ML12180A443

From kanterella
Jump to navigation Jump to search

Miscellaneous Exam Material (Folder 1)
ML12180A443
Person / Time
Site: Beaver Valley
Issue date: 04/23/2012
From: David Silk
NRC Region 1
To:
FirstEnergy Nuclear Operating Co
Jackson D
Shared Package
ML113320121 List:
References
TAC U01846
Download: ML12180A443 (3)


Text


Beaver Valley NRC Written Exam Seating Chart 4/16/12 Rear

---J--

Door SRO-I £,

t:O-I~

I*

.~

-5 Feet 1-SF",

1 RO~

1 SRO-I; SRO-IL I.

SRO-I z:.

I SRO-u_L Door Front Room 103 BVPS Training Center

1 LOTS NRC Examination Student Questions During Exam and Proctor Responses Time 0850 Individual 1

5RoI2 0857 0918 S~vlG 1004 5RuI i 1022 SA-OI "5 1028 S~1>3 I 1041 SRVL 1 1046 5 t!.b' -(-;.

1113 Sfv.J-:r 7 I 1118 1153 f>Rorc S'Rc.)"t "2 1158 SKeY! £ 1208 sit-v"!. ~

S~vI Z.

Question/Res.ponse Question 19: Are we asking for Programmed li9vel or Actual level?

Response: What does the question ask?

Steve's reply: Program level.

(No further clarification required)

Question 42: Is the question asking if 8 psig is the setpoint for Containment Hi-Hi pressure?

Response: NO Question 22: When it says in the 2nd part of thE~ question "in this area" is it referring to the East Cable Vault?

Response: Yes.

Question 16: Are we to assume no operator actions?

Response: Yes.

Question 67: Is SPDS the one on the plant computer?

Response: Yes.

Question 48: Are there other alarms or are these the only alarms that come in?

Response: There may be other alarms, but these are the ones provided.

Question 99: For the "0" distractor, are we still in E-3?

Response: Read the choice again.

Question 67: What does reverse video red Response: Our procedures refer to reverse video red.

Question 16: Are we to assume there are Response: Re-read the question.

Question 87: Is the question asking for design bases or Tech Specs?

Response: Re-read the question.

Question 70: Is a maintenance deficiency sticki9r Response: There is enough information in the question to answer the question.

Question 16: Are we to assume no operator actions?

Response: Yes.

I Question 8: For the PZR Heaters, are we talking initially or ten minutes later?

Response: The initially applies to both.

Beaver Valley Unit 1 1LOT8 April 16, 2012 Page 1 of 2

1 LOT8 NRC Examination Student Questions During Exam and Proctor Responses Time Individual Question/Response 1234 Question 71: Are we asking for the Federal Limit for declared pregnant worker?

Response: Re-read the question.

SRu14 1407 Question 42: Are we to assume 8 psig corresponds to Hi-Hi containment pressure?

Response: Assume this is containment pressure.

S~~7 1450 Question 100: I'm confused with the last statement "A valid dose projection is now available that requires an upgrade PAR @ 1258' S~{)I 7 Response: Re-read the question Beaver Valley Unit 1 1 LOT8 April 16, 2012 Page 2 of 2