RTL#AS.640U J/2-ADM-J301.F04 Page I of9 Revision J OPERATIONS JOB PERFORMANCE MEASURE (JPM)

TRAINING MATERIAL TITLE: p,-,,,>n,,, Borate the Reactor Coolant TRAINING MATERIAL NUMBER: lCR-511 PROGRAM TITLE: Licensed COMPUTER CODE: lCR-511 --------------

REVISION NUMBER: 4 TECHNICAL

REFERENCES:

1OM -7.4 _S, "Emergency Boration", Revision 7 INSTRUCTIONAL SETTING: Simulator APPROXIMATE DURATION: 15 Minutes PREPARED BY: 1. Forbes .,+i':!..--

Date PEER REVIEW BY: -----,.---

Date APPROVED FOR USE:

Training Supervisor or Designee Date

RTL#A5.640U 112-ADM-1301.F04 Page 2 of9 Revision I OPERATIONS JOB PERFORMANCE MEASURE TRAINING MATERIAL CHANGE FORM Affected Training Materials: 1CR~S 11 Type of Change:

Changes Requiring Learning Objective Related Change?

Revision Yes No Changes Not The Change Does Not Impact Requiring Revision Objectives or Material List/Description of Change(s):

Updated left hand column of JPM to properly reflect verbatim procedure per current standards.

Added a note so that JPM can be used in conjunction with another simulator JPM.

Changed Initiating Cue from SM directs to US directs to retlect plant operations.

Reason for Change (s):

Updated JPM prior to implementation.

NOTE: Additions, deletions or Date changes to training materials

  • must be reviewed for their possible impact to the Training Training Superintendent/Supervisor/Peer Date Qualification Matrix. See Incumbent Impact Review,

("Changes Not Requiring Revision" only) 1104.

RTL#A5.640L 1/2-ADM- \301.F04 Page 3 of9 Revision I OPERATIONS JOB PERFORMANCE MEASURE JPM REVISION: 14CR-Sll JPM NUMBER: I' TP1\'11'ITI E' : E mergency Borate the R eactor C

, 1 V .o IS 00 ant* ystem KIA

REFERENCE:

004 A2.14 3.8/3.9 TASK 10: 0071-038-01-013 JPM APPLICATION: [gJ REQUALIFICATION INITIAL EXAM TRAINING

[gJ FAULTED JPM D ADMINISTRATIVE JPM EV ALUATION METHOD: LOCATION: TYPE: ADMINISTERED BY:

[gJ Perform D Plant Site D Annual Requal Exam D BVT D Simulate [gJ Simulator 0 Initial Exam 0 NRC 0 Classroom 0 OJT/TPE 0 Other:

D Training 0 Other:

EVAUJATION RESULTS Performer Name: Perfonner SSN:

~

Time Yes Allotted Actual 15 Minutes minutes Critical: No Time: Time:

JPM RESULTS:

0 SAT 0 UNSAT (Comments required for UN SAT evaluation)

Comments:

OBSERVERS Name/SSN: Name/SSN:

Name/SSN: Name/SSN:

EVALUATOR Evaluator (Print): Date:

I

RTL#A5.640LJ 1/2-ADM-130 1.F04 Page 4 of9 Revision I OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-511 JPM TITLE: Emergency Borate the Reactor Coolant System JPM REVISION: 4 EVALUATOR DIRECTION SHEET TASK STANDARD: Emergency borate to the RCS from the R WST at ~ 105 gpm.

RECOMMENDED Simulator STARTING LOCATION:

DIRECTIONS: You are to emergency borate to the Reactor Coolant System.

INITIAL CONDITIONS:

  • The plant is 100% power, with all systems in NSA following a recent escalation of power.
  • An event has occurred that caused A4-124, ROD CONTROL BANK D LOW-LOW", to alarm.
  • This is a valid alarm.

INITIATING CUE: The US directs you to respond to the annunciator by borating the RCS until the control rods are above the RIL, using 10M-7.4.S, "Emergency Boration".

10M-7.4.S, "Emergency Boration", Revision 7.

REFERENCES:

TOOLS: None I OM-7.4.S, "Emergency Boration", Revision 7.

HANDOUT:

RTL#A5,640U 1/2-ADM-130 I.F04 Page 5 of9 Revision I OPERATIONS JOB PERFORMANCE MEASURE CANDIDA TE DIRECTION SHEET

  • THIS SHEET TO BE GIVEN TO CANDIDATE
  • DRead:

TASK: You are to emergency borate to the Reactor Coolant System.

INITIAL CONDITIONS:

  • The plant is 100% power, with all systems in NSA following a recent escalation of power.
  • An event has occurred that caused A4-124, ROD CONTROL BANK D LOW-LOW", to alarm.
  • This is a valid alarm.

INITIATING CUE: The US directs you to respond to the annunciator by borating the RCS until the control rods are above the RIL, using 10M-7.4,S, "Emergency Boration".

D At this time, ask the evaluator any questions you have on this lPM.

D When satisfied that you understand the assigned task, announce "I am now beginning the JPM".

Simulate performance or perform as directed the required task.

D Point to any indicator or component you verify or check and announce your observations.

After determining the Task has been met announce" I have completed the JPM".

D Then hand this sheet to the evaluator.

RTL#A5.640U \/2-ADM-\301,F04 Page 6 of9 Revision \

OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-511 JPM REVISION: 4 i JPM TITLE: Emergency Borate the Reactor Coolant System "s" FOR SAT or "U" FOR SETUP:

  • Select 100% power Ie.
  • Inseli Control Rods in manual until Rod Control Bank D LOW-LOW annuciator alarms.
  • Adjust RCS boron concentration until Tavg-Tref is within 1 F using Malfunction RCS 21 (approximately 40 ppm depending on core life).
  • Select VLV -CHS 17, set severity to 0 and insert (Prevents MOV-ICH-350 from opening).
  • Ensure charging flow is < 105 gpm prior to snapping Ie.

EVALUATOR CUEINOTE:

[MOV-1 CH-350] will not open. (Fault)

Prior to beginning JPM. set Band D Group Counters to match IRP1.

Do NOT place simulator in RUN until candidate is ready to begin.

Provide the candidate with a copy of OM-7.4.S prior to beginning the JPM.

START TIME: _ _ _ _ _ _ __

l. Review 10M-7.4.S. l.1 Candidate reviews 10M-7.4. S provided.

"Emergency Boration".

COMMENTS:

2. Ensure at least one [1 CH-P 2.1 Verifies at least one Charging Pump is running by 1A( 1B)( 1C)] Charging Pump Hi observing Red Light above pump control switch Head Safety Injection, is LIT; White Light - NOT LIT. Also verifies running. (BB-A) associated pump amperage is reading normal (approximately 60 amps).

COMMENTS:

RTL#A5.640U 1!2-ADM-1301.F04 Page 7 of9 Revision J OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR**511 JPM TITLE: Emergency Borate the Reactor Coolant System JPM REVISION: 4

3. Place Emergency Boration Isol 3.1 Places [MOV-ICH-350] control switch to OPEN.

Vlv [MOV-ICH-350] control switch to OPEN. (BB-A) 3.2 Identifies Green Light - REMAINS LIT and Red Light- NOT LIT.

3.3 Determines [MOV-ICH-350] has not opened.

COMMENTS:

EVALUATOR NOTE: This step will be omitted if candidate correctly determines no flow will be available with [MOV -1 CH-350] not open and should proceed to procedure step 5 for alternate f10wpath.

4. Place the online Boric Acid 4.1 Places [1 CH-P-2A (2B)] control switch to FAST.

2A(2B) Transfer Pump [1 CH P-2A(2B)] control switch to 4.2 Verifies Red FAST Light - LIT; Red SLOW Light FAST. (BB-A) NOT LIT.

COMMENTS;

RTL#A5.640U I i2-ADM-130 I.F04 Page 8 of9 Revision I OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR*Sll JPM TITLE: Emergency Borate the Reactor Coolant System JPM REVISI01\: 4 "c" Denotes EVALUATOR NOTE: This step will be omitted if candidate correctly determines no flow will be available

\\lith [MOV -\ CH-350] not open and should proceed to procedure step S for alternate tlowpath.

5. Verify [FI-ICH-llO], 5.1 Candidate checks [FI-l CH-llOJ greater than or equal Emergency Boration Flow to 30 gpm.

greater than or equal to 30 gpm. (VB-A) COMMENTS:

EVALUATOR NOTE:

FAL'LT STATEMENT Alternate path begins here: [MOV-ICH 3S0] will not open. Candidate must align alternate flowpath from the RWST. (Procedure step 5.a).

EVALUATOR NOTE/CUE: If the candidate tries to have [MOV-ICH-3S0] locally opened or align the blender to the charging pump suction, cue that the SM desires to use the R WST flowpath.

Align the R WST to the Places [MOV-ICH-llSB] OR [MOV-ICH-115D]

charging pump suction: control switch to OPEN.

1). Open [MOV -1 CH-l15B] or Verifies Red Light LIT; Green Light NOT LIT.

[MOV-ICH-115D], RWST Disch to Chg Pumps Suet Vlv. Places [MOV -I CH-llSC] OR [MOV-I CH-115E]

(BB-A) control switch to CLOSE.

2). Close [MOV-ICH-llSC] or 6.4 Verifies Green Light LIT; Red Light NOT LIT.

[MOV-ICH-115E], VCT Outlet to Chg Pumps Suet Vlv. COMMENTS:

(BB-A)

RTL#A5.640U 1/2-ADM-J30 I.F04 Page 9 of9 Revision I OPERATrONS JOB PERFOR\1ANCE MEASURE JPM NUMBER: 1CR-511 JPM TITLE: Emergency Borate the Reactor Coolant System JPM REVISION: 4 CRITICAL STEP "S" FOR SAT or 7.C Place [FCV-ICH-122J, Chg 7.1 Places [FCV -I CH-122] control station to MANUAL Flow to Regen Hx Inlet by depressing MAN pushbutton.

ControJ Vlv controller to MAN (BB-A) 7.2 Verifies Red MAN Light - LIT; White AUTO Light NOT LIT.

  • If R WST is the source of boric acid, establish 2: 105 7.3C Depresses T pushbutton and establishes 105 gpm as gpm charging 110w as indicated on [FI-ICH-122A].

indicated on [FI-ICH-122A]

Charging Pump Flow. (BB COMMENTS:

A)

8. Verify [PI-1 RC-455, Verifies PRZR pressure on [PI-l RC-455, 456, 457]

PRZR Press indicates are indicating < 2335 psig.

pSlg.

EVALUATOR CLE: That completes this JPM.

If performing this JPM in parallel with another simulator JPM that takes longer, reposition MOV ICH-II5B or IISD and MOV-ICH-l1SC or II to minimize impact on ReS and subsequent distraction to the other candidate who is still performing their JPM.

TIME: ~ _ _ _ _ _ _ __

RTL#A5.640U 1/2-ADM-130l.F04 Page I of II Revision I OPERATIONS JOB PERFORMANCE MEASURE (JPM)

TRAINING MATERIAL TITLE: and Load No.1 Diesel Generator TRAINING MATERIAL NUMBER: 1CR-524 PROGRAM TITLE: Licensed COMPUTER CODE: lCR-524 REVISION NUMBER: o TECHNICAL

REFERENCES:

IOST-36.1, "Diesel Generator No.1 Monthly Test", Rev 55 10M-36.4.ADY, "Diesel Generator No.1 Differential, Issue 3, Rev. 0 INSTRUCTIONAL SETTING: Simulator APPROXIMATE DURATION: 15 Minutes PREPARED BY: I. Forbes PEER REVIEW BY: - ------

Date APPROVED FOR USE:

Training Supervisor or Designee Date

RTL#A5.640U 1i2-ADM-130J .F04 Page 2 of J J Revision J OPERATIONS JOB PERFORMANCE MEASURE TRAINING MATERIAL CHANGE FORM lCR-524 Learning Objective Related Change? New Rev. #0 Revision Yes No Changes Not The Change Does Not Impact Learning! Existing Rev. #

Requiring Revision New Change #

List/Description of Change(s):

Created new JPM modeled after Unit 2 version.

Reason for Change (s):

To build BVPS Unit 1 JPM Infrastructure.

APPROVALS:

NOTE: Additions, deletions or changes to training materials Prepared by Date must be reviewed for their possible impact to the Training Qualification Matrix. See Incumbent Impact Review, Training Superintendent/Supervisor/Peer Date NOBP-TR-II04.

('Changes Not Requiring Revision" only)

RTL#A5.640U 1i2-ADM-\30 I.F04 Page 3 of 11 Revision 1 OPERA TIO'\JS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR*,524 JPM TITLE: Synchronize and Load No.1 Diesel Generator JPM REVISION: 0 KIA

REFERENCE:

064A4.06 3.9/3.9 TASK 10: 0362-005-06-013 JPM APPLICATION: REQUALIFICATION kS] INrrIAL EXAM D TRAINING FAULTED JPM D ADMINISTRATlVE JPM EVALUATION METHOD: LOCATION: TYPE: ADMINISTERED BY:

Perform D Plant Site Annual Requal Exam BVT Simulate kS] Simulator Initial Exam NRC Classroom OJT/TPE Other:

Training Other:

EV ALUA TlON RESULTS Performer Name: Performer SSN:

Time D Yes Allotted 15 Minutes Actual minutes Critical: kS] No Time: Time:

JPM RESULTS:

D SAT D UNSAT (Comments required for UNSAT evaluation)

Comments:

OBSERVERS Name/SSN: Name/SSN:

Name/SSN: Name/SSN:

EVALUATOR Evaluator (Print): Date:

RTL#A5.640U I12-ADM-130 l.F04 Page 4 of 11 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: lCR-524 JPM TITLE: Synchronize and Load No.1 Diesel Generator JPM REVISION: 0 EVALUATOR DlRECTION SHEET TASK STANDARD: No.1 Diesel Generator is synchronized and loaded in accordance with lOST-36.1, "Diesel Generator No.1 Monthly 'rest" AND then opens ACB 1E9 in response to Annunciator A9-3.

RECOMMENDED Simulator STARTING LOCATION:

DIRECTIONS: You are to synchronize and load No.1 Diesel Generator.

INITIAL CONDITIONS: The plant is in Mode 1 with lOST-36.1 being performed. The test has been completed up to Section V, Step 27. All steps up to this point have been completed satisfactorily.

INITIATING CUE: Your supervisor directs you to perform Section V, Steps 27 through 34 of lOST-36.1. You are responsible to respond to all alarms on Annunciator panel A8 & A9.

REFERENCES:

lOST-36.L "Diesel Generator No.1 Monthly Test", Rev 55 lOM-36.4.ADY, "Diesel Generator No.1 Differential, Issue Rev. 0 TOOLS: None HANDOUT: IOST-36.L "Diesel Generator No.1 Monthly Test", Rev 55, place kept up to step 27.

lOM-36.4.ADY, "Diesel Generator No.1 Differential, Issue 3, Rev. 0 (AFTER ALARM OCCURS)

RTL#A5.640U 112-ADM-130 I.F04 Page 5 of II Revision I OPERATIONS JOB PERFORMANCE MEASURE CANDIDATE DIRECTION SHEET

  • THIS SHEET TO BE GIVEN TO CANDIDATE
  • DRead:

TASK: You are to synchronize and load No.1 Diesel Generator.

INITIAL CONDITIONS: The plant is in Mode 1 with 10ST-36.1 being performed. The test has been completed up to Section V. Step 27. All steps up to this point have been completed satisfactorily.

INITIA TING CUE: Your supervisor directs you to perform Section V, Steps 27 through 34 of lOST-36.1. You are responsible to respond to all alarms on Annunciator panel AS & A9.

D At this time, ask the evaluator any questions you have on this JPM.

D When satisfied that you understand the assigned task. announce "I am now beginning the JPM".

Simulate performance or perform as directed the required task.

D Point to any indicator or component you verify or check and announce your observations.

After determining the Task has been met announce" I have completed the JPM".

D Then hand this sheet to the evaluator.

RTL#AS.640U 1/2-ADM-130 I.F04 Page 6 of 11 Revision I OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR**524 I JPM TITLE S h' d L d N 1 D' 1 G JPM REVISION: 0 I  : ync romze an oa .0. lese enerator Denotes CRITICAL STEP "S" FOR SAT or "U" Simulator Setup: Initialize to any Mode 1 IC Set Ensure simulator is setup for OST -36.1 conditions up to step 27 as follows:

  • DG in EXERCISE & running 900 RPM
  • EDG voltage at ~ 122 volts
  • Turn on Annunciator A 11-81, DIESEL GEN BLDG A FIRE PROT SYSTEM TROUBLE
  • Si;lect EPS288, Diesel Generator 1 Droop Setting and select Parallel Ops Set Trigger 1 to actuate when DG Load reaches 500 KW and actuates Annunciator A9-3, to support Alternate Path JPM as follows:
  • Select Event Triggers
  • Enter X 17D049M >= 500 into event tab
  • Enter imf XN09003 1 into command tab Freeze and snap IC Set.

ENSURE "B" PROTECTED TRAIN POSTED START TIME: ----------------

~--------------

EVALlJATOR CUE: Provide the candidate a place kept copy of lOST-36.1 and when ready to begin, place Simulator in RUN.

1. Reviews place kept copy of 1.1 Reviews place kept copy of 1OST-36.1 AND begins at lOST-36.1, "Diesel Generator Step 27a.

No.1 Monthly Test".

COMMENTS:

RTL#A5.640U I !2-ADM-130 I.F04 Page 7 of II Revision I OPERA TIO~S JOB PERFORMA\lCE MEASURE JPM ~UMBER: lCR-524 JPM TITLE: Synchronize and Load No.1 Diesel Generator JPM REVISION: 0 "s" FOR SAT or "U" EVALUATOR eUE: If necessary, remind the candidate that Digital voltmeter readings are NOT required.

2. Perform the following voltage 2.1 Records EMERG GEN 1 VOLTS benchboard and frequency verifications: indication in Step 27a.

SR 3.8.1.2 2.2 Records EMERG GEN 1 FREQUENCY benchboard

a. If using benchboard indication in Step 27a.

instrumentation, obtain the following readings: COMMENTS:

  • EDG Output Voltage (A-B) volts.
  • EDG Output Frequency__ Hz.

3.e Close the Motor Operated 3.1 e Places EMERG GEN 1 MOTOR OPERATED GND Ground Switch by positioning SW OS! control switch to CLOSE position.

the No.1 Diesel Generator Motor Operated Ground 3.2 Releases switch when White light NOT LIT and Red Switch Control to CLOSE. light LIT.

(Generator Section of the Benchboard) 3.3 Acknowledges Annunciator A9-2, "DIESEL GEN 1 MO GROUND SW NOT FULLY OPEN".

a. Check ANN. A9-2, "DIESEL GENERA.TOR COMMENTS:

NO.1 M.O. GROUND SWITCH NOT FULLY OPEN" is OK

RTL#A5.640U 1/2-ADM-130 1.F04 Page 8 of 11 Revision I OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-524 JPM TITLE: Synchronize and Load No.1 Diesel Generator JPM REVISION: 0 "C" Denotes CRITICAL STEP "s" FOR SAT or "U" FOR 4.C Position the No. 1 Diesel

  • 4.1C Places the EMERG GEN 1 SYNCHRONIZING SEL Generator Synchroscope SW to the ACB I E9 position.

Selector Switch to the 1E9 position to compare the diesel 4.2 Compares EMERG GEN 1 FREQUENCY to MAIN generator frequency to the GEN FREQUENCY on generator section benchboard.

frequency on bus 1 (Generator Section of the 4.3 Acknowledges A9-8. ACB lE7 or lE9 IN Benchboard). SYNCHRONIZING MODE" alarm.

a. Check A9-8, "ACB lE7 or COMMEJ\TS:

lE9lN SYNCHRONIZING MODE" alarms when the Synchroscope Selector Switch is moved from OFF position.

_ _ _ .... _ _ ~_ ..._ _ _ _- L -_ _ _ _ __

5.C Using the No.1 Diesel 5.1 C Raise or lowers EMERG GEN 1 GOVERNOR control Generator Govenor Control switch to adjust No.1 EDG speed until the Switch, adjust generator speed synchroscope is rotating very slowly in the fast until the synchroscope needle direction.

is rotating very slowly in the FAST direction (Generator COMMENTS:

Section of the Benchboard).

- . - - - - - - . - -----+----~----~ - - - - - - - - - - - - - - - - - - + - - - - - - i

6. Using the No.1 Diesel 6.1. Raises or lowers voltage using EM ERG GEN 1 VOLT generator Voltage Control ADJUST control switch to match generator voltage Switch, match generator (SYNC VOLTS INCOMING NORM) with the voltage Oncoming) with the voltage on Bus 1AE (SYNC VOLTS RUNNING voltage on Bus 1AE NORM) on the kickup section of the benchboard (Running). above the synchroscope.

COMMENTS.

RTL#A5,640U I/2-ADM-130 1.F04 Page 9 of 11 Revision I OPERATIONS JOB PERFORMAN CE MEASURE JPM NUMBER: 1CR-524 I JPM REVISION: 0 JPM TITLE: Synchronize and Load No.1 Diesel Generator When both synchronizing 7.lC Places EMERG GEN 1 CIRCUIT BREAKER IE9 lights are completely dark control switch to START position when synchronizing AND synchroscopc needle is at needle is at 12 0' clock and lamps are dark.

the 12 0' clock position. place the No.1 Diesel Generator 7.2 Verifies ACB lE9 Red Light - LIT and White Light Breaker Control to CLOSE. NOT LIT and releases switch.

(Red light) (Generator Section of the Benchboard). COMMENTS:

Pick up a small amount of load 8.1 C Increases load on No. I EDG by turning EMERG by moving the No.1 Diesel GEN I GOVERNOR Control switch intermittently to Generator Govenor Control RAISE, limiting load to approximately 300 KW.

Swtich, intermittently, to the RAISE position. 8.2 Observes increasing No.1 EDG watts and amps.

EM ERG No.1 GEN WATTS - EMER GEN 1 Bus JAE AMPS COMMENTS:

I

9. Turn synchroscope selector 9.1 Places EMERG GEN 1 SYNCHRONIZING SEL SW switch to OFF. in the OFf position.

9.2 Acknowledges A9-8, ACB IE7 or IE9 IN SYNCHRONIZING MODE" clears.

9.3 NI As Step 32.c.I-4 and continues with Step 33.

COMMENTS:

RTL#AS.640U 1/2-ADM-130 I .F04 Page 10 of II Revision 1 OPERATIONS JOB PERFORMANCE MEASURE

/

i~~ ~~-0i~~~ ~R-524 I JPM TITLE: Synchronize and Load No. 1 Diesel Generator STANDARD liS" FOR SAT or "U" EVALIJATOR CUE: If asked Role Play US and direct candidate to load NO. I EDG to 2450 KW over ten minutes.

10.C Load the diesel to 10.1 C Adjusts EMERG GEN 1 POWER FACTOR using approximately 2450 KW by the EMERG GEN VOLTAGE ADJUST switch to performing the following: between 0.90 - 1.00 LAGGING while raising EDG load.

a. While raising load. Adjust generator power factor 10.2 Verifies power factor on Power Factor meter.

from 0.90 lagging to 1.00, by using the generator voltage adjusT switch COMMENTS:

(Generator section of the benchboard).

11.C With the No. 1 Diesel 11.IC Using EMERG GEN 1 GOVERNOR Switch Generator ACB closed, intermittently in the RAISE position, picks up load increase load to Approximate on NO.1 EDG.

Load listed in Table A by placing the Govenor Control t t .2 Begins raising EDG load to 2450 K W over a ten Switch. intermittently. to the minute period oftimc.

RAISE position.

COMMENTS:

RTL#A5.640U 1/2-ADM-1301.F04 Page 11 of 11 Revision I OPERA TIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-524 JPM TITLE: Synchronize and Load No.1 Diesel Generator JPM REVISION: 0 STANDARD Denotes CRITICAL FAULT STATEMENT: At this point the JPM alternate path begins. Annunciator A9-3, "GENERATOR NO.1 DIFFERENTIAL" will annunciate when NO.1 EDG loading reaches 500 KW.

Candidate should respond to ARP and trip 1E9.

12.C Responds to Annunciator 12.1 Acknowledges the alarm and responds by reviewing A9-3, "GENERATOR NO.1 the ARP tor A9-3.

DIFFERENTIAL".

12.2C Places ACB I E9 output breaker to STOP position.

12.3 Verifies EMERG GEN 1 MOTOR OPERATED GNU SW OS 1 White Light LIT, Red Light - NOT LIT.

EVALUATOR CUE: Terminate the JPM after the candidate opens the output breaker and verifies the motor operated ground switeh is open using evaluator discretion.

COMMENTS:

STOP TIME: ~ . ., ..-------,-------

RTL#A5,640U 112-ADM-130 1,F04 Page 1 of 12 Revision 1 OPERATIONS JOB PERFOR\1ANCE MEASURE PPM}

TRAINING MATERIAL TITLE: Isolate SI Accumulators a LOCA TRAINING MATERIAL NUMBER: 1CR-642 PROGRAM TITLE: Licensed COMPUTER CODE: I CR-642 REVISION NUMBER: 3 TECHNICAL

REFERENCES:

1OM-53.A.l.ES-1.2. Post LOCA Cooldown and Depressurization, Issue 1C, Rev. 15 lOM-ll.4.H, Venting Safety Injection Accumulator [lSI-TK-IA (IB) (IC)], Rev. 6 1OM-53A.I.6-A. 0 F Plus Subcooling Based on Core Exit TCs, Issue 1C, Rev. 0 INSTRUCTIONAL SETTING: Simulator APPROXIMATE DURATION: 12 Minutes PREPARED BY: 1. Forbes Date PEER REVIEW BY ~

Date APPROVED FOR USE:

Training Supervisor or Designee Date

RTL#AS.640U 1/2-ADM-130 l.F04 Page 2 of 12 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE TRAINING MATERIAL CHANGE FORM Affected Training Materials: lCR-642 Type of Change:

L8J Changes Requiring Learning Objective Related Change? New Rev. # 3 Revision DYes ~~No D Changes Not The Change Does Not Impact Learning Existing Rev. # 2 Requiring Revision Objectives or Material Quality.

New Change #

List/Description of Change( s):

1. Updated to reflect most current procedure revisions.
2. Added Evaluator Note to set up VB-A & VB-B computer screens.

-'. Added acknowledge annunciators when MOV-ISI-86SA/B are taken to close (step 6) .

Reason for Change (s):

To ensure JPM is up to date prior to administration.

APPROVALS:

NOTE: Additions, deletions or

1. Forbes changes to training materials Prepared by Date must be reviewed for their possible impact to the Training Qualification Matrix. See Incumbent Impact Review, Training S uperintendent/Supervisor/Peer Date NOBP-TR-l104.

("Changes Not Requiring Revision" only)

RTL#A5.640U 1I2-ADM-130 1.F04 3 of 12 Revision I OPERATIONS JOB PERFOR.\1ANCE MEASURE

.rPM NU.vIBER: 1CR-642 I .

JPM REVISlON: 3 JPM TITLE: Isolate SI Accumulators DUring a LOCA.

KIA

REFERENCE:

009 EA 1.13 4.4/4.4 TASK ID: 0111-011-01-013 JPM APPLICATION: ~ REQUALIFICATION INITIAL EXAM D TRAINING lSJ FAULTED JP.\1 ADMINISTRATIVE JPM EVALUATION METHOD: LOCATION: TYPE: ADMINISTERED BY:

~ Perform 0 Plant Site D Annual Requal Exam D BVT Simulate Simulator D Initial Exam D NRC Classroom D OJT/TPE D Other:

D Training C Other:

EVALUATION RESULTS Performer Name: Performer SSN:

Time D Yes I ~.llotted 12 Minutes Actual minutes Critical: ~ )10 Jllne: Time:

.rPM RESULTS:

0 SAT D UNSAT (Comments required for UNSAT evaluation)

Comments:

OBSERVERS Name/SSN: Name/SSN.

Name/SSN: Name/SSN.:

EVALUATOR Evaluator (Print): Date:

Evaluator Signature: -

RTL#A5.640U 1/2-ADM-130 I.F04 Page 4 of 12 Revision I OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: I CR-642 JPM TITLE: Isolate SI Accumulators During a LOCA.

JPM REVISIO:t\: 3 EVALUATOR DIRECTION SHEET TASK STANDARD: SI Accumulators 'A' and 'B' are isolated. SI Accumulator 'C' venting 111 progress.

RECOMMENDED Simulator STARTING LOCATION:

DIRECTIONS: You are to Isolate the SI Accumulators During a LOCA.

INITIAL CONDITIONS: A LOCA has occurred. The crew is performing ES-I.2, Post LOCA Cooldown and Depressurization.

INITIATING CUE: The Unit Supervisor directs you to isolate the SI accumulators in accordance with ES-l.2. Post LOCA Cooldown and Depressurization, Step 27.

REFERENCES:

1OM-53.A.l.ES-l.2. Post LOCA Cooldown and Depressurization, Issue I C Rev. 15 1OM-1IA.1-1, Venting Safety Injection Accumulator [I SI-TK-IA (lB)

(1 C)], Rev. 6 IOM-53A.l.6-A, 0 F Plus Subcooling Based on Core Exit TCs, Issue IC Rev. 0 TOOLS: Shorting Bars HANDOUT: 1OM-53.A.l.ES-1.2. Post LOCA Cooldown and Depressurization, Issue 1C. Rev. 15. STEP 27 ONLY.

10M-I1A.H. Venting Safety Injection Accumulator [lSI-TK-IA (1B)

(1 C)]. Rev. 6 1OM-53A.l.6-A, 0 F Plus Subcooling Based on Core Issue lC, Rev. 0

RTL#A5.640U 1/2-ADM-130 I.F04 Page 5 of 12 Revision 1 OPERAnONS JOB PERFORMANCE MEASURE CANDIDATE DIRECTION SHEET

  • THIS SHEET TO BE GIVEN TO CANDIDATE
  • DRead:

DIRECTIONS: You are to Isolate the SI Accumulators During a LOCA.

INITIAL CONDITIONS: A LOCA has occurred. The crew is performing ES-l.2, Post LOCA Cooldown and Depressurization.

INITIATING CUE: The Unit Supervisor directs you to isolate the SI accumulators in accordance with ES-l.2, Post LOCA Cooldown and Depressurization, Step 27.

D At this time, ask the evaluator any questions you have on this .rPM.

D When satisfied that you understand the assigned task, announce "I am now beginning the JPM".

Simulate performance or perform as directed the required task.

D Point to any indicator or component you veri fy or check and announce your observations.

After determining the Task has been met announce" I have completed the JPM".

D Then hand this sheet to the evaluator.

RTL#A5.640U J/2-ADM- J30 I.F04 Page 6 of 12 Revision I OPERA TIONS JOB PERFORMANCE MEASURE JP:VI KUMBER: 1CR-642 JPM TITLE: Isolate Sl Accumulators During a LOCA.

JPM REVISION: 3 I STEP I STANDARD

( "e" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)=> StU i

SIMULATOR SETUP: Start with 100% power Ie.

Override MOVISI-865C to OPEN by inserting VLV S1S28 to 100%. Insert a SBLOCA by inserting RCS02C 700 gpm. Progress through E-O - E-l ES-l.2 up to step 27 and freeze simulator. (Ensure subcooling and PZR Level requirements of step 27 are met). ENSURE CIA signal is reset per procedure.

Also ensure PZR is properly trending so that it is maintained greater than 17%.

EVALUATOR NOTE: Ensure shorting bars for MOV -I SI-865A B, C are available.

When candidate is ready to begin, go to RU>J on the simulator.

EVALUATOR NOTE:

Provide candidate a copy of ES-l STEP 27 ONLY.

DO NOT PROVIDE candidate with a copy of 10M IIA.H. Venting Safety Injection Accumulator [J SI TK-IA (IB) (IC)], UNTIL he/she recognizes the need for the procedure in step 10 of the lPM.

EVALUATOR NOTE: Set up VB-A Display (Select VB-Display 2 and then Rx Trip Group Display) Set up VB-B Display (Select VB-Display J and then PZR Lvi

& RCS Wide Range Pressure)

START TIME: ~. . . . . . . . _ _ _ _ _ __

1. Reviews procedure. 1.1 Candidate reviews procedure provided.

COMMENTS:

RTL#A5.640U II2-ADM- 130 I.F04 7 of 12 Revision I OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-642 JPM TITLE: Isolate SI Accumulators During a LOCA.

JPM REVISION: 3

2. RCS subcooling based on core 2.1 Determines lCCM RCS subcooling is exit TCs .. greater than subcooling listed on Att. 6-A.

subcooling listed on Attachment 6-A EVALUATOR CUE:

Provide candidate with a copy of Attachment 6-A.

COMMENTS:

.J. PRZR level greater than 3.1 Verifies PRZR level indication LI-l RC- 459A, 460, 17%. and 461 are greater than 17%.

COMMENTS'

4. Power to [MOV -1 Sl-865A, B, 4.1 Verifies MOV -1 SI-865A, Band C Red Lights LIT C] available. and Green Lights - NOT LIT.

COMMENTS:

5.C Insert shorting bars into jack 5.1 C Inserts shorting bars into jacks for MOV -1 SI-865A, B, for [MOV-ISI-865A, B, C]. and C.

! Provide candidate with shorting bars, when requested.

5.2 Verifies Red in service or Ground Light - LIT.

COMMENTS:

RTL#A5.640U I12-ADM-130 I.F04 Page 8 of 12 Revision I OPERATIONS JOB PERFORMANCE MEASLRE JPM NUMBER: 1CR-642 I JPM REVISION: 3 . JPM TITLE: Isolate S[ Accumulators During a LOCA.

EVALUATOR CUE:

FAULT STATEMENT MOV-I SJ-865C will NOT close in the next step.

6.C Close [MOV-ISI-865A, B, C]. 6.1C Places ~tl10V-lS1-865A & B control switches to CLOSE.

6.2 Acknowledges AI-IOIIl02, "SAFETY INJECTOR ACCUMULATOR # 1 DISCH VALVE NOT FULL Y OPEN" annunciator after each corresponding valve is taken to CLOS 6.3 Verities MOV-ISI-865A & B Green Light - LIT and Red Light - NOT LIT.

6.4 Places MOV-1 SI-865C control switch to CLOSE.

6.5 Determines Red Light - REMAINS LIT and Green Light - REMAINS NOT LIT.

COMMENTS:

7. Verify at least one station air 7.1 Verifies ISA-C-IA or 1B White Light - NOT LIT and compressor or the diesel air Red Light - LIT.

compressor is running.

COMMENTS:

RTL#A5.640U li2-ADM-J30 I.F04 Page 9 of 12 Revision J OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: lCR-642 I JPM REVISION: 3 I JPM TITLE: Isolate SI Accumulators During a LOCA.

"e" Denotes CR1TICAL STEP

[TV-llA-400] - Open. Verifies TV-lIA-400 Train A & B Green Lights LIT and Red Lights LIT.

COMMENTS:

I

9. Check CNMT instrument air 9.1 Verifies PI-IIA-\ 06A containment instrument air header pressure greater than header pressure GREATER THAN 85 psig.

85 psig.

COMMEN'rS:

I I

EVALUATOR NOTE:

DO NOT PROVIDE candidate with a copy of 10M 11.4.H, Venting Safety Injection Accumulator [1 Sl-TK-IA (1B) (lC)], UNTIL he/she recognizes the need for the procedure in step 10 of the JPM.

~

10. Locates and reviews procedure 10.1 Locates and reviews procedure 10M-I1.4.H, Venting 10M-l1.4.H, Venting Safety Safety Injection Accumulator [lSI-TK-IA (I 8)

Injection Accumulator [I SI- (1 C)].

TK-IA (IB) (IC)].

EVALUATOR CUE:

Once candidate has located the procedure, provide a copy of 10M-lI.4.H, Venting Safety Injection Accumulator [lSI-TK-lA (IB) (lC)].

COMMENTS:

I

RTUiA5,640U 1I2-ADM-J30 I ,F04 10 of 12 Revision 1 OPERA TIO:NS JOB PERFORMANCE MEASURE JPM :NUMBER: lCR-642 JPM TITLE: Isolate SI Accumulators During a LOCA.

JPM REVISION: 3 Denotes CRITICAL CUE:

If necessary, Role-play the Unit Supervisor and inform the Candidate that Radiation Protection does not require a nitrogen sample.

11. Check [HIC-l SI-9361 SI ACC 11.1 Verifies HIC-lSI-936 indicates ZERO percent.

N2 Vent to Atm control, output is adjusted to "Zero" percent. COMMENTS:

12. Close [1 SI -69], Nitrogen 12.1 Dispatches local operator to close 1SI-69.

Supply to S.l. Accumulators.

EVALUATOR CUE:

Role-play the Local operator report and acknowledge the request AND report that 1SI 69 is CLOSED.

COMMENTS:

13. If desired by the SM/US, Close 13.1 No action required.

[IS1-437J, Nitrogen Supply to EVALlJATOR CUE:

Overpressure Protection Role-play the Unit Supervisor. Inform System.

Candidate it is NOT desired to close 1SI-437.

COMMENTS:

RTL#A5.640U II2-ADM-130 I.F04 Page II of 12 Revision I OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: ICR-642 JPM REVISION: 3 * .rPM TITLE: Isolate SI Accumulators During a LOCA.

Denotes CRITICAL STEP) 114.~open [MOV-ISI-853C], (I C) 14.1C Places MOV-ISI-853C control switch SI Acc N2 Sup Isol VIvo 14.2 Verifies Red Light - LIT and Green Light - NOT LIT.

COMMENTS:

15.C Open [TV -1 Sl-l 0 1-1], SI Acc 15.1 C Places TV -1 SI-lO 1-1 control switch to OPEN.

N2 Sup Iso! Vlv.

15.2 Verifies Red Light - LIT and Green Light NOT LIT.

COMMENTS:

16.C Open [TV-ISI-lOl-2], SI Ace 16.1C Places TV-ISI-IOl-2 control switch to OPEN.

N2 Sup Isol Vlv.

16.2 Verifies Red Light - LIT and Green Light - -NOT LIT.

COMMENTS:

RTUfA5.640LJ II2-ADM-J30 I.F04 Page 12 of 12 Revision I OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: lCR-642 JPM TITLE: Isolate SI Accumulators During a LOCA.

JPM REVISION: 3 "C" Denotes CRITICAL 17.C Operate [HIC-ISI-936] to 17.1C Rotates HIC-l SI-936 controller CLOCKWISE.

lower accumulator to the desired pressure A.S 17.2. Verifies PI-l SI-929 & 931 indicate accumulator INDICATED ON [PI-l SI-929 pressure is LOWERING.

& 931].

COM"'1ENTS:

EVALUATOR CUE:

Once Accumulator pressure is verified lowering, inform candidate "That Completes this JPM".

I I

STOP TIME: ----------------

RTL#A5.640U I12-ADM-130 I.F04 Page 1 of 11 Revision 1 OPERA TlONS JOB PERFORMANCE MEASURE (JPM)

TRAINIJ\G MATERIAL TITLE: for Hot/Cold Recirculation TRAINING MATERIAL NUMBER: 1CR-570 Licensed 1CR-570 REVISION NUMBER: 3 TECHNICAL

REFERENCES:

1OM-53A.l.ES-1.4 (ISS I C). Rev. 6 INSTRUCTIONAL SETTING: Control Room APPROXIMATE DURATION: 10 Minutes PREPARED BY: I. Forbes Date PEER REVIEW BY:

Date APPROVED FOR USE:

Training Supervisor or Designee Date

RTL#A5.640U I i2-ADM-130 I.F04 Page 2 of 11 Revision I OPERA.TlONS JOB PERFORMANCE MEASURE TRAI"JING MATERIAL CHANGE FORM Affected Training Materials: 1CR-570 Requiring Learning Objective Related Change? New Rev. # 3 Yes ~~ No 11U.ll",,".;) Not The Change Does Not Impact Learning Existing Rev. # 2 Requiring Revision or Material Quality.

New Change #

List/Description of Change(s):

Removed continuing training to allow flexibility for both Initial & Continuing Training Programs.

Changed statting location to simulator vs. control room.

Clarified use of shorting bar.

Streamlined simulator setup.

Added in accordance with ES-l.4 to initiating cue.

Reason for Change (s):

Cpdated for use on upcoming exam.

APPROVALS:

I NOTE: Additions, deletions or I changes to training materials i must be reviewed for their .

Date I. possible impact to the TraiJlin* g Qualification Matrix. See I Incumbent Impact Review, Training Superintendent/Supervisor/Peer Date

  • NOBP- TR-Il 04.

('Changes NOl Requiring Revision" only) L.----.-__ _ __ **

RTL#A5.640U 1/2-ADM-130 I.F04 Page 3 of 11 Revision 1 OPERATrONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-S70 JPM TITLE: Align SI Pumps for Hot/Cold Leg Recirculation JPM REVISION: 3 K/A

REFERENCE:

006A4.07 4.4/4.4 TASK ID: 0111-019-01-013 JPMAPPLICATION: ~ REQUALIFICATION ~ INITIAL EXAM ~ TRAINING

~ FAULTEDJPM D ADMINISTRATIVE JPM EVALUATION METHOD: LOCATION: TYPE: ADMINISTERED BY:

~ Perform D Plant Site D Annual Requal Exam D BVT D Simulate ~ Simulator D Initial Exam D NRC D Classroom D OJTITPE D Other:

D Training D Other:

EVALUATION RESULTS Performer Name: Performer SSN:

Time D Yes I ~.llotted 1(I Minutes Actual minutes Critical: ~ No lIme: Time:

JPM RESULTS:

D SAT D UNSAT (Comments required for UNSAT evaluation)

Comments:

OBSERVERS Name/SSN: Name/SSN:

Name/SSN: Name/SSN:

EVALUATOR Evaluator (Print): Date:

Evaluator Signature:

RTL#A5.640U 1i2-ADM-130 I.F04 Page 4 of 11 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-570

.rPM Align SI Pumps for Hot/Cold Leg Recirculation JPM REVISION: 3 EVALUATOR DIRECTION SHEET TASK STANDARD: LHSI Pumps are aligned for simultaneous cold leg and hot leg recirculation.

RECOMMENDED Simulator STARTI:-JG LOCATION:

DIRECTIONS: You are to align the LlISJ Pumps for simultaneous cold leg and hot leg recirculation.

INITIAL CONDITIONS:

  • It has been approximately 6.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> since the plant suf1ered a Loss of Coolant Accident.
  • All required procedures have been perfc)rmed to this point with the plant currently on cold leg recirculation.
  • The TSC has recommended aligning to simultaneous cold leg and hot leg recirculation.

INITIATING CUE: Your supervisor directs you to align simultaneous cold leg and hot leg recirculation in accordance with ES-l.4 at this time.

REFERENCES:

1OM-53A.l.ES-l.4 Issue 1C Revision 6 TOOLS: Shorting Bar(s) (keep in pocket until requested by candidate)

(will need only 1 shorting bar)

HANDOUT: IOM-53A.l.ES-1.4 Issue IC Revision 6

RTL#AS.640U 112*ADM*130 I ,F04 Page 5 of 11 Revision 1 OPERATIONS JOB PERFORMANCE \1EASURE CANDIDATE DIRECTION SHEET

  • TIllS SHEET TO BE GIVEN TO CANDIDATE
  • DRead:

DIRECTIONS: You are to align the LHSI Pumps for simultaneous cold leg and hot leg recirculation.

INITIAL CONDITIONS:

  • It has been approximately 6.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> since the plant suffered a Loss of Coolant Accident.
  • All required procedures have been performed to this point with the plant currently on cold leg recirculation.
  • The TSC has recommended aligning to simultaneous cold leg and hot leg recirculation.

INITIATING CUE: Your supervisor directs you to align simultaneous cold leg and hot leg recirculation in accordance with ES-l.4 at this time.

D At this time, ask the evaluator any questions you have on this JPM.

D When satisfied that you understand the assigned task, announce" I am now beginning the JPM".

Simulate performance or perform as directed the required task.

D Point to any indicator or component you verify or check and announce your observations.

After determining the Task has been met announce" I have completed the JPM".

D Then hand this sheet to the evaluator.

RTL#A5.640U 1/2-ADM-130 I.F04 Page 6 of II Revision I OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-570 I JPM REVISION: 3 JPM TITLE: Align SI Pumps for Hot/Cold Leg Recirculation STANDARD SIMULATOR SETUP:

Initialize to any at power IC Set.

Insert YLV -SIS24 to prevent MOY -1 SI864A from closing. (.IPM FAULT)

Insert MALF RCS02D and SIS 1 to 1000.

Perform E-O to 1 to l.3 back to E-l then to ES 1.4 at E-I step 29.

This will include tripping RCPs, Resetting Reheat Controlier, Aligning NR-NI-45 to operable SR & IR displays, Resetting SI & CIA & C[8, Stopping Quench Spray Chemical Addition Pumps and placing in AUTO. Closing MOY-IQS-I04A & B, Stopping Quench Spray Pumps and placing in AUTO. Closing MOV-IQS-IOIA & B, Reducing AFW flow when NR S/G level are between 31 % 65%, Closing MOY -1 SI 865A, B, C, and Opening MOY -I SI-863 at the appropriate times as directed by the EOPs. Freeze &

Snap.

EVALUATOR CUE:

Place Simulator in RUN when candidate is ready to begin the JPM.

Ensure shorting bar is available. Keep them in your pocket until requested by the candidate.

START TIME:

EVALUATOR CUE: Provide candidate a copy of ES-1.4.

1. Review 1A "Transfer To 1.1 Reviews ES-1 .4 and begins at step 1.

Simultaneous Cold Leg And Hot Recirculation". COMMENTS:

RTL#AS.640U 1/2-ADM-130 I.F04 Page 7 of II Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: lCR-570  !

JPM REVISION: 3 * -'PM TITLE: Align SI Pumps for Hot/Cold Leg Recirculation "e" Denotes CRITICAL

2. LHSI Pumps - NO SIGNS OF 2.1 Checks flow indicators and pump ammeters for both CAVITATION. LHSI pumps.

2.2 Determines flow and amps are stable and that there are NO indications of LHSI Pump cavitation.

COMMENTS:

3.C Align lA LHSI pump for Hot 3.1 Checks flow indicator, pump ammeter and breaker Leg Recirculation. position for 1A LHSI pump.

a. Check 1A LHSl Pump FAULT STATEMENT: Alternate path starts Ru'NNING. here. MOV -1 SI-864A will NOT close.
b. Close [MOV -J SI-864A], lA 3.2 Places [MOV -1 SI-864A] to CLOSE.

LJISI To RCL Cold Leg.

3.3 Observes RED Light remains LIT and GREEN Light - NOT LIT.

3.4 Determines [MOV-I SI-864A] failed to CLOSE and Step 2.b. RNO actions: RNO step actions are applicable.

Perform the following:

I) Insert shorting bar into 3.SC Obtains shorting bar and inserts it into the VB-A jack jacks for [MOV -I SI- for [MOV-lSI-890C].

890C], LHSI to RCS Hot Legs 3.6 Verifies Red inservice or Ground Light LIT.

2) Close [MOV-lSI-890C] 3.7C Places [MOV-ISI-890C] to CLOSE.

3.8 Verifies GREEN Light LIT and RED Light NOT LIT.

3) Remove shorting bar.

3.9. Removes shorting bar from the VB-A jack for [MOV 1SI-890C].

NOTE: There are NO failures 1SI-864B, Valve has long stroke time.

RTL#AS.640U \i2-ADM-\30 I.F04 8 of 11 Revision I OPERATIONS JOB PERFORMA NCE MEASURE JPM NUMBER: lCR-570 JPM TITLE: Align SI Pumps for Hot/Cold Leg Recirculation JPM REVISION: 3

4) Close [MOV-lSI-864BJ, 3.10CPlaces [MOV-lSI-864B] to CLOSE.

t B LHSI To RCL Cold Leg. 3.11 Verifies GREEN Light - LIT and RED Light NOT LIT.

COMME~TS:

4.C Align 1A LHSI pump for Hot 4.1 C Obtains shorting bar and inserts it into the VB-A jack Leg Recirculation. (continued) for [MOV-lSI-890A].

c. Insert shorting bar into jacks 4.2 Verifies Red inservicc or Ground Light for [MOV-lSI-890AJ. lA LHSI to RCS Hot 4.3C Places [MOV -1 SI-890A] to OPEN.
d. Open [MOV -1 SI-890A] 4.4 Verifies RED Light - LIT and GREEN Light NOT LIT.
e. Remove shorting bar.

4.5 Removes shorting bar li'om the VB-Ajack for [MOV

f. Check proper operation of 1SI-890A].

the following pumps:

4.6 Checks flow indicator and pump ammeter for 1A

  • 1A LHSI Pump LHSI pump.
  • Operating HHSI Pumps 4.7 Determines flow and amps are stable and that lA LHSI pump is operating properly.

4.8 Checks flow indicators and pump ammeters for 1A and I B E-[HSI pumps.

4.9 Determines flow and amps are stable and that both HHS] pumps are operating properly.

COMMENTS:

RTL#AS.640U I !2-ADM-130 I.F04 9 of II Revision I OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: ICR-570 JPM TITLE: Align SI Pumps for Hot/Cold Leg Recirculation JPM REVISION: 3 "s" FOR SAT or "U" FOR

5. Align] B LHSI pump for Hot Checks flow indicator. pump anlmeter and breaker Leg Recirculation position for 1B LHSI pump.
a. Check IB LHSI Pump 5.2 Determines flow and amps are stable for the 1B LHSI RUNNING. pump.
b. Close [MOV-1 SI-864B], 1B 5.3 Verifies RED Light LIT and WHITE Light NOT LHSI To RCL Cold Leg. LIT.

5.4 Verifies that 1B LHSI pump is running.

EVALUATOR NOTE: Valve was closed in previous step as part of Alternate Path actions.

5.5 Verifies GREEN Light LIT and RED Light NOT LIT for [MOV-lSI-864B]

COMMENTS:

RTL#AS.640U I12-ADM-130 I.F04 Page 10 of 11 Revision 1 OPERAnONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-570 JPM TITLE: Align SI Pumps for Hot/Cold Leg Recirculation JPM REVISION: 3 STANDARD "C" Denotes CRITICAL STEP) Indicate "S" FOR SAT or "U" FOR UNSAT)=>

6.C Align 1B LHSI pump for Hot 6.1 C Obtains shorting bar and inserts it into the VB-A jack Leg Recirculation. (continued) for [MOV-lSI-890B].

c. Insert shorting bar into jacks 6.2 Verities Red inservice or Ground Light LIT.

for [MOV-1SI-890B]. 1B LHSI to RCS Hot Legs 6.3C Places [MOV -1 SI-890B] to OPEN.

d. Open [MOV-ISI-890B] 6.4 Verifies RED Light LIT and GREEN Light NOT LIT.
e. Remove shorting bar.

6.5 Removes shorting bar from the VB-A jack for [MOV

f. Check proper operation of 1SI-890I3].

the following pLlmps:

6.6 Checks flow indicator and pump ammeter for 1B LHSI

  • IB LHSI Pump pump.
  • Operating HHSI Pumps 6.7 Determines flow and amps are stable and that 1B LHSI pump is operating properly.

6.8 Checks flow indicators and pump ammeters for lA and 1B HHS [ pumps.

6.9 Determines f10w and amps are stable and that both HHSI pumps are operating properly.

COMMENTS:

RTL#A5.640U 112-ADM-130 I.F04 Page II of II Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-S70 JPM TITLE: Align SI Pumps for Hot/Cold Leg Recirculation JPM REVISION: 3 STEP I STANDARD

( "e" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)=> S/U

7. RETURN to Procedure And 7.1 Candidate indicates that a transition back to the Step In Effect. previous procedure would now occur.

EVALUATOR CUE: State "That completes this JPM" COMMENTS:

STOP TIME:

RTL#A5.640U 112-ADM-130 1.F04 Page 1 of 10 Revision J OPERATTONS JOB PERFORMANCE MEASURE (JPM)

TRAINING MATERIAL TITLE: Establish a Containment to the Ventilation Duct TRAINING MATERIAL NUMBER: 1CR-026 Licensed lCR-026 o

TECHNICAL

REFERENCES:

1OM-44CA.A, "Containment Air Purge And Exhaust System Sta11Up", Rev. 21 INSTRUCTIONAL SETTING: Simulator APPROXIMATE DURATION: 12 Minutes PREPARED BY: L Forbes Date Date APPROVED FOR USE:

Training Supervisor or Designee Date

RTL#A5.640U 1I2-ADM-130 I.F04 Page 2 of 10 Revision I OPERA TIONS JOB PERFORMANCE MEASURE TRAINING MATERIAL CHANGE FORM Affected Training Materials: lCR-026 Type of Change:

~ Changes Requiring Learning Objective Related Change? New Rev. # 0 Revision DYes ~No D Changes Not The Change Does Not Impact Learning Existing Rev. # N/A Requiring Revision Objectives or Material Quality.

New Change #

List/Description of Chang (s):

Original Issue Reason for Change (8):

To expand BVPS Unit 1 Simulator JPM infrastructure.

APPROVALS:

i NOTE: Additions, deletions or changes to training materials Date must bc reviewed for their possible impact to the Training Qual ification Matrix. See Incumbent Training Superintendent/Supervisor/Peer Date ~OBP-TR-("Changes Not Requiring Revision only) OJ

RTL#A5.640U 1I2-ADM-\301.F04 3 of \0 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-026 JPM TITLE: Establish a Containment Purge to the Ventilation Duct JPM REVISION: 0 K/ A

REFERENCE:

029 Kl.04 3.0/3.1 TASK ID: 0443-009-01-013 JPM APPLICATION: 12:?] REQUALIFICATION 12:?] INITIAL EXAM D TRAINING D FAUL TED JPM D ADMINIS'fRATIVE JPM EVALCATION METHOD: LOCATION: TYPE: ADMINISTERED BY:

12:?] Perform 0 Plant Site 0 Annual Requal Exam D BVT D Simulate 12:?] Simulator 0 Initial Exam D NRC D Classroom 0 OJT/TPE D Other:

10 Training

[J Other:

EVALUATION RESULTS Performer Name: Performer SSN:

Time D Yes Allotted 12 Minutes Actual minutes Critical: 12:?] No Time: Time:

JPM RESULTS:

D SAT D UNSAT (Comments required for UNSAT evaluation)

Comments:

OBSERVERS Name/SSN: Name/SSN:

Name/SSN: Name/SSN:

EVALUATOR Evaluator (Print): Date:

Evaluator Signature:

RTL#A5.640U 1/2-ADM-130 I.F04 Page 4 of 10 Revision I OPERATIONS JOB PERFORMANCE MEASURE JPM NU:v1BER: 1CR-026 JPM TITLE: Establish a Containment Purge to the Ventilation Duct JPM REVISION: 0 EVALUATOR DIRECTION SHEET TASK STANDARD: Containment Purge flowpath is established to the Ventilation Duct with Exhaust [1 VS-F-5] fan running.

RECOMMENDED Simulator STARTING LOCATION:

DIRECTIONS: You are to Establish a Containment Purge to the Ventilation Duct INITIAL CONDITIONS:

  • The plant is in MODE 5.
  • Containment Vacuum has been broken.
  • A RWDA-G with Monitor Alarm adjustments has been issued and approved to Purge Containment to the Ventilation Duct.
  • 10M-44CA.A, Containment Air Purge And Exhaust System Startup, Section A "Breaking Containment Vacuum" has just been completed.
  • Outside Temperature is 55 OF.
  • The testing crew (Engineering) has been infonned that dampers will be repositioned.

INITIATING CUE: Establish a Containment Purge to the Ventilation Duct in accordance with lOM-44.C.4.A, beginning at Section B.3.

REFERENCES:

lOM-44C.4.A, "Containment Air Purge And Exhaust System Startup",

Rev. 21 TOOLS: NONE HANDOUT: 10M-44C.4.A, "Containment Air Purge And Exhaust System Startup",

Rev. 21, place kept up to Section B.3.

RTL#A5,640U 1/2-ADM-130 I,F04 Page 5 of 10 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE CANDIDATE DIRECTION SHEET

  • THIS SHEET TO BE GIVEN TO CANDIDATE
  • DRead:

DIRECTIONS: You are to Establish a Containment Purge to the Ventilation Duct INITIAL CONDITIONS:

  • The plant is in MODE 5,
  • Containment Vacuum has been broken,
  • A R WDA-G with Monitor Alarm adjustments has been issued and approved to Purge Containment to the Ventilation Duct.
  • 10M-44C.4.A, Containment Air Purge And Exhaust System Startup, Section A "Breaking Containment Vacuum" has just been completed.
  • Outside Temperature is 55 OF,
  • The testing crew (Engineering) has been informed that dampers will be repositioned.

INITIATING CUE: Establish a Containment Purge to the Ventilation Duct in accordance with IOM-44.CA.A, beginning at Section B,3.

D At this time, ask the evaluator any questions you have on this lPM.

D When satisfied that you understand the assigned task, announce "I am now beginning the JPM",

Simulate performance or perform as directed the required task.

D Point to any indicator or component you verify or check and announce your observations.

After determining the Task has been met announce" I have completed the JPM".

D Then hand this sheet to the evaluator.

RTL#A5.640U 1!2-ADM-130 I.F04 Page 6 of 10 Revision I OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: lCR-026 JPM TITLE: Establish a Containment Purge to the Ventilation Duct JPM REVISION: 0 DARD SIMULATOR SETUP:

Start with a Mode 5 IC (unless desired to pair with another JPM)

Ensure CNMT Purge is Shutdown Perform 10M-44CA.A, Containment Air Purge and Exhaust System Startup Section A.

To energize 1VS-D-3A, 1VS-D-5A, 1VS-D-5-3B, &

I VS-D-5-5B, select EPS026, 027, 028, 029 and select T.

Ensure NORMAL/REFUELING control switch on BSP is in the REFUELING position Once setup, freeze simulator and snap IC EVALUATOR CUE: This JPM may be setup to work as a pair with another JPM and may not reflect Mode 5 plant conditions. If the candidate questions plant status, inform the candidate that you understand the concern and to continue the JPM since it will have no impact on the JPM task or words to that nature so that JPM progress is not hampered.

EVALUATOR CUE: Provide candidate a place kept copy of IOM-44CA.A place kept up to Section B.3. If asked about reviewing R WDA-G, inform the candidate that it is NOT necessary to review this paperwork for purposes of this JPM and direct the candidate to proceed with the stated task at hand.

START TIME: ----------------

1. Reviews IOM-44CA.A, 1. 1 Revi ews 10M-44C A.A.

"Containment Air Purge And Exhaust System Startup" COMMENTS:

procedure.

RTL#A5.640U I12-ADM-130 J .F04 Page 7 of 10 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-026 JPM TITLE: Establish a Containment Purge to the Ventilation Duct JPM REVISION: 0 CNMT 2.1 C Places [1 VS-D-5-9] control switch to OPEN position.

Purge Inlet Dmpr. (BSP) 2.2 Verifies Red Light LIT and Green Light - NOT LIT.

COMMENTS:

EVALUATOR CUE: If asked, inform the candidate that the testing crew has already been informed per initial conditions and it is not necessary to inform them again.

3.C Open [1 VS-0-5-5A], CNMT 3.1C Places [1 VS-D-5-5A] control switch to OPEN Isol Purge Supply Damper. position.

(BSP) 3.2 Verifies Red Light LIT and Green Light 1\OT LIT.

COMMENTS:

4. Verify Open or Open [1 VS 4.1 0-5-5B], CNMT Isol Purge Sup Ompr. (BSP)

COMMENTS:

RTL#A5.640U 1/2-ADM-130 1.F04 Page 8 of 10 Revision I OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-026 JPM REVISION: 0 I JPM TITLE: Establish a Containment Purge to the Ventilation Duct "e" Denotes CRITICAL Open [1 VS-D-5-3B], CNMT 5.1 C Places [1 VS-D-5-3B] control switch to OPEN Isol Purge Exhaust Dmpr. position.

(BSP)

  • 5.2 VerifIes Red Light - LIT and Green Light - NOT LIT.

COMMENTS:

6.C Open [1 VS-D-5-3AJ, CNMT 6.lC Places [1 VS-D-5-3AJ control switch to OPEN Isol Purge Exhaust Dmpr. position.

(BSP) 6.2 Verifies Red Light - LIT and Green Light - NOT LIT.

COMMENTS:

EVALUATOR NOTE: This valve has a long stroke time.

7.C Open [IVS-D-5-1], CNMT 7.1C Places [IVS-D-5-1] control switch to OPEN position.

Purge Exhaust to Exhaust Fan. (BSP) 7.2 Verifies Red Light LIT and Green Light NOT LIT.

. COMMENTS:

RTL#A5.640U 1/2-AOM-130 I.F04 Page 9 of]O Revision I OPERATlONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-026 i JPM TITLE: Establish a Containment Purge to the Ventilation Duct JPM REVISION: 0 EV ALUA TOR CUE: When asked, Role Play an NLO and report [I VS-D-4-19A] is CLOSED.

8. Verify Closed or Close 8.1 Dispatches an NLO to verify [I VS-D-4-19A] is

[lVS-D-4-19AJ, CNMT CLOSED.

Purge Exhaust to SFGDS Leak Coil Iso1. Damper. COMMENTS:

(Aux Bldg 768', Purge Duct Rm).

EVALUATOR CUE: When asked, Role Play an NLO and report [1 VS-D-5-3C] is OPEN.

9. Verify Open or Open [1 VS 9.1 Dispatches an NLO to verify [1 VS-D-5-3C] is OPEN.

D-5-3C], CNMT Purge &

Exhaust Balance Damper. COMMENTS:

(SFGDS 768', SG BD Room).

EVALUATOR CUE: When asked, Role Play an NLO and report [IVS-D-5-5C] is OPEN.

10. Verify Open or Open [1 VS 10.1 Dispatches an NLO to verify [1 VS-D-5-5C] is D-5-5C], CNMT Purge & OPEN.

Supply Balance Damper.

(SFGDS 768', SO BD COMMENTS:

Room).

RTL#A5.640U 112-ADM-J30 I.F04 Page 10 of 10 Revision I OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-026 JPM TITLE: Establish a Containment Purge to the Ventilation Duct JPM REVISION: 0 STEP I STANDARD

( "c" Denotes CRITICAL STEP) (Indicate "~SIt FOR SAT or "U" FOR UNSAT)=> S/U l1.C Start [lVS-F-5], CNMT Purge 11.1C Places [lVS-F-5] control switch to START.

Exhaust Fan. (BSP) 11.2 Verifies Red Light - LIT and White Light -NOT LIT.

EVALUATOR CUE:

It is NOT desired to start [1 VS-HV -5], CNMT Purge Vent Supply Fan.

This JPM is COMPLETE.

COMMENTS:

STOP TIME: ----------------

RTL#A5.640U I12-ADM-130 I.F04 Page I of9 Revision 1 OPERA TIONS JOB PERFORMANCE MEASURE (JPM)

TRAINING MATERIAL TITLE: ",....nonl"1 to a RCP # 1 Seal Failure TRAINING MATERIAL NUMBER: 1CR-040 PROGRAM TITLE: Licensed COMPUTER CODE: lCR-040 REVISION NUMBER: 10 TECHNICAL

REFERENCES:

lOM-53CA.1.6.8, "Abnormal Rep Operation", Rev. 12 INSTRUCTIONAL SETTING: Simulator APPROXIMATE DURATION: 15 Minutes PREPARED BY: I. Forbes

." Date PEER REVIEW BY:

Date APPROVED FOR USE:

Training Supervisor or Date

RTL#A5.640U 112-ADM-1301.F04 Page 2 of9 Revision I OPERAnONS JOB PERFORMANCE MEASURE TRAINING MATERIA.L CHANGE FORM Affected Training Materials: 1CR-040 Type of Change:

~ Changes Requiring Learning Objective Related Change? New Rev. # 10 Revision D Changes Not The Change Does Not Impact Learning Existing Rev. # 9 Requiring Revision Objectives or Material Quality.

New Change #

List/Description of Change(s):

  • Updated to current procedure revision.
  • Changed from 100% power to Mode 3 to focus on task as opposed to reactor trip actions. This resulted in changes to Task Standard and critical steps.
  • Removed reference to continuing training.
  • Changed simulator as starting location.
  • Removed all simulate cues.
  • Enhanced simulator setup.
  • JPM enhancements to meet current JPM standards.
  • Modified to reflect [FR-ICH-154] no longer pegging high at 6 gpm.
  • Modified JPM to remove reference to ARP and begin with the alarm already received.

Reason for Change (s):

Updated JPM to improve BVPS infrastructure in accordance with most recent standards.

Updated to incorporate validator comments.

APPROVALS:

I. Forbes NOTE: Additions, deletions or Prepared by Date changes to training materials must be reviewed for their possible impact to the Training Training Superintendent/Supervisor/Peer Date Qualification Matrix. See Incumbent Impact Review,

("Chunges Not Requiring Revision" only)

NOBP-TR-1104.

RTL#A5.640U 1!2-ADM-130 l.F04 Page 3 of9 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-040 JPM TITLE: Respond to a RCP # 1 Seal Failure JPM REVISION: 10 KJA

REFERENCE:

015AA1.22 4.0/4.2 TASK ID: 0062-029-04-011 JPM APPLlCA TION: ~ REQUALIFICATION ~ INITIAL EXAM o TRAINING o FAUL TED JPM o ADMINISTRATIVE JPM EV ALUA TION METHOD: LOCATION: TYPE: ADMINISTERED BY:

~ Perform 0 Plant Site 0 Annual Requal Exam 0 BVT 0 Simulate ~ Simulator 0 Initial Exam 0 NRC 0 Classroom D OJT/TPE 0 Other:

D Training 0 Other:

EVALUATION RESULTS Performer Name: Performer SSN:

Time ~ Yes Allotted 15 Minutes Actual minutes Critical: 0 No Time: Time:

JPM RESULTS:

D SAT D UNSAT (Comments required for UNSAT evaluation)

Comments:

OBSERVERS Name/SSN: Name/SSN:

Name/SSN: Name/SSN:

EVALUATOR Evaluator (Print): Date:

Evaluator Signature:

RTL#A5.640U 1/2-ADM-130 1.F04 40f9 Revision I OPERA.TlONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-040 JPM TITLE: Respond to a RCP #1 Seal Failure JPM REVISION: 10 EV ALUATOR DIRECTION SHEET TASK STANDARD:

  • Closes PCV -1 RC-455A.
  • Closes MOV -1 CH-303A greater than 3 minutes but less than 5 minutes following the time lRC-P-lA was tripped.

RECOMMENDED Simulator STARTING LOCATION:

DIRECTIONS: You are to respond to reactor coolant pump seal trouble annunciator.

INITIAL CONDITIONS:

  • The plant is in Mode 3 at normal operating temperature and pressure.
  • Reactor trip breakers are open and all loops are in operation.

INITIATING CUE: Annunciator [A3-87J, "REACTOR COOLANT PUMP SEAL LEAKOFF FLOW HIGH" alarm has just been received. You are to analyze the problem and respond in accordance with AOP 1.6.8, "Abnormal RCP Operation".

This JPM contains time critical elements.

REFERENCES:

lOM-53C.4.1.6.8, "Abnormal RCP Operation", Rev. 12 TOOLS: None HANDOUT: 1OM-53CA.l.6.8, "Abnormal RCP Operation", Rev. 12

RTL#A5.640U J12-ADM-J30 J.F04 Page 5 of9 Revision J OPERATIONS JOB PERFORMANCE MEASURE CANDIDATE DIRECTION SHEET

  • THIS SHEET TO BE GIVEN TO CANDIDATE
  • DRead:

TASK: You are to respond to reactor coolant pump seal trouble annunciator.

INITIAL CONDITIONS:

  • The plant is in Mode 3 at normal operating temperature and pressure.
  • Reactor trip breakers are open and all loops are in operation.

INITIATING CUE: Annunciator [A3-87], "REACTOR COOLANT PUMP SEAL LEAKOFF FLOW HIGH" alarm has just been received. You are to analyze the problem and respond in accordance with AOP 1.6.8, "Abnormal RCP Operation".

This JPM contains time critical elements.

D At this time, ask the evaluator any questions you have on this JPM.

D When satisfied that you understand the assigned task, announce "I am now beginning the JPM".

Simulate performance or perform as directed the required task.

D Point to any indicator or component you verify or check and announce your observations.

After determining the Task has been met announce" I have completed the JPM".

D Then hand this sheet to the evaluator.

RTL#A5.640U I12-ADM-\30 1.F04 Page 6 of9 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-040 I JPM REVISI01\: 10 JPM TITLE: Respond to a RCP #1 Seal Failure STEP STANDARD

( "C" Denotes CRITICAL STEP) (\ndicate"S" FOR SAT or "U"FORUNSAT):::;:.I S/U I START TIME: I SIMULA TOR SETUP:

Initialize IC-3. 11, or 25. Mode 3, all RCPs rum1ing.

NOPINOT Open RTB and allow the plant to stabilize.

Select MALF RCS05A severity 8, ramp time 30 sec, delay time = 30 sec. (This will insert a 6 -8 gpm seal leakoff for the RCP after a time delay)

Once alarm has actuated RC-P-1A #1 seal failure,

  • malfunction, freeze and take a snap.

EVALUATOR CUE: Provide the candidate with a non place kept copy of AOP 1.6.8. When the candidate is ready to begin, ensure the simulator is in RUN.

EVALUATOR CUE: If candidate references the ARP. mform the candIdate that the daectlon was to respond with AOP 1.6.8.

EVALUATOR NOTE: [FR-ICH-154A] upper range is 10 gpm.

Observe [FR-ICH-154A] No. 1.1 Observes [FR-l CH-154A] is reading> 6 gpm.

1 Seal Leakoff Flow (VB-A).

COMMENTS:

RTL#A5.640U J12-ADM-J30 J.F04 Page 7 of9 Revision 1 OPERATIONS lOB PERFORMANCE MEASURE lPM NUMBER: 1CR-040 lPM TITLE: Respond to a RCP #1 Seal Failure lPM REVISION: 10 STEP I STANDARD

( "c" Denotes CRITICAL STEP) (Indicate "s" FOR SAT or "V" FOR VNSAT)=> S/V

2. Go to 10M-53C.4.1.6.8, 2.1 References AOP 1.6.8.

"Abnormal RCP Operation".

COMMENTS:

-'. Check Criteria For Immediate 3.1 Refers to Left Hand Page and determines high seal RCP Shutdown in Table 1 leakoffflowon [FR-ICH-154A] is> 6 GPM and (Left Hand Page) immediate RCP shutdown criteria is met.

a. Any criteria - EXCEEDED COMMENTS:

EVALAUTOR NOTE: The candidate may trip the reactor to comply with AOP; however, it is NOT necessary since initial conditions specified Mode 3.

4. Trip the reactor. 4.1 Places reactor trip switch on BB-B to TRIP position or recognizes the reactor is already tripped and continues on to the next procedure step.

COMMENTS:

RTL#A5.640U J/2-ADM-130 1.F04 80f9 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-040 JPM TITLE: Respond to a RCP #1 Seal Failure JPM REVISION: 10 "S" FOR SAT or "U" FOR EVALUATOR CUE: If the candidate attempts to GO to E-O and perform immediate actions, role play the Unit Supervisor and inform the candidate that another operator has performed E-O IMAs and you are to complete the AOP actions.

5. Go to E-O, "Reactor Trip Or 5.1 Continues on in the AOP with the understanding that Safety Injection". E-O IMAs are complete.

COMMENTS:

EVALUATOR NOTE: This is a "Time Critical" JPM, the time critical portion begins when lRC-P-lA is shutdown and ends when MOV -1 CH-303A is closed.

MOV-1 CH**303A is required to be closed no sooner than 3 minutes and no later than 5 minutes following the shutdown of 1RC-P-IA.

6.C When immediate actions of 6.1 Notes the current time.

o are complete, perform the following: 6.2C Places lRC-P-IA control switch to STOP or Pull to Lock position.

  • Note the time
  • Stop affected RCP(s) 6.3 Verifies White Light - LIT and Red Light - NOT
  • Close PRZR spray valves for LIT.

affected RCP(s)

  • Continue with this procedure 6.4C Places PCV-IRC-455A in MANUAL by depressing in parallel with EOPs the MAN pushbutton and depresses the ...

pushbutton until 0% demand is indicated.

COMMENTS:

RTL#A5.640U J12-ADM-\30 1.F04 Page 90f9 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-040 i JPM REVISION: 10 ' JPM TITLE: Respond to a RCP #1 Seal Failure 7.C Reactor trip and reactor coolant 7.1C Places MOV-ICH-303A in CLOSE no sooner than 3 pump shutdown -- DUE TO minutes and no longer than 5 minutes after stopping HIGH SEAL LEAKOFF IRC-P-IA.

FLOW 7.2 Verifi~:s Green Light - LIT and Red Light NOT LIT.

1) WHEN 3 minutes elapsed from pump shutdown, Close affected EVALUATOR NOTE: When MOV-ICH-303A is RCP(s) sealleakoff closed, "This JPM is COMPLETE".

isolation valve within the following 2 minutes:

COMMENTS:

  • [MOV-ICH-303A], RCP lA No. 1 Seal Leakoff Isol Vlv
  • [MOV-ICH-303B], RCP IB No. 1 Seal LeakoflIsol Vlv
  • [MOV-ICH-303C], RCP IC Isol Vlv TIME: _ _ _ _ _ _ _ __

RTL#A5.640U 1/2-ADM-130 I.F04 Page I of 10 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE PPM)

TRAINING MATERIAL TITLE: Control Room Evacuation TRAINING MATERIAL NUMBER: CR-609 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ----------------

PROGRAM TITLE: Licensed COMPUTER CODE: 1CR-609 REVISION NUMBER: 4 TECHNICAL REfERENCES:

1OM-56CA.C, "Alternate Safe Shutdown From Outside Control Room Operating Procedures - NCO Procedure", Rev. 3S INSTRUCTIONAL SETTING: Simulator APPROXIMATE DURATION: 10 Minutes PREPARED BY: 1. M. Forbes Date PEER REVIEW BY:

Date APPROVED FOR USE: - - - - - - - - - - - - - - - - - . - - - - - - - - -.~---------

Training Supervisor or designee Date

RTL#A5.640U 1/2-ADM-130 I.F04 Page 2 of 10 Revision I OPERATIONS JOB PERFORMANCE MEASURE TRAINING MATERrAL CHANGE FORM ICR-609 Changes Requiring Learning Objective Related Change? New Rev. # 4 Revision Yes No Changes Not The Change Does Not Impact Learning Existing Rev. # 3 Requiring Revision Objectives or Material Quality.

New Change #

List/Description of Change(s):

Added Inhibit to MSIV closure.

Revised Task Standard.

Added a note about impact on JPM if SJ were to occur due to natural circulation and steam dumps in Tavg mode.

Added a note to ref1ect "A" MFP status based on ACB 141A being opened and modified critical steps associated with this step.

Added provision to provide the candidate first three pages of procedure to save paper.

Revised Task Number to ref1ect a valid task within Vision (TAl # 26618)

JPM Accuracy and enhancement.

To address TAl #26618.

NOTE: Additions, deletions or Prepared by Date changes to training materials must be reviewed for their possible impact to the Training

. Qualification Matrix. See Training S uperintendent/S upervisor/Peer Date Incumbent Impact Review,

("Changes No! Requiring Revision" only) NOBP-TR-1104.

RTL#A5.640U I !2-ADM-130 I.F04 Page 3 of 10 Revision I OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-609 JPM TITLE: Control Room Evacuation JPM REVISION: 4 KIA

REFERENCE:

APE 068AAl.04 3.3/3.6 TASK 10: 0535-002-04-013 APE 068AA1.06 4.114.4 A.PE 068AA1.22 4.0/4.3 i,\PE 068AAl.23 4.3/4.4 JPM APPLICATION: ~ REQUALIFICATION INITIAL EXAM D TRAINING

~ FAUL TED JPM ADMINISTRATIVE JPM EV ALUA TION METHOD: LOCATION: TYPE: ADMINISTERED BY:

~ Perform 0 Plant Site [J Annual Requal Exam 0 BVT Simulate ~ Simulator Initial Exam D NRC D Classroom OJT/TPE D Other:

Training IJ Other:

EVALUATION RESULTS Performer Name: Performer SSN:

~

Time Yes Allotted Actual 10 minutes minutes Critical: No Time: Time:

JPM RESULTS:

D SAT D UNSAT (Comments required for UN SA T evaluation)

Comments:

OBSERVERS Name/SSN: Name/SSN:

Name/SSN: Name/SSN:

EVALUATOR Evaluator (Print): Date:

Evaluator Signature:

RTL#A5.640U 1/2-ADM-130 1.F04 Page 4 of 10 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: lCR-609 I JPM REVISION: 4 JPM TITLE: Control Room Evacuation EVALUATOR DIRECTION SHEET TASK STANDARD: The follovving components are STOPPED/TRIPPED:

  • Reactor
  • Charging Pumps The following components/systems are ISOLATED:
  • Letdown
  • MSIVs Charging pump suction aligned to RWST and isolated from VCT RECOMMENDED Simulator STARTING LOCATION:

DIRECTIONS: You are to perform Control Room Initial Actions prior to evacuation of the Control Room in accordance with 10M-56CA.C.

INITIAL CONDITIONS:

  • A fire is confirmed in the Cable Spreading Room (CS-l).
  • The Control Room must now be evacuated.
  • The Shift Manager (SM) has directed CONTROL ROOM initial actions of 10M-56CA.C be completed prior to evacuation.

INITIATING CllE: The SM directs you to perform CONTROL ROOM Initial Actions of lOM-56CA.c' "Alternate Safe Shutdown From Outside Control Room Operating Procedures -NCO Procedure".

Perform actions 11J2 to and including the step which notifies SM that you are leaving the control room.

REFEREN CES: lOM-56CA.C, "Alternate Safe Shutdown From Outside Control Room Operating Procedures - NCO Procedure", Rev. 35.

TOOLS: None

RTL#A5.640U 112-ADM-130 1.F04 Page 5 of 10 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE CANDIDATE DIRECTION SHEET

  • THIS SHEET TO BE GIVEN TO CANDIDATE
  • DRead:

TASK: You are to perform Control Room Initial Actions prior to evacuation of the Control Room in accordance with lOM-56CA.C.

INITIAL CONDITIONS:

  • A fire is confirmed in the Cable Spreading Room (CS-I).
  • The Control Room must now be evacuated.
  • The Shift Manager (SM) has directed CONTROL ROOM initial actions of 1OM-56CA.C be completed prior to evacuation.

INITIATING CUE: The SM directs you to perform CONTROL ROOM Initial Actions of 1OM-56CA.C, "Alternate Safe Shutdown From Outside Control Room Operating Procedures -NCO Procedure".

Perform actions ill2 to and including the step which notifies SM that you are leaving the control room.

D At this time, ask the evaluator any questions you have on this JPM.

D When satisfied that you understand the assigned task, announce" I am now beginning the JPM".

Simulate performance or perform as directed the required task.

D Point to any indicator or component you verify or check and announce your observations.

After determining the Task has been met announce" I have completed the JPM".

D Then hand this sheet to the evaluator.

RTL#AS.640U 112-ADM-130 I.F04 Page 6 of 10 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-609 JPM TITLE: Control Room Evacuation JPM REVISION: 4 STEP I STANDARD

( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)=> S/U START TIME: _ _ _ _ _ _ __

SIMULATOR SETUP:

INIT to any 100% power IC.

Ensure 1CH-P-l C in PTL.

Fail Control Switch for 1RC-P-1 B stop signal OFF by inserting X06i036L= = 1.

Insert MALF INH51 to inhibit MSIV auto closure.

Freeze and Snap Ie.

EVALUATOR CUE:

When candidate is ready to begin JPM, place Simulator in RUN.

l. Locate and review lOM- l.1 Locates and reviews 1OM-56C.4.C, "NCO 56C.4.C. "NCO Procedure". Procedure" .

EVALUATOR CUE: Provide candidate First 3 pages of 1OM-56C.4.C after it is located.

COMMENTS:

2.C Manually Trip the reactor. 2.1 C Trips reactor from BB-B by turning the RED Reactor Trip Control Switch to TRIP OR from BB-A by depresslng the Reactor Trip pushbutton.

2.2 Verifies Reactor & Bypass Breakers OPEN.

2.3 Verifies that all control rods insert and or NI power dropping rapidly to 0%.

COMMENTS:

RTL#A5.640U 1/2-ADM-130 1.F04 Page 7 of 10 Revision 1 OPERA. TIONS JOB PERFORMANCE MEASURE JPM NUMBER: lCR-609 JPM TITLE: Control Room Evacuation JPM REVISION: 4 "c" Denotes CRITICAL 3.C Place [lRC-P-IA ]8, AND 3.1C Places [lRC-P-IA 18, AND IC] in PULL-TO 1C] in PULL-TO-LOCK on LOCK.

BB-A Verifies 1A & I C Reactor Coolant Pump Status by observing pump amps dropping to ZERO and loop flow dropping to ZERO.

Verifies lA & 1C RCP Red Light - NOT LIT and White Light NOT LIT.

COMMENTS:

I FALLT STATEMENT: lRC-P-lB remains running when control switch is placed in PULL TO LOCK. ,

4.C If any Reactor Coolant Pump 4.1 Determines I RC-P-l B remains running by observing remains running (running pump amps and tlow - NORMAL or verifying Red amps, normal loop flow Light LIT and White Light NOT LIT.

indicated, etc.), Perform the following for the RUl\l\JING 4.2C Places ACB-141A Control Switch to the TRIP pump: position.

  • Place [lRC-P-IA, 18, AND 4.3 Verifies Red Light - NOT LIT and White Light LIT.

1C] in PULL-TO-LOCK Trip ACB 141A on BB-C. 4.4 Determines lRC-P-IB is no longer running by

  • If pump remains running, observing pump amps dropping to ZERO and loop Trip OCB-92. flow dropping to ZERO.

COMMENTS:

I

RTL#A5.640U 1I2-ADM-130 I.F04 Page 8 of 10 Revision 1 OPERATIONS JOB PERFORMANCI.:: MEASURE JPM NUMBER: 1CR-609 JPM TITLE: Control Room Evacuation JPM REVISION: 4 STEP "C" Denotes CRITICAL EVALUATOR l\OTE: "A" MFP is already tripped due to opening ACB-141 A.

S.C Place [lFW-P-IA AND IB] in S.1C Places MAIN FW Pump IB [IFW-P-IB] Control PULL-TO-LOCK on BB-C. Switch to PULL-TO-LOCK position on BB-C.

5.2 Verifies Red Lights - NOT LIT and White Lights NOT LIT.

5.3 Places MAIN FW Pump lA [IFW-P-IA] Control Switch 1:0 PULL-TO-LOCK position on BB-C.

5.4 Verifies Red Lights - NOT LIT and White Lights NOT LIT.

COMMENTS:

EVALUATOR NOTE: I C CHG Pump already in PTL.

6.C Place[l lA,IB,IC(AE) 6.lC Places lA CHG Pump AND IB CHG Pump Control AND lC(DF)] in PULL-TO Switches [ICH-P-IA and IB] to PULL-'rO-LOCK LOCK on BB-A. position on BB-A.

6.2 Verifies Red Lights - NOT LIT and White Lights NOT LIT.

COMMENTS:

RTUM5.640U I 12-ADM-130 1.F04 Page 9 of 10 Revision J OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-609 JPM TITLE: Control Room Evacuation JPM REVISION: 4 STANDARD Denotes CRITICAL EVALUATOR NOTE: It is possible that due to natural circulation and Steam Dumps in Tavg Mode, that SI may occur. In this case the valves in Step 7 & 8 will ACTO reposition and these steps are NOT critical as the candidate will take no action other than to verify 7.C Isolate letdown as follows: 7.1C Places 45 GPM LTDT\ ORIFICE ISOL VLV [TV 1CH-200A] AND 60 GPM LTDN ORIFICE ISOL

  • Close [TV -1 CH-200A, B, VL V [TV -1 CH-200B] control switch to CLOSE.

AND C] on BB-A.

  • Close[LCV-lCH-460A AND 7.2 Verifies Red Lights NOT LIT and Green Lights B] on BB-B. LIT.

7.3C Places LTDN TO REGEN HX INLET ISOL VLV's

[LCV-1 CH-460A AND B] control switch to CLOSE.

7.4 Verifie5, Red Lights NOT LIT and Green Lights LIT.

COMMENTS:

8.C Align suction to charging 8.1 C Places [MOV -1 CH-115B and 11SD] control switches pumps as follows: to OPEN on BB-A.

  • Open [MOV-ICH-I15B 8.2 Verifies Red Lights LIT and Green Lights - NOT AND 115D], "R WST Supply LIT.

Valves to Charging Pumps".

  • Close [MOV-ICH-115C 8.3C Places [MOV-JCH-II5C and 115E] control switches AND lISE], "Charging to CLOSE on BB-A.

Pump Suction from VCT".

8.4 Verifies Red Lights -NOT LIT and Green Lights LIT.

COMMENTS:

RTL#A5.640U 1!2-ADM-130 I.F04 Page 10 of 10 Revision 1 OPERA TrONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-609 i JPM REVISION: 4 I JPM TITLE: Control Room Evacuation STEP STANDARD

( "e' Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT):::::> I SIt:

NOTE: Either the Train A or Train B control switches for each MSIV is taken to close momentarily (spring return to normal) to close each MSIV.

9.C Close [TV-IMS-IOIA, 9.IC Places IA, IB, IC SG MAIN STEAM A or B TRN 10IB, AND 101C] on BB~C. TRIP VLV's [TV-IMS-lOlA, 101B, AND lOlC]

control switches to CLOSE on BB-C.

9.2 Verities Red Lights ~NOT liT and Green Lights ~

liT.

COMMENTS:

lO. Notify Shift Manager that 10.1 Notifies Shift Manager that you are leaving the you are leaving the Control Control Room.

Room.

EVALUATOR CUE: Acknowledge announcement and inform the candidate that the JPM is COMPLETE.

COMMENTS:

STOP TIME: _~_ _~. .,_ __

~ ...............------~.-- ...............- - - - ' - - - - - ...- -....... _ - - - - - -

RTL#A5,640U 112-ADM-J 30 1,F04 Page J of8 Revision J OPERATIONS JOB PERFORMANCE MEASURE (JPM)

TRAINING MATERIAL TITLE: to an Intermediate Malfunction TRAINING MATERIAL NUMBER: 1CR-l 06 PROGRAM TITLE: Licensed COMPUTER CODE: lCR-106 REVISION NUMBER: 3 TECHNICAL

REFERENCES:

1OM-53CA.1.2.1B, "Intermediate Range Channel Malfunction", Revision 4.

INSTRUCTIONAL SETTING: Simulator APPROXIMATE DURATION: 15 Minutes PREPARED BY:

Date PEER REVIEW BY:

Date APPROVED FOR USE:

Training Supervisor or Designee Date

RTL#AS.640U 112-ADM-130 1.F04 Page 2 of8 Revision I OPERATIONS lOB PERFORMANCE MEASURE TRAINING MATERIAL CHANGE FORM Affected Training Materials: 1CR-1 06 Type of Change:

~ Changes Requiring Learning Objective Related Change? New Rev. # 3 Revision D Changes Not The Change Does Not Impact Learning Existing Rev. # 2 Requiring Revision Objectives or Material Quality.

New Change #

List/Description of Change(s):

1. Added some editorial enhancements including grader discretion if administering to an RO with regard to Technical Specification application.
2. Added Cond A to step 5.2 Reason for Change (s):

Updated lPM prior to implementation.

APPROVALS:

NOTE: Additions, deletions or I. Forbes changes to training materials Prepared by Date must be reviewed for their possible impact to the Training Qual ification Matrix. See Incumbent Impact Review, Training Superintendent/S upervisor/Peer Date NOBP-TR-\\ 04.

("Changes Not Requiring Revision" only)

RTL#A5.640U 1I2-ADM-130 l.F04 Page 3 of8 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER:

JPM REVISION: lCR-106 3 * .JPM 'TITLE : R espond I Interme to an d 'late Range [Ma IfunctIOn KIA

REFERENCE:

033AA2.09 3.4/3.7 TASK ID: 0535-010-04-013 JPM APPLICATION: cg] REQUALIFICATION INITIAL EXAM o TRAINING FAULTED JPM o ADMINISTRATIVE JPM EV ALUA TION METHOD: LOCATION: TYPE: ADMINISTERED BY:

cg] Perform D Plant Site 0 Annual Requal Exam 0 BVT 0 Simulate Simulator 0 Initial Exam 0 NRC Classroom 0 OIT/TPE 0 Other:

0 Training 0 Other:

EVALUAnON RESULTS Performer Name: Performer SSN:

Time 0 Yes Allotted 15 Minutes Actual minutes Critical: cg] No Time: Time:

JPM RESULTS:

0 SAT D UNSAT (Comments required for UNSAT evaluation)

Comments:

OBSERVERS Name/SSN: Name/SSN:

Name/SSN: Name/SSN:

EVALUATOR Evaluator (Print): Date:

Evaluator Signature:

I

RTL#A5.640U li2-ADM-130 I.F04 Page 4 of8 Revision I OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: lCR-106 JPM TITLE: Respond to an Intermediate Range Malfunction JPM REVISION: 3 EVALUATOR DIRECTION SHEET TASK STANDARD: Select NI Recorder to N-36.

Remove Intermediate Range Channel N-35 from service.

Determine Technical Specification Condition(s), Required Action(s),

and Completion Time(s). (SRO candidate ONLY)

RECOMMENDED Simulator STARTI:-.JG LOCATION:

DIRECTIONS: You are to respond to an Intermediate Range Channel Malfunction.

INITIAL CONDITIONS:

  • A startup is in progress.
  • The reactor is stable at approximately 1X 10-8 amps.
  • Critical Dma is being recorded.
  • All other conditions are normal for present plant status.

INITIATING CUE: N-35 has just failed low and your supervisor directs you to respond to the malfunction.

REFERENCES:

I OM-53CA.1.2.1 B, "]ntermediate Range Channel Malfunction",

Revision 4.

TOOLS: None HANDOUT: 1OM-53CA.l.2.1 B, "Intermediate Range Channel Malfunction",

Revision 4.

RTL#A5.640LJ Ji2-ADM-J301.F04 Page 5 of8 Revision J OPERATlONS lOB PERFORMANCE MEASURE CANDIDATE DIRECTION SHEET

  • THIS SHEET TO BE GIVEN TO CANDIDATE
  • DRead:

TASK: You are to respond to an Intermediate Range Channel Malfunction.

INITIAL CONDITIONS:

  • A startup i5, in progress.
  • The reactor is stable at approximately 1X 10-8 amps.
  • Critical Data is being recorded.
  • All other conditions are normal for present plant status.

INITIATING CUE: N-35 has just failed low and your supervisor directs you to respond to the malfunction.

D At this time, ask the evaluator any questions you have on this lPM.

D When satisfied that you understand the assigned task, announce III am now beginning the lPM II .

Simulate performance or perform as directed the required task.

D Point to any indicator or component you verify or check and announce your observations.

After determining the Task has been met announce" I have completed the lPM".

D Then hand this sheet to the evaluator.

RTL#A5.640U \ /2-ADM-\30 I.F04 Page 6 of8 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: lCR-106 JPM TITLE: Respond to an Intermediate Range Malfunction JPM REVISION: 3 i STEP STANDARD I ( "c" Denotes CRITICAL STEP) (Indicate"S" FOR SAT or "U" FORUNSAT)=> I S/U I Simulator Setup:

Initialize to an IC set with Rx Power critical at 1X 10- 8 amps. (Mode 2 with power >P-6 but less than 5%)

Fail N-35 low by inserting MALF NIS04A at -0.0001 amps severity value.

Ensure N -35 and N -41 are selected for VB recorders.

Freeze and snap IC.

EVALUATOR CUE: Ensure Control Bank Rods are at 100 steps.

EVALUATOR NOTE: Place simulator in RUN when candidate is ready to begin.

START TIME: _ _ _ _ _ _ __

Obtain and review 10M 1.1 Candidate obtains and reviews 1OM-53C.4.1.2.1 B.

53C .4.1.2.1 B, "Intermediate Range Channel Malfunction". EVALUATOR CUE: Provide candidate a copy of 1OM-53C.4.1.2.1 B. Intermediate Range Channel Malfunction once located.

COMMENTS:

2.C Ensure that Vertical Board 2.1C Places NI SYS RECORDER SEL SW (IN 45) to N-36 Recorders are Selected to position.

Monitor Only Operable Detectors. COMMENTS:

I

RTL#A5.640U I12-ADM-130 1.F04 Page 70f8 Revision I OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-I 06 JPM TITLE: Respond to an Intermediate Range Malfunction JPM REVISION: 3 3.C If in Mode I or refer to T.S. 3.1 C References T.S. 3.3.3 and determines Condition A is 3.3.3 for Post Accident applicable and Required Action A.I "Restore required Monitoring Instrumentation channel (N-35) to OPERABLE status within 30 days" Req uirements. is required.

EVALUATOR CUE: If asked, Role Play the US and state that the T.S. determination will be made at a later time.

COMMENTS:

4. Determine MODE in which 4.1 Determines the plant is in Mode 2 > P-6 but < P-l 0, malfunction of Intermediate and proceeds to Step 5.

Range (N-35) Instrument has occurred. COMMENTS: I 5.C If a single channel is 5.l Verifies N-35 has failed LOW and N-36 is at~ lXlO- 8 inoperable, then refer to T.S. amps.

3.3.1, Table 3.3.1-1, Function

4. 5.2C References T. S 3.3.1, Table 3.3.1-1, Function 4 and determines T.S.3.3.1 Condition A and F, with required action F.I Reduce THERMAL POWER to < P-6 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> OR Increase THERMAL POWER to

> P-I 0 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is required.

I EVALUATOR CUE: If asked, Role Play the US and i state that the T.S. determination will be made at a later time.

COMMENTS:

RTL#A5.640U 112-ADM-130 1.F04 Page 8 of8 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-106 JPM TITLE: Respond to an Intermediate Range Malfunction JPM REVISION: 3 STEP STANDARD

( "e" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)~ S/U 6.C Bypass reactor trip function by 6.1 C Repositions LEVEL TRIP switch to BYPASS on N-35 placing LEVEL TRIP switch of drawer.

inoperable channel in BYPASS position. 6.2 Observes LEVEL TRIP BYPASS neon light - LIT 6.3 Acknowledges "NIS SOURCE INTER RANGE NEUTRON FLUX HI TRIP BYPASS" annunciator A4 alarms EVALUATOR NOTE/CUE: Prompt the SRO candidate to make TS determinations at this time if this has not been previously performed since it is critical to candidate success.

COMMENTS:

I EVALUATOR CUE: That completes this JPM. I EVALUATOR NOTE: Grader discretion is required for Technical Specification application (required for SRO candidate ONLY)

(Refer to 3.1 & 5.2 for grading).

STOP TIME: ------------------

RTL#A5.640U 112-ADM-130 l.F04 Page 1 of9 Revision 1 OPERAnONS JOB PERFORMANCE MEASURE (JPM)

TRAINING MATERIAL TITLE: Vent the Suction Header TRAINING MATERrAL NUMBER: 1PL-OS7 PROGRAM TITLE: Licensed Operator Training COMPUTER CODE: IPL-OS7 REVISION NUMBER: 5 TECHNICAL

REFERENCES:

lOM-7.4.AV, "Charging Pump Suction Header Venting", Rev, 3 INSTRUCTIONAL SETTING: In-Plant APPROXIMATE DURATION: 12 Minutes PREPARED BY: _I_,_M_,_F_o_rb_e_s_______________________________ L

-Jr.------

,p 77" Date PEER REVIEW BY:


~

Date APPROVED FOR USE:

Training Supervisor or v~gnee Date

RTL#A5.640U I 12-ADM-130 I.F04 Page 2 of9 Revision I OPERATIONS JOB PERFORMANCE MEASURE TRAINING MATERIAL CHANGE FORM Affected Training Materials: IPL-057 Type of Change:

~ Changes Requiring Learning Objective Related Change? New Rev. # 5 Revision DYes ~~No D Changes Not The Change Does Not Impact Learn ing Existing Rev. # 4 Requiring Revision Objectives or Material Quality.

New Change #

List/Description of Change(s):

Removed unnecessary cueing (i.e.: valve open & shut).

Added place-keeping information to avoid human performance error traps.

Reason for Change (s):

JPM enhancement.

APPROVALS:

I. M. Forbes NOTE: Additions, deletions or Prepared by Date changes to training materials must be reviewed for their possible impact to the Training Qualification Matrix. See Training Superintendent/Supervisor/Peer Date Incumbent Impact Review,

("Changes Not Requiring Revision" only) NOBP-TR-II04.

RTL#A5.640U 112-ADM-1301.F04 Page 3 of9 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: IPL-057 JPM TITLE: Vent the Charging Pump Suction Header JPM REVISION: 5 KIA

REFERENCE:

2.1.30 4.4/4.0 TASK ID: 0071-021-01-043 JPM APPLICATION: ~ REQUALIFICATION ~ INITIAL EXAM TRAINING o FAULTED JPM o ADMINISTRATIVE JPM EVALUATION METHOD: LOCATION: TYPE: ADMINISTERED BY:

0 Perform ~ Plant Site 0 Annual Requal Ex am 0 BVT

~ Simulate 0 Simulator 0 Initial Exam 0 NRC 0 Classroom 0 OJT/TPE 0 Other:

0 Training 0 Other:

EV ALUATION RESULTS Performer Name: Performer SSN:

Time 0 Yes Allotted 12 minutes Actual minutes Critical: ~ No Time: Time:

JPM RESULTS:

0 SAT 0 UNSAT (Comments required for UNSAT evaluation)

Comments:

i OBSERVERS Name/SSN: Name/SSN:

Name/SSN: I Name/SSN:

EVALUATOR

! Evaluator (Print): Date:

RTL#AS.640U 112-ADM-130 1.F04 Page 4 of9 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: IPL-057 JPM TITLE: Vent the Charging Pump Suction Header JPM REVISION: 5 EVALUATOR DIRECTION SHEET TASK STANDARD: A solid stream of water is observed through the vent flow indicator and the vent system is isolated.

RECOMMENDED In-Plant (P AB, Elev. 735)

STARTING LOCATION:

DIRECTIONS: You are to simulate venting the Charging Pump Suction Header.

INITIAL CONDITIONS: The unit is at 100% power. The 'A' charging pump is in operation with the 'B' charging pump in standby, and will be started within one hour.

NDE has determined that a gas void greater than limits exists in the 6 inch Charging Pump suction header.

INITIA TING CUE: Your supervisor directs you to vent the Charging Pump 6 inch suction header per 1OM-7.4.A V. Steps IV.A.I and 2 are complete.

REFERENCES:

lOM-7.4.AV, "Charging Pump Suction Header Venting", Rev. 3 TOOLS: None HANDOUT: lOM-7.4.AV, "Charging Pump Suction Header Venting", Rev. 3, place kept up to but not including step IV.A.3. Should also N/A the 8" header portion to alleviate human performance issues.

RTL#AS.640U \/2-ADM-130I.F04 Page 5 of9 Revision I OPERATIONS JOB PERFORMANCE MEASURE CANDIDATE DIRECTION SHEET

  • THIS SHEET TO BE GIVEN TO CANDIDATE
  • DRead:

TASK: You are to simulate venting the Charging Pump Suction Header.

INITIAL CONDITIONS: The unit is at 100% power. The 'A' charging pump is in operation with the 'B' charging pump in standby, and will be started within one hour.

NDE has determined that a gas void greater than limits exists in the 6 inch Charging Pump suction header.

INITIATING CUE: Your supervisor directs you to vent the Charging Pump 6 inch suction header per lOM-7.4.AV. Steps IV.A.I and 2 are complete.

D At this time, ask the evaluator any questions you have on this JPM.

D When satisfied that you understand the assigned task, announce "I am now beginning the JPM".

Simulate performance or perform as directed the required task.

D Point to any indicator or component you verify or check and announce your observations.

At1er determining the Task has been met announce" I have completed the JPM".

D Then hand this sheet to the evaluator.

RTL#A5.640U 1I2-ADM-1301.F04 Page 6 of9 Revision 1 OPERA TIONS JOB PERFORMANCE MEASURE JPM NUMBER: IPL-057 JPM REVISION: 5 I JPM TITLE: Vent the Charging Pump Suction Header STEP STANDARD I ("e" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)=> S/U I I  !

START TIME: _ _ _ _ _ __

EVALUATOR NOTE: Provide the candidate a place kept copy of 1OM-7.4.A V.

1. Reviews the procedure. 1.1 Reviews the provided copy of 10M-7.4.AV.

COMMENTS:

2.C Open [1 CH-487], "Charging 2.1C OPENS [lCH-487] by rotating valve T-Handle in the Pump Vent Common Isolation, counterclockwise position.

located in Aux Bldg 735'.

COMMENTS:

3.C Open [lCH-486], Outlet 3.lC OPENS [lCH-486] by rotating valve T-Handle in the Isolation for [FI-l CH-170], countef(~lockwise position.

located in Aux Bldg. 735',

COMMENTS:

i

RTL#A5.640U J/2-ADM-J30LF04 Page 7 of9 Revision J OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1PL-057 I JPM REVISION: 5 JPM TITLE: Vent the Charging Pump Suction Header STEP ANDARD

( "e" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)=.:;.

4.C Open [lCH-484], Inlet 4.lC OPENS [lCH-484] by rotating valve T-Handle in the Isolation for [FI-ICH-170], counterclockwi se position.

located in Aux Bldg. 735'.

COMMENTS:

5.C Vent the 6 inch charging pump 5.lC OPENS [lCH-483] by rotating valve T-Handle in the suction header from the safety counterclockwise position.

injection system by performing the following:

5.2C Observes the vent flow indicator, [1 CH-FI-170].

a. Open [lCH-483]., Charging Pump Vent Isolation Valve, EVALUATOR CUE: A solid stream of water is located in Aux Bldg. 735'. flowing through the indicator.
b. When a solid stream of flow is 5.3C CLOSES [ICH-483] by rotating valve T-Handle in observed through [FI-l CH the clockwise position.

170], Charging Pump Suction Line Vent Sight Flow Indicator, located in Aux Bldg. 5.4 Requests independent verification that [1 CH -483] is 735', Close and independently SHUT.

verify closed on daily journal,

[lCH-483], Charging Pump EVALUATOR CUE: Inform the candidate that an Vent Isolation Valve. operator has performed independent verification of

[lCH-483] when asked.

COMMENTS:

RTL#A5.640U 112-ADM-130 I. F04 Page 8 of9 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: IPL-057 JPM TITLE: Vent the Charging Pump Suction Header JPM REVISION: 5

6. Notify NDE to perform an 6.1 Notifies NDE to perform a UT on the 6 inch Ultrasound Test (UT) to Charging Pump suction header.

confirm no gas voids exist in the 6 inch Charging Pump EV ALUATOR CUE: NDE has determined NO suction header, in accordance voids exist in the 6 inch Charging Pump suction with 3BVTOl-11.04, "Void header and the void limit was NOT exceeded.

Monitoring" .

EVALUATOR NOTE: The candidate will not perform the next step (Venting the 8 inch header) since it was NI A. However, to be successful they must continue on in the procedure to secure the 6" line-up.

COMMENTS:

7.C Close [lCH-484], Inlet 7.1C CLOSES [lCH-484] by rotating valve T-Handle in Isolation for [FI-l CH-170]. the clockwise position.

COMMENTS:

8.C Close [1 CH-486], Outlet 8.lC CLOSES [lCH-486] by rotating valve T-Handle in Isolation for [FI-l CH-170]. the clockwise position.

COMMENTS:

RTL#A5.640U I i2-ADM-130 1.F04 Page 9 of9 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: IPL-057 JPM TITLE: Vent the Charging Pump Suction Header JPM REVISION: 5 STEP STANDARD

( "C" Denotes CRITICAL STEP (Indicate "s" FOR SAT or "U" FOR UNSA!)=>

9.C Close [lCH-487], "Charging 9.1C CLOSES [ICH-487] by rotating valve T-Handle in Pump Vent Common Isolation. the clockwise position.

COMMENTS:

10. Independently verify closed on 10.1 Indicates that IV is required.

Daily Journal, the following valves: EVALUATOR CUE: An independent Verifier will be sent by the Control Room. This completes this

a. [1 CH -484], Inlet Isolation for JPM.

[FI-l CH-170].

b. [1 CH-486], Outlet Isolation for [FI-ICH-170].

COMMENTS:

c. [lCH-487], "Charging Pump Vent Common Isolation.

STOP TIME: -----------------

i

RTL#A5.640U J/2-ADM-J30 l.F04 Page J of 8 Revision J OPERATIONS JOB PERFORMANCE MEASURE (JPM)

TRAINING MATERIAL TITLE: AMSAC System Trouble - PT Failure TRAINING MATERIAL NUMBER: -IPL-147 PROGRAM TITLE: Licensed Operator Training COMPUTER CODE: IPL-147 REVISION NUMBER: 3 TECHNICAL

REFERENCES:

10M-45BA.AAE, AMSAC Bypassed C-20 PERM, Rev. 5 INSTRUCTIONAL SETTING: In-Plant APPROXIMATE DURATION: 10 Minutes PREPARED BY: I. Forbes Date PEER REVIEW BY: ------------------ - - - -- --

W" Date APPROVED FOR USE:

Training Supervisor or De§ignee Date

RTL#A5.640U 1/2-ADM-130 1.F04 Page 2 of8 Revision I OPERATIONS JOB PERFORMANCE MEASURE TRAINING MATERIAL CHANGE FORM IPL-147 The Change Does Not Impact Objectives or Material Quality.

List/Description of Change(s):

1. Removed the need to use Key # 31 since the cabinet is left unlocked.
2. Updated cabinet door name to reflect actual plant nomenclature.

Reason for Change (s):

Updated JPM prior to implementation.

f------- ----- - - - - - - - . - - - - - - - - - - - - - - - - - - - -

APPROVALS:

NOTE: Additions, deletions or changes to training materials Prepared by Date must be reviewed for their possible impact to the Training Qual ification Matrix. See Incumbent Impact Review, Training Superintencient/S upervisor/Peer Date

  • NOBP-TR-ll04.

("Changes Not Requiring Revision only)

P

RTL#AS.640U 1/2-ADM-J30 1.F04 Page 3 of8 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: IPL-147 I JPM REVISION: 3

REFERENCE:

016A2.01 3.0/3.1 TASK ID: 0452-008-04-01 I JPM APPLICATION: [g] REQUALIFICATION [g] INITIAL EXAM D TRAINING D FAULTED JPM D ADMINISTRA TIVE JPM EVALlJATION METHOD: LOCATION: TYPE: ADMINISTERED BY:

D Perform ~ Plant Site C] Annual Requal Exam D BVT

~ Simulate D Simulator D Initial Exam D NRC D Classroom D OJT/TPE D Other:

D Training 0 Other:

EVALUATION RESULTS Performer )Jame: Performer SSN:

Time Critical:

D

~ No Yes Allotted Time:

10 Minutes ~I minutes JPM RESULTS:

D SAT D UNSAT (Comments required for UNSAT evaluation)

Comments:

OBSERVERS Name/SSN: Name/SSN:

Name/SSN: Name/SSN:

EVALUATOR Evaluator (Print): Date:

Evaluator Signature:

RTL#A5.640U 112-ADM-1301.F04 Page 4 of8 Revision I OPERA TIONS JOB PERFORMANCE MEASURE JPM NUMBER: IPL-147  !

JPM REVISIO:-J: 3

  • JPM TITLE: AMSAC System Trouble - PT Failure EVALUATOR DIRECTION SHEET TASK STANDARD: Failed Pressure Transmitter (PT) channel identified and bypassed.

RECOMMENDED In-Plant STARTINO LOCA nON:

DIRECTIONS: You are to simulate the task, Respond to AM SAC System Trouble.

INITIAL CONDITIONS: The plant is at 100(Vo power when annunciator A3-20, AMSAC TROUBLE actuated, followed by AMSAC BYPASSED C-20 PERM status panel light three minutes later. 10M-45.4.AAC, "AM SAC Trouble" is being implemented. Other actions pertaining to the instrument failure have been performed.

INITIATING CUE: Your supervisor directs you to perform actions of Probable Cause No.

2 of 10M-45B.4.AAE, AMSAC Bypassed C-20 PERM, beginning at step #1.

REFERENCES:

10M-45B.4.AAE, AMSAC Bypassed C-20 PERM, Rev. 5 TOOLS: None HANDOUT: 10M-45B.4.AAE, AMSAC Bypassed C-20 PER'\1, Rev. 5

RTL#A5.640U 1I2-ADM-130 1.F04 Page 5 of8 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE CANDIDATE DIRECTION SHEET

  • THIS SHEET TO BE GIVEN TO CANDIDATE
  • DRead:

TASK: You are to simulate the task, Respond to AMSAC System Trouble.

INITIAL CONDITIONS: The plant is at 100% power when annunciator A3-20, AMSAC TROUBLE actuated followed by AMSAC BYPASSED C-20 PERM status panel light three minutes later. IOM-45.4.AAC, "AM SAC Trouble" is being implemented. Other actions pertaining to the instrument failure have been performed.

INlTIA TING CUE: Your supervisor directs you to perform actions of Probable Cause No.

2 of 10M-45B.4.AAE, AMSAC Bypassed C-20 PERM, beginning at step #1.

D At this time, ask the evaluator any questions you have on this JPM.

D When satisfied that you understand the assigned task, announce "I am now beginning the JPM".

Simulate performance or perform as directed the required task.

D Point to any indicator or component you verify or check and announce your observations.

After determining the Task has been met announce" I have completed the .TPM".

D Then hand this sheet to the evaluator.

RTL#AS.640U J12-ADM-J30 J.F04 Page 6 of8 Revision J OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1PL-14 7 JPM TITLE: AMSAC System Trouble - PT Failure JPM REVISION: 3 STEP STANDARD

( "c" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)~ S/U EVALUATOR NOTE: Provide Candidate a copy of 10M-4SB.4.AAE, AMSAC Bypassed C-20 PERM.

START TIME:

1. Reviews procedure. 1.1. Candidate reviews procedure provided.

COMMENTS:

2. Verify ANN. A3-20, AMSAC 2.1 No action required. Information provided in Initial TROUBLE, is ON. Conditions.

COMMENTS:

RTL#A5.640U I12-ADM-130 1.F04 Page 70f8 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: IPL-147 JPM REVISION: 3 i JPM TITLE: AMSAC System Trouble - PT Failure "S" FOR SAT or "U" FOR EVALUATOR NOTE: Cabinet normally left unlocked.

3.C Determine which Turbine 1st 3.1 Opens "PNL-AMSAC" door.

Stage Pressure channel has failed by observing which Test 3.2 Verities TLlMS446/447 test light status.

light has turned OFF at the test panel of [PNL-AMSAC] (Key EVALUATOR CUE: Test light TLlMS446 LIT. Test No. 31), located in Process light TLlMS447 NOT LIT.

Equipment Room, 713'.

EVALUATOR NOTE: This step is critical to ensuring failed transmitter is bypassed.

3.3C Determines TLiMS 447 is failed based on test light is NOT LIT.

COMMENTS:

i 4.C Place TPS/MS 446 (447) Trip 4.lC Places TPS/MS 447 Trip switch in the TEST (UP) switch for the affected channel position.

in the TEST (UP) position.

I EVALUATOR CUE: TPSIMS 447 Trip switch in the TEST (UP) position.

COMMENTS:

RTL#A5.640U 112-ADM-130 1.F04 Page 8 of8 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1PL-14 7 JPM TITLE: AMSAC System Trouble PT Failure JPM REVISION: 3 "S" FOR SAT or "u" FOR

5. Verify that the following Test 5.1 Verifics the following Test Lights are ON:

lights moe ON:

  • TUMS 446
  • TUMS 446
  • TUMS 447
  • TUMS 447
  • TUMS 440A
  • TUMS 440A (2/2 1st
  • TUMS 440B Stage Pressure;::: 40%)
  • TUMS 440B (C-20 EV ALUATOR CUE: Provide cues that each Permissive) test light is LIT.

COMMENTS:

6. Verify that Status Light Panel 6.1 Contacts Control Room to verify Status Light Panel 623, Window A-20, AMSAC 623, Window A-20, AMSAC BYPASSED C-20 BYPASSED C-20 PERM has PERM is OFF.

turned OFF.

EVALUATOR CUE: Report as Control Room operator that Status Light Panel 623, Window A-20 is NOT LIT. This completes this JPM.

COMMENTS:

STOP TIME: _ _ _ _ __

RTL#AS.640U I/2-ADM-J30 1.F04 Page 1 of 10 Revision I OPERATIONS JOB PERFORMANCE MEASURE (JPM)

TRAINING MATERIAL TITLE: Transfer 120 VAC Vital Power TRAINING MATERIAL NUMBER: IPL-524 PROGRAM TITLE: Licensed COMPUTER CODE: IPL-524 REVISION NUMBER: o TECHNICAL

REFERENCES:

1OM-53C.4.1.38.1 C, AOP 1.38.1 C, "Loss of Vital Bus III", Revision 3 IOM-53C.4.1.38.lD, AOP 1.38.1D, "Loss of Vital Bus IV", Revision 3 INSTRUCTIONAL SETTING: In-Plant APPROXIMATE DURATION: 10 Minutes PREPARED BY: I. Forbes Date PEER REVIEW BY:

Date APPROVED FOR USE:

Training Supervisor or Date

RTL#A5.640U J/2-ADM-130 I.F04 Page 2 of 10 Revision I OPERATIONS JOB PERFORMANCE MEASURE (JPM)

TRAINING MATERIAL CHANGE FORM IPL-524 Learning Objective Yes D Changes Not The Change Does Not Impact Learning Existing Rev. # N/A Requiring Revision Objectives or Material Quality.

New Change #

List/Description of Change(s):

1. Created new JPM for AC Vital Bus III & IV. (AC Vital Bus I & II components are to be replaced during 1R21)

Reason for Change (8):

1. To improve BVPS JPM infrastructure.

APPROVALS:

NOTE: Additions, deletions or changes to training materials Date mllst be reviewed for their possible impact to the Training Qualification Matrix. See I Incumbent Impact Review, I Train.. ing Superintendent/Supervisor/Peer Date NOBP-TR-ll04.

("Changes Not Requiring Revision" only)

~... ........... _--------_._-------------------'

RTL#A5.640U 1/2-ADM-1301.F04 Page 3 of 10 Revision I OPERATIONS JOB PERFORMANCE MEASURE (JPM)

JPM NUMBER: I PL-524  !

JPM REVISION: 0 JPM TITLE: Transfer 120 VAC Vital Power KiA

REFERENCE:

062K4.10 3.1/3.5 TASK ID: 0381-001-01-043 JPM APPLICATION: [g] REQUALIFICATION [g] INITIAL EXAM [g] TRAINING

[g] FAULTED JPM D ADMINISTRATIVE JPM EVALUATION METHOD: LOCATION: TYPE: ADMINISTERED BY:

D Perform [g] Plant Site 0 Annual Requal Exam D BVT

[g] Simulate D Simulator 0 Initial Exam D NRC D Classroom 0 OJTITPE D Other:

0 Training D Other:

EV ALUATION RESULTS Performer Name: Performer SSN:

Time D Yes Allotted 10 Minutes Actual minutes Critical: [g] No Time: Time:

JPM RESULTS:

D SAT D UNSAT (Comments required for UNSAT evaluation)

Comments:

~

OBSERVERS Name/SSN: Name/SSN:

Name/SSN: Name/SSN:

EVALUATOR Evaluator (Print): Date:

Evaluator Signature:

RTL#A5.640U 1/}-ADM-1301.F04 Page 4 of 10 Revision I OPERATIONS JOB PERFORMANCE MEASURE (JPM)

JPM NUMBER: 1PL-524 JPM TITLE: Transfer 120 VAC Vital Power JPM REVISION: 0 EVALUATOR DIRECTION SHEET Restore vital bus power supplied by MCC1-EI3 (E-14).

TASK STANDARD:

RECOMMENDED In-Plant STARTING LOCATION:

EV ALUA TOR NOTE: This JPM is designed for either train. Perform for Vital Bus III if Protected Train "B", and Vital Bus IV if Protected Train "A". Train "B" equipment in parentheses.

DIRECTIONS: You are to simulate transferring 120 VAC Vital Bus Power.

INITIAL CONDITIONS:

  • A loss of uninterruptible power supply III (IV), UPS-3 (4) has occurred, and the 120 VAC Vital Bus III (IV) failed to automatically re-energize.
  • Annunciator Al-l2(13), Vital Bus III (IV) Trouble, is LIT.
  • NI rack Channel III (IV) is deenergized.
  • CNMT HI or HI-HI pressure bistables are NOT LIT.
  • Abnormal Operating Procedure AOP 1.38.1C (1.38.1D) has been completed through steps 7a (6a).

INITIATING CUE: Your supervisor directs you to restore 120 V AC Vital Bus III (IV) power using AOP 1.38.1 C (AOP 1.38.10), starting at step 7b (6b).

10M-53C.4.1.38.1C, AOP 1.38.1C, "Loss of Vital Bus III", Rev. 3

REFERENCES:

10M-53C.4.1.38.1D, AOP 1.38.lD, "Loss of Vital Bus IV", Rev. 3 TOOLS: NONE HANDOUT: AOP 1.38.1C, "Loss of Vital Bus III", Rev. 3, place kept up to but not including Step 7b. (TRAIN B Only)

AOP 1.38.1D, "Loss of Vital Bus IV", Rev. 3, place kept up to but not including Step 6b. (TRA.IN A Only)

RTL#A5.640U \/2-ADM-130 l.F04 5 of 10 Revision I OPERATIONS JOB PERFORMANCE MEASURE (JPM)

CANDIDATE DIRECTION SHEET Use This Sheet if Protected Train"A"

  • THIS SHEET TO BE GIVEN TO CANDIDATE
  • DRead:

TASK: You are to simulate transferring 120 VAC Vital Bus Power.

INITIAL CONDITIONS:

  • A loss of un interruptible power supply IV, UPS-4 has occurred, and the 120 V AC Vital Bus IV failed to automatically re energIze.
  • NI rack Channel IV is deenergized.
  • CNMT HI or HI-HI pressure bistables are NOT LIT.
  • Abnormal Operating Procedure AOP 1.38.lD has been completed through steps 6a.

INITIATING CUE: Your supervisor directs you to restore 120 VAC Vital Bus IV power using AOP 1.38.1 D, starting at step 6b.

D At this time, the evaluator any questions you have on this JPM.

D When satisfied that you understand the assigned task, announce "I am now beginning the JPM".

Simulate performance or perform as directed the required task.

D Point to any indicator or component you verify or check and announce your observations.

After determining the Task has been met announce" I have completed the JPM".

D Then hand this sheet to the evaluator.

RTL#A5.640U 1/2-ADM-1301.F04 Page 6 of 10 Revision I OPERA TIONS lOB PERFORMANCE MEASURE (JPM)

CANDIDATE DIRECTION SHEET Use This Sheet if Protected Train "B"

  • THIS SHEET TO BE GIVEN TO CANDIDATE
  • DRead:

TASK: You are to simulate the task transferring 120 VAC Vital Bus Power.

INITIAL CONDITIONS:

  • A loss of uninterruptible power supply III, lJPS-3 has occurred, and the 120 V AC Vital Bus III failed to automatically re energIze.
  • NI rack Channel III is deenergized.
  • CNMT HI or HI-HI pressure bistables are NOT LIT.
  • Abnormal Operating Procedure AOP 1.38.lC has been completed through steps 7a.

INITIATING CUE: Your supervisor directs you to restore 120 VAC Vital Bus III power using AOP 1.38.1 C, starting at step 7b.

D At this time, ask the evaluator any questions you have on this lPM.

D When satisfied that you understand the assigned task, announce "I am now beginning the JPM".

Simulate performance or perform as directed the required task.

D Point to any indicator or component you verify or check and announce your observations.

After determining the Task has been met announce "I have completed the lPM".

D Then hand this sheet to the evaluator.

RTL#AS.640U I 12-ADM-130 I.F04 Page 7 of 10 Revision I OPERA TIONS lOB PERFORMANCE MEASURE JPM NUMBER: IPL-524 JPM TITLE: Transfer 120 V AC Vital Power lP}.1 REVISION: 0 "e" Denotes CRITICAL STEP TIME: _ _ _ _ _ __

CUE: Provide candidate with copy of 1OM-53C.4.1.38.1 C(1D).

EVALUATOR CUE: Inform Candidate, "I will interface with you as the Control Room Operator and any necessary control room actions should be r - - - - - - - - - - - - - - - + - - - - - - - - - ....- . . .~ -------------'------1

1. Review procedure. 1.1 Candidate reviews procedure provided.

COMMENTS:

I

2. Verify that [B4], Alternate 2.1 Locates INV-VITBUSI-3 Vital Bus #3 Source AC Input to Static Invertc:r/Static SW (INV -VITB US 1-4 Vital Bus #4 Switch circuit breaker, is ON. Inverter/Static SW) and verifies INV -VITBUS 1-3-B4 (Service Bldg. 713'). (INV-VITBUSI-4-B4) is ON.

EVALUATOR CUE: INV-VITBUSl-3-B4 (INV VITBUSl-4--B4) is in the ON position.

COMMENTS:

I I

RTL#A5.640U I 12-ADM-130 I.F04 Page 8 of 10 Revision I OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1PL-524 JPM TITLE: Transfer 120 VAC Vital Power JPM REVISION: 0 STEP I STANDARD

( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "u" FOR UNSAT)=> S/U

.). Place Steam Dump Control 3.1 Requests the Control Room repositions steam dump Bypass Interlock Selector A control bypass interlock selector A and B train and B Trn switches to OFF switches selected to OFF/RESET/INTERLOCK RESET INTLK. position.

EVALUATOR CUE: When requested, role play the BOP and inform the candidate that the Steam Dump Control Bypass Interlock Selector A and B Train Switches are selected to OFF/RESET/INTERLOCK position.

COMMENTS:

EVALUATOR NOTE: Step 4 & 5 are critical for making the determination that the bus has NOT yet been energized.

4.C Press AL TERNA TE SOURCE 4.1C Presses ALTERNATE SOURCE TO LOAD (S202)

TO LOAD pushbutton and pushbutton.

then check AL TERN ATE SOURCE SUPPLYING 4.2 Checks AL TERNA TE SOURCE SUPPLYING LOAD Red Light- ON. LOAD Red Light (P202) - ON EVALUATOR CUE: ALTERNATE SOURCE SUPPL YING LOAD Red Light - OFF.

EVALUATOR NOTE: If asked, Static Switch output current is 0 amps and output voltage is 0 volts.

COMMENTS:

RTL#A5.640U 1/2-ADM-\301.F04 Page 9 of 10 Revision I OPERA TIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1PL-524 JPM TITLE: Transfer 120 VAC Vital Power JPM REVISION: 0 S.C Check AC Volts and AC Checks AC output volt and ampere meters and amperes meters for output verifies voltage and current are NOT normal.

voltage and current indications.

EVALUATOR CUE: If asked, Inverter Output Voltage is 0 volts and Inverter Output Current is 0 amps.

EVALUATOR CUE: lfnecessary, Role-Play control room and report NI Rack Channel III (IV)

Instrumentation is NOT Energized.

5.2 Detemlines vital bus power is still de-energized.

COMMENTS:

the Manual Bypass 6.1 C Rotates the Manual Bypass Switch to the in AL TERN ATE ALTERNATE SOURCE TO LOAD position.

TO LOAD position.

EV ALUATOR CUE: Manual Bypass Switch is in the ALTERNATE SOURCE TO LOAD position.

If asked, Inverter Output Voltage is 126 volts and Inverter Output Current is 30 amps.

If necessary, Role-Play control room and report NI Rack Channel m(lV) Instrumentation is Energized.

COMMENTS:

RTL#AS.640U I!2-ADM-130 1.F04 Page 10 of 10 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: IPL-524 JPM TITLE: Transfer 120 VAC Vital Power JPM REVISION: 0 Place Steam Dwnp Control 7.1 Requests the Control Room repositions steam dump Bypass Interlock Selector A control bypass interlock selector A and B train and B Tm switches to ON. switches selected to ON position.

EVALUATOR CUE: When requested, role play the BOP and inform the candidate that the Steam Dump Control Bypass Interlock Selector A and B Train Switches are selected to ON position.

Inform the candidate "This JPM is complete".

COMMENTS:

A~ppen d'IX 0 . 0 UtrIne s cenarlo II Facility: BVPS Unit 1 Scenario No.:2 Op Test No.: lLOT8NRC F:xaminers: Candidates: SRO ATC BOP Initial IC 235: 5% power, EOL, Xe increasing, CB "D" @ 115 steps, RCS boron - 664 ppm.

Conditions:

Turnover: Continue power inerease IA W reactivity plan and commence turbine rolL PCV -IRC-456 isolated due to seat leakage, block valve closed. TS 3.4.11, Condition A Critical Tasks: 1. E-3.A Isolate Ruptured S/G

2. E-3.B Establish/maintain RCS temperature
3. ECA-3.3.A Terminate Safety In.iection Event Mali. No. Event Type Event Description No.

1 N/A (R)ATC Raise power O~) SRO 2 IMF PRS08E (0 0) (/) ATC, SRO PT-IRC-445 fails high, PORV's 455D & 456 open, ATC 250015 (TS) SRO required to manually close PORV, PCV-IRC-455D IMF PRS04B 3 IMF BST -CCW006 (C) BOP, SRO "A" CCR pump trips, Auto start failure of "B" CCR pump IMFCCW3A (TS) SRO IMF MSSl1 (00) (C) BOP, SRO Steam Dump pressure setpoint drifts low, steam dumps open in 4

14001200 response:, BOP required to manually control steam dumps IMF RCS 1OB (0 0) (C)ATC, SRO "B" RCP high vibration - will require RCP/Rx trip 5

10.6 TRG 6 'IMF RCS I OB (0 120) 16.4 600 10.6' IMF RCS03A (1 120) (M) -ALL "A" SG - 450 gpm tube rupture 6

450 7 IMF MSS08A (5 0) 50 (C) BOP, SRO Steam dump, PCV -1 MS-! OM fails at 50% following cooldown during E-3. Crew required to isolate steam lines and control RCS temperature via atmospheric steam dumps IMP PRS09A (I 0) 0 (C) ATC, SRO pzr spray valves and remaining PORV fail to open during 8

IMF PRS09B (10) 0 depressurization in E-3, will require transition to ECA-3.3 lOR X07I0970 (N)ormal, (R)eactivity, (l)nstrument, (C)omponent, (M)ajor NUREG*1021, Revision 9 Supplement 1 FENoe FaCSimile Rev. 1

Appendix 0 Scenario Outline 1L8N2 11e crew will assume the shift at 5% power with instructions to raise power in accordance with the reactivity vian and lOM-52.4.A.

After the power increase is commenced, PT-IRC-445 will fail high causing PORV 455D and 456 to open, (per turnover, 456 previously isolated with block valve closed.) the ATC will be required to manually close PORV, PCV-IRC-455D. The US will respond and give direction lAW lOM-6.4.IF, Attachment 2 and determine applicable Tech Spec actions.

The "A" CCR pump will then trip due to a faulty breaker with a failure of the "B" to auto start. The BOP will manually start the "B"; the US will dispatch an operator to place the "C" pump in service on the "AE" 4kv bus.

The US will then address Technical Specifications.

When Tech Specs have been addressed, the steam dump pressure setpoint will drift low, causing the steam dumps to open and an RCS cooldown. The crew will take action to control steam dumps manually.

When steam dumps are in manual control, an RCP will show signs of high vibration, the crew will respond using AOP 1.6.8, "Abnormal RCP Operation". The vibration will increase in severity to the point where the Rx and RCP must be tripped.

As a result of the reactor trip a 450 gpm SGTR occurs on the "A" S/G. The crew will progress through E-O and diagnose the "A" S/G as ruptured and transition to E-3. The crew will isolate the "A" S/G and cooldown to a target temperature. Following the Cooldo~TI to target temperature, Condenser Steam Dump valve, PCV-IMS

'16A will fail at 50% open, the crew will identify the failure and isolate the mainsteam lines and stabilize

...:mperature using the "B" and "C" S/G atmospheric steam dump valves.

When the crew attempts to depressurize the RCS, the spray valves will not function, nor will the PZR PORV's, 456 was previously isolated on turnover - block valve will open but PORV will not, 455D was isolated per event 2, block valve will not open, 455C will fail to open via control switch, crew will then transition to ECA 3.3.

The scenario is terminated when the crew establishes a normal charging flow path in ECA-3.3.

Expected procedure flow path is E-O - E ECA-3.3.

NUREG-1 021. Revision 9 Supplement 1 FENoe Facsimile Rev. 1

BEAVER VALLE'Y . ..JWER STATION INITIAL CONDITIONS: 5 % Power, CB-D 115, EOL, 664 PPM Boron, IC-235

! ADDITIONAL LINEUP CHANGES STICKERS VOND MARKINGS MOV-1 RC-536clc:l~~~~i!~p()wer maintained YCTonCS EOUIPMENT STATUS DATEITIME OOS TECHNICAL SPECIFICATION(S)

I PCV-IRC-456 isolated I Yesterday / 1200 I 3 A.l1, Condition A SHIFT TURNOVER INFORMATION

1. EOL plant startup, Mode 1 just entered, continue plant startup lAW 10M-52.4.A, step IV.A.6.b in progress.

SCENARIO SUPPORT MATERIAL REQUIRED

1. Place kept lOM-52A.A
2. Reactivity plan BVPS - lL8 2, Rev 1 30f28

BEAVER VALLEy . JWER STATION INSTRUCTIONAL GUIDELINES r PLANT STAfOsTpROCEDURAL GUIDANCE EXPECTED STUDENT RESP<5NSE - I Initialize IC 235, and establish initial Reactor plant at 5% power, EOL, RCS boron plant conditions. 670 PPM, CB-D 115 steps.

Insert the following per the Simulator Insert all pre-loads required to support the Setup section of the HTML File for this scenario.

scenarIO:

TRGSET 1 'JPPLP4(1)' Set Trigger 1 on Reactor Trip TRGSET 2 'JPPLSI(I), Set Trigger 2 on Safety Injection actuation IMF PRS09A (2120) 0 Spray Valve PCV-RC-455A fails closed IMF PRS09B (2 120) 0 Spray Valve PCV-RC-455B fails closed TRGSET4 Set Trigger 4 on PCV-IMS-I06Bl >50% open FIX for Current command

'RMSI06C.GE.0.5.AND.JPPLSI(I)' with Safety Injection actuated IMF MSS08A (40) 50 PCV-IMS-106A failed to 50% open IMF RCS03A (1 0) 450 ,A' S/G develops a 450 gpm tube rupture IMF BST-CCW006 (0 0) 1 PS-ICC-I02 lCC-P-IA OR lCC-P-IB Low Press Auto Start inhibit.

TRGSET 6 'VRCPF(2) >= 3' Set Trigger 6 on "B" RCP Frame Vib >= 3.0 TRG 6 'IMF RCSIOB (0180) 16.4 B RCP high ramps to 16,4 mills in 10 mins 60010.6' lOR X07I0970 Inhibit PORV 455C open CS.

lOR X07I080C Inhibit MOV-IRC-537 open es lOR X07I0950 Inhibit PORV 456 open es.

lOR 'X07I095C == l' Inhibit PORV 456 open CS.

IMFINH51 Inhibit Automatic Steam Line Isolation BVPS - 1L8 Scenario 2, Rev 1 40f28

BEAVER VALLEy . ..JWER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE Assign shift positions SRO:_ _ _ _ _ _ _ __

Conduct a shift turnover with oncoming Simulator Frozen until after shift turnover unless operators. it needs to be run momentarily for an alignment change.

When the shift turnover is completed, Simulator running. Crew assumes control of the Unit.

place the simulator to RUN and commence the drilL BVPS 1L8 Scenario 2, Rev 1 50f28

BEAVER VALLEy JWER STATION

[ INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENT 1:

Normal Plant Startup, Reactor Power increase to 15% to support Turbine Startup.

ATC commences raising reactor power to between 10 and 14%.

Status lights on Panel 176 actuate at 10%. ATC verifies P-l 0 bistables lit on Panel 176.

Status Light PNL 176, DIO, - 'INT RNG RX ATC blocks the IR High Flux Trip AND IR High Flux TRIP BLOCKED' - LIT. Rod Stop by placing the IR BLOCK TRAIN and TRAIN B control switches to the BLOCK position and verifies status pnl 176, D lOis LIT.

Status Light PNL 176, B12, - 'PW RA LO SET ATC blocks the Power Range Low Overpower Trip by R TRIP BLKD' LIT. placing the PR BLOCK TRAIN A and TRAIN B control switches to the BLOCK position and verifies status pnl176, B12 is LIT.

A TC selects highest power ranges on N-45.

Proceed with next event at LE discretion BVPS - 1L8 Scenario 2, Rev 1 60f28

BEAVER VALLEY. -,WER STATION rU-UTNSTRUCTIONAL GUIDELINES I PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENT 2:

Pressurizer Pressure Transmitter Fails PT-IRC-445 fails high High IMF PRS08E (0 0) 2500 15 Pressurizer Pressure Alarms; ATC notes alarm, informs US.

A4-9; Pressurizer Control Press High BOP refers to ARP's.

A4-5; Pressurizer Power Oper Relief Valve Open A4-6; Pressurizer Safety Valve or PORV Open Crew identifies PT-1 RC-445 failed high.

NOTE: SRO enters 1OM-6.4.IF, Attachment 2 ATC places control switches for PCV-IRC-455D and PCV-1RC-456 was previously isolated PCV-1 RC-456 to close.

due to seat leakage - given on turnover.

IfDNB Tech Spec entry not identified ATC and SRO recognize entry conditions met for by the crew at this time, ask as a DNB Technical Specification; follow-up question. 3.4.1, Condition A, restore parameters within limit within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

Continue with next event at LE discretion BVPS - 1L8 Scenario 2, Rev 1 70f28

BEAVER VALLEY. -,WER STATION INSTRUCTIONAL GUIDELINES n , PLANT STATUS I PROCEDURAL GUIDANCE ,.. EXPECTED STUDENT RESPONSE EVENT 3:

Reactor Plant Component Cooling CC-P-IA trips due to a faulty breaker with an Water Pump Tripi Auto start failure of auto start failure ofCC-P-lB standby pump IMF CCW3A (0 0)

Numerous Component Cooling water alarms; A TC recognizes and announces multiple component A6-33, Primary Comp Cool Pump Auto Start cooling water and reactor coolant pump annunciators.

Stop ATC reviews ARP's A6-35, Pri Comp Cool Pump Disch Press Low A6-38, Pri Comp Cool Wtr Heat Exchanger 8" Disch Line Flow Low A6-46, Pri Comp Cool Wtr Heat Exchanger 14" Disch Line Flow Low Numerous Reactor Coolant pump alarms; A3-75, React Cool Pp Lower Brg Lube Oil Cool Water Flow Low A3-77, React Cool Pp Stator Winding Cool Water Flow Low A3-83, React Cool Pp Upper Brg Lube Oil Cool Water Flow Low A3-91, Non Regen Heat Exchanger Disch Temp High BVPS lL8 Scenario 2, Rev 1 8of28

BEAVER VALLEY , ..JWER STATION

[ INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENT 3: (continued)

NOTE: BOP starts CC-P-l B A6-33 ARP will direct manual starting of standby pump, Crew may manually start CC-P-l B without specific procedural guidance if they recognize that a design Automatic action did not occur.

NOTE: SRO determines CC-P-IA is inoperable and TS 3.7.7 The crew may enter AOP 1.1 1 for Condition A is applicable; Restore train to Loss of CCR, the 2nd pump is not operable status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

required for the remainder of the scenario. Once the standby pump has been started, the next event can be entered at the LE discretion. A follow up question on TS 3.7.7 may be required.

When requested - wait 5 minutes then SRO dispatches operator to place CC-P-IC inservice insert: on the "A" train.

IRF EPS007 (0 0) F to Rack out A pp IRF EPS009 (0 0) BusAE to rack in C ROLE PLAY:

Report back to CR that CC-P-l C is now available on AE bus.

Continue next event at discretion BVPS lL8 Scenario 2, Rev 1 90f28

BEAVER VALLEY . .JWER STATION

[ INSTRUCTIONAL GUIDELINES I PLANTSTA.IUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENT 4:

Stearn Dump Pressure Setpoint Drifts It is expected that A4-46, Tavg-Tref deviation, Low will be in alarm at this time due to the plant SID that is in progress.

IMF MSSll (00) 1400 1200 Tavg decreases ATC determines Tavg is decreasing and reactor power is rising.

Reactor power increases Stearn dumps start opening further BOP determines condenser steam dumps are opening.

Depending on timing of recognition and response, A4-46 may clear due to this malfunction.

BOP places stearn dump controller to Manual and closes steam dumps to stabilize the plant.

BOP manually controls RCS temperature at previous value.

SRO contacts I&C to investigate.

Continue with next event at LE discretion BVPS - lL8 Scenario 2, Rev 1 10 of28

BEAVER VALLEy . JWER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENT 5:

A3-126; Reactor Cool Pump Vibration High ATC reviews ARP while BOP goes behind Vertical B RCP High Vibration, after TD Board and checks indications on Rep vibration vibrations increase at a rate that monitor.

requires tripping the RX and RCP.

BOP reports "B" RCP frame vibration at 3.2 mils and IMF RCStOB (0 0) 10.6 shaft is at 10.6 mils, both are stable.

Additional commands pre-loaded TRGSET 6 'VRCPF(2) >= 3' SRO enters AOP 1.6.8 for Abnormal RCP SRO directs ATC to review RCP parameters to TRG 6 'IMF RCStoB (0180) 16.4 Operation. determine if immediate Rep shutdown is required.

60010.6' Crew determines Immediate Rep shutdown is not required and continues to monitor parameters while the SRO proceeds with AOP instructions.

After a 3 minute time delay, Rep vibrations BOP identifies that "B" RCP vibrations are rising.

begin increasing.

Crew determines immediate RCP shutdown is The frame vibration rate of rise is > 0.2 required.

mils/hour.

Crew pre-briefs BOP actions for manual control of the condenser steam dump after the reactor trip. (due to previous malfunction with condenser steam dumps)

SRO directs the A TC to manually trip the reactor and perform the Immediate Operator actions of E-O.

SRO directs the crew to perform the Immediate Operator actions of E-O.

SRO additionally directs the A TC that following completion of the lOA's, to note the time and stop lRC-P-lB.

BVPS - lL8 Scenario 2, Rev 1 11 of28

BEAVER VALLEy . ..IWER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENT 6:

"A" S/G develops 450 gpm SGTR on reactor trip.

Command pre-loaded.

IMF RCS03A (1 0) 450 Reactor trip and bypass breakers open A TC Manually trips the reactor Rod bottom lights lit RPI's at zero Neutron flux dropping SRO enters E-O ATC and BOP commence lOA's SRO references E-O.

ATC verifies Reactor trip

  • Rx trip and bypass breakers open
  • Power range indication is < 5%
  • Throttle OR Governor valves ALL closed
  • Main Generator output brks - open
  • Exciter Circuit breaker - open BOP verifies Power to AC Emergency Busses
  • Using VB-C voltmeters, verifies either AE or DF has voltage indicated.

BVPS - 1L8 Scenario 2, Rev 1 120f28

BEAVER VALLEY, -,WER STATION INSTRUCTIONAL GUIDELINES ~ Pl..J!\f\JI sI.A.TUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENT 6: (continued)

NOTE: Check SI Status Dependant upon timing and crew

  • ATC checks if SI is actuated actions, a transition to ES-O.l may be
  • ATC verifies Cnmt press < 5psig made due to SI not actuated; in this
  • ATC verfies PRZR press> 1850 psig case a return to E-O upon SI initiation
  • A TC or BOP verifies Steamline pressure> 500 will occur, therefore ES-O.l actions are pSIg not scripted.

A TC manually actuates S1 - both trains.

ATC/BOP alerts plant personnel.

BOP verifies 1VS-F-4A running.

ROLEPLAY: Crew dispatches an operator to perform lOM-46.4.G After the crew has opened the control to place hydrogen analyzers in service.

room operated valves and dispatched a field operator; Wait 7 minutes then insert:

IMF XN02097 (0 0) ON IMF XN0210S (0 0) ON Then report back to the CR that the WR Hydrogen analyzers have been placed 111 serVIce.

ATC verifies S1 System Status

  • 2 charging pumps running
  • Both LHSI pumps running
  • BIT Flow indicated B VPS - IL8 Scenario 2, Rev I 130f28

BEAVER VALLEy . JWER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS / PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENT 6: (continued)

NOTE: BOP verifies AFW status If the crew has previously identified the

  • Both motor-driven pumps running "A" S/G level rising, the BOP may
  • Turbine-driven pump running have already pre-emptively isolated
  • AFW throttle valves all FULL OPEN AFW flow to the "A" S/G by this time.
  • Total AFW flow is > 370 gpm NOTE: List of Attachment 1~K Discrepancies: SRO directs BOP to perform Attachment l-K Evaluation of BOP performing All Automatic actions of l-K are SAT Attachment l-K begins on page 27 ATC checks RCS Tavg stable at or trending to 547°F
  • A TC verifies no steam release is occurring.

RCS temperature < 547°F and dropping due to

  • ATC verifies Reheat steam is isolated.

Safety Injection flow.

  • ATe reduces total feed flow to minimize C/o.

ATC Check Recirc Spray Pumps NONE RUNNfNG ATC verifies PRZR isolated

  • Spray Valves - CLOSED
  • PRT conditions CONSISTENT WITH EXPECTED VALUES
  • Power to at least one block valve AVAILABLE
  • Block valves AT LEAST ONE OPEN BVPS 1L8 Scenario 2, Rev 1 140f28

BEAVER VALLE') . ...JWER STATION L INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENT 6: (continued) checks if RCPs should be stopped

  • DIP between RCS pressure and highest S/O pressure - LESS THAN 200 PSID
  • Criteria for stopping is not met - Leaves RCPs runmng ATCIBOP checks if any SIGs are faulted
  • Pressures in all S/Gs - ANY DROPPING IN AN UNCONTROLLED MANNER OR
  • ANY S/O COMPLETELY DEPRESSURIZED Crew determines NO S/G's are faulted Crew checks if S/O tubes are intact
  • Check all S/O levels - NONE RISING UNCONTROLLED MANNER
  • Check Secondary Radiation CONSISTENT WITH PRE-EVENT VALUES Crew determines "A" S/O level rising in an uncontrolled manner and Secondary Radiation - is NOT CONSISTENT WITH PRE-EVENT VALUES.

SRO transitions to E-3 ATC Checks If CREVS Should Be Actuated:

Check EITHER of the following:

  • Control Room Radiation Monitor

[RM-IRM-21SA,B] - NOT IN HIGH ALARM

  • cm - HAS NOT OCCURRED Crew determines CREVS actuation NOT required BVPS - I L8 Scenario 2, Rev I 150f28

BEAVER VALLEY. JWER STATION I

mm INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENT 6: (continued) SRO directs STA to Commence Control Room ventilation actions. Refer to Attachment 4-F.

ATC checks if RCPs should be stopped

  • DIP between RCS pressure and highest S/G pressure LESS THAN 200 PSID
  • Criteria for stopping is not met - Leaves RCPs running Crew Identifies Ruptured S/Gs
  • Unexpected rise in any S/G narrow range level

-OR

  • High radiation from any S/G sample

-OR

  • High radiation from any S/G steamline N16 monitor Radiation Protection survey

-OR

  • High radiation from any S/G blowdown line

[RlS-l SS-1 00] S/G BD Sample Radiation Protection survey Crew determines S/G is ruptured.

BVPS - 1L8 Scenario 2, Rev J 160f28

BEAVER VALLEy. JWER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENT 6: (continued)

Critical Task: E-3.A ATC/BOP Isolates Flow from the Ruptured S/G.

Crew isolates feed flow into and steam flow from the ruptured S/G and directs BOP places ruptured S/G atm stm dump valve, operator to close isolation valve(s) PCV-IMS-101A, in MAN and verifies valve is operated from outside of the control CLOSED.

room before a transition to ECA-3.1 occurs. BOP verifies residual heat release valve - CLOSED.

Basis for Selection:

SAFETY SIGNIFICANCE -- Failure to isolate the ruptured S/G causes a loss of differential pressure between the ruptured S/G and the intact S/Gs. Upon a loss of differential pressure, the crew must transition to a contingency procedure that constitutes an incorrect performance that "... necessitates the crew taking compensating action which complicates the event mitigation strategy.... "

NOTE:

addition to these actions, the next 2 pages contain actions required to meet this Critical Task, these steps are designated as "CT E-3.A" BVPS IL8 Scenario 2, Rev I 170f28

BEAVER VALLE"! . .JWER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS / PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENT 6: (continued) Steam supply valve from ruptured S/G - OPEN

  • BOP verifies IMS-15 open CT E-3.A BOP verifies at least one Motor-driven AFW pump is runnmg BOP closes MOV-IMS-I05, AFW Turbine Steam Is01 Vlv.

ROLEPLAY:

5 minutes after being dispatched to Crew dispatches an operator to locally isolate steam locally isolate IMS-15 and open IMS supply valve from "A" S/G, IMS-15 and to:

17, insert

  • Verify open steam supply valve from "B" S/G, IRF FWM34 (0 0) 0 IMS-16 IRF FWM36 (0 0) 100
  • Unlock and open steam supply valve from "C" then report S/G,IMS-17 1MS-15 is CLOSED IMS-16 is OPEN If necessary, crew restarts FW-P-2 by opening MOV

& iMS-17 was OPENED. IMS-I05 CT E-3.A BOP closes ruptured S/G Pre nrtrn Drain Isol Vlvs.

  • [TV-IMS-llIA]

CT E-3.A BOP closes ruptured S/G main steam trip, bypass, and non-return valves.

  • [TV-IMS-IOIA] trip
  • [MOV-IMS-IOIA] bypass
  • [NRV-IMS-IOIA] non return BVPS - I L8 Scenario 2, Rev I 180f28

BEAVER VALLE) . JWER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENT 6: (continued)

CT E-3.A BOP checks ruptured S/G level

  • Narrow range level - GREATER THAN 31 %

NOTE:

crew had previously l...."'"LlH"'.... BOP closes AFW throttle valves on ruptured S/G "A" S/G level rising, the BOP may * [MOV-lFW-iS have pre-emptively isolated AFW flow to the "A" S/G. Checks FWI - PREVIOUSLY VERIFIED BOP checks ruptured S/G pressure- GREATER THAN 380 PSIG.

BOP verifies station instrument air header pressure GREATER THAN 100 PSIG.

BVPS - 1L8 Scenario 2, Rev 1 190f28

BEAVER VALLEY . ..;WER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENT 7: Condenser available Crew initiates RCS cooldown SRO determines required core exit temperature as a Steam dump, PCV -1 MS-l 06A fails at function of ruptured S/G pressure:

50% open following the cooldown.

SRO directs ATC to block low steamline pressure SI IMF MSS08A (4 0) 50 when PRZR pressure less than 1950 PSIG.

BOP dumps steam to condenser from B & C S/Gs at maximum rate by;

  • Checking MSIV s - AT LEAST ONE OPEN
  • Checking condenser available
  • Confirming condenser steam dump controller in MANUAL
  • VerifYing demand is at ZERO
  • Confirms steam dumps are in STM PRESS Mode
  • Checks TAVG > 541°F by Status light 0-11, "2/3 Lo-Lo Tavg" (Panel 6 22) - NOT LIT
  • Gradually raises steam dump rate to maximum rate (~25% demand)
  • As TAVG approaches 541°F, defeats T A VG interlock until status light A-12, "Stm Dump Defeat Interlock" (Panel 622) - LIT
  • When Core exit TCs (average of five hottest)

LESS THAN REQUIRED TEMPERATURE

  • Stops RCS cooldown and Maintains core exit TCs - LESS THAN REQUIRED TEMPERATURE.

BVPS - 1L8 Scenario 2, Rev 1 20of28

BEAVER VALLE'r ->WER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANC EXPECTED STUDENT RESPONSE EVENT 7: (continued) RCS temperature continues to decrease Steam dump valve, PCV-IMS-I06A indicates BOP recognizes PCV-IMS-I06A has failed open and 50% open. cannot stabilize RCS temperature.

Critical Task: E-3.B Crew SRO directs BOP operator to close the "ll" & "c" establishes/maintains an RCS steam line isolation valves and to stabilize RCS temperature so that transition from E-3 temperature using the "B" & "C" atmospheric steam does not occur because the RCS dump valves.

temperature is in either of the following conditions: BOP closes TV-IMS-lOIB and TV-IMS-lOIC.

Too high to maintain minimum BOP operates PCV-IMS-IOIB & 10lC as necessary required subcooling for subsequent to stabilize and maintain target RCS temperature.

RCS depressurization OR Below the RCS temperature that causes a red or orange path challenge to Sub-criticality or Integrity CSF Basis for Selection:

SIGNIFICANCE -- Failure to establish and maintain the correct RCS temperature during a SGTR leads to a transition from E-3 to a contingency procedure, which constitutes an incorrect performance that

"... necessitates the crew taking compensating action which complicates the event mitigation strategy .... "

BVPS - 1L8 Scenario 2, Rev 1 210f28

BEAVER VALLEy . .JWER STATION

[-INSTRl.JCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENT 7: (continued) BOP checks intact S/G levels

  • "B" & "C" narrow range levels - GREATER THAN 31%

BOP controls feed flow to maintain narrow range level between 25% and 65%.

ATC Checks PRZR PORVs and Block valves

  • Power to block valves AVAILABLE
  • Block valves - AT LEAST ONE OPEN ATC Resets SI, CIA and CIB BOP Verifies Containment Instrument Air A VAILABLE by~
  • Checking Station Instrument Air Header Pressure GREATER THAN 100 PSIG
  • Verifying [TV-lIA-400] - OPEN
  • Checking CNMT instrument air header pressure - GREATER THAN 85 PSIG ATC Checks If LHSI Pumps Should Be Stopped
  • ATC checks LHSI pumps - ANY WITH SUCTION ALIGNED TO RWST
  • ATC checks RCS pressure - GREATER THAN 275 PSIG [400 PSIG ADVERSE CNMT]
  • ATC stops LHSI Pumps AND places in AUTO BVPS 1L8 Scenario 2, Rev 1 220f28

BEAVER VALLEY. JWER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENT 7: (continued) BOP checks if RCS cooldown should be stopped

  • When Core exit TCs (average of five hottest)

NOTE: LESS THAN REQUIRED TEMPERATURE See previous steps for required actions when the RCS cooldown won't stop BOP stops RCS cooldo\\'TI and maintains core exit due to Condenser Steam dump failing TCs - LESS THAN REQUIRED TEMPERATURE.

open.

BOP checks ruptured "A" S/G Pressure- STABLE OR RISING ATC checks RCS subcooling based on core exit TCs GREATER THAN 66°F BVPS - lL8 Scenario 2, Rev 1 230f28

BEAVER VALLEY. JWER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENT 8:

Both Spray valves fail to open with 1 ATC Depressurizes RCS To Minimize Break Flow Both pzr spray valves and remaining demand signal. Refill PRZR PORV fail to open. Remaining operable PORV PCV-IRC-455C

  • Checks RCPs lA and 1C - BOTH also fails to open.
  • Fully opens available PRZR spray valves (commands pre-loaded)
  • Opens one PRZR PORV IMF PRS09A (1 0) 0 Pressure is not reducing.

IMF PRS09A (10) 0 Checks depressurization method - IS NOT lOR X0710970 EFFECTIVELY REDUCING RCS PRESSURE A TC recognizes and informs SRO that the depressurization method is not effectively reducing RCS Pressure.

SRO directs ATC to close pzr spray valves.

SRO enters ECA-3.3 BOP checks "A" S/G Narrow range level less than 89%.

Step skipped if "A" NR level was> 89% ATC confirms 1C RCP running and normal spray did not result in pressure reduction therefore normal spray is not available.

Step skipped if "A" NR level was> 89% ATC attempts to open remaining PORV's/ Block valves - none will result in pressure reduction.

SRO continues with procedure.

BVPS IL8 Scenario 2, Rev 1 240f28

BEAVER VALLEY . .JWER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENT 8: (continued) Step skipped if"A" NR level was> 89% BOP checks intact S/G levels

  • "B" & "C" narrow range levels - GREATER THAN 31%

BOP controls feed flow to maintain narrow range level between 25% and 65%.

Step skipped if "A" NR level was > 89% BOP checks station instrument air header pressure GREATER THAN 100 PSIG.

Step skipped if "A" NR level was> 89% ATC verifies PZR level> 17%.

Crew checks if SI can be terminated.

ATC verifies RCS Subcooling is greater than 46°F based on CETe's BOP confirms secondary heat sink available by >370 gpm of feed flow available OR NR level in "B" or "C" S/G> 31%.

ATC confirms RVLlS Dynamic head range is> 43%.

Crew determines "A" S/G NR level is rising in an uncontrolled manner or is offscale high.

SRO directs ATC to stop 1 charging pump.

BVPS - lL8 Scenario 2, Rev I 250f28

BEAVER VALLEy. ,JWER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENT 8: (continued)

Critical Task: ECA-3.3.A Crew SRO directs ATC to Isolate the BIT terminates SI when ECA-3.3 termination criteria are met and prior to ATC closes MOV-lSI-867A, B completion of "SI Flow Verification" ATC closes MOV-lSI-867C, D step ofECA-3.3. Indicated SIIBIT flow decreases to zero.

Basis for Selection: SRO directs ATC to establish normal charging flow SAFETY SIGNIFICANCE -- Failure to path.

terminate SI during a SGTR (when the termination criteria are met) needlessly ATC closes FCV-lCH-122 complicates the mitigation strategy. It ATC opens MOV-lCH-3l0 also constitutes a "significant reduction ATC opens MOV-lCH-289 of safety margin beyond that ATC adjusts FCV-lCH-122 to maintain Pzr level.

irreparably introduced by the scenario."

Verify SI tlow not required.

A TC verifies RCS Subcooling is greater than 46°F based on CETC' s.

Terminate scenario when the crew ATC confirms RVLIS Dynamic head range is> 43%.

establishes normal charging flowpath in ECA-3.3. Crew determines SI flow is not required.

Classify Event:

ALERT due to Tab 1.2.4, LOSS of RCS Barrier, Primary to Secondary Leak.

BVPS - 1L8 Scenario 2, Rev 1 260f28

BEAVER VALLEY, ,JWER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE Attachment l-K 'Verification of BOP performs the verifications/actions of Attachment Automatic Actions' l-K 'Verification of Automatic Actions' as follows:

Diesel generators BOTH RUNNING Station Instrument Air Header Pressure - GREATER THAN 100 PSIG Ensure Reheat Steam Isolation Ensure Reheat Steam Isolation

  • Verify [MOV-IMS-100A,B] - CLOSED
  • Reset reheater controller.

Verify CCR Pumps - TWO RUNNING Align Neutron Flux Monitoring For Shutdown

  • Transfer [NR-INI-4S] Nuclear Recorder to operable source and intermediate range displays.

Verify River Water System In Service

  • RPRW Pumps - TWO RUNNING
  • Check CCR Heat EX R W pressure GREATER THAN 20 PSIG Attachment l-K 'Verification of Check If Main Steamline Isolation Required Automatic Actions' (continued)

-OR

  • Steamline pressure - LESS THAN SOO PSIG

-OR

  • Steamline pressure high rate of changc - ANY ANNUNCIATOR LIT Annunciator A7-41, A7-49 or A7-57 Determines steamline isolation is NOT required.

BVPS lL8 Scenario Rev 1 270f28

BEAVER VALLEY. JWER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE~

Check CIB And CNMT Spray Status

  • Containment pressure - HAS REMAINED LESS THAN 11 PSIG Verify ESF Equipment Status
  • Verify SI status by checking all RED SIS marks

-LIT

  • Verify CIA by checking all ORANGE CIA marks - LIT
  • Verify FWI by checking all GREEN FWI marks - LIT Verify Power To Both AC Emergency Busses Discrepancies: Upon Completion, Report Any Discrepancies to SMfUS NONE BVPS IL8 Scenario 2, Rev 1 28of28

A.ppend"IX 0 " 0 utrme s cenarlo II Facility: BVPS Unit 1 Scenario No.:3 Op Test No.: lLOT8NRC Examiners: Candidates: SRO ATC BOP Initial IC 238 (18): 100% power, MOL, Equ. XE Conditions, CB "D" @ 225 steps, RCS boron-Conditions: 1019 ppm.

Turnover: Maintain 100% power.

PCV-IRC-456 isolated due to seat leakage, block valve closed. TS 3.4.11, Condition A FW-P-2 Out ofservice, TS 3. 7.5, Condition B Control Rods in Manual due to scheduled MSP on N-44 Critical Tasks: 1. E-O.C Energize 1 AC Emergency Bus

2. E-O.D Manually actuate 1 tr~lin of Safety Injection
3. FR-H.1.A Establish feed flow to SG before Feed and Bleed is required
4. E-2.A Isolate faulted SG I~ent o.

Malf. No. Event Type Event Description 1 IMF PRS08D (0 0) (1) ATC, SRO PT-IRC-444 fails high, requires ATC to close PORV and 2500 15 CTS) SRO manually control RCS pressure.

2 lOR XI2I027L (12 0) (TS) SRO OCB-92 trips open, de-energizes SSST-IA ON

., IMF AUX02A (C) BOP, SRO "A" Station air compressor trips, "B" fails to auto start BOP

.)

manually starts "B" air compressor, Diesel Air compressor fails to auto start but will start locally.

II 4 IMF MSS 18C (0 0) (R)ATC "c" SG Fault in MSVR, causes Rx overpower, requires .1 2.5E5 3000 (N) SRO, BOP emergency power reduction.

I IMF CRF04BV (2 2) (C) ATC, SRO 2 Rods drop during power reduction requires manual Rx trip.

5  !

1 Loss of 4kv busses, "A", "B" and AE occurs on Rx trip IMF CRF04BT (2 4) 1 I 6 TRG 3 'IMF (M)ALL "c" SG Steam Break occurs on Rx trip causes Safety Inj.

MSS 18C (0 0) 6ES' 7 IMF srSIOA (C) ATC, SRO Automatic SI fails to actuate - requires manual actuation.

IMFSISlOB IMFEPSIIB(I30) (C) BOP, SRO "B" train 4kv emergency bus de-energizes, #2 EDG trips while 8

IMF INH53 (00) loading, #1 EDG auto start inhibited, will start manually.

IMF EPS04F (1 10)

IMF FWM IIC (430) (M) ALL Loss of all Aux Feedwater flow, requires entry into FR-H.l 9

IMF FWMIIA (0 0)

(N)ormal, (R)eactivity, (J)nstrument, (C)omponent, (M)ajor NUREG-1 021. Revision 9 Supplement 1 FENoe Facsimile Rev, 1

Appendix D Scenario Outline 1L8N3 fier taking the shift at 100% power, PT-IRC-444 will fail high causing the pzr spray valves and PORV PCV

.RC-455C to open. The ATC will close the PORV and spray valves to stabilize RCS pressure. The ATC will manually control pzr pressure for the remainder of the scenario. The SRO will utilize 10M-6.4IF, Attachment 2 to address the Pressure transmitter failure. The SRO will address Technical Specifications for DNB and Shutdown panel instrumentation.

OCB-92 will then trip open, de-energizing SSST-IA, the SRO will address Technical Specifications and direct the BOP to perform OST -1.36.7, "Offsite to Onsite Power Distribution System Breaker Aligmnent Verification" .

The "A" station air compressor will trip with auto start failures of the "B" station air compressor and the Diesel driven air compressor. The SRO will direct activities in accordance with AOP 1.34.1, "Loss of Station Instrument Air", the BOP will manually start the "B" station air compressor.

A fault will occur on the "c" S/G outside of containment upstream of the MSIV, the fault will ramp in over a 5 minute time period, RCS temperature will decrease and reactor power will increase. High temperature alarms will actuate in the main steam valve room and aux feed pump room.

The crew will recognize the over power and begin an immediate power reduction in accordance with AOP 1.51 "Reactor Overpower".

The A TC will insert the control rods in response to the turbine load reduction, 2 rods will drop during the rod insertion, the immediate actions of AOP 1.1.8, "Rod Inoperability", will be taken and the reactor will be

'anually tripped due to more than 1 rod being dropped. When the reactor is tripped, the "A", "B" and "AE"

]{v buses will become de-energized on the transfer to offsite power.

Upon the Rx trip, the steam leak becomes a break resulting in an SI signal being initiated due to the faulted S/G.

Safety Injection will not automatically actuate, requiring manual actuation to initiate SI flow.

EDG - 1 will fail to auto start and is required to be started manually.

The "DF" bus will be -de-energized after the transfer to offsite power following the reactor trip. EDG-2 will auto start but trip while loading, and will not be recoverable Aux Feedwater malfunctions will occur such that FW-P-3A fails completely, FW-P-3B will not have power and the turbine driven pump, FW-P-2 was OOS on turnover, and cannot be recovered due to high temperatures in the Aux feed pump room.

The crew will enter E-O on the reactor trip, and then enter FR-H-l due to no auxiliary feed water being available. When the crew dispatches an operator to start up FW-P-4, the dedicated Feedwater pump will start and supply Feedwater. After Feedwater has been established, the crew will return to E-O and progress to diagnose the "C" S/G as being faulted and enter E-2 to isolate the "c" S/G.

The scenario will be terminated when the crew determines transition to ES-l.l is appropriate.

Expected procedure flow path is E-O - 4 FR-H.l - 4 E-O -* E-2.

NUREG-1021. Revision 9 Supplement 1 FENOC Facsimile Rev. 1

BEAVER VALLEy. ->WER STATION INITIAL CONDITIONS: 100 % Power, CB-D 225, Equ XE, MOL, 10 19 PPM Boron, IC-238 (18)

STICKERS VOND MARKINGS MOV-IRC-536 closed EQUIPMENT STATUS I DATErrIME OOS I TECHNICAL SPECIFICATION(S PCV-IRC-456 isolated Yesterday / 1200 3.4.11 Condition A FW-P-2 OOS 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> ago 3.7.5, Condition B SHIFT TURNOVER INFORMATION

1. 100% power, MOL equilibrium conditions, shift goal is to maintain 100% power.
2. Control Rods are in Manual due to scheduled MSP on N-44.

SCENARIO SUPPORT MATERIAL REQUIRED

1. None required BVPS IL8 Scenario 3, Rev 1 30f24

BEAVER VALLE) . .JWER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE initialize IC 238, and establish initial Reactor plant at 100% power, MOL, equilibrium plant conditions. conditions. RCS boron=1019 PPM, CBD = 225 steps with control rods in ManuaL Insert the following per the Simulator Inserts all pre-loads required to support the Setup section of the HTML File for this scenarIO.

scenano:

IMF CRF04BV (2 2) 1 K6 Control Rod drops when rods insert IMF CRF04BT (2 4) 1 FlO Control Rod drops when rods insert IMFFWMllC FW-P-2 tripped IMF FWMIIA (0 0) TRUE FW-P-3A start failure TRGSET 1 'JBK341B & JPPLP4(1)' Trigger 1 = AC 8-341 B closure AND reactor trip TRGSET 2 'MCRFNS(43) <= 220' Trigger 2 on rods less than 220 steps TRGSET 3 'JPPLP4(1)' Trigger 3 = reactor trip TRG 3 'IMF MSS18C (0 0) 6E5' Increase fault size on reactor trip TRGSET 5 'INIIB04 == 5' 'I'rigger 5 AII-26 in alarm IMF XNll048 (5 30) 1 A 11-48, AFWIQuench Spray pp temp High IMF EPSllB (130) TRUE #2 EDG trips while loading IMF INH53 (0 0) TRUE # 1 EDG auto start failure IMF EPS04F (1 10) TRUE IDF bus deenerg 10 sees. after transfer to offsite IMF SISIOA Train A SI auto actuation failure IMF SISIOB Train B SI auto actuation failure IMF XN08041 (12 0) 1 OCB-92 low pressure alarm A8-41 actuates lOR X12I027L (12 0) ON OCB-92 trips open IMF XN06106 (0 0) 0 Disable SA-C-IB trouble alarm A6-106 IRF AUX023 (0 0) STOP SA-C-4 auto start disabled IMF AUX02B (0 0) TRUE SA-C-I B trip (start failure)

TRGSET 4 'XIlI037R = l' Trigger 4 SA-C-18 start attempt TRG 4 'DMF AUX02B' DMF, allows SA-C-IB to manually start IRF FWM70 (14180) ON Local Start IFW-P-4 IRF FWM67 (14195) 100 Local open IFW-MOV-160 IMF CRF02A Inhibit Auto Rods BVPS lL8 Scenario 3, Rev 1 40f24

BEAVER VALLEy . ..JWER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE Assign positions SRO:_ _ _ _ _ _ _ __

BOP:-----------------

Conduct a shift turnover with oncoming Simulator Frozen until after shift turnover unless operators. it needs to bc run momentarily for an alignment change.

When the shift turnover is completed, Simulator running. Crew assumes control of the place the simulator to RUN and commence the scenario.

BVPS - I L8 Scenario 3, Rev I 50f24

BEAVER VALLEY * ..IWER STATION r INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE nn~

EVENT 1:

PR-IRC-444 fails high PT-IRC-444 fails high IMF PRS08D (0 0) 250015 A4-10, Pressurizer Control High Pressure Dev, ATC recognizes pressurizer pressure related alarms followed by numerous Pressurizer pressure and announces to the crew.

related alarms.

PCV-IRC-445A & 445B Pzr spray valves modulate open.

PORV, PCV-IRC-455C opens All Pzr heaters tum off.

RCS pressure decreases Crew identifies PT-1 RC-444 failure.

NOTE: SRO enters 10M-6.4.IF, attachment 2 SRO directs ATC to respond to PT-1 RC-444 failure.

A TC is required to manually control RCS pressure for remainder of ATC responds to PT-IRC-444 failure by; scenarIO.

  • Closing PCV-IRC-455C
  • Placing Master Pressure control in Manual and manually operating the pressurizer spray valves and heaters to control pressure.

NOTE: SRO evaluates Technical Specifications:

IfDNB Tech Spec entry not identified by the crew at this time, ask as a 3.4.1 (RCS DNB Parameters) Condition A: restore follow-up question. RCS pressure within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

3.3.4 (Remote Shutdown System) Table B 3.3.4-1 Function 2.a: LCO met ifPT-IRC-455 is operable.

Proceed with next event at LE discretion BVPS - 1L8 Scenario 3, Rev 1 60f24

BEAVER VALLEy . .JWER STATION INSTRUCTIONAL GUIDELINES I PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENT 2:

OCB-92 trips open, Loss of offsite power supply to SSST IA and TRG! 12 busses lA, IB, and lAE.

(follmving commands pre-loaded)

IMF XN08041 (120) 0 lOR X12I027L (12 0) ON ROLEPLAY: A8-27, SSST lA Undervoltage, BOP notes alarms and notifies crew.

If dispatched as an operator or A8-41, OCB-92 Low Pressure, maintenance, after 5 minutes, report A9-53, ERF DG and ACB panel trouble. Crew reviews alarms and ARPs.

that a low pressure alarm condition is indicated on OCB-92.

ROLEPLAY: SRO evaluates Technical Specifications:

If contacted as System operator, report the failure is not grid related. A 3.8.1. Condition A - with one offsite circuit traveling operator will be dispatched to inoperable, demonstrate others operable within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> investigate. and every 8 thereafter; restore within 72 hrs.

3.0.5 is met No train B ESF components arc OOS.

ROLEPLAY:

If dispatched to the ERF, report that SRO notifies System Operations of OCB-92 status.

local alarms A14-17 (480V bus IS supply ACB 12S1 auto trip) and A14 SRO notifies electrical maintenance and relay crew to 21 (480V busses IS & 1T tie ACB investigate.

12S10 auto close) are actuated.

Proceed with next event at LE SRO directs BOP to commence OST 1.36.7 to discretion perform breaker alignment verification.

BVPS - IL8 Scenario 3, Rev 1 7of24

BEAVERVALLE'r. ->WER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENT 3:

SA -C-l A trips Station air compressor 1SA-C-IA trips, lSA-C IB and lSA-C-4 auto starts disabled.

IMF XN06106 (0 0) 0 IRF AUX023 (0 0) STOP IMF AUX02B (0 0) TRUE IMF AUX02A (0 0) TRUE A6-98; Station air compressor lA local panel BOP notes degrading conditions and informs crew.

trouble.

A TC reviews Alarm response procedures.

SRO may enter AOP 1.34.1 for "Loss Crew dispatches operator to air compressors.

of Station Air".

BOP manually starts lSA-C-1B.

Crew informs Maintenance and management of air compressor status.

ROLEPLAY:

If dispatched as plant operator, wait 2 minutes then report that SA-C-IA has tripped on motor thermal overload. You are ready to attempt a local start of the Diesel-driven air compressor.

Insert:

IRF AUX023 (0 0) START Continue with next event at LE discretion BVPS IL8 Scenario 3, Rev 1 80f24

BEAVER VALLEY. JWER STATION INSTRUCTIONAL GUIDELINES [ PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENT 4 Faulted "C" S/G "C" S/G faulted outside of cnrnt, upstream of MSIV.

IMF MSS18C (0 0) 2.SES 300 "C" S/G stearn flow increases RCS temperature decreases Reactor power increases All-26; Main Steam Valve Area Temp High BOP acknowledges alanns, reports indications of a 1-48; Aux Fd Wtr & Quench Spray PP steam leak in the main steam valve room and aux feed Compartment Temp High-Low (occurs 30 pump room.

seconds later)

A TC monitors RCS temperature and reactor power, informs SRO that power is rising above 100%.

SRO enters AOP 1.51 Reactor Overpower SRO directs BOP to perform immediate operator actions of AOP 1.51.2, Reactor Overpower.

BOP reduces power by;

  • Depressing 1st in PB
  • Setting EHC setter ~5% below current pwr Iv!.
  • Setting the load rate thumbwheel to 5%/min.

NOTE:

  • Depressing GO Next event is pre-loaded, 2 rods will Turbine load decreases.

drop when Control Bank D rods are at Reactor power decreases ATC manually inserts control rods to match Tavg-Tref 220 steps. RCS temperature increases. and monitors reactor power and RCS pressure.

Rods step in as operated by A TC NOTE:

[f the Crew borates for the power reduction, initiate dropped rod malitmctions by actuating 2 BVPS - I L8 Scenario 3, Rev 1 90f24

BEAVER VALLEY, .JWER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENTS 2 dropped rods! requires manual reactor Rods K6 and FlO drop into the core. ATC recognizes Rods dropped and reports to SRO.

trip.

IMF CRF04BV (2 2) 1 IMF CRF04BT (2 4) 1 SRO enters AOP 1.1.8, Rod Inoperability A TC performs Immediate Operator Actions for Rod Drop and per the RNO action, with 2 or more rods dropped, manually trips the reactor.

BVPS - 1L8 Scenario 3, Rev 1 100f24

BEAVER VALLEy' . JWER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENTS 6, 7, 8, & 9 The "A", "B", and "AE" 4Kv busses will Multiple malfunctions occur on reactor become de-energized on the transfer to offsite trip. power.

The "DF" 4Kv bus will become de-energized 10 All commands preloaded seconds after the transfer to offsite power.

TRGSET 1 'JBK341B & JPPLP4(1)' The # 1 EDG will fail to auto start but will start TRGSET 3 'JPPLP4(1)' manually from the control room.

TRG 3 'IMF MSS18C (0 0) 6ES' The #2 EDG will auto start and then trip while IMF FWMIIA (0 0) TRUE loading. and be unavailable for the remainder of IMF EPSllB (1 30) TRUE the scenario.

IMF INHS3 (0 0) TRUE The Steam leak becomes a break upon trip IMF EPS04F (110) TRUE causing an SI actuation, however, Automatic SI IMF SISI0A will fail to actuate.

IMF SISI0B The "A" motor-driven Aux feedwater pump will fail completely, The "B" motor-driven Aux Feedwater pump will not have power and the turbine-driven aux Feedwater pump was OOS on turnover, and cannot be recovered due to high temperatures in the Aux feedpump room.

SRO enters E-O. ATC and BOP commence lOA's ofE-O.

ATC verifies Reactor trip

  • Rx trip and bypass breakers open.
  • Power range indication is < 5%.
  • Neutron flux is dropping.

BOP verifies Turbine trip

  • Throttle OR Governor valves ALL closed.
  • Main Generator output brks - open.

BVPS - lL8 Scenario 3, Rev 1 11 of24

BEAVER VALLEY . JWER STATION r INSTRUCTIONAL GUIDEliNES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENTS 6, 7,8, & 9 Critical Task: E-O.C BOP verifies Power to AC Emergency Busses Crew energizes at least one AC

  • Using VB-C voltmeters, verifies either AE or emergency bus before transition out of DF has voltage indicated.

E-O, unless the transition is to ECA-O.O, in which case the critical task must be BOP identifies that AE bus is de-energized and that performed before placing safeguards the EDG did not auto start.

equipment hand switches in pull-to lock position. BOP performs CR actions to start the #1 EDG.

Basis for Selection: BOP observes DF bus de-energize, #2 EDG auto starts SAFETY SIGNIFICANCE -- Failure to and then trips while loading.

energize an ac emergency bus constitutes "misoperation or incorrect crew performance which leads to degraded...emergency power capacity."

Failure to perform the critical task also results in needless degradation of a barrier to fission product release, specifically of the RCS barrier at the point of the RCP seals. Additionally, failure to perform the critical task results in the unnecessary continuation of a situation in which RCS inventory is being lost uncontrollably and cannot be replaced. This situation is equivalent to "misoperation or incorrect crew performance which leads to degraded ECCS ... capacity" at a time when a small-break LOCA is in progress.

BVPS - 1L8 Scenario 3, Rev 1 120f24

BEAVER VALLEY . ..JWER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS / PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENTS 6, 7, 8, & 9 (continued)

ROLEPLAY:

If directed to investigate EDG status, wait 4 minutes then report:

  1. 1 EDG - diesel is running sat with normal cooling flow.
  1. 2 EDG - diesel is not running, oil and parts on the floor, as field operator request maintenance support.

ROLEPLAY:

If directed to investigate the DF bus, wait 3 minutes then report that there is a ground overcurrent relay flagged on the 1F7 breaker.

Critical Task: E-O.D SI automatically actuated due to low RCS Check SI Status Crew manually actuates at least one pressure. ATC checks if SI is required train of SIS-actuated safeguards before

  • A TC verifies Cnmt press < 5psig transition to any ORP.
  • A TC verifies PRZR press> 1850 psig
  • A TC or BOP verifies Steamline pressure> 500 Basis for Selection: pSlg SAFETY SIGNIFICANCE -- Failure to manually actuate SI under the Crew determines SI is Required; ATC manually postulated conditions constitutes actuates SI by depressing both trains' pushbuttons.

"misoperation or incorrect crew performance that leads to degraded ATC/BOP, Sounds Standby Alarm, announces reactor ECCS capacity." trip and safety injection.

BVPS lL8 Scenario 3, Rev 1 13 of24

BEAVER VALLEy . .JWER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS / PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENTS 6, 7, 8, & 9 (continued) BOP checks IVS-F-4A(B), Leak Collection Exhaust Fan - at least ONE RUNNING ROLEPLAY: Crew dispatches an operator to perform IOM-46.4.G After the crew has opened the control to place hydrogen analyzers in service.

room operated valves and dispatched a field operator; Wait 7 minutes then insert:

IMF XN02097 (0 0) ON IMF XN02105 (0 0) ON Then report back to the CR that the WR Hydrogen analyzers have been placed III servIce.

DF Bus has no power. ATC verifies SI System Status

  • A charging pump running
  • A LHSI pump running
  • BIT Flo\v indicated, DF Bus has no power. BOP verifies AFW status
  • "A" motor-driven pp not running & won't start
  • Turbine-driven pump (OOS on turnover)

A7-7 is LIT, turbine driven pump tripped

  • AFW Throttle valves open
  • AFW flow is zero.

BOP reports no Aux Feedwater pumps running and no aux feed water flow.

BOP reports that "A" train AFW throttle valves are all open and have power. "B" train valves were last open before power was lost.

BVPS - 1L8 Scenario 3, Rev 1 140f24

BEAVER VALLEY . ..JWER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS / PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENTS 6, 7,8, & 9 (continued) SRO recognizes that AFW flow cannot be established and enters FR-H.l ATC checks if secondary heat sink is required by:

  • Verifying RCS press is > any non-faulted S/O.
  • RCS Hot leg temperatures> 350°F.

NOTE: Crew checks ifRCS Bleed and Feed should be PORV's may lift several times during initiated.

this transient due to natural circulation being established while Safety Injection

  • BOP verifies Wide Range level in at least 2 flow is occurring. S/O's is greater than 14%.
  • ATC verifies Pzr pressure is less than 2325 With WR levels >14%, PORV's pSlg.

opening are not due to Loss of Heat Sink; Bleed and Feed is not required. SRO notifies crew that this is a continuous action step.

BOP checks Primary Plant Demineralized Water storage tank level is > 27.5 feet.

BVPS - J L8 Scenario 3, Rev 1 150f24

BEAVER VALLEY . ,;WER STATION INSTRUCTIONAL GUIDELINES mr=e=LANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE .~

EVENTS 6, 7, 8, & 9 (continued) Crew tries to establish AFW flow to at least 1 S/O.

ATC/BOP verifies S/O Blowdown and blowdown ROLEPLAY: sample lines are isolated.

When directed to investigate AFW pump status, wait 3 minutes then report: Crew confirms

  • "A" motor-driven pump won't start Aux feed pump room is inaccessible * "B" motor-driven pump has no power due to heat and steam.
  • Turbine-driven pump previously OOS If dispatched to Emergency Switchgear, BOP reports that "A" train AFW throttle valves are all report IFW-P-3A -ACB lE16 ground open and have power. "B" train valves were last open OC relay 50- VE 1160 is flagged. before power was lost.

Crew recognizes that local suction pressure is not available due to room being inaccessible.

SRO continues to try to restore AFW flow while continuing in procedure.

BOP confirms AFW flow is not> 370 gpm.

ROLEPLAY: SRO dispatches operator with attachment 2-K to When dispatched with attachment 2-K, establish alternate AFW flow using the Dedicated actuate TRG! 14. 1FW-P-4 will start AFWpump.

in 3 minutes with the discharge valve opening 15 seconds later. SRO directs crew to reset SI and FWI signals.

Report in to the control room that 1FW ATC/BOP resets; P-4 is running and Attachment 2-K has

  • SI signal - both trains been completed up through step 8.
  • FWI signal - both trains.

BVPS - lL8 Scenario 3, Rev 1 16of24

BEAVER VALLEY . ..JWER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENTS 6, 7, 8, & 9 (continued) ATC/BOP opens "A" & "B" Feedwater cnmt isol valves, HYV-IFW-IOOA & B.

Critical Task: FR-H.1.A Feedwater flow established BOP throttles the Bypass feed regulating valves to Crew establishes feedwater flow into at S/G levels begin rising. establish flow to the "A" and "B" S/G's least one SG before RCS feed and bleed is required.

Basis for Selection:

SAFETY SIGNIFICANCE -- Failure to establish feedwater flow to any SG results in the crew's having to rely upon the lower-priority action of establishing RCS bleed and feed to minimize core uncovery. This constitutes incorrect performance that "leads to degradation of any barrier to 11ssion product release."

NOTE:

At this point the faulted S/G ("C") is readily apparent, ifthe crew initiates Feedwater flow to the "c" S/G at this time, they must isolate it in E-2 to meet Critical Task E-2.A SRO completes CR steps of Attachment 2-K.

SRO returns to procedure and step in effect, FR H.I step 4.e RNO.

Feedwater flow >370 gpm now verified.

SRO returns to E-O, Step 9 IA W FR-H-I, step 4.f.

BVPS - I L8 Scenario 3, Rev I 170f24

BEAVER VALLEY . ..>WER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENTS 6, 7,8, & 9 (continued)

NOTE: List of Attachment l-K Discrepancies: SRO directs BOP to perform Attachment l-K Evaluation of BOP performing Attachment l-K begins on page Safety Injection failed to automatically actuate, Manual SI initiated satisfactorily.

  1. 1 EDG failed to auto start, did start manually
  1. 2 EDG failed No AFW pumps running NOTE: RCS temperature decreasing due to faulted S/G. ATC checks RCS temp. stable at or trending to 547°F Main steam line isolation signal was not inhibited for this scenario; SRO directs A TC to close or verify closed, all main therefore, dependant upon faulted S/G steam trip and bypass valves.

pressure, automatic MSLI may have already occurred by this time.

ATC Check Recirc Spray Pumps NONE RUNNING ATC verifies PRZR isolated

  • Spray Valves - CLOSED
  • PRT conditions - CONSISTENT WITH EXPECTED VALUES
  • Power to at least one valve AVAILABLE
  • Block valves - AT ONE OPEN BVPS IL8 Scenario 3, Rev 1 180f24

BEAVER VALLEY. --,WER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENTS 6, 7, 8, & 9 (continued) ATC checks if RCPs should be stopped

  • DIP between RCS pressure and highest S/G pressure - LESS THAN 200 PSID [350 PSID ADVERSE CNMT]
  • Criteria for stopping is not met - Leaves RCPs runmng ATC/BOP checks if any S/Gs are faulted
  • Pressures in all S/Gs - ANY DROPPING IN AN UNCONTROLLED MANNER OR
  • ANY S/G COMPLETELY DEPRESSURIZED Crew determines "C" S/G is faulted.

SRO transitions to E-2.

ATC/BOP actuates CREVS DF Bus has no power.

  • Verifies the control room air intake and (only "A" train of power is available) exhaust Dampers are CLOSED.

SRO requests a BV-2 operator to verify Unit 2 CREVS actuation.

SRO directs STA to Commence Control Room ventilation actions. Refer to Attachment 4-F.

NOTE: A TC/BOP verifies steamline isolation has occurred by Main steamline isolation should have checking all YELLOW SLI identified components are already occurred and verified via in the designated position. (previously verified) attachment 1-K by this time, crew not likely to verify again at this time.

BVPS - 1L8 Scenario 3, Rev 1 190f24

BEAVER VALLEy. JWER STATION CTNSTRl.JCTIONAL GUIDELINES r PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENTS 6, 7, 8, & 9 (continued) "C" S/G pressure is lower than "A" & "B. BOP identifies "A" & "B" steam generator pressures "A" & "B" may be slowly lowering as expected are "Stable or rising".

due to the cooldown. Crew should respond with "Stable" for "A" & "B" S/G's.

"C" S/G pressure & level lowering. Crew identifies "C" S/G as faulted.

Critical Task: E~2.A BOP isolates the faulted, S/G as follows; Crew isolates the faulted S/G and directs operator to close isolation valves

  • Verifies FWI (previously verified via operated from outside of the control Attachment l-K) room before transition out of E~2.
  • Closes AFW throttle valves on "C" S/G MOV-IFW-151A, B Basis for Selection:
  • Directs field operator to verify closed IMS-17 SAFETY SIGNIFICANCE -- Failure to and Verify open IMS-15 and IMS-16. (Crew isolate a faulted S/G that can be isolated recognizes that MSVR is inaccessible and that causes chaiienges to CSFs beyond those the valves were in correct positions on irreparably introduced by the postulated turnover) conditions. Also, depending upon the
  • Verifies closed, "C" S/G Atmospheric steam plant conditions, it could constitute a dump valve.

demonstrated inability by the crew to

  • Verities Residual Heat Release Valve is recognize a failure of the automatic closed.

actuation of an ESF system or

  • Verifies main feedwater alignment to "C" S/G component is isolated. (either CNMT isol valve or Main &

Bypass Feed regulating valves CLOSED)

BOP verifies PPDWST level is> 27.5 feet.

BVPS I L8 Scenario 3, Rev 1 200f24

BEAVER VALLEy . .JWER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENTS 6, 7, 8, & 9 (continued) Crew checks if S/G tubes are intact

  • Check all S/G levels NONE RISING IN AN UNCONTROLLED MANNER
  • Check Secondary Radiation CONSISTENT WITH PRE-EVENT VALUES Determines no S/G levels are rising in an uncontrolled manner and Secondary Radiation is CONSISTENT WITH PRE-EVENT VALUES; Crew determines S/G Tubes INTACT.

Crew checks if SI be Reduced A TC verifies RCS Subcooling is greater than 46°F

[54°F ADVERSE CNMT] based on CETC's BOP confirms secondary heat sink available by >370 gpm of feed flow available OR NR level in at least 1 S/G> 31 % [50% ADVERSE CNMT].

ATC confinns RCS pressure is stable or rising.

ATC confirms Pzr level is> 17% [38% ADVERSE CNMT]

Crew determines that current plant conditions support SI reduction.

SRO determines transition to 1.1, SI Termination is appropriate.

BVPS - IL8 Scenario 3, Rev 21 of24

BEAVER VALLEY. --,WER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE Terminate scenario when the crew determines transition to ES-l.l is appropriate.

Classify Event:

SAE, Site Area Emergency is appropriate classification per the Fission Product Matrix; Tabs 1.1.1 and 1.2.1 - Potential Loss Heat Sink Red Path.

BVPS 1L8 Scenario 3, Rev 1 220f24

BEAVER VALLEY. -,WER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE Attachment l-K 'Verification of BOP performs the verifications/actions of Attachment Automatic Actions' l-K 'Verification of Automatic Actions' as follows:

EDG failed to auto start, manual successful Diesel generators BOTH RUNNING EDG is not Station Instrument Air Header Pressure - GREATER THAN 100 PSIG Ensure Reheat Steam Isolation Ensure Reheat Steam Isolation

  • Verify [MOV-IMS-IOOA,B] - CLOSED
  • Reset reheater controller.

DF bus has no power Verify CCR Pumps - TWO RUNNING Align Neutron Flux Monitoring For Shutdown

  • Transfer [NR-INI-45] Nuelear Recorder to operable source and intermediate range displays.

DF bus has no power Verify River Water System In Service

  • RPRW Pumps - TWO RUNNING
  • Check CCR Heat EX RW pressure GREATER THAN 20 PSIG BVPS - I L8 Scenario 3, Rev I 230f24

BEAVER VALLEY. JWER STATION

[m INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE Attachment l-K 'Verification of Check If Main Steamline Isolation Required Automatic Actions' (continued)

-OR

  • Steamline pressure - LESS THAN 500 PSIG

-OR

  • Steamline pressure high rate of change - ANY ANNUNCIATOR Annunciator A7-41, A7-49 or A7-57 Determines steamline isolation is required and verifies SLI occurred by checking all YELLOW SLI marks LIT.

Check cm And CNMT Spray Status

  • Containment pressure - HAS REMAINED LESS THAN 11 PSIG Verify ESF Equipment Status Actuation failure of automatic SI, manual
  • Verify SI status by checking all RED SIS marks actuation successful. -LIT No AFW pumps running
  • Verify CIA by checking all ORANGE CIA marks - LIT
  • Verify FWI by checking all GREEN FWI marks-LIT Verify Power To Both AC Emergency Busses.

Discrepancies: Upon Completion, Report Any Discrepancies to No train B power, Only AE 4kv bus is energized SM/US.

  1. 1 EDG failed to automatically start SI failed to automatically actuate.

AFW pumps running BVPS lL8 Scenario 3, Rev 1 240[24

A ppen d'IX 0 . 0 utrme 5 cenano II Facility: BVPS Unit 1 Scenario No.:4 Op Test No.: ILOT8 NRC Examiners: Candidates: SRO ATC BOP Initial IC 255(10): 100% power, BOL, Equ. XE Conditions, CB "D" @ 225 steps, RCS boron Conditions: 1434 ppm.

Turnover: Maintain 100% power.

PCV-1 RC-4S6 isolated due to seat leakage, block valve closed. TS 3.4.11, Condition A Critical Tasks: 1. FR-S.1.C Initiate negative reactivity

2. FR-S.1.B Start Auxiliary Fe~:dwater pumps
3. E-O.O Close cnmt isolation valves Event Malf. No. Event Type Event Description No.

IMF PRS06A (0 0) 0 (I) ATC, SRO LT IRC-459 fails low, letdown isolates, crew removes 1

5 (TS) SRO channel from service.

2 N/A (N) ATC, SRO letdown j

IMF TUR15 (0 0) 78 (C)ATC, SRO Turbine valve position limiter fails low, causes - 100 mw JO (TS)SRO load reduction, 1 Rod stuck at ARO position.

IMFCRFllBR 0 4 IMF FWM09C (1 0) (C) BOP, SRO "c" SG Feedwater valve, FCV-IFW-498, begins oscillating, 250 requiring BOP to manually control level.

IMP TUR03E (0 0) (C) BOP, SRO Turbine high bearing vibration requires crew to manually trip 5

15 8 the unit.

IMF CRF02A (50) (M) ALL Reactor fails to trip from the control room, requires entry into 6

IMF CRFl2A FR-S.l, ATC manually inserts control rods.

IMFCRFl2B 7 IMF IN H20 (C) BOP, SRO All Aux Feedwater pumps fail to automatically start, requires IMF INH21 BOP to start AFW pumps.

IMF INH35 IMF INH36 8 IMF MSS02C (4 0) (M)ALL Main st<:::am line break downstream ofMSIV's, causes safety 3.5E6 20 0 injection actuation.

IMF INH49 (C) ATC, SRO Train "A" CIA fails to actuate along with train "B" valve 9

IMF VLV-SEAIO (0 MOV-ICH-381 failing to automatically close, ATC must

0) 1000100 manually actuate CIA or close MOV-ICH-38L (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor NUREG-1021 , Revision 9 Supplement 1 FENce Facsimile Rev. 1

Appendix D Scenario Outline 1L8N4

'.fter taking the shift at 100% power, LT-IRC-459 will fail low, letdown will automatically isolate. The SRO will direct the ATC to remove the 459 channel from service in accordance with IOM-6.4.IF.

The ATC will restore letdown using IOM-7.4.AF, "Restoring Charging and Letdown," while the SRO reviews applicable Technical Specifications for the level transmitter failure.

A malfunction will then occur with the turbine valve position limiter causing a load rejection, rods will auto insert in response. Rod P-8 will be stuck at 225 steps and not insert with the rest of control bank D.

At the same time, a malfunction will occur with the "c" main feed regulating valve, (FCV-IFW-498) causing oscillations in the "C" S/G level requiring the BOP to manually stabilize and control level.

The SRO will enter AOP 1.35.2, "Load Rejection," initially and then after the plant has stabilized enter AOP 1.1.8, "Rod Inoperability," and address the rod misalignment with applicable technical specifications.

A main turbine bearing #5 will exhibit high vibrations, at 15 mils the ARP for A 7-104, probable cause 5 will require a unit trip.

The ATC will unsuccessfully attempt to trip the reactor from BB-B and BB-A.

The SRO will enter FR-S.l with the ATC and BOP performing the lOA's.

The reactor will be locally tripped 2 minutes after the crew dispatches an operator to locally trip the reactor.

The ATC will verify reactor power is <5% after which the SRO will return to E-O.

Additional malfunctions that occur during the ATWS condition are that all the Aux feed water pumps fail to automatically start, all can be manually started.

\ main steam line break will also occur downstream of the MSIV's, this will be isolated via automatic MSLI.

i'he safety injection that occurred as a result of the MSLB will fail to actuate the train "A" CIA signal, and MOV-1 CH-381 (a train "B" CIA valve) will fail to automatically close. The crew will be required to isolate the containment penetration via either manually actuating Train "A" CIA or manually closing MOV -1 CH-38 1.

After returning to E-O, the SRO will determine that SI is not required. The scenario will be terminated after the crew determines that transition to ES-l.1 is appropriate.

Expected procedure flow path is E-O ~ FR-S.l ~ E-O.

NUREG*1 021, Revision 9 Supplement 1 FENOC Facsimile Rev. 1

BEAVER VALLEY I JWER STATION INITIAL CONDITIONS: 100 % Power, CBD = EQU XE BOL, 1434 PPM Boron, IC-255 ADDITIONAL LINEUP CHANGES STICKERS VOND MARKINGS MOV-1 RC-536 closed with power maintained YCTonCS SHIFT TURNOVER INFORMATION

1. 100% power, BOL equilibrium conditions, shift goal is to maintain 100% power.

SCENARIO SUPPORT MATERIAL REQUIRED L None Required BVPS - 1L8 Scenario 4, Rev 1 301'24

BEAVER VALLEY t-0WER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS / PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE Initialize IC 255, and establish initial Reactor plant at 100% power, BOL, equilibrium plant conditions. conditions. RCS boron =1434 PPM, CBD = 225 steps.

Insert the following per the Simulator Inserts all pre-loads required to support the drill Setup section of the HTML File for this drill:

IMF CRF12A Auto Rx trip failure (FR-S.l)

IMFCRF12B Manual Rx trip failure (FR-S.1)

IMF CRF14A (2 120) RTB "A" manually opened IMF CRF14B (2 125) RTB "B" manually opened IRF CRF03 (2 140) 1 "A" Rod Drive MG set output breaker opened IRF CRF04 (2 145) 1 "B" Rod Drive MG set output breaker opened TRGSET 4 'MCRFNS(41).LE.165' Set trigger 4 on CBD rods < 165 steps IMF MSS02C (4 0) 3.5E6 20 0 Steam line break during ATWS transient IMF INH20 (0 0) TRUE TV-IMS-105A auto open fail IMF INH21 (0 0) TRUE TV-IMS-I05B auto open fail IMF INH35 (0 0) TRUE FW-P-3A auto start failure IMF INH36 (0 0) TRUE FW-P-3B auto start failure IMF INH49 (0 0) TRUE Train A CIA auto actuation failure IMF VLV-SEA10 (0 0) 1000100 MOV-ICH-381 auto CIA closure failure TRGSET 3 'X06I0570' Set trigger 3 on MOV-ICH-381 closure attempt TRG 3 'DMF VLV-SEA10' MOV-ICH-381 closure attempt successful IMF CRFBR (0 0) 1 Rod P-8 mechanically stuck at 225 TRGSET 6 'X100034G == l' Set trigger 6 on TV-IMS-I0IC2 Closed IMF SIS08 (6 0) Actuate Safety Injection ifMSIV's are pre emptively closed prior to SI actuation.

TRGSET 1 'JMLTUR15 == l' Set trigger 1 on VPL failure IRF PLP-MAL07 (1 0) 180 0 Set oscillation period = 3 minutes IMF FWM09C (1 0) 25 FCV-1 FW-498 oscillates in auto TRGSET 5 'JMLTUR3(5) == l' Set trigger 5 on turbine bearing failure IMF CRF02A (5 0) Auto Rod Insertion failure BVPS - lL8 Scenario 4, Rev 1 40f24

BEAVER VALLEY . JWER STATION c=!NSTRUCTIONAL GUIDEI..INES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE Assign shift positions ATC:_ _ _ _ _ _ _ __

BOP:,_ _ _ _ _ _ _ _ _ ___

Conduct a shift turnover with oncoming Simulator Frozen until after shift turnover unless operators. it needs to be run momentarily for an alignment change.

When the shift turnover is completed, Simulator running. Crew assumes control ofthe Unit.

place the simulator to RUN and commence the scenario.

BVPS IL8 Scenario 4. Rev 1 50f24

BEAVER VALLEY r- JWER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENT 1:

Pressurizer level transmitter Channel 1 pzr level indication drops. Charging Crew notes alarms and determines level transmitter LT-IRC-459 fails low. flow and actual PRZR level rise. failure.

IMF PRS06A (O 0) 0 5 A4-4, PRZR Control Low Level Deviation, ATC takes manual control ofFCV-lCH-122 to reduce A4-3, PRZR Control Level Low, charging flow.

(A4-3 & 4 are both due to transmitter failure).

A4-35, PRZR Heater Group Auto Trip, (upon BOP reviews ARP's.

letdown isolation).

A3-58, Charging Pump Disch Flow High-Low A3-78, React Cool Pp Seal Injection Flow Low NOTE: SRO implements Instrument Failure procedure, ATe selects Pos 3, to replace 459 channel with 461 If level transmitter failure not lOM-6.4.lF, attachment 1. channel immediately recognized, crew may initially enter AOP 1.7.1, Loss ATC selects alternate channel, 460 or 461, for input to Charging or Letdown. the level recorder.

ATC ensure adequate makeup to the vcr and ensures pzr heaters are operating as necessary or manually operates heaters.

SRO directs ATC to restore letdown lA W With letdown isolated, ATC may reduce seal injection 10M-7.4.AF, Restoring Charging and Letdown. flow to minimize pzr level rise.

BVPS 1L8 Scenario 4, Rev 1 60f24

BEAVER VALLEY. ..JWER STATION rm INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENT 1:

Pressurizer level transmitter SRO references Technical Specifications:

LT -1 RC-459 fails low. 3.3.1 (RTS Instrumentation) Condition A; immediately enter the Condition referenced in Table 3.3.1-1 function 9 (PRZR level high) Condition K; trip channel in 72 hrs. or reduce power to < P-7 in 78 hrs.

SRO determines following TS are for tracking only 3.3.3 (PAM instrumentation) Table 3.3.3-1 function 11 is met ifLT 460 and LT461 are operable.

3.3.4 (Remote Shutdown System) Table B.3.3.4-1 function 4.a requirement is met if LT460 is operable.

BVPS - 1L8 Scenario 4, Rev 1 70f24

BEAVER VALLEY . ,.JWER STATION I INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENT 2: ATC restores Letdown lAW lOM-7.4.AF as follows:

Restoration of Letdown directed; raises VCT level to 43% and manually cycles PCV-ICH-14S.

Verifies TV -I CH-204 , Regen HxJLtdn outlet cnmt isol valve is OPEN.

Verifies all Ltdn orifice isolation valves CLOSED TV-I CH-200A, 200B, & 200C Places Ltdn back press reg valve, PCV-ICH-145, in MANUAL with controller set at 25% (75% open)

Places Charging flow to regen hx inlet control valve, FCV-ICH-122 in MANUAL and CLOSED.

Verifies Charging Cnmt Isolation valves open; MOV-ICH-310 & MOV-ICH-289 Opens Letdown to Regen Hx Inlet Isolation valves; LCV-ICH-460A & LCV-ICH-460B MANUALLY adjusts FCV-ICH-122 to establish indicated flow on FI-ICH-122A.

BVPS - lL8 Scenario 4, Rev 1 80[24

BEAVER VALLEY. JWER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENT 2: (continued) Restoration of Letdown Monitors Letdown Pressure (PI-ICH-145) and Flow (Fl-l CH-ISO) while placing letdown orifices in servlCC.

Opens TV-ICH-200A and adjusts FCV-ICH-122 as necessary to prevent flashing.

If directed to place a second orifice in service; ATC adjusts PCV -1 CH-145 as necessary to maintain 120 - 140 psig on PI-lCH-14S.

Opcns TV-ICH-200B or C and adjusts FCV-ICH-122 as necessary to prevent flashing.

Adjusts PCV-ICH-145 to obtain 300 psig on PI-ICH 145 and places controller in AUTO.

Adjusts FCV-ICH-122 as necessary to restore pzr level to program level then places FCV-ICH-122 controller in AUTO.

Verifies all RCP seal injection flows between 6-9 gpm and adjusts HCV-ICH-186 as necessary.

Proceed with next event at discretion BVPS - 1L8 Scenario 4, Rev 1 901'24

BEAVER VALLEY . .JWER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENTS 3, 4 & 5:

Turbine Runback due to Valve Position Rods begin stepping in, IA W Immediate Operator Action of AOP 1.1.3, ATC limiter failure, Rod P-8 mechanically Megawatts decrease announces unexpected rod motion, verifies megawatts stuck out and FCV -1 FW-498 begins RCS temperature and pressure rise accordingly decreasing and announces load rejection.

oscillating due to load change.

IMF TUR15 (0 0) 78 10 Following commands pre-loaded IMF CBRllBR (0 0) 1 IRF PLP-MAL07 (1 0) 180 IMF FWM09C (1 0) 25 SRO enters AOP 1.35.2, Load Rejection ATC checks Rods are inserting in AUTO and Tavg is dropping to Tref.

ATe identifies rod P-S as being misaligned from bank and fully withdrawn, informs SRO.

SRO enters AOP 1.1.8 for misaligned Rod ATC places Rod control in MANUAL A TC verifies the Rx is critical with Tavg > 541°F.

ATC checks Tavg within 4°F ofTref.

If Tavg/Trefmismatch is > 4°F, BOP adjusts Turbine Load as necessary to maintain Tavg within 4 OF of Tref.

BVPS - 1L8 Scenario 4, Rev 1 100f24

BEAVER VALLEY . JWER STATION INSTRUCTIONAL GUIDELINES nnl PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE J EVENTS 3, 4 & 5: (continued)

SRO reviews Technical Specification 3.1.4, NOTE: Conditions A and B for applicability.

May need to ask follow-up questions regarding TS 3.1.4 applicability; Condition A: Rod P-8 is INOPERABLE, within 1 LCO 1.4 NOTE states that hour verify SOM within limits OR Initiate boration to verification of operability is not restore SOM AND be in Mode 3 within 6 required for the first hour following rod motion. Additionally, Part B of AOP Condition B: Rod P-8 not within alignment limits, 1.1.8 does not provide positive within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> restore rod to within alignment limits indication (A4-1 05 is NOT LIT) that OR either verify SOM or initiate boration to restore the rod is operable. SDM AND reduce Thermal power to:::S 75% RTP Following the Rx trip, the crew will within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

identify that the rod remains at 225 steps and will therefore be positively confirmed as being "inoperable",

therefore Conditions A and B would have been applicable at the time.

When the BOP notices Main Feed A7-61, SO IC Level Deviation From Setpoint BOP notes erratic automatic operation informs SRO Regulating Valve oscillations. and takes manual control of main feed regulating valve, FCV-IFW-498 and restores stable level at setpoint.

SRO provides a control band and Rx trip criteria for operation ofFCV-IFW-498 in Manual.

Crew notifies I&C of FCV-IFW-498 controller auto control failure with satisfactory manual control.

Continue with next event at LE discretion BVPS 1L8 Scenario 4, Rev I 11 of24

BEAVER VALLEY. JWER STATION

[ INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENT 6:

Main turbine bearing #5 high vibration. Bearing #5 vibration at 15 mils, adjacent BOP acknowledges and reports bearing vibration bearings also indicate abnormally high indications.

IMF TUR03E (0 0) 158 vibration.

ATC reviews ARP.

NOTE: A 7-104, Turbine Supervisory Instrument ARP directs an immediate turbine trip if Trouble bearing vibration exceeds 14 mils ROLEPLAY:

2 minutes after malfunction inserted report in to the Control Room as field operator; "State that the turbine deck is shaking."

BVPS - IL8 Scenario 4, Rev 1 120f24

BEAVER VALLEY . ...JWER STATION I_m INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENTS 7 - 10, (all preloaded)

ATWS Crew determines that a manual turbine trip is AFW pump auto start failures warranted.

MSL break downstream of MSIV' s Train "A" CIA actuation failure with ATC attempts a manual reactor trip, reports trip failure ofMOV-ICH-381 to auto close. failure! ATWS condition.

IMF CRF12A (0 0)

IMF CRF12B (0 0)

IMF CRF02A (5 0)

(pre1oaded)

SRO enters FR-S.1 US directs operators to perform lOA ofFR-S.l, implements FR-S.l at step 1 ofE-O.

BVPS - 1L8 Scenario 4, Rev 1 13 of24

BEAVER VALLEY. JWER STATION r INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENTS 7 - 10, (continued)

CriticaJ Task FR-S.1.C: When Bank D Rods insert to <165 steps, a Crew performs Immediate Operator Actions of FR-S. 1 Crew inserts negative reactivity into the steam line break will occur downstream of the core by inserting RCCAs before MSIV's, this is to ensure a SI initiates, the BOP manually trips Turbine completing the immediate action steps steam break will isolate by automatic MSLI ofFR-S.1. signal. A TC places rods in Manual and begins inserting rods.

Basis for SeJection:

SAFETY SIGNIFICANCE -- Failure to insert negative reactivity, under the postulated plant conditions, results in an unnecessary situation in which the reactor remains critical or returns to a critical condition. Performance of the critical task would make the reactor subcritical and provide sufficient shutdown margin to prevent (or at least minimize the power excursion associated with) any subsequent return to criticality.

Failure to insert negative reactivity constitutes "mis-operation or incorrect crew performance which leads to incorrect reactivity control (e.g., failure to initiate emergency boration or manually insert RCCAs)."

BVPS - 1L8 Scenario 4, Rev 1 140f24

BEAVER VALLEY . ..JWER STATION r

INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENTS 7 -10: (continued)

Critical Task FR-S.l.B BOP verifies AFW status, Notes there are NO AFW Crew starts AFW pumps before WR SG pumps running.

level is less than 10%.

BOP manually starts 1FW-P-3A and IFW-P-3B Basis for Selection: motor-driven AFW pumps.

SAFETY SIGNIFICANCE -- Failure to start at least the minimum required BOP manually opens TV-IMS-I05A and 105B to start number of AFW pumps under the Turbine-driven AFW pump, 1FW-P-2 and verifies postulated plant conditions can lead to pump running by A7-7 NOT lit.

violation of the RCS emergency stress limit. BOP verifies all AFW throttle valves are open.

IMFINH20 BOP verifies AFW flow.

IMF INH21 IMFINH35 IMFINH36 (preloaded)

Crew initiates Emergency Boration Flow by; Verifying at least 1 charging pump is running Checking Safety Injection is NOT actuated.

Aligning Boration path by; Opening MOV-ICH-350 Starting "A" Boric Acid pump in "FAST" Verifying Emergency Boration flow> 30 gpm.

Aligning Charging flow path by adjusting FCV-1CH 122 to establish> 75 gpm charging flow.

Verifying RCS pressure is < 2335 psig.

BVPS - 1L8 Scenario 4, Rev 1 1501'24

BEAVER VALLEY, JWER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENTS 7 -10: (continued)

Crew alerts plant personnel by; ROLEPLAY:

  • Sounding the standby alarm When requested to open the reactor trip
  • Announcing a Unit 1 Rx trip wlo SCRAM breakers & trip the rod drive MG set
  • Dispatching an operator to locally trip the Rx.

output ACBs, inseli:

TRG!2 Following commands are preloaded, activate Trigger 2 as soon as requested, 1st Rx trip breaker will open 2 minutes after actuating Trigger 2.

IMF CRF14A (2 120)

IMF CRF14B (2 125)

IMF CRFOIA (2140) 1 IMF CRFOIB (2145) 1 ROLEPLAY:

When all breakers are open, report actions to the control room.

Crew continues in FR-S.l after dispatching an BOP verifies turbine is tripped.

operator. BOP verifies MOV-IMS-I00A, B automatically CLOSED.

BOP depresses the RESET Pushbutton on the Reheater Controller.

A TC checks if SI is actuated.

BVPS - 1L8 Scenario 4, Rev 1 160f24

BEAVER VALLEy. JWER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENTS 7 -10: (continued)

NOTE: ATC checks ifRx is subcritical This is a continuous action step, when

  • Power range channels < 5%

the Rx is locally tripped the crew

  • IR channels - negative startup rate.

return to this step and then Transition back to E-O, Step 1.

When the Rx is locally tripped.

SRO returns to E-O, step 1.

ATC verifies Reactor trip

  • Rx trip and bypass breakers open
  • Power range indication is < 5%
  • Throttle OR Governor valves ALL closed
  • Main Generator output brks - open
  • Exciter Circuit breaker open BOP verifies Power to AC Emergency Busses
  • Using VB-C voltmeters, verifies either AE or DF has voltage indicated.

BOP identifies that both emergency busses are energized from off-site power.

SI automatically actuated due to the Main Steam Check SI Status Line Break.

  • ATC checks that SI is actuated
  • ATC manually actuates SI by depressing both trains BVPS - 1L8 Scenario 4, Rev 1 170f24

BEAVER VALLEy. JWER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENTS 7 -10: (continued) ATC/BOP, Sounds Standby Alarm, announces reactor trip and safety injection.

BOP checks 1VS-F-4A(B), Leak Collection Exhaust Fan - at least ONE RUNNING.

ROLEPLAY: Crew dispatches an operator to perform IOM-46.4.G After the crew has opened the control to place hydrogen analyzers in service.

room operated valves and dispatched a field operator; Wait 7 minutes then insert:

IMF XN02097 (0 0) ON IMF XN0210S (0 0) ON Then report back to the CR that the WR Hydrogen analyzers have been placed m serVIce.

A TC verifies SI System Status

  • Two charging pumps running
  • Both LHSI pumps running
  • BIT Flow indicated, BOP verifies AFW status
  • Both motor-driven pumps running
  • Turbine-driven pump TV-I MS-105A, B open A7-7 is NOT LIT, turbine driven pump runnmg
  • AFW Throttle valves open
  • AFW flow> 370 gpm is indicated.

BOP reports ALL Aux Feedwater pumps were manually started earlier in FR-S.l.

BVPS - IL8 Scenario 4, Rev 1 180f24

BEAVER VALLEY, JWER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENTS 7 -10: (continued)

NOTE:

Evaluation of BOP perfonning SRO directs BOP to perfonn Attachment l-K -K begins on page 23. List of Attachment l-K Discrepancies:

Critical Task E-O.O: Train "A" CIA failed to actuate.

Crew closes Cnmt isolation valves such Train "B" CIA valve, MOV-ICH-381 failed to that at least one valve is closed on each automatically close.

critical phase A penetration before the All AFW pumps failed to automatically start, all end of the drill. started manually.

Basis for Selection:

SAFETY SIGNIFICANCE -- Failure to close at least one containment isolation valve on each critical phase-A penetration, lmder the postulated plant conditions and when it is possible to do so, constitutes "mis-operation or incorrect crew perfonnance which leads to degradation of any barrier to fission product release." In this case, the containment barrier is needlessly left in a degraded condition.

NOTE:

Main steam line isolation signal was not Due to S/G Fault that was isolated by automatic ATC checks RCS Tavg stable at or trending to 547°F inhibited for this scenario, fault was MSLI, RCS temperature less than 547°F but is inserted to cause SI, therefore, now trending to 547°F.

automatic MSLl will have already occurred by this time.

ATC Check Recirc Spray Pumps BVPS lL8 Scenario 4, Rev 1 190f24

BEAVER VALLEy. JWER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENTS 7 -10: (continued) A TC verifies PRZR isolated

  • Spray Valves - CLOSED
  • PRT conditions CONSISTENT WITH EXPECTED VALUES
  • Power to at least one block valve AVAILABLE
  • Block valves AT LEAST ONE OPEN A TC checks if RCPs should be stopped
  • DIP between RCS pressure and highest S/G pressure LESS THAN 200 PSID [350 PSID ADVERSE CNMT]

Crew determines for stopping Rep's is not met - Crew leaves RCPs running.

ATC/BOP checks if any S/Gs are faulted

  • Pressures in all S/Gs - ANY DROPPING IN AN UNCONTROLLED MANNER OR
  • ANY S/O COMPLETELY DEPRESSURIZED Crew determines NO S/G's are faulted.

BVPS - lL8 Scenario 4, Rev 1 20of24

BEAVER VALLEy. JWER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS / PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENTS 7 -10: (continued) Crew checks if S/G tubes are intact

  • Check all S/G levels - NONE RISING IN AN UNCONTROLLED MANNER
  • Check Secondary Radiation - CONSISTENT WITH PRE-EVENT VALUES Crew determines no S/G levels are rising in an uncontrolled manner and Secondary Radiation - is CONSISTENT WITH PRE-EVENT VALUES.

Crew determines S/G Tubes ARE INTACT.

Crew checks if RCS is intact by checking cnmt conditions consistent with pre-event values.

  • Cnmt radiation
  • Cnmt pressure
  • Cnmt sump level Crew determines the RCS is intact based on cnmt conditions being consistent with pre-event values.

BVPS - lL8 Scenario 4, Rev 1 210f24

BEAVER VALLEY I JWER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS / PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE EVENTS 7 -10: (continued) Crew checks if SI flow should be reduced A TC verifies RCS Subcooling is greater than 46°F based on CETC's BOP confinns secondary heat sink available by >370 gpm of feed flow available OR NR level in at least 1 S/G> 31%.

ATC confinns RCS pressure is stable or rising.

A TC confinns Pzr level is > 17%.

Crew detennines that current plant conditions support SI reduction.

SRO detennines transition to ES-1.1, SI Tennination is appropriate.

Tenninate scenario when the crew detennines transition to ES-1.1 is appropriate.

Classify Event:

SITE AREA EMERGENCY due to TAB 2.3, Failure of the reactor protection system.

BVPS lL8 Scenario 4, Rev 1 220f24

BEAVER VALLEY , JWER STATION CTNSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE Attachment l-K 'Verification of BOP performs the verifications/actions of Attachment Automatic Actions' l-K 'Verification of Automatic Actions' as follows:

Both EDG' s are running Diesel generators - BOTH RUNNING Station Instrument Air Header Pressure - GREATER THAN 100 PSIG Ensure Reheat Steam Isolation Ensure Reheat Steam Isolation

  • Verify [MOV-IMS-IOOA,B] - CLOSED
  • Reset reheater controller.

Verify CCR Pumps - TWO RUNNING Align Neutron Flux Monitoring For Shutdown

  • Transfer [NR-INI-45] Nuclear Recorder to operable source and intermediate range displays.

Verify River Water System In Service

  • RPRW Pumps - TWO RUNNING
  • Check CCR Heat EX R W pressure GREATER THAN 20 PSIG BVPS - 1L8 Scenario 4, Rev 1 230f24

BEAVER VALLEY I JWER STATION INSTRUCTIONAL GUIDELINES PLANT STATUS I PROCEDURAL GUIDANCE EXPECTED STUDENT RESPONSE Attachment l-K 'Verification of Check If Main Steamline Isolation Required Automatic Actions' (continued)

-OR

  • Steamline pressure - LESS THAN 500 PSIG

-OR

  • Steamline pressure high rate of change - ANY ANNUNCIATOR LIT Annunciator A7-41, A7-49 or A7-57 Determines steamline isolation previously occurred.

Check CIB And CNMT Spray Status

  • Containment pressure - HAS REMAINED LESS THAN 11 PSIG Critical Task FR-S.l.B Verify eqmpment Status Crew starts AFW pumps before WR
  • Verify SI status by checking all RED SIS marks SG level is than 10%. All AFW pumps failed to auto start. LIT Critical Task E-O.O Train "A" CIA failed to actuate, manual
  • Verify CIA by checking all ORANGE CIA Crew closes Cnmt isolation valves such actuation successful. marks - LIT that at least one valve is closed on each Train "B" CIA valve, MOV-ICH-381 failed to
  • Verify FWI by checking all GREEN FWI critical phase A penetration before the automatically close, manual isolation successful. marks - LIT end of the scenario.

Verify Power To Both AC Emergency Busses Discrepancies: Upon Completion, Report Any Discrepancies to All AFW pumps failed to auto start. SM/US Train "A" CIA failed to actuate, manual actuation successful.

Train "B" CIA valve, MOV-ICH-381 failed to automatically close, manual isolation successful.

BVPS - lL8 Scenario 4, 240[24

RTL#A5.640U 1/2-ADM-130 1.F04 Page 1 of7 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE (JPM)

Calculate The RCS Initial Void Volume And Final Void Volume TRAINING MATERIAL TITLE: (IA W lOM-6.4.Q, "Response To Void In Reactor Vessel")

TRAINING MATERIAL NUMBER: lAD-030 PROGRAM TITLE: Licensed Operator Training COMPUTER CODE: 1AD-030 REVISION NUMBER: o TECHNICAL

REFERENCES:

1 OM-6.4.Q, "Response To Void In Reactor Vessel", Rev. 5 INSTRUCTIONAL SETTING: Classroom APPROXIMA TE DURATION: 12 Minutes PREPARED BY: 1. Forbes Date PEER REVIEW BY: ------------------------------ - -- . - ----

Date APPROVED FOR USE: -------------------------- - --------

Training Supervisor or Designee Date

RTL#A5,640U 1/2-ADM-130 1,F04 20f7 Revision 1 TRAINING MATERIAL CHANGE FORM lAD-030 Related Change?  :\lew Rev. # 0 D Changes Not The Change Does Not Impact Learning' Existing Rev. # N/A Requiring Revision i Objectives or Material Quality.

i--_ _ _ _ _ _ _ _ _-'--_ _ _ _ _ _ _ _ _ _ _ _ _-----L",New Change '~--------l List/Description of Change(s):

Original Issue Reason for Change (s):

To improve BVPS JPM Admin Infrastructure.

NOTE: Additions, deletions or changes to training materials Date

  • must be reviewed for their possible impact to the Training Qualification Matrix. See Incumbent Impact Review, Superintendent/Supervisor/Peer Date Not Requiring Revision" only)

RTL#A5.640U 1I2-ADM-J30 LF04 Page 3 of7 Revision I OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: lAD-030 JPM TITLE: Calculate The RCS Initial Void Volume And Final Void JPM REVISION: 0 Volume (lAW lOM-6.4.Q, "Response To Void In Reactor Vessel")

KIA

REFERENCE:

2.1.7 4.4 TASK ID: 0061-016-01-013 JPM APPLICATION: ~ REQUALIFICAnON ~ INITIAL EXAM TRAINING o FAUL TED JPM ~ ADMINISTRATIVE JPM EVALUATION METHOD: LOCATION: TYPE: ADMINISTERED BY:

Perform 0 Plant Site Annual Requal Exam BVT Simulate 0 Simulator Initial Exam NRC

~ Classroom OJTITPE Other:

Training Other:

EV ALUA TION RESULTS Performer Name: Performer SSN:

Time D Yes Allotted 12 Minutes Actual minutes Critical: ~ No Time: Time:

JPM RESULTS:

D SAT D UNSAT (Comments required for UNSAT evaluation)

Comments:

OBSERVERS Name/SSN: Name/SSN:

Name/SSN: Name/SSN:

EVALUATOR Evaluator (Print): Date:

Evaluator Signature:

RTL#A5.640U 1/2-ADM-130 I.F04 Page 4 of7 Revision I OPERAnONS JOB PERFORMANCE MEASURE JPM >-rUMBER: IAD-030 ]PM TITLE: Calculate The RCS Initial Void Volume And Final Void JPM REVISION: 0 Volume (lAW 10M-6.4.Q, "Response To Void In Reactor Vessel")

EV ALUATOR DIRECTION SHEET TASK STANDARD: Calculated RCS Initial Void Volume is 3995.325 FT3 + 4 AND Final Void Volume is 3835.512 FT3 + 4 RECOMMENDED Classroom STARTING LOCATION:

DIRECTIONS: Calculate The RCS Initial Void Volume And Final Void Volume (IA W IOM-6.4.Q. "Response To Void In Reactor Vessel'")

INITIAL CONDITIONS:

  • SI has NOT been actuated
  • Power was lost to all RCPs.
  • Normal Charging and Letdown are in operation.
  • A plant cooldown was in progress.
  • RCS Hot Leg temperature is stable.

INITIATING CUE: The Unit Supervisor has directed the performance of lOM-6.4.Q.

Response To Void In Reactor Vessel. The necessary data to calculate the RCS Initial VOid Volume And Final Void Volume has been collected and recorded within lOM-6.4.Q, Response To Void In Reactor Vessel.

Using the data recorded in 1OM-6.4.Q. the Unit Supervisor directs you to Calculate The RCS Initial Void Volume And Final Void Volume lAW 10M-6.4.Q. Response To Void In Reactor Vessel steps IV.A.IIa.

and b. Report your results in the space provided. (Space provided on candidate direction sheet).

REFERENCES:

10M-6.4.Q. "Response To Void In Reactor Vessel". Rev. 5 TOOLS: Calculator HANDOUT: 1OM-6.4.Q, "Response To Void In Reactor Vessel", Rev. 5 filled out up to step IV.A.II.

RTL#A5.640U li2-ADM-130 I.F04 Page 5 of7 Revision I OPERA. TIONS JOB PERFORMANCE MEASURE CANDIDATE DIRECTION SHEET

  • THIS SHEET TO BE GIVEN TO CANDIDATE
  • DRead:

TASK: Calculate The RCS Initial Void Volume And Final Void Volume (1AW 1OM-6.4.Q. "Response To Void In Reactor Vessel")

INITIAL CONDITIONS:

  • SI has NOT been actuated
  • Power was lost to all Reps.
  • Normal Charging and Letdown are in operation.
  • A plant cooJdOWl1 was in progress.
  • Res Hot Leg temperature is stable.
  • Voids are indicated in the Reactor Coolant System by an abnormal change in Pressurizer level due to a change in Rcactor Coolant System pressure.

U\fITIATING CUE: The Unit Supervisor has directed the performance of 10M-6.4.Q, Response To Void In Reactor Vessel. The necessary data to calculate the Res Initial Void Volume And Final Void Volume has been collected and recorded within lOM-6.4.Q, Response To Void In Reactor Vessel.

Using the data recorded in I OM-6.4.Q, the Unit Supervisor directs you to Calculate The ReS Initial Void Volume And Final Void Volume IAW 1OM-6.4.Q, Response To Void In Reactor Vessel steps IV .A.11 a.

and b. Report your results in the space provided. (Space provided on candidate direction sheet).

RESULTS:

RCS Initial Void Volume ~~.. ----------------

RCS Final Void Volume ~----

D At this time, ask the evaluator any questions you have on this JPM.

D When satisfied that you understand the assigned task. announce "I am now beginning the JPM".

Simulate performance or perform as directed the required task.

D Point to any indicator or component you verify or check and announce your observations.

After determining the Task has been met announce "I have completed the JPM".

D Then hand this sheet to the evaluator.

RTL#A5.640U 112-ADM-130 I.F04 Page 6 of7 Revision I OPERATIONS JOB PERFORMANCE MEASURE lPM NUMBER: lAD-030 I JPM TITLE: Calculate The RCS Initial Void Volume And Final Void JPM REVISION: 0 Volume (lAW 10M-6.4.Q. "Response To Void In Reactor Vessel")

EV ALVATOR NOTE:

Provide candidate a place kept copy of 10M-6.4.Q filled out with data provided up to step IV.A.II.

EVALUATOR NOTE:

Some judgment may be required to determine satisfactory performance on this lPM.

START TIME: ---------------

1.C Calculate the size of the Res 1.1 C Calculates the size of the RCS initial void volume initial void volume (G 1) as (GI) follows:

G 1 =(Vc +V2 -V 1)/(l-(P 1/P 2) fe + ~._ fe) - __ ft3) ft 3 ) I (l - ( _ psi 1 _ psi)

,_ _ _ psi I. ___psi) 3

- - - ft .

G 1 =(186.213 ft 3+437.6 ft3) - 464 ft 3)/(1 - (1800 psi/1875 G1 159.813 fel (1 .96 psi)

G 1 =(159.813 fe) I ( .04 )

G1 3995.325 fe.

COMMENTS:

RTL#A5.640U 1/2-ADM-130 1.F04 Page 70f7 Revision I OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: lAD-030 JPM TITLE: Calculate The RCS Initial Void Volume And Final Void JPM REVISION: 0 Volume (lAW lOM-6.4.Q, "Response To Void In Reactor Vessel")

"C" Denotes CRITICAL STEP 2.C Calculate the size of the RCS 2.1 C Calculates the size ofthe RCS final void volume (02) final void volume (02) from from the initial RCS void volume.

the initial RCS void volume (Step A.ll.a) as follows:

O2 0 1( PI i P2 )

psi! psi) 02 =( 3995.325 ft3) ( 1800 psi 11875 psi) 02 3995.325) x (0.96) 3 O2 = 3835.512 ft COMMENTS:

3. Records Initial and Final 3.1 Provides Initial and Final Void Volume calculated in the Calculated Void Volume in the space provided on the candidate direction sheet.

space provided on the candidate direction sheet. COMMENTS:

EVALUATOR CUE:

That Completes this JPM STOP TIME:

RTL#A5.640U II2-ADM-130 I.F04 Page I of8 Revision I OPERATIONS JOB PERFORMANCE MEASURE (JPM)

TRAINING MATERIAL TITLE: Perform Shutdown Margin Calculation TRAINING MATERIAL NUMBER: 1AD-008 PROGRAM TITLE: Licensed Operator Training COMPUTER CODE: lAD-008 REVISION NUMBER:

TECHNICAL

REFERENCES:

1 OST -49. L Shutdown Margin Calculation (Plant Critical), Rev. 19 INSTRUCTIONAL SETTING: Classroom APPROXIMATE DURATION: 15 Minutes PREP ARED BY: 1. Forbes _ _ .L-'"_ _ _ _ _ _ _ __

Date PEER REVIEW BY: --_._-

Date APPROVED FOR USE:

Training Supervisor or Designee Date

RTL#A5.640U I 12-ADM-130 I.F04 Page 2 of8 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE TRAINING MATERIAL CHANGE FORM Affected Training Materials: lAD-008 Type of Change:

D Changes Requiring learning Objective Related Change? New Rev. # 1 Revision DYes DNo D Changes Not The Change Does Not Impact learning Existing Rev. # 0 Requiring Revision Objectives or Material Quality.

New Change #

list/Description of Change(s):

Updated JPM to ref1ect most current procedure revision.

Updated critical task and step to reflect procedure change (boration required changed).

Changed Rod Height in initial conditions to reflect most current plant configuration.

Added placekeeping to procedural handout.

Added calculator to tools needed to perform this JPM.

Changed Cb in initial conditions from 750 to 900 PPM to be more reflective of Cycle 21.

Removed Cycle 20 from Evaluator Note.

Reason for Change (s):

To maintain JPM updated for next use.

APPROVALS:

NOTE: Additions, deletions or

r. Forbes changes to training materials Prepared by Date must be reviewed for their possible impact to the Training Qual ification Matrix. See Incumbent Impact Review, Training Superintendent/Supervisor/Peer Date NOBP-TR-I104.

("Changes Not Requiring Revision" only)

RTL#A5.640U I !2-ADM-130 I.F04 Page 3 of8 Revision I OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1AD-008 JPM TITLE: Perform Shutdown Margin Calculation JPM REVISION: 1 KIA

REFERENCE:

2.1 TASK ID: 0011-006-01-013 JPM APPLICATION: [J REQUALIFICATION [J INITIAL EXAM TRAINING o FAULTED JPM [J ADMINISTRATIVE JPM EVALLATION METHOD: LOCATION: TYPE: ADMINISTERED BY:

[J Perform D Plant Site Cd Annual Requal Exam Cd BVT D Simulate D Simulator Initial Exam NRC l8J Classroom OJT/TPE Other:

Training D Other:

EV ALUA TION RESULTS Performer Name: Performer SSN:

Time [] Yes Allotted Actual 15 Minutes minutes I Critical: ~ No Time: Time:

0 SAT JPM RESULTS:

0 UNSAT (Comments required for UNSAT evaluation)

Comments:

OBSERVERS Name/SSN: Name/SSN:

Name/SSN: Name/SSN:

EVALUATOR Evaluator (Print): Date:

Evaluator Signature:

RTL#AS,640U I 12-ADM-130 I, F04 Page 4 ofS Revision I OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1AD-008 JPM TITLE: Perform Shutdown Margin Calculation JPM REVISION: 1 EVALUATOR DIRECTION SHEET TASK STANDARD: Determine that Shutdown Margin is not within the limits specified in accordance with lOST-49,1 and Boration to 1844 ppm is necessary.

RECOMMENDED Classroom STARTING LOCATION:

DIRECTIONS: Determine if Shutdown Margin is within the limits specified in accordance with lOST-49.1, Shutdown Margin Calculation (Plant Critical).

INITIAL CONDITIONS:

  • The Unit is in Mode L 100% power.
  • All rods are at 225 steps.
  • Annunciator [A4-46], TAVG DEVIATION FROM TREF is "Off'.
  • Current RCS boron concentration is 900 ppm.
  • Core Burnup is 12,000 MWD/MTU INITIATING CUE: Your Supervisor directs you to perform a shutdown margin calculation for the present plant conditions using 1OST-49.1, Shutdown Margin Calculation (Plant Critical), and report your results in the COMMENT section of the OST cover sheet.

REFERENCES:

lOST-49.1, "Shutdown Margin Calculation (Plant Critical)", Rev. 19 TOOLS: Calculator HANDOUT: 1OST-49.1, Shutdown Margin Calculation (Plant Critical), Rev. 19 with SM authorization signature and place kept up to Step VILA.

RTL#A5.640U \12-ADM-\30 I.F04 Page 5 of8 Revision \

OPERATIO"lS JOB PERFORMANCE MEASURE CANDIDA TE DIRECTION SHEET

  • THIS SHEET TO BE GIVEN TO CANDIDATE
  • DRead:

TASK: Determine if Shutdown Margin is within the limits specified in accordance with lOST-49.1. Shutdown Margin Calculation (Plant Critical ).

INITIAL CONDITIONS:

  • The Unit is in Mode 1. 100% power.
  • All rods are at 225 steps.
  • Annunciator lA4-46J. TA VG DEVIATION FROM TREF is "Off'.
  • Current RCS boron concentration is 900 ppm.
  • Core Burnup is 12.000 MWO/MTU INITIATING CUE: Your Supervisor directs you to perform a shutdown margin calculation for the present plant conditions using I OST-49.1. Shutdown Margin Calculation (Plant Critical). and report your results in the COMMENT section of the OST cover sheet.

D At this time, ask the evaluator any questions YOLI have on this JPM.

D When satisfied that you understand the assigned task, announce "I am now beginning the JPM".

Simulate performance or perform as directed the required task.

D Point to any indicator or component you verify or check and announce your observations.

After determining the Task has been met announce" I have completed the JPM".

D Then hand this sheet to the evaluator.

RTL#A5.640U 1/2-ADM-130 I. F04 Page 6 of8 Revision 1 OPERAnONS JOB PERFORMA~CE MEASURE JP.'v1 NUMBER: 1AD-008 I JPM TITLE' P f' I;'h d M . C I I .

JPM REVISION: 1 i' 1 . er orm d ut own argm a cu atlon ndicate "S" FOR SAT or "U" FOR Provide the Candidate with a copy of the attached IOST-49.1 and a calculator.

START TIME: _ _._ _ _ _ _ __

1. If the plant is in Mode 1, 1.] Initials Step VILA. L (Plant in Mode L Tavg < 5°F Verify that Tavg IS less than above Tref (Annunciator A4-46 OFF) from Initial 5°F above Tref (Annunciator Conditions.

A4-46, TAVG DEVIATION FROM TREF is OFF) COMMENTS:

(Otherwise N/A).

(Step VILA.1 )

2. If the plant is in Mode 2, 2.1 Places NIA in Step VII.A.2, (Plant not in Mode 2).

Verify that T avg is less than 8°F above Program Tavg as COY1MENTS.

follows: (Otherwise NI A)

(Step VII.A.2)

Request Chemistry to 3.l. Determines current boron concentration is 750 ppm determine current RCS Boron from initial conditions.

concentration in ppm.

COMMENTS:

VII.A.3)

I I

RTL#A5.640U I12-ADM-J30 I.F04 Page 7 of8 Revision I OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1AD-008 JPM TITLE: Perform Shutdown Margin Calculation JPM REVISION: 1 "C" Denotes CRITICAL STEP Indicate "SI! FOR SAT

4. Record the number of steps 4.1 Records Control Bank D as 225 steps withdrawn on withdrawn for Control Bank D Data Sheet 1 (section A 4.) from initial conditions.

from the group demand counters. (BB-B) on Data COMMENTS:

Sheet 1.

(Step VII.A.4)

5. Record the current reactor 5.1 Records reactor power as 100% on Data Sheet 1 power level in percent of full (section AS.).

power from [NR-1NI-45].

Power Range Recorder. (VB COMMENTS:

B) OR IPC computer point U 1150. PWR R"lG NUCLEAR FLUX J M A VG, on Data Sheet 1.

(Step VILA.S) 6.C Record the number of Records number of immovable or untrippable rods as immovable or untrippable on Data Sheet 1 (section A 6.) (given in Initial control rods on Data Sheet 1. Conditions).

(Step VII.A.6) COMMENTS:

RTL#A5.640U JI2-ADM-J30 I.F04 Page 8 of8 Revision I OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1AD-008 \. rPM TITLE' Perform Shutdown Margin Calculation JPM REVISION: 1 . _.

"e" Denotes CRITICAL 7.C If the number of immovable or 7.1 C Refers to Attachment I and determines for a burnup untrippable control Rods is of 12,000 MWD/MTU (provided in initial greater than 1, U se Attachment conditions), the required boron concentration is 1844 1 to determine the required ppm.

boron concentration with greater than one struck rod and 7.2 Records 1844 ppm in step 7 and initials Record below. (Otherwise N/A)

EVALUATOR CUE:

If necessary role-play Reactor engineering and report (Step VII.A.7) core burnup as 12,000 MWD/MTU.

COMMENTS:

8.C With the number of immovable 8.1 C Documents on OST cover sheet that shutdown margin or untrippable rods greater than is not met and that boration is required to restore one, the shutdown margin is < required shutdown margin.

1.77% k/k. Perform Step VII.C.2 UNTIL the required COMMENTS:

boron concentration of Attachment 1 is reached .

  • (Step VII.A.7.a)

I STOP TIME: ----~-------------

RTL#A5.640U 1/2-ADM-130 I.F04 Page 1 of7 Revision 1 OPERATI01\S JOB PERFORMANCE MEASURE (JPM)

TRAINING MATERIAL TITLE: Complete Surveillance of RHR Pump (RO ONLY)

TRAINING MATERIAL NUMBER: lAD-027 PROGRAM TITLE:

COMPUTER CODE: 1AD-027 REVISION NUMBER: o TECHNICAL

REFERENCES:

1 OST-l 0.1, "Residual Heat Removal Pump Performance Test", Rev. 25 INSTRUCTIONAL SETTING: Classroom APPROXIMATE DURATION: 15 Minutes PREPARED BY: I. Forbes Date PEER REVIEW BY:

Date APPROVED FOR USE:

Training Supervisor or D~;ignee Date

RTL#A5.640U 1/2-ADM-\30 I .F04 Page 2 of7 Revision 1 OPERA TIONS JOB PERFORMANCE MEASURE TRAINING MATERIAL CHANGE FORM lAD-027 Changes Requiring Learning Objective Related Change?

DYes Changes Not The Change Does Not Requiring Revision Objectives or Material List/Description of Change(s):

Original Issue.

Reason for Change (s):

To build Unit 1 Admin JPM Infrastructure.

NOTE: Additions, deletions or changes to training materials Date mllst be reviewed for their possible impact to the Training Qualification Matrix. See Incumbent Impact Review, i Training Superintendent/Supervisor/Peer Date NOBP-TR-\I04.

("Changes Not Requiring Revision" only)

RTL#A5.640U 1i2-ADM-130 I.F04 Page 3 of7 Revision I OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: IAD-027 JPM TITLE: Complete Surveillance of RHR Pump JPM REVISION: 0 KIA

REFERENCE:

2.2.37 3.6 TASK ID: 010-017-06-013 JPM APPLICATION: ~ REQUALIFICATION ~ INITIAL EXAM o TRAINING o FAULTED JPM [6] ADMINISTRAnVE JPM EV ALUA nON METHOD: LOCATION: TYPE: ADMINISTERED BY:

[6] Perform 0 Plant Site 0 Annual Requal Exam 0 BVT 0 Simulate 0 Simulator Initial Exam 0 NRC

[6] Classroom OJT/TPE 0 Other:

Training 0 Other:

EV ALUATION RESULTS Performer Name: Performer SSN:

Time 0 Yes Allotted 15 Minutes Actual minutes Critical: ~ No Time: Time:

JPM RESULTS:

0 SAT 0 UNSAT (Comments required for UNSA T evaluation)

Comments:

OBSERVERS Name/SSN: Name/SSN:

Name/SSN: Name/SSN:

EVALUATOR Evaluator (Print): Date:

Evaluator Signature:

RTL#AS.640U 1/2-ADM-\30 \.F04 Page 4 of7 Revision I OPERAnONS JOB PERFORMANCE MEASURE JPM NUMBER: lAD-027 JPM TITLE: Complete Surveillance of RHR Pump JPM REVISION: 0 EVALUATOR DIRECTION SHEET TASK STANDARD: 1RH-P-l A ~ P is calculated and a determination is made that the ~ P does NOT meet the acceptance Criteria. A determination is made that the pump vibrations do NOT meet the acceptance criteria.

RECOMMENDED Classroom STARTING LOCATION:

DIRECTIONS: You are to perform the independent verifications of the calculations on Data Sheet 1 of 10ST-lO.l, "Residual Heat Removal Pump [lRH-P lA] Performance Test" and determine if acceptance criteria is met.

INITIAL CONDITIONS:

  • Unit 1 is in Mode 5 with RCS CET temperatures at 110°F.
  • Surveillance I OST-l 0.1, "Residual Heat Removal Pump [1 RH P-IA] Performance Test" is being performed ONLY.
  • This is a COMPRHENSIVE Pump Test.
  • Independent verifications of the calculations on Data Sheet 1 are req uired.

INITIATING CUE: Complete the required independent verifications of the calculations on Data Sheet 1 of lOST-10.1, "Residual Heat Removal Pump [1 RH-P 1A] Performance Test" AND Determine if the Pump meets ALL of the Applicable Acceptance Criteria specified in step III A. (disregard Data Sheet 3 & 4 which are for lRH-P-1 B)

DOCUMENT the results of your Acceptance Criteria Determination in the comments section of the cover page or OST Problem Sheet (if applicable).

REFERENCES:

10ST-1O.l, "Residual Heat Removal Pump Performance Test", Rev.

25 TOOLS: None HANDOLT: 10ST-I0.l, "Residual Heat Removal Pump Performance Test", Rev.

25 completed With unacceptable A P and vibrations.

RTL#AS.640U I i2-ADM-J30 I .F04 Page 5 of7 Revision I OPERATIONS JOB PERFORMANCE MEASURE CANDIDATE DIRECTION SHEET

  • THIS SHEET TO BE GIVEN TO CANDIDATE
  • DRead:

DIRECTIONS: You are to perform the independent verifications of the calculations on Data Sheet 1 of 10ST-IO.l, "Residual Heat Removal Pump [lRH-P 1A] Performance Test" and determine if acceptance criteria is met.

INITIAL CONDITIONS:

  • Unit 1 is in Mode 5 with RCS CET temperatures at 110°F.
  • This is a COMPRHENSIVE Pump Test.
  • Independent verifications of the calculations on Data Sheet 1 are required.

INITIATING CUE: Complete the required independent verifications of the calculations on Data Sheet 1 of lOST-10.1, "Residual Heat Removal Pump [1 RH-P 1A] Performance Test" AND Determine if the Pump meets ALL of the Applicable Acceptance Criteria specified in step III A. (disregard Data Sheet 3 & 4 which are for lRH-P-IB)

DOCUMENT the results of your Acceptance Criteria Determination in the comments section of the cover page or OST Problem Sheet (if applicable).

D At this time, ask the evaluator any questions you have on this JPM.

D When satisfied that you understand the assigned task, announce "I am now beginning the JPM".

Simulate performance or perform as directed the required task.

D Point to any indicator or component you verify or check and announce your observations.

After determining the Task has been met announce" I have completed the JPM",

D Then hand this sheet to the evaluator.

RTL#A5,640U 1i2-ADM-J30 1, F04 Page 6 of7 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: ] AD-027 JPM TITLE: Complete Surveillance of RHR Pump JPM REVISION: 0 "e" Denotes CRITICAL START TIME: _ _ _ _ _ _ __

EVALUATOR CUE: Provide the candidate with the Handout Materials, Criteria/steps may be checked/verified in any order.

1. Reviews lOST-I l.1 Reviews IOST-lO,1 and verifies calculations/data to Data Sheet determine if acceptance criteria (lILA) met.

provided.

COMMENTS:

2. Reviews 1RH-P-I A Pump 2,1 4009 gpm - 0 gpm = 4009 gpm, Flowrate data pro\"ided.

, 2.2 Determines 4009 gpm is within Acceptable range of 3950-4050 gpm. (No information will be recorded in thc comments section)

COMMENTS:

3.C [IRH-P-IA] Residual Heat 3.1 Calculates lRH-P-IA Pump.i1P and determines Removal Pump: Operates acceptance criteria. 110 psig - 24 psig (86 psig) -l within the limits ofBVPS 1ST 48112 (4) + 15 - 65112 (5.417) /2.31 (5.88) = 91.88 Program ( T.S.5.5.4) as follows: psid.

Differential Pressure (Data Sheet 1) 3.2C Determines 9] .88 psid is GREATER THAN acceptable range of86.7- 91.1 psid (Comprehensive Pump Test) by comparing calculated Delta P on Data Sheet 1 to Acceptable Range (lILA).

COMMENTS:

RTL#A5,640U 112-ADM-J30 1,F04 Page 70f7 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: lAD-027 .

JPM REVISION: 0 I JPM TITLE: Complete Surveillance ofRHR Pump STANDARD "C" Denotes CRITICAL STEP 4.C [lRH-P-IA] Residual Heat 4.1 Compares Actual Motor Vibrations Removal Pump: Operates to Acceptable and Alert range.

within the limits ofBVPS 1ST Program ( T.S.S.5.4) as follows: 4.2C Determines Motor Inboard (2) Axial (A) vibrations Motor Vibration (Data Sheet 2) are GREATER THAN Acceptable and Alert Range.

COMMENTS:

S.C Complete the front cover S.IC Lists the following problems on OST problem or sheet. cover sheet:

  • C Motor Inboard (2) Axial(A) vibration is GREATER THAN Acceptable and Alert Range C Calculated Delta P is GREATER THAN Acceptable Range.

EV ALUATOR NOTE: Grader discretion may be required.

COMMENTS:

STOP TIME: ----------------

RTL#A5.640U ORIG~NAL tl2-ADM-130 l.F04 Page 1 of7 Revision I OPERATIONS JOB PERFORMANCE MEASURE (JPM)

TRAINING MATERIAL TITLE: Determine GW Storage Tank Discharge Bleed Flow Rate TRAINING MATERIAL NUMBER: .::.;lAD:..=--::;O:.;;;.lO.::.-.-_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

PROGRAM TITLE: Licensed Operator Training COMPUTER CODE: lAD-OlO REVISION NUMBER: o TECHNICAL

REFERENCES:

lOM-19.4E, Decay Tank Discharge, Rev. 10 INSTRUCTIONAL SETTING: Classroom APPROXIMATE DURATION: 10 Minutes PREPARED BY: R. J. Brooks PEER REVIEW BY:

APPROVED FOR USE:

ORIG:J,NAII-

~

RTL#A5.640U lI2*ADM-1301.F04 Page 2 of 7

, Revision 1 TRAINING MATERIAL CHANGE FORM Affected Training Materials: 1AD*O 10 Type of Change:

D Changes Requiring Learning Objective Related Change? New Rev. # 0 Revision DYes DNo D Changes Not The Change Does Not Impact Learning Existing Rev. #

Requiring Revision Objectives or Material Quality.

New Change #

ListlDescription of Change(s):

NewJPM Reason for Change (s):

APPROVALS:

NOTE: Additions, deletions or R. J. Brooks 'f/Z-Uj,D changes to training materials must be reviewed for their Prepared by Date possible impact to the Training Qualification Matrix. See Incumbent Impact Review, Training SuperintendentiSupervisorlPeer Date NOBP*TR*I104.

("Changes Not Requiring Revision" only)

RTL#A5.640U 112-ADM-J30 1.F04 Page 1 of7 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE (JPM)

TRAINING MATERIAL TITLE: Determine GW Storage Tank Discharge Bleed Flow Rate TRAINING MATERIAL NUMBER: 1AD-O 10

~--~----------------------------------------

PROGRAM TITLE: Licensed Operator Training COMPUTER CODE: lAD-OlD REVISION NUMBER: o TECHNICAL

REFERENCES:

10M-19.4E, Decay Tank Discharge, Rev. 10 INSTRUCTIONAL SETTING: Classroom APPROXIMATE DURATION: 10 Minutes PREPARED BY: R. J. Brooks Date PEER REVIEW BY:

Date APPROVED FOR USE:

Training Supervisor or Designee Date

RTL#A5.640U 112-ADM-1301.F04 Page 2 of7 Revision 1 TRAINING MATERIAL CHANGE FORM Affected Training Materials: lAD-OlO Type of Change:

D Changes Requiring Learning Objective Related Change? New Rev. #0 Revision DYes DNo D Changes Not The Change Does Not Impact Learning Existing Rev. #

Requiring Revision Objectives or Material Quality.

New Change #

List/Description of Change(s):

NewJPM Reason for Change (s):

APPROVALS:

NOTE: Additions, deletions or R. J. Brooks changes to training materials Prepared by Date must be reviewed for their possible impact to the Training Qualification Matrix. See Incumbent Impact Review, Training Superintendent/SupervisorlPeer Date NOBP-TR-II04.

("Changes Not Requiring Revision" only)

RTL#A5.640U 112-ADM-1301.F04 Page 3 of7 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE IJPM NUMBER: 1AD-OlO JPM REVISION: 0 JPM TITLE: Detennine GW Storage Tank Discharge Bleed Flow Rate KIA

REFERENCE:

2.3.11 3.8/4.3 TASK ID: 0191-006-01-011 JPM APPLICATION: ~ REQUALIFICATION C8J INITIAL EXAM o TRAINING o FAULTEDJPM C8J ADMINISTRATIVE JPM EVALUATION METHOD: LOCATION: TYPE: ADMINISTERED BY:

o Perfonn 0 Plant Site 0 Annual Requal Exam o BVT 0 Simulate 0 Simulator 0 Initial Exam D NRC 0 Classroom [J OJT/TPE D Other:

[J Training D Other:

EV ALUA TION RESUL TS Perfonner Name: Perfonner SSN:

Time D Yes Allotted 10 Minutes Actual minutes Critical: C8J No Time: Time:

JPM RESULTS:

D SAT D UNSAT (Comments required for UNSAT evaluation)

Comments:

OBSERVERS Name/SSN: Name/SSN:

Name/SSN: Name/SSN:

EVALUATOR Evaluator (Print): Date:

Evaluator Signature:

RTL#A5.640U 1/2-ADM-1301.F04 Page 4 of7 Revision 1 OPERATlONS JOB PERFORMANCE MEASURE EVALUATOR DIRECTION SHEET TASK STANDARD: GW Storage Tank Discharge Bleed Flow rate is calculated to be GREATER than 2 SCFM and the candidate determines that the discharge MUST BE TERMINATED.

RECOMMENDED Classroom STARTING LOCATION:

DIRECTIONS: You are to calculate the GW Storage Tank Discharge Bleed Flow rate AND based on your calculation make a recommendation for continuing the discharge.

INITIAL CONDITIONS:

  • The plant is in Mode 5, making preparations to enter Mode 6.
  • Unit 1 Gaseous Waste Decay Tank 1GW-TK-l A is being discharged to the Unit 1 Atmospheric Vent, lAW lOM-19.4.E, Decay Tank Discharge.
  • The initial pressure of the tank was 64.2 psig.
  • The discharge has been ongoing for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.
  • The current pressure of the tank is 34.8 psig.
  • The Shift chemist has completed proper tritium sampling.

INITIATING CUE:

Determine the GW Storage Tank Discharge Bleed Flow rate lAW Step IV.K.17 of 10M-19.4.E, AND make a recommendation for continuing the discharge in the box below.

(Provided in the candidate direction sheet)

REFERENCES:

lOM-19.4E, Decay Tank Discharge, Rev. 10 1I2-ENV-OS.OS.FOI RWDA-G TOOLS: Calculator HANDOUT: 1OM-19.4.E, Decay Tank Discharge, Rev. 10 place kept up to step IV.K.l7.

1I2-ENV-OS.OS.FOI RWDA-G filled out with a MAXIMUM undiluted discharge rate of2 SCFM.

RTL#A5.640U 1/2-ADM-1301.F04 Page 5 of7 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE CANDIDATE DIRECTION SHEET

  • THIS SHEET TO BE GIVEN TO CANDIDATE
  • DRead:

DIRECTIONS: You are to calculate the GW Storage Tank Discharge Bleed Flow rate AND based on your calculation make a recommendation for continuing the discharge.

INITIAL CONDITIONS:

  • The plant is in Mode 5, making preparations to enter Mode 6.
  • Unit 1 Gaseous Waste Decay Tank, 1GW-TK-IA is being discharged to the Unit 1 Atmospheric Vent lAW IOM-19.4.E, Decay Tank Discharge.
  • The initial pressure of the tank was 64.2 psig.
  • The discharge has been ongoing for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.
  • The current pressure of the tank is 34.8 psig.
  • The Shift chemist has completed proper tritium sampling.

INITIATING CUE:

Determine the GW Storage Tank Discharge Bleed Flow rate lAW Step IV.K.17 of 1OM-19 A.E, AND make a recommendation for continuing the discharge in the box below.

Recommendation:

D At this time, ask the evaluator any questions you have on this JPM.

D When satisfied that you understand the assigned task, announce "I am now beginning the JPM".

Simulate performance or perform as directed the required task.

D Point to any indicator or component you verifY or check and announce your observations.

After determining the Task has been met announce" I have completed the JPM".

D Then hand this sheet to the evaluator.

RTL#A5.640U 1I2-ADM- J301.F04 Page 6 of7 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE I JPM NUMBER: lAD-Ol 0 JPM REVISION: 0 JPM TITLE: Determine GW Storage Tank Discharge Bleed Flow Rate STEP STANDARD

( "e" Denotes CRITICAL STEP) Indicate "S" FOR SAT or "U" FOR UNSAT)=> SIU START TIME:

1. Reviews procedure step 1.1 Reviews lOM-19.4E, Decay Tank Discharge, Step IV.K.17 COMMENTS:

2.C Two hours after the 2.1 C Inserts the numbers from the initial conditions and discharge has been initiated, determines bleed flow:

perform the following steps:

Confirm the bleed flow rate using the following Bleed flow rate (SCFM) =

equation:

(132)(64.2-34.8)

Bleed flow rate (SCFM) (14.7)(120)

(132FT3)(Pi-Pd Bleed flow rate (SCFM) = 2.2 SCFM (14.7 psi)(Tr-Ti)

COMMENTS:

RTL#A5.640U 112-ADM-130 1.F04 Page 7 of7 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPMNUMBER: lAD-OlO I JPM REVISION: 0 JPM TITLE: Determine GW Storage Tank Discharge Bleed Flow Rate STEP STANDARD

( "c" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "u" FOR UNSAT)~ SIU EVALUATOR NOTE:

Pi=Initial Decay Tank pressure in PSIG from [PR-1GW 103]

Pf=Current Decay Tank pressure in PSIG from [PR-1GW 103]

Ti=Time the discharge started Tf=Current time (Tf-Ti) shall have units of minutes 3.C If the bleed flow rate exceeds 3.1C Determines that the discharge MUST be Terminated 2 SCFM, THEN Stop the discharge by performing Steps IV.K.18 thru IV.N.2 AND Notify Radiation Protection of the problem.

(Otherwise NIA)

COMMENTS:

EVALUATOR CUE:

When the applicant makes the decision to terminate the discharge, the evaluation for this JPM is complete STOP TIME: ----------------

RTL#A5.640U 1I2-ADM-J301.F04 Page lof7 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE (JPM)

TRAINING MATERIAL TITLE: Evaluate 11M Data and Determine Required Actions TRAINING MATERIAL NUMBER: lAD-019 PROGRAM TITLE: Licensed Operator Training COMPUTER CODE: lAD-019 REVISION NUMBER: o TECHNICAL

REFERENCES:

10M-50A.D, Reactor Startup From Mode 3 To Mode 2, Rev. 54 1OM-50A.F, Performing An Estimated Critical Position Calculation, Rev. 4 INSTRUCTIONAL SETTING: Classroom APPROXIMATE DURATION: 20 Minutes PREPARED BY: 1. Forbes PEER REVIEW BY: ------------_.---------, .;

f Date APPROVED FOR USE:

Training Supervisor or Designee Date

RTL#A5.640U 1I2-ADM-130 I.F04 Page 2 of7 Revision I OPERATIONS JOB PERFORMANCE MEASURE TRAINING MATERIAL CHANGE FORM I Learning Objective Related Change? New Rev. # 0 DYes []No Changes Not The Change Does Not Impact Learning Existing Rev. # NI A Requiring Revision I Objectives or Material Quality. I I New Change #

List/Description of Change(s):

Original Issue Reason for Change (s):

To expand Unit 1 Admin JPM Infrastructure.

APPROVALS:

NOTE: Additions, deletions or changes to training materials Prepared by Date must be reviewed for their possible impact to the Training Qualification Matrix. See Training Superintendent/Supervisor/Peer Date I. lncumbent Impact Review,

("Changes Not Requiring Revision" only)

RTL#A5.640U 1I2-ADM-1301.F04 Page 3 of7 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: lAD-019 JPM TITLE: Evaluate 11M Data and Determine Required Actions JPM REVISION: 0 (SRO Only)

KiA

REFERENCE:

2.1.43 4.3 TASK ID: 1340-007-03-023 JPM APPLICATION: L2J REQUALIFICATION L2J INITIAL EXAM o TRAINING o FAULTED JPM [g] ADMINISTRA TIVE JPM EVALUATION METHOD: LOCATION: TYPE: ADMINISTERED BY:

[g] Perform 0 Plant Site 0 Annual Requal Exam 0 BVT 0 Simulate 0 Simulator 0 Initial Exan1 0 NRC L2J Classroom 0 OJT/TPE 0 Other:

0 Training 0 Other:

EV ALUATION RESULTS Performer Name: Performer SSN:

Time D Yes Allotted 20 Minutes Actual minutes Critical: L2J No Time: Time:

JPM RESULTS:

0 SAT 0 UNSAT (Comments required for UNSAT evaluation)

Comments:

OBSERVERS Name/SSN: Name/SSN:

Name/SSN: Name/SSN:

EVALUATOR Evaluator (Print): Date:

Evaluator Signature:

RTL#A5.640U 112-ADM-130 I.F04 Page 4 of7 Revision I OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1AD-O 19 JPM TITLE: Evaluate 11M Data and Determine Required Actions JPM REVISION: 0 (SRO Only)

EVALUATOR DIRECTION SHEET TASK STANDARD: Determine that 11M data predicts >500 pcm below ECP value for critical rod height.

Determines No further rod withdrawal will be allowed, and 10M 50.4.D, Attachment 2, Action #4 are applicable (Refer to JPM Step 4).

RECOMMENDED Classroom STARTING LOCATION:

DIRECTIONS: You are to evaluate 11M data.

INITIAL CONDITIONS: The Unit is in Mode 2.

A reactor startup is in progress.

Control Bank C is at 144 steps.

Control Bank D is at 41 steps.

RCS Boron concentration is 1874 ppm.

INITIATING CUE: The Shift Manager directs you to review the 11M plot per IOM-50.4.F Data Sheet 3 using the SR count rate data provided. Compare the N-31 11M data with the predicted ECP data (Data Sheet 1, Pg. 15) and determine actions related to further rod withdrawal. Document any recommended actions in the box below. (Located on the candidate direction sheet)

REFERENCES:

10M-50.4.F, Performing An Estimated Critical Position Calculation, Rev. 4 lOM-50.4.D, Reactor Startup From Mode 3 To Mode 2, Rev. 54 TOOLS: None HANDOUT: 10M-50.4.F, Performing An Estimated Critical Position Calculation, Rev. 4, place-kept with a completed Data Sheet 3 & Figure 1. (Data Sheet 1 ECP Form pages 13, 14 & 16 removed with only pg 15 provided) 10M-50.4.D, Reactor Startup From Mode 3 To Mode 2, Rev. 54, place-kept up to D.14.fwith Attachment 2 & 3 Bank Step Data completed.

RTL#A5.640U 1I2-ADM-1301.F04 Page50f7 Revision 1 OPERATIONS lOB PERFORMANCE MEASURE CANDIDATE DIRECTION SHEET

  • THIS SHEET TO BE GIVEN TO CANDIDATE
  • DRead:

TASK: You are to evaluate 11M data.

INITIAL CONDITIONS: The Unit is in Mode 2.

A reactor startup is in progress.

Control Bank C is at 144 steps.

Control Bank D is at 41 steps.

RCS Boron concentration is 1874 ppm.

INITIATING CUE: The Shift Manager directs you to review the 11M plot per 10M-50A.F Data Sheet 3 using the SR count rate data provided. Compare the N-31 11M data with the predicted ECP data (Data Sheet 1, Pg. 15) and determine actions related to further rod withdrawaL Document any recommended actions in the box below.

RECOMMENDED ACTIONS:

D At this time, ask the evaluator any questions you have on this lPM.

D When satisfied that you understand the assigned task, announce "I am now beginning the lPM".

Simulate performance or perform as directed the required task.

D Point to any indicator or component you verify or check and announce your observations.

After determining the Task has been met announce" I have completed the JPM".

D Then hand this sheet to the evaluator.

RTL#A5.640U 1/2-ADM-1301.F04 Page 6 of7 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: IAD-019 JPM TITLE Evaluate 11M Data and Determine Required Actions JPM REVISION: 0 (SRO Only)

"S" FOR SAT or "u" FOR START TIME: ~ _ _ _ _ _ __

EVALUATOR eUE: Provide the candidate with a place kept copy of IOM-50.4.D and IOM-50.4.F which includes completed Data Sheet 3 (11M Data) & Figure 1 (lIM Plot). Only Page 15 of Data Sheet 1 (ECP) is provided since the intent of this JPM is not for the candidate to review an ECP in its entirety.

1. Refer to Data Sheet 3. 1.1 Refers to Data Sheet 3 for count rate data.

COMMENTS:

2. Refer to 11M plot. 2.1 Evaluates count rate data from Data Sheet 3 and compares the 11M data recorded for 300, 400, AND 425 total steps and determines the data is properly recorded.

COMMENTS:

3.e Evaluate 11M plot data 3.1 e Determines that the 11M plot predicts criticality >500 pcm below ECP. Minimum rod height is Bank D at 50 steps versus ECP of Bank D 100 steps.

COMMENTS:

RTL#AS.640U II2-ADM-J301.F04 Page 7 of7 Revision I OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1AD-O 19 JPM TITLE Evaluate 11M Data and Determine Required Actions JPM REVISION: 0 (SRO Only)

STEP STANDARD

( "e" Denotes CRlTICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)=> S/U ,

EVALUATOR CUE:

If necessary ask candidate to provide specific actions required.

4.C Determines action for 4.lC Detemlines lOM-50.4.D, Attachment 2, Action #4 continued startup lAW 10M- actions are applicable.

50.4.0 Attachment 2 (Continuous Actions)

  • Immediately insert ALL control banks to ZERO Action # 4. steps.
  • Notify the Plant General Manager or designee.
  • Notify Reactor Engineering to evaluate the initial ECP and all applicable calculation data.
  • Recalculate the ECP.
  • Subsequent reactor startup is NOT permitted without Plant General Manager permission.

EVALUATOR NOTE: It is also acceptable to document] OM-50.4D Attachment 2 Action #4.

Grader Discretion required.

EVALUATOR CUE: When the applicant makes a recommendation on continued startup, the evaluation for this JPM is complete.

COMMENTS:

STOP TIME:

I

RTL#A5.640U 112-ADM-J30 I.F04 Page J 0[6 Revision I OPERAnONS JOB PERFORMANCE MEASURE (JPM)

TRAINING MA TERrAL TITLE: Review Shutdown Margin Calculation (SRO ONLY)

TRAINING MATERIAL NUMBER: lAD-03J PROGRAM TITLE: Licensed COMPUTER CODE: IAD-03J REVISION NUMBER: a TECHNICAL

REFERENCES:

1 OST -49.1, Shutdown Margin Calculation (Plant Critical) (Updated for Cycle 21), Rev. 19 fechnical Specifications and Bases License Requirement Manual INSTRUCTIONAL SETTING: Classroom APPROXIMA TE DURATION: 15 Minutes PREPARED BY: I. Forbes Date PEER REVIEW BY:

Date APPROVED FOR USE:

Training Supervisor or Designee Date

RTL#A5.640U 1I2-ADM-1301.F04 Page 2 of6 Revision I OPERATIONS JOB PERFORMANCE MEASURE TRAINING MATERIAL CHANGE FORM Affected Training Materials: 1AD-031 Type of Change:

D Changes Requiring Learning Objective Related Change? New Rev. # 0 Revision DYes DNo D Changes Not The Change Does Not Impact Learning Existing Rev. # NI A Requiring Revision Objectives or Material Quality.

New Change #

List/Description of Change(s):

Original Issue Reason for Change (s):

To build BVPS Cnit 1 Admin JPM Infrastructure.

APPROVALS:

NOTE: Additions, deletions or I. Forbes changes to training materials Prepared by Date must be reviewed for their possible impact to the Training Qualification Matrix. See Incumbent Impact Review, I Training Superi~~t~ndentlSupervisor/Peer Date

("Changes Nor Requiring Revision" on(y)

RTL#A5.640U 1/2-ADM-130 1.F04 Page 3 of6 Revision I OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1AD-031 JPM TITLE: Review Shutdown Margin Calculation (SRO ONLY)

JPM REVISION: 0 KIA

REFERENCE:

2.l.25 (4.2) TASK ID: 0011-006-06-013 JPM APPLICATION: ~ REQUALIFICATION ~ INITIAL EXAM D TRAINING D FAULTED JPM ~ ADMINISTRATIVE JPM EVALUA TION METHOD: LOCATION: TYPE: ADMTI\JISTERED BY:

~ Perform D Plant Site [J Annual Requal Exam D BVT D Simulate D Simulator [J Initial Exam D NRC

~ Classroom D OJT/TPE D Other:

[J Training D Other:

EV ALUA TION RESULTS Performer Name: Performer SSN:

Time D Yes Allotted 15 Minutes Actual minutes Critical: ~ No Time: Time:

JPM RESULTS:

D SAT D UNSAT (Comments required for UNSAT evaluation)

Comments:

OBSERVERS Name/SSN: Name/SSN:

Name/SSN: Name/SSN:

EVALUATOR Evaluator (Print): Date:

Evaluator Signature:

RTL#A5.640U I /2-ADM-130 I.F04 Page 4 of6 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1AD-031 JPM TITLE: Review Shutdown Margin Calculation (SRO ONL Y)

JPM REVISION: 0 EVALUATOR DIRECTION SHEET TASK STANDARD: Identifies the correct Shutdown Margin Requirement required boron concentration is 1844 ppm versus 165l. Determines TS LCO 3.1.4.A actions apply (Initiate boration to restore SDM within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and be in Hot SID within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />).

RECOMMENDED Classroom STARTING LOCATION:

DIRECTIONS: Refer to Initiating Cue below.

INITIAL CONDITIONS:

  • The Unit is in Mode 1, 100% power.
  • All rods at 225 steps.
  • Annunciator [A4-46], TAVG DEVIATION FROM TREF is "Off'.
  • Current RCS boron concentration is 900 ppm.
  • Current burnup is 12,000 MWD/MTU

INITIATING CUE: The Shift Manager directs you to review and verify the accuracy of the recently completed shutdown margin (SDM) calculation (1 OST-49.1)

RepOli your results in the space provided on the CANDIDATE DIRECTION SHEET. Be specific and include LCO required actions (if any).

REFERENCES:

10ST-49.1, Shutdown Margin Calculation (Plant Critical) (Updated for Cycle 21), Rev. 19.

Technical Specificationsl TS Bases.

License Requirement Manual.

TOOLS: Calculator HANDOUT: lOST-49.1, Shutdown Margin Calculation (Plant Critical) (Updated for Cycle 21), Rev. 19. (Handout should contain filled out incorrect data).

Technical Specificationsl TS Bases.

License Requirement Manual.

RTL#AS.640U I12-ADM-130 I.F04 Page 5 of6 Revision I OPERATIONS JOB PERFORMANCE MEASURE CANDIDATE DIRECTION SHEET

  • THIS SHEET TO BE GIVEN TO CANDIDATE
  • DRead:

TASK: Refer to Initiating Cue below.

INITIAL CONDITIONS:

  • The Unit is in Mode 1, 100% power.
  • All rods at 225 steps.
  • Annunciator [A4-46], TAVG DEVIATION FROM TREF is "Off'.
  • Current RCS boron concentration is 900 ppm.
  • Current burnup is 12,000 MWD/MTU

INITIATING CUE: The Shift Manager directs you to review and verify the accuracy of the recently completed shutdown margin (SDM) calculation (lOST-49.1)

Report your results in the space provided on the CANDIDATE DIRECTION SHEET. Be specific and include LCO required actions (if any).

RESULTS:

D At this time, ask the evaluator any questions you have on this JPM.

D When satisfied that you understand the assigned task, announce "I am now beginning the JPM".

Simulate performance or perform as directed the required task.

D Point to any indicator or component you verify or check and announce your observations.

After determining the Task has been met announce "1 have completed the JPM".

D Then hand this sheet to the evaluator.

RTLffA5.640U 1/2-ADM-1301.F04 Page 6 of6 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM 1\UMBER: 1AD-031 JPM TITLE: Review Shutdown Margin Calculation (SRO ONLY)

JPM REVISION: 0 CUE: Provide the eandidate with the up copy of 10ST-49.1 for review.

Also ensun~ there are adequate copies of Technical Specification, Technical Specification Basis, and License Requirement Manuals on hand for candidate reference.

START TIME: _ _ _ _ _ __

I.C Candidate reviews 10ST-49.1, 1.1 Reviews 10ST-49.1 provided.

Shutdown Margin Calculation (Plant Critical) (U pdated for 1.2C Determines incorrect Boron Concentration should Cycle 21) provided. be 1844 PPM versus 1651 PPM and documents this on CANDIDATE DIRECTION SHEET.

COMMENTS:

2.C Consults Technical 2.1 Consults Technical Specification and/or basis.

Specification and/or basis and determines TS LCO 2.2C Determines TS LCO 3.1A.A is applicable and there is 3.1A actions are applicable. a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> action to initiate boration and 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> action to be in Hot Shutdown and documents the required actions on CANDIDATE DIRECTION SHEET.

COMMENTS:

EVALllATOR CL'E: When the candidate hands back the JPM paperwork and states completion, "That Completes this JPM".

STOP TIME: _ _ _ _ _ _ _ __

RTL#A5.640L 1I2-ADM-J30 l.F04 Page J of7 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE (JPM)

TRAINING MATERIAL TITLE: Review! Approve Completed Surveillance of RHR Pump TRAINING MATERIAL NUMBER: IAD-026 PROGRAM TITLE:

COMPUTER CODE: lAD-026 REVISION NUMBER: o TECHNICAL

REFERENCES:

,OST-lO.I, "Residual Heat Removal Pump Performance Test", Rev. 25 INSTRUCTIONAL SETTING: Classroom APPROXIMATE DURATION: 20 Minutes PREPARED BY: I. Forbes Date PEER REVIEW BY:


,------------ -- d-,--

Date APPROVED FOR USE:

Training Supervisor or I..JtSignee Date

RTL#A5.640U l/2-ADM-130 1.F04 Page 2 of7 Revision I TRAINING MATERIAL CHANGE FORM No D Changes Not The Change Does Not Impact Learning Existing Rev. # NIA Requiring Revision Objectives or Material Quality.

New Chan e #

List/Description of Change( s):

Original Issue.

Reason for Change (s):

To expand BVPS Unit 1 Admin JPM Infrastructure.

APPROVALS:

NOTE: Additions, deletions or changes to training materials Date must be reviewed for their possible impact to the Training

  • Qualification Matrix. See Incumbent Impact Review, Training Superintendent/S upervisor/Peer

("Changes Not Requiring Revision n only)

RTL#A5.640U 1I2-ADM-1301.F04 Page 3 of7 Revision 1 OPERA TIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1AD-026 JPM REVISION: 0 JPM TITLE: ReviewlApprove Completed Surveillance of RHR Pump KIA

REFERENCE:

2.2.37 4.6 TASK ID: 1320-011-03-023 JPM APPLICATION: l2.?J REQUALIFICATION l2.?J INITIAL EXAM D TRAINING D FAUL TED JPM [S] ADMINISTRATIVE JPM EVALUATION METHOD: LOCATION: TYPE: ADMINISTERED BY:

[S] Perform D Plant Site D Annual Requal Exam D BVT D Simulate D Simulator D Initial Exam D NRC

~ Classroom D OJT/TPE D Other:

D Training D Other:

EVALUATION RESULTS Performer Name: Performer SSN:

Time D Yes Allotted 20 Minutes Actual minutes Critical: l2.?J No Time: Time:

D SAT JPM RESULTS:

D UNSAT (Comments required for UNSAT evaluation)

Comments:

OBSERVERS Name/SSN: Name/SSN:

Name/SSN: Name/SSN:

EVALUATOR Evaluator (Print): Date:

Evaluator Signature:

RTL#A5.640U 112-ADM-1301.F04 40f7 Revision 1 OPERA TIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1AD-026 JPM REVISION: 0 JPM TITLE: Review/Approve Completed Surveillance ofRHR Pump EVALUATOR DIRECTION SHEET TASK STANDARD: lRH-P-IA is declared inoperable based on unacceptable ~ P AND vibrations.

RECOMMENDED Classroom STARTING LOCATION:

DIRECTIONS: You are to Review/Approve completed Surveillance ofRHR Pump lRH-P-IA to determine operability as defined by the acceptance criteria lILA ONLY.

INITIAL CONDITIONS:

  • Unit 1 is in Mode 5 with RCS core exit thermocouple temperatures at 110°F.
  • Comprehensive Test was performed (SDP Test was NOT performed)..

INITIATING CUE: Review/Approve completed Surveillance ofRHR Pump IRH-P-IA to determine operability as defined by the acceptance criteria lILA.

ONLY. Document the results of vour review in the comments section of the cover page.

REFERENCES:

IOST-lO.I, "Residual Heat Removal Pump Performance Test", Rev.

25 TOOLS: None HANDOUT: IOST-lO.l, "Residual Heat Removal Pump Performance Test", Rev.

25, completed with unacceptable ~ P and vibrations.

RTL#A5.640U 1/2-ADM-1301.F04 Page 5 of7 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE CANDIDATE DIRECTION SHEET

  • THIS SHEET TO BE GIVEN TO CANDIDATE
  • DRead:

TASK: You are to Review/Approve completed Surveillance ofRHR Pump lRH-P-IA to determine operability as defined by the acceptance criteria llLA ONLY.

INITIAL CONDITIONS:

  • Unit 1 is in Mode 5 with RCS core exit thermocouple temperatun::s at 110°F.
  • Comprehensive Test was performed (SOP Test was NOT performed).

INITIATING CUE: Review/Approve completed Surveillance ofRHR Pump 1RH-P-1A to determine operability as defined by the acceptance criteria lILA.

ONLY. Document the results of your review in the comments section of the cover page.

D At this time, ask the evaluator any questions you have on this JPM.

D When satisfied that you understand the assigned task, announce HI am now beginning the JPM".

Simulate performance or perform as directed the required task.

D Point to any indicator or component you verify or check and announce your observations.

After determining the Task has been met announce" I have completed the JPM".

D Then hand this sheet to the evaluator.

RTL#A5,640U I12-ADM-130 I.F04 Page 6 of7 Revision I OPERA TIONS JOB PERFORMANCE MEASURE JPM NUMBER: lAD-026 JPM TITLE: Review/Approve Completed Surveillance ofRHR Pump JPM REVISION: 0 STANDARD

( "e" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR Y;N:SAT)=> SIU .

I START TIME:

EVALUATOR CUE: Provide the candidate with the Handout Materials. Criteria/steps may be checked/verified in any order.

l. Refers to lOST-10.1 and 1.1 Consults Acceptance Criteria lILA for acceptable associated data provided. performance.

I COMMENTS:

2.C [lRH-P-IA], Residual Heat 2.1 Compares Actual Motor Vibrations on Data Sheet 2 Removal Pump: Operates to Acceptable and Alert range.

within the limits ofBVPS 1ST Program (T.S.S.S.4) as specified 2.2C Determines Motor Inboard (2) Axial (A) vibrations in the Data Sheets for: Motor are GREATER THAN Acceptable and Alert Range.

Vibration (Data Sheet 2)

  • COMMENTS:

3.C [lRH-P-IA], Residual Heat 3.1 Compares calculated Delta P on Data Sheet 1 to Removal Pump: Operates Acceptable Range.

within the limits of BVPS 1ST Program (T.S.S.S.4) as specified 3.2C Determines calculated Delta P is GREATER in the Data Sheets for: Delta-P THAN Acceptable Range for the Comprehensive (Data Sheet 1) Test.

COMMENTS:

RTL#A5.640U J/2-ADM-1301.F04 Page 7 of7 Revision J OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1AD-026 JPM TITLE: Review/Approve Completed Surveillance ofRHR Pump JPM REVISION: 0

! STEP STANDARD I ("C" Denotes CRITICAL STEP) (l I Stu 4.C Complete the front cover 4.lC Lists the following problems in Comments Section or sheet. OST problem sheet:

  • C Motor Inboard (2) Axial (A) vibrations are GREATER THAN Acceptable and Alert Range.
  • C Calculated Delta P is GREATER THAN Acceptable Range.

COMMENTS:

EVALUATOR NOTE: Grader Discretion may be required. Acceptance Criteria for Flow is met and does not need to be documented.

STOP TIME:

RTL#A5.640U 112-ADM-130 I.F04 Page 1 of7 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE (JPM)

TRAINING MATERIAL TITLE: Review/Approve L W Discharge (SRO ONLY)

TRAINING MATERIAL NUMBER: lAD-023 PROGRAM TITLE: Licensed COMPUTER CODE: lAD-023 REVISION NUMBER: o TECHNICAL

REFERENCES:

lOM-17.4.AN, "Discharging A Coolant Recovery Tank To Cooling Tower Blowdown", Rev. 2 INSTRUCTIONAL SETTING: Classroom APPROXIMATE DURATION: 20 Minutes PREPARED BY: I. Forbes .,,,...J----

.,1(#~ Date PEER REVIEW BY:

Date t

APPROVED FOR USE: ------=-~-=-----:----~ .,..:.~

,!",,-?>4 Training Supervisor or Designee Date

RTL#A5.640U l/2-ADM-1301.F04 Page 2 of7 Revision I OPERATrONS JOB PERFORMANCE MEASURE TRAINING MATERIAL CHANGE FORM Affected Training Materials: IAD-023 Type of Change:

~ Changes Requiring Learning Objective Related Change? I New Rev. # 0 i

Revision DYes ~No I D Changes Not The Change Does Not Impact Learning Existing Rev. # N/A Requiring Revision Objectives or Material Quality.

i New Change #

List/Description of Change(s):

Original Issue.

Reason for Change (s):

To expand BVPS Unit 1 Admin JPM Infrastructure.

APPROVALS:

NOTE: Additions, deletions or Prepared by Date changes to training materials must be reviewed for their possible impact to the Training Training Superintendent/Supervisor/Peer Date Qualification Matrix. See

. Incumbent Impact Review,

("Changes Not Requiring Revision" only) i NOBP-TR-II04.

RTL#A5.640U J/2-ADM-J301.F04 Page 3 of7 Revision I OPERA TIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1AD-023 I* . .

JPM REVISION: 0 JPM TITLE: Review/Approve LW Discharge (SRO ONLY)

KIA

REFERENCE:

2.3.11 4.3 TASK ID: 1300-009-03-023 JPM APPLICATION: cg] REQUALIFICATION cg] INITIAL EXAM o TRAINING cg] FAULTED JPM cg] ADMINISTRATIVE JPM EV ALUATION METHOD: LOCATION: TYPE: ADMINISTERED BY:

~ Perform 0 Plant Site 0 Annual Requal Exam 0 BVT 0 Simulate 0 Simulator 0 Initial Exam o NRC

~ Classroom 0 OJT/TPE 0 Other:

0 Training D Other:

EV ALUATION RESULTS Performer Name: Performer SSN:

~

Time Yes Allotted Actual 20 Minutes minutes Critical: No Time: Time:

JPM RESULTS:

D SAT D UNSAT (Comments required for UNSAT evaluation)

Comments:

OBSERVERS Name/SSN: Name/SSN:

Name/SSN: Name/SSN:

EVALUATOR Evaluator (Print): Date:

i Evaluator Signature:

RTL#A5.640U 1!2-ADM-130 l.F04 Page 4 of7 Revision 1 OPERA TIONS lOB PERFORMANCE MEASURE lPM NUMBER: 1AD-023 JPM TITLE: Review!Approve LW Discharge (SRO ONLY)

JPM REVISION: 0 EVALUATOR DIRECTION SHEET TASK STANDARD: RWDA-L-00811 is NOT approved for the following reasons:

1. Incorrect tank volume.
2. Incorrect alternate radiation monitor alarm setpoint calculation.

RECOMMENDED Classroom STARTING LOCATION:

DIRECTIONS: You are to perform the task Review!Approve L W Discharge.

INITIAL CONDITIONS:

  • Unit 1 is at 100% power.
  • RWDA-L-OOSll has been prepared for discharging Coolant Recovery Tank (lBR-TK-4B) to Cooling Tower Blowdown.
  • Coolant Recovery Tank (lBR-TK-4B) level is 12 feet.
  • 10M-17.4.AN, "Discharging A Coolant Recovery Tank To Cooling Tower Blowdown", has been completed up to step IV.D.l INITIATING CUE:
  • RevieW/Approve RWDA-L-00Sl1 lAW 10M-17.4.AN, "Discharging A Coolant Recovery Tank To Cooling Tower Blowdown" and COMPLETE Step IV.D.I (includes steps la & Ib)
  • Document the results of your approval in appropriate steps of 1OM-17.4.AN, AND in the block below. (Located on candidate direction sheet) ENSURE ALL RESULTS ARE DOCUMENTED.

REFERENCES:

1OM-17.4.AN, "Discharging A Coolant Recovery Tank To Cooling Tower Blowdown"., Rev. 2 TOOLS: Calculator HANDOUT: RWDA-L-OOSll filled out with the following errors:

72,000 gal volume for the tank instead of 78,000 gals.

6 Wrong alternate radiation monitor alarm setpoint calculation. (1. 70F instead of 1. 70E's) lOM-17.4.AN, "Discharging A Coolant Recovery Tank To Cooling Tower Blowdown", Rev. 2, filled out up to step but not including Step IV.D.l.

Tank Curve Book with the latest BR-TK-4A,4B, "Coolant Recovery Tanks" Tank Level Curve" (6!20!0 1)

RTL#A5.640U \!2-ADM-1301.F04 Page 5 of7 Revision I OPERATIONS JOB PERFORMANCE MEASURE CANDIDATE DIRECTION SHEET

  • THIS SHEET TO BE GIVEN TO CANDIDATE
  • DRead:

TASK: You are to perform the task Review/Approve L W Discharge.

INITIAL CONDITIONS:

  • Unit 1 is at 100% power.
  • RWDA-L-0081I has been prepared for discharging Coolant Recovery Tank (lBR-TK-4B) to Cooling Tower Blowdown.
  • Coolant Recovery Tank (lBR-TK-4B) level is 12 feet.
  • 10M-17.4.AN, "Discharging A Coolant Recovery Tank To Cooling Tower Blowdown", has been completed up to step IV.D.I INITIA TING CUE:
  • Review/Approve RWDA-L-00811 lAW 10M-17.4.AN, "Discharging A Coolant Recovery Tank To Cooling Tower Blowdown" and COMPLETE Step IV.D.I (includes steps la & Ib)
  • Document the results of your approval in appropriate steps of 1OM-17.4.AN, AND in the block below. ENSURE ALL RESULTS ARE DOCUMENTED.

RESULTS:

D At this time, ask the evaluator any questions you have on this lPM.

D When satisfied that you understand the assigned task, announce "I am now beginning the JPM".

Simulate performance or perform as directed the required task.

D Point to any indicator or component you verify or check and announce your observations.

After determining the Task has been met announce" I have completed the JPM".

D Then hand this sheet to the evaluator.

RTL#A5.640U 1I2-ADM-J30 l.F04 Page6of7 Revision J OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: lAD-023 JPM TITLE: Review/Approve LW Discharge (SRO ONLY)

JPM REVISION: 0 I STEP I STANDARD i ("C" Denotes CRITICAL STEP) I (Indicate "S" FOR SAT or "V" FOR VNSAT)~ I SIU START TIME:

l.C After the RWDA-L has been l.IC Refers to Tank Curve Book and 1OM-17.4.AN and generated by Radiation determines that the tank data is INCORRECT on Protection, have the SM OR RWDA-L-00811. The correct volume for 12 feet US review the R WDA-L to should be 78,000 gals. NOT 72,000 gals.

confirm the following:

EVALUATOR NOTE: Candidate may also refer to The tank data is correct. recirculation time of the tank. The recirculation time is more than the minimum required.

I I COMMENTS:

2. Confirm the RWDA-L has 2.1 Verifies Rad Pro has signed the Peer Reviewed been Peer Reviewed by Signature on the RWDA-L Radiation Protection or Environmental/Chemistry . COMMENTS:

i 3.C Confirms all hand 3.1C Determines that the alternate radiation Alarm setpoint calculations are correct. calculation is INCORRECT.

EVALUATOR NOTE: 11000/35 X 542 should equal 1.70E-5 NOT 1.55E"6 AND this also makes 1.70E-6 X .7 INCORRECT.

i (should be 1. 70E"5 X .7 = 1.19E"5) i COMMENTS:

I I I

RTL#A5.640U II2-ADM-1301.F04 Page 7 of7 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: lAD-023 '\ JPM TITLE: Review/Approve LW Discharge (SRO ONLY)

JPM REVISION: 0 (Indicate "s" FOR SAT or "U" FOR UNSAT)::::}

4. Verify the effective period 4.1 Determines RWDA-L is still effective.

for the RWDA-L has NOT expired. EVALUATOR NOTE: IA W P&L G on page 3 the RWDA-L is effective for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from the time the sample was drawn COMMENTS:

5.C If the tank is NOT acceptable 5.1 C In the remarks section places the following for discharge, an approval information:

signature is NOT required. Mark the RWDA-L VOID Mark the RWDA-L VOID, C Tank volume is incorrect.

state reason, initial, AND C Radiation monitor alarm setpoint calculation Return the RWDA-L to is incorrect Radiation Protection. Candidate initials (Otherwise NI A this step).

EVALUTOR NOTE: Some discretion is required when grading this step of the lPM. It is NOT required to place the exact words listed here for the tank volume and radiation monitor alarm setpoint. However, it is critical the candidate documents all the errors on the form.

EVALUATOR CUE: If necessary remind the candidate to perform ALL of Step IV.D.l.

(this cue is necessary only if they think they should go no further after finding first issue)


~

COMMENTS:

I i EVALUATOR CUE: That completes this JPM.

~--------------------------~

III .

STOP TIME:

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _L -_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _~I !J

RTL#A5.640U 1/2-ADM-130 I.F04 Page I of 10 Revision I OPERATIONS JOB PERFORMANCE MEASURE (JPM)

TRAINING MATERIAL TITLE: an Event and Determine Protective Action Recommendations TRAINING MATERIAL NUMBER: lAD-01S IAD-OIS REVISION NUMBER: o TECHNICAL

REFERENCES:

r;pP/I-l a, Recognition And Classification of Emergency Conditions, Rev. 13 j2-EPP-IP-4.1, Offsite Protective Actions, Rev. 28 INSTRUCTIONAL SETTING: Classroom APPROXIMA TE DURATION: 30 Minutes

1. Forbes Date

~-

Date Training Supervisor or Designee Date

RTL#A5.640U 1/2-ADM-130 1.F04 Page 2 of JO Revision 1 TRAINING MATERIAL CHANGE FORM lAD-01S Changes Requiring I Learning Objective Related Change? New Revision

  • D Yes No

' D Changes Not The Change Does Not Impact Learning I Existing Rev. # NIA I* Requiring Revision

  • Objectives or Material Quality.

f-..... ...--~. . . - - - - - - - New Change #

! List/Deseription of Change(s):

Original Issue.

- - - ------------. --------------1 Reason for Change (s):

To expand Unit 1 Admin JPM Infrastructure.

1. Forbes Prepared by Date ~ - ***1 NOTE: Additions, deletions or changes to training materials must be reviewed for their possible impact to the Training Ii Qualification Matrix. See .

IT" S . d ***/*-S--*- ' P - - - - D - -- Incumbent Impact Review,

  • rammg upennten ent uperVlsorl eer ate ~OBP-TR-ll 04.

(,'Changes No/ Requiring Revision" only)

RTL#A5.640U 112-ADM-130 l.f04 Page 3 of 10 Revision I OPERATIONS .rOB PERFORMANCE MEASURE JPM NUMBER: 1AD-O 15 JPM TITLE: Classify an Event and Determine Protective Action JPM REVISION: 0 Recommendations KIA

REFERENCE:

2.4.40 (4.5) TASK 10: 1350-004-03-023 1350-007 023 JPM APPLICATION: REQUALIFICATION [8J INITIAL EXAM TRAINING o FAULTED JPM [8J ADMINISTRATIVE JPM EVALUATION METHOD: LOCATION: TYPE: ADMINISTERED BY:

D

~ Perform

~

Simulate B

[8J Plant Site Simulator Classroom

[J

[J Annual Requal Exam Ini tial Exam OJTITPE Cd BVT NRC Other:

[J Training

[J Other:

EVALUATION RESULTS Performer Name: Performer SSN:

Time [8J Yes Allotted Aetual 30 Minutes minutes Critical: D No Time: Time:

JPM RESULTS:

D SAT D UNSAT (Comments required for UNSA T evaluation)

Comments: -_.

OBSERVERS Name/SSN: Name/SSN:

Name/SSN: Name/SSN:

EVALUATOR Evaluator (Print): Date:

Evaluator

RTL#A5.640U li2-ADM-\301.F04 Page 4 of 10 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: IAD-015 i JPM TITLE: Classify an Event and Determine Protective Action JPM REVISION: 0 I Recommendations EVALUATOR DIRECTION SHEET 1 EMERGEI'-TY CLASSIFIC ArrON TASK STANDARD: Determines based on initial conditions and EPP/I-l a that a General Emergency ClassitLcation is required per Tab 3.1. This task must be performed within 15 minutes of beginning the JPM.

RECOMMENDED Classroom STARTING LOCATIOI\:

DIRECTIONS: Classify an emergency event using EPP/I-l a.

INITIAL CONDITIONS:

  • The Unit was operating at 100% power for 160 days.
  • Emergency Diesel No.1 \vas 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> into a maintenance outage to replace the motor driven fuel oil pump and not expected to return for another 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br />.
  • [ACB 1F9]. Emerg Gen '.10. 2 Circuit Breaker tripped on overcurrent de-energizing the 4K V IDF Bus.
  • 30 minutes into the event. SPDS displayed the 5 hottest CETs at greater than 730 c F and RVLIS Full Range at 30%.
  • No 4KV emergency power is expected for at least another 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

INITIATING ClIE: As the Emergency Director. you are to evaluate the given plant conditions and determine the emergency classification in accordance with EPP/I-l a, Recognition and Classification of Emergency Conditions. Repon your results in the box below. (Provided on candidate direction sheet) This JPM is time critical from the time you begin. The Initial Notification Form will NOT be completed for this JPM.

REFERENCES:

EPP/I-l a. Recognition and Classitication of Emergency Conditions, Rev.I3 TOOLS: NONE HANDOUT: EPPII-I a. Recognition

-- and Classification of Emergencv Conditions, Rev. 13

RTL#A5.640U 1/2-ADM-1301.F04 Page 5 of 10 Revision I OPERATIONS JOB PERFORMANCE MEASURE JPM 1\UMBER: 1AD-O IS JPM TITLE: Classify an Event and Determine Protective Action JPM REVISION: 0 Recommendations EVALUATOR DIRECTION SHEET 2 PROTECTIVE ACTION RECOMMENDATIONS TASK STANDARD: Determines the PAR(s) and downwind wedge as specified in JPM steps 4 & 5.

RECOMMENDED Classroom STARTING LOCATION:

DIRECTIONS: Determine Protective Action Recommendations in accordance with 1/2-EPP-fP-4.1 INITIAL CONDITIONS: A General Emergency has been declared at Unit 1 at 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br /> following a small break LOCA and the loss of all 4KV emergency power.

The following plant conditions exist:

  • 35' wind direction is lI'om 270° at 4 MP:t1.
  • 150' wind direction is from ::noo at 11 MPH.
  • 500' wind direction is from 285° at 15 MPH.
  • No radioactive release has occurred or is imminent (within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />).
  • Health Physics has provided the following dose projections:

At the EAB: II REM TEDE: 8 REM CDE At 5 miles: 0.9 REM TEDE, REM CDE At 2 miles: 1.5 REM TEDE; 4 REM CDE INITIATING CUE: You are the Emergency Director and the TSC/EOF has NOT yet been activated. YOli are to evaluate the above conditions and determine which. if any, offsite Protective Action Recommendations are necessary. Provide PAR in box below. (Provided on candidate direction sheet)

This JPM is time critical from the time YOll begin. The Initial Notification Form will1\OT be completed for this JPM.

REFERENCES:

1I2-EPP-IP-4.1. Offsite Protective Actions, Rev. 28 TOOLS: NONE

RTL#AS.640U 1/2-ADM-130 I.F04 Page 6 of 10 Revision I OPERATIONS JOB PERFORMANCE MEASURE CANDIDATE DIRECTION SHEET 1 EMERGENCY CLASSIFfCATION

  • THIS SHEET TO BE GIVEN TO CANDIDATE
  • DRead:

TASK: Classify an emergency event using EPP/I-I a.

INITIAL CO:t\DITIONS:

  • The Unit was operating at J 00% power for 160 days.
  • Emergency Diesel No.1 was 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> into a maintenance outage to replace the motor driven fuel oil pump and not expected to return for another 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br />.
  • [ACB 1F9], Emerg Gen No.2 Circuit Breaker tripped on overcurrent de-energizing the 4KV IDF Bus.
  • 30 minutes into the event SPDS displayed the 5 hottest CETs at greater than 730°F and RVUS Full Range at 30%.
  • No 4KV emergency power is expected for at least another 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

lJ\lTIA TING CLE: As the Emergency DirectoL you are to evaluate the given plant conditions and determine the emergency classification in accordance with EPP/I-l a, Recognition and Classification of Emergency Conditions. Report your results in the box below. (Provided on candidate direction sheet) This JPY1 is time critical from the time you begin. The Initial Notification Form will NOT be completed for this

.TPY1.

EMERGENCY CLASSIFICATION:

TAB:

D At this time, ask the evaluator any questions you have on this JPM.

D When satisfied that you understand the assigned task, announce "I am now beginning the JPM".

Simulate performance or perform as directed the required task.

D Point to any indicator or component you verifY or check and announce your observations.

After determining the Task has been met announce "I have completed the JPM".

D Then hand this sheet to the evaluator.

RTL#A5.640U 1/2-ADM-130 I.F04 Page 7 of 10 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE CANDIDATE DIRECTION SHEET 2 PROTECTIVE ACTION RECOMMENDATIONS

  • THIS SHEET TO BE GIVEN TO CANDIDArE
  • DRead:

TASK: Determine Protective Action Recommendations in accordance with 1/2-EPP-IPA.l INITIAL CONDITIONS: A General Emergency has been declared at Unit I at 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br /> following a small break LOCA and the loss of a1l4KV emergency power.

The following plant conditions exist:

  • 35' wind direction is from 270° at 4 MPH.
  • 150' wind direction is from 270° at 11 MPH.
  • 500' wind direction is from 285° at 15 MPH.
  • No radioactive release has occurred or is imminent (within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />).
  • Health Physics has provided the following dose projections:

At the EAB: 11 REM TEDE: 8 REM CDE At 5 miles: 0.9 REM TEDE, 2.5 REM CDE At 2 miles: 1.5 REM TEDE; 4 REM CDE INITIA TING CUE: You are the Emergency Director and the TSC/EOF has NOT yet been activated. You are to evaluate the abovc conditions and determine which. if any. offsite Protective Action Recommendations are necessarv. Provide PAR in box below.

This JPM is time critical from the time you begin. The Initial

"\lotification Form will NOT be for this JPM.

D At this time. ask the evaluator any questions YOLl have on this .rPM.

D When satisfied that you understand the assigned task. announce "I am now beginning the JPM".

Simulate performance or perform as directed the required task.

D Point to any indicator or component you verify or check and announce your observations.

After determining the Task has been met announce "I have completed the JPM".

D Then hand this sheet to the evaluator.

RTL#A5,640U 1/2-ADM-130 I ,F04 Page 8 of 10 Revision I OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: IAD-OIS i JPM TITLE: Classify an Event and Determine Protective Action JPM REVISION: 0 I Recommendations i STEP "C" Denotes CRITICAL STEP Indicate "S" FOR SAT or EVALUATOR NOTE: Provide the Candidate with the Candidate Direction Sheet #1 and a copy of EPP/I-Ia, Recognition and Classification of Emergency Conditions.

(DO NOT PROVIDE 1I2-EPP-IP-4.1 AT THIS TIME)

TIME: - - -

f - - - -.. - ..- ...- - - _ _ _- - l . .

1. C C orrectl y classi fy the 1.1 C Candidate classifies the event based on Tab 3.1, Loss emergency event within IS of AC (Power Ops) as a General Emergency using the minutes of recorded start time. following criteria:
  • AE and OF 4KV emergency buses NOT energized from Unit I sources for> 15 minutes, and
  • Five hottest CETs > 719°F with no Reps running (lnd RVLIS full range < 40%.

1.2C Completes classification within 15 minutes of recorded st311 time.

EVALUATOR CUE: In necessary, inform Candidate that the Initial Notification Form will NOT be completed at this time and record stop i time for Part 1.

EV ALUATOR NOTE: This JPM is conducted in nvo (2) parts. Once the Candidate determines the emergency classification, then administer the PAR section of the JPM.

COM'v1ENTS:

STOP TIME: - - -

RTL#A5.640U 1/2-ADM-130 1. F04 Page 9 of 10 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1AD-O 15 \ JPM TITLE: Classify an Event and Determine Protective Action JPM REVISION: O . Recommendations STANDARD CRITICAL STEP !IS" FOR SAT or !lU" FOR EVA~UA;~; NO~~E: Provide the~~an~~date w~tm' I. Candidate Direction Sheet #2 and a copy of 1I2-EPP I \ IP-4.1, Offsite Protective Actions. II I I

PAR START TIME: --~~---~ .. ~~~-.~~ .. ~-~.~

I I EVALUATOR CUE: Record start time after I I providing candidate with Direction Sheet # 2. I

2. Locate OtTsite Protective Action 2.1 Refers to I/2-EPP-IPA. L Attachment A OtTsite Recommendation Flowchmi. Protective Action Recommendation Flowchart.

COMMENTS:

3. Determine otfsite protective 3.1 Navigates PAR Howchart as follows:

action.

  • General Emergency already declared (1)
  • Met data provided in Initial Conditions (1)
  • None of the following are TRUE (1):

, 35' wind speed LESS than 2 MPH (or unavai lable)')

, [s either 150' or 500' wind directions unavailable?

, The difference between the 150' & 500' wind directions is 2: 165 and :s 195 degrees?

(opposite wind directions) or unavailable?

, Re[ease (other than a non-routine minor release below Federally approved operating limits or wholly comprised of tritium) has started or is imminent. (within one hour)

, Release transport will span sunrise or sunset hours.

COMMENTS:

i I I I

i J

RTL#A5.640U 1/2-ADM-130 I.F04 Page 10 of 10 Revision I OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: IAD-015 JPM TITLE: Classify an Event and Determine Protective Action JPM REVISION: 0 Recommendations STA\lDARD 4.C Determine Offsite Protective 4.1 C Determines the following PARs:

Action Recommendations.

  • Evacuate 2 miles, 360 degrees, and
  • Evacuate 5 miles downwind wedge, and
  • Shelter the remainder of 10 mile EPZ, and
  • Advise the general public to administer KI EVALUATOR CUE: If necessary, direct the Candidate to perform the downwind wedge determination as part of the PAR.

COMMENTS dowmvind wedge. . 5.1 Determines that the 150' elevation downwind sectors are "CDEFG".

5.2 Determines that the 500' evaluation downwind sectors are "DEFGH".

S.3C Determines that the combined sectors are "CDEFGH".

5.4C Completes PAR determination within 15 minutes of recorded start time.

EVALUATOR CUE: If necessary, inform the Candidate that the Initial Notification Form will NOT be completed at this time.

COM~lENTS:

EVALUATOR CUE: When the candidate completes the Protective Action Recommendation, the evaluation for this ,JPM is complete. Grader discretion required.

PAR STOP TIME: -----------------