-53C.4.1.2.1A , Rev. 6, Pg. 1,2, & 6 BVPS TS Definitions, Amend 2781161, Pg. 1.1-2 BVP8 TS 3.9.2, Amend 2781161, Pg. 3.9.2-1 BVPS T8 B3.9.2, Rev. 0, Pg. B3.9.2-1 &2 1/2RP-1.1, Issue 0, Rev. 22, Pg. 5 Question Source: Modified Bank Vision # 81944 (2LOT6 NRC 0#94) Question Cognitive Level: Higher _ Comprehension or Analysis 10 CFR Part 55 Content: CFR: 43 (b)(6) ObJective:

14. Given a copy of TS or LRM, analyze a given set of plan conditions for compliance with licensing requirements, including the determination of equipment operability and applicable action statements.

(SRO Beaver Valley Unit 1 NRC Written Exam 96. Given the following plant conditions: The Unit is operating at 100%. You have just returned from a day off and are reviewing the narrative logs. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> ago, a valve was repositioned out of NSA and selected as an OPEN item using the Short Term Configuration Change Process. Based on the requirements of NOP-OP-1014, "Plant Status Control", does this comply with the Short Term Configuration Change Process? No; a clearance should have been posted 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> ago. No; a system status print sheet should have been issued 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> ago. Yes; a clearance will only be necessary if restoration does not occur within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. Yes; a system status print sheet will be necessary if restoration does not occur within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. Answer: A Explanation/Justification: Correct. According to NOP-OP-1 014, if a component is not restored to its normal configuration within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, then a clearance is hung provide a plant status control tracking method and documentation of the deviation from the components normal alignment.

A clearance have been posted 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> ago. The SRO is responsible for operating changes and configuration control in the Incorrect.

Correct that it does not comply with the short term configuration control process. A System Status Print is required to be filled out at all times reflecting system status conditions, if the system is deemed necessary by the Ops Manager. Either way if not deemed necessary the system status print would not be required.

If deemed necessary than it should have been filled out 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> ago. Incorrect. Refer to correct answer explanation.

The candidate may believe the requirement is 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> as opposed to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Incorrect. Refer to incorrect choice B explanation.

Plausible and balanced distractor.

Sys # System Category KA Statement N/A NlA Equipment Control Ability to determine the expected plant configuration using design and configuration control documentation, such as drawings, line* ups, tagouts, etc. KJ All 2.2.15 KJ A Importance 4.3 Exam Level SRO References provided to Technical

References:

None NOP-OP-1Q14, Rev. 1, pg. 12-14 1/20M-48.3.D, Rev. 6, pg. 8 Question Source: New Question Cognitive Level: Higher -Comprehension or Analysis 10 CFR Part 55 Content: CFR: 43 (b)(3) Objective:

3808-48.1

20. From memory, explain all of the Operations Expectations.

(SRO Beaver Valley Unit 1 NRC Written Exam 97. Given the following plant conditions:

  • The plant is operating at 100% power.
  • At 2300 on July 5 th , the (8) Quench Spray Pump (1 QS-P-1 8) becomes INOPERABLE.
  • At 0215 on July 6 th , the (A) Quench Spray Pump (1QS-P-1A) is restored to OPERABLE.

Including any extensions that are permitted by Technical Specifications and using references provided, which ONE of the following describes the LATEST time and date to restore 1 18 to OPERABLE status, without requiring a unit shutdown? (Reference Provided)

A. 0830 on July 6th B. 0830 on July 7th c. 2300 on July 8th D. 2300 on July 9th Answer: B Explanation/Justification: Incorrect.

Refer to correct answer explanation.

This answer is plausible if the pumps were associated with the same train in which case the hour extension time would not be Correct. In accordance with Section 1 of TS (Use and application), when a subsequent train, subsystem, or component expressed in the condition is discovered inoperable or not within limits, the completion time may be! extended provided two criteria are met: The subsequent inoperability must exist concurrent with the first inoperability and must remain inoperable or not within limits after the first inoperability is resolved.

In this case the more limiting time must be used. Incorrect.

This time corresponds with 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from second inoperability which is the less restrictive time and therefore cannot be used. Incorrect.

This time corresponds with the 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from the second inoperability plus the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> extension which is another Sys # System Category KA Statement N/A N/A Equipment Control Ability to apply technical specifications for a system. KIM 2.2.40 KIA Importance 4.7 IExam Level SRO References provided to Candidate TS 1.3, Amend 278/161, pg.1-11) Technical

References:

TS 1.3, Amend 278/161 TS 3.6.6, Amend 278/161 pg 1-2) TS 3.6.6, Amend 278/161 Question Source: Bank -Vision 82088 (2LOT7 NRC 0#88) Question Cognitive Level: 10 CFR Part 55 Content: Higher -Comprehension or CFR 43(b)(2) Objective:

1

28. Using a copy of TS, analyze a given set of plant conditions for compliance with the licensing requirements; including the determination of equipment operability and applicable actions statements.

(SRO Beaver Valley Unit 1 NBC Written Exam 98. The following radiological conditions exist for an area in the plant: General dose rate levels range from 25 -45 mr/hr. A Non-Licensed Operator needs to entl3r this area to isolate a safety related system during Emergency Operating Procedun3 Implementation. Measurements taken on pipes and valves include: Point 1 is 100 mr/hr at 30 cm. Point 2 is 500 mr/hr at 30 cm. Point 3 is 1100 mr/hr at 30 cm. Based on these plant conditions, what is the radiological posting required AND which entry requirements are applicable according to NOP-OP-41 01, "Access Controls for Radiologically Controlled Areas"? Radiological posting required (2) NOP-OP-4101 Entry Requirements A. (1) Very High Radiation Area. (2) Shift Manager must grant access. B. (1) Very High Radiation Area. Radiation Protection must grant access. C. (1) Locked High Radiation Area. (2) Shift Manager must grant access. Only key will be required to gain access. D. (1) Locked High Radiation Area. Radiation Protection must grant access. Two keys are required to gain access. Answer: C Explanation/Justification: Incorrect.

A Very High Radiation Area is defined as an accessible area in which radiation levels could result in an individual receiving an absorbed dose in excess of 500 Rlhr at a distance of 1 meter or more from a radiation source or any surface that radiation penetrates.

The candidate could confuse 500 r/hr with mr/hr requirements.

To the ex1ent possible, entry into a VHRA should be forbidden unless there is a sound operational or safety reason for entering.

Although entering to isolate a safety related system during EOPs does meet this criteria, it is not a VHRA. Both SM and RP permission is required to enter a VHRA. Incorrect.

Refer to discussion above. Correct. A Locked High Radiation Area is defined as an accessible high radiation area in which radiation levels could result in an receiving a deep dose in excess of 1000 mr/hr at a distance of 30 centimeters or more from a radiation source or any surface that penetrates.

The conditions in the stem of the question meet this criteria" According to both TS 5.7 and NOP-OP-41 01, RP permission to access to a LHRA during an emergency can be waived. Only one key is required to gain access and can be issued from the CR by the Incorrect.

Correct that this is a LHRA. RP can normally provide permission to gain access, however, this is an emergency and their permission not required, however, it is required that the SM grant access and issue the key of which there is only one versus two required to gain Sys # System KA Statement N/A N/A Radiation Knowledge of radiological safety procedures pertaining to licensed operator duties, such as response to radiation monitor alarms, containment entry requirements, fuel handling responsibilities, access to locked high radiation areas, aligning filters etc. KJA# 2.3.13 KJA Importance 3.8 Exam SRO References provided to Candidate None Technical NOP-OP-41 01 , Rev. 5, pg. 4 -5, 10, 11, 14, 15, 20 TS 5.7 Amend. 278/161, pg. 5.7-1 Question Source: Bank -Vision 82097 (2L0T7 NRC 0#97) Question Cognitive Level: Lower -Memory or Fundamental 10 CFR Part 55 Content: CFR 43 (b)(4) Objective:

3SSG-15. Explain the controls implemented by the Health Physics Program in accordance with: %-ADM-1601, Radiation Protection Admin Standards and NOP-OP-4102, Radiological Postin!Js, Labeling, and Markings.

(SRO Beaver Valley Unit 1 NRC Written Exam 99. Given the following plant conditions: The Control Room Team is performing E-3, "Steam Generator Tube Rupture". While verifying Station Instrument air available in Step 7, it is determined that Station Instrument Air (IA) has been lost. Which ONE of the following describes required procedure usage regarding IA (AOP-1.34.1

= "Loss of Station Instrument (EOP Att. 2-S = "Monitoring AFW Pump Performance During Loss of Station Instrument Stop at this step in E-3. Transition to AOP 1.34.1. When IA is restored, return to Step 7 of E-3 and continue subsequent E-3 steps. Stop at this step in E-3. Transition to AOP 1.34.1. When IA is restored, return to Step 7 of E-3 and perform EOP Att. 2-S. Continue in E-3 without performing AOP-1.34.1.

Attempt to restore IA using E-3 Step 7. If IA cannot be restored, perform EOP AU. 2-S. Continue in E-3 and concurrently perform AOP-1.34.1.

Attempt to restore IA using AOP 1.34.1. When IA is restored, continue in E-3 and perform EOP Att. 2-S. Answer: C Explanation/Justification: Incorrect.

EOPs are higher priorities than AOPs. Although plausible that AOP 1.34.1 is used, Step 7 RNO does not refer to usage of AOP 1.34.1. Incorrect.

There is no direction to concurrently use AOP 1.34.1 during performance of E*3. EOP Att 2*S is only performed if IA is not restored. Correct. The intent of E-3 is to get S/G pressure equalized with RCS as soon as possible to stop primary to secondary leakage. This can be accomplished without IA which is not required per design bases. Step 7 is a continuous action step and attempts to restore IA should be continued.

The SRO needs to prioritize procedures and E-3 has the overriding priority and does not direct concurrent use of AOP 1.34.1. Step 7 RNO does direct performance of Attachment 2-S if IA is not restored because AFW recirculation valves fail closed and this could damage the AFW pump if there is insufficient flow. This is an important concept that the SRO must be aware of, otherwise AFW could be jeopardized.

This is an SRO level question because it requires an assessment of Loss of IA impact on E-3 and knowledge of procedure content and diagnostic steps in E*3. The KIA is met because E-3 is a higher priority than AOP 1.34.1. The SRO must know this procedure is not used in conjunction with E-3. Incorrect. Refer to correct answer explanation.

There is no direction to concurrently use AOP 1.34.1 during performance of E-3. Step 7 does direct Attachment 2-S usage if IA is not restored, however, IA is restored so therefore is unnecessary to perform. The background document and step bases is more concerned with restoration of air to ensure AFW recirculation.

EOP Attachment 2S is referenced if air header pressure cannot be restored.

Sys# System Category KA Statement NlA NlA Emergency ProcedureS/Plan Knowledge of how abnormal operating procedures are used in conjunction with EOPs. KIM 2.4.8 KIA Importance 4.5 Exam Level SRO References provided to Candidate Technical

References:

1 OM-53A.1.E-3, Issue 1 C, Rev. 14, pg 9 None lOM-S3BA.E-3, Issue 1C, Rev. 14, pg 64 1/20M-53B.2, Issue 1C, Rev. 7, pg 3-7 1/20M-48.2.C, Rev. 18, pg. 11 Question Source: New Question Cognitive Level: Higher Comprehension or Analysis 10 CFR Part 55 Content: CFR: 43 (b)(5) Objective:

3SaS-48.1

9. From memory explain the requirements of adherence to and familiarization with operating procedures.
20. From memory, explain all of the Operations Expectations.

(SRO Beaver Valley Unit 1 NRC Written Exam 100. Given the following plant conditions: The Emergency Director declared a Site Area Emergency at 1215. The initial report to state and local government was completed at 1227. An upgrade to General Emergency was declared at 1245. The Initial Protective Action Recomm8!ndation (PAR) was made without a dose projection. A Valid dose projection is now available that requires an upgraded PAR at 1255. The Initial AND Upgraded (PAR) to the State/County Agencies must be given by which ONE of the following times? INITIAL UPGRADED A. 1255 B. 1310 C. 1345 D. 1355 Answer: B Explanation/Justification: Incorrect.

All distractors are plausible but incorrect as they are intervals of the given time in the question stem. Correct. The Initial PAR must be declared within 15 minutes of declaration of a GE. The upgraded PAR does not change emergency classification status. Upgraded PAR determination must be completed within 15 minutes of assessment being available (ie: dose projection)

This is SRO level knowledge only. Incorrect.

All distractors are plausible but incorrect as they are intervals of the given time in the question stem. Incorrect.

All distractors are plausible but incorrect as they are intervals of the given time in the question stem. Sys# System Category KA Statement N/A N/A Emergency ProcedureS/Plan Knowledge of emergency plan protective action recommendations.

KIM 2.4.44 KIA Importance 4.4 Exam Level SRO References provided to Candidate None Technical

References:

V2.. EPP.. IP..4.1, Rev. 28, pg. 10, 12, & 13 Question Source: Bank -Vision 17585 Question Cognitive Level: 10 CFR Part 55 Content: Lower -Memory or Fundamental CFR: 43 (b)(5) Objective: