ML15126A114

From kanterella
Revision as of 19:01, 21 January 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
IR 05000250/2015201 and 05000251/2015201, on 04,30,2015, Turkey Point Units 3 & 4 Security Baseline Inspection Report Cover Letter
ML15126A114
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/28/2015
From: Johnson R C
Division of Security Operations
To: Kiley M
Florida Power & Light Co
Coughlin P L
References
IR 2015201
Download: ML15126A114 (3)


See also: IR 05000250/2015201

Text

SAFEGUARDS INFORMATION

SAFEGUARDS INFORMATION

May 28, 2015

Mr. Michael Kiley, Site Vice President

Turkey Point Nuclear Generating Station Florida Power & Light Company

9760 SW 344 Street

Florida City, FL 33035

SUBJECT: TURKEY POINT NUCLEAR GENERATING STATION, UNITS 3 AND 4 - NRC SECURITY INSPECTION REPORT 05000250/2015201 AND

05000251/2015201

Dear Mr. Kiley:

On April 30, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Turkey Point Nuclear Generating Station, Units 3 and 4, and discussed the

results of this inspection with Mr. Mitch Guth and other members of your staff. Inspectors

documented the results of this inspection in the enclosed inspection report.

NRC inspectors documented one finding of very low security significance (Green) in this report. This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest this violation or the significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region

II; the Director, Office of Nuclear Security and Incident Response; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission,

Washington, DC 20555-0001; and the NRC resident inspector at the Turkey Point Nuclear

Generating Station, Units 3 and 4.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your

disagreement, to the Regional Administrator, Region II; the Director, Office of Nuclear Security,

and Incident Response; and the NRC resident inspector at the Turkey Point Nuclear Generating

Station, Units 3 and 4.

The enclosure transmitted herewith contains Safeguards Information. When separated from the enclosure, this transmittal document is decontrolled.

SAFEGUARDS INFORMATION

M. Kiley -2-

SAFEGUARDS INFORMATION

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Request for Withholding,"

of the NRC's "Rules of Practice," a copy of

this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management

System (ADAMS). ADAMS

is accessible from the NRC

Web site at http://www.nrc.gov/reading-rm/adams.html

(the Public Electronic Reading Room).

However, the material enclosed herewith contains Safeguards Information as defined by

10 CFR 73.21 "Protection of Safeguards Information; Performance Requirements," and its

disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS

component of NRC's ADAMS. If you choose to provide a response and Safeguards Information

is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if Security-Related Information is necessary to provide

an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with

10 CFR 2.390(b)(1)(ii), the NRC is waiving the

affidavit requirements for your response.

Sincerely,

/RA/ Robert C. Johnson, Chief

Security Performance Evaluation Branch

Division of Security Operations Office of Nuclear Security and Incident Response

Docket Nos. 50-250, 50-251

License Nos. DPR-31, DPR-41

Nonpublic Enclosure: Inspection Report 05000250/2015201 and 05000251/2015201 w/Attachments: Supplemental Information

cc w/encl: Timothy Eck, Security Manager

ML15126A114

OFFICE NSIR/DSO NSIR/DSO NSIR/DSO RII NSIR/DSO/SPEB NAME P. Coughlin

J. Clark D. Johnson B. Desai D. Cardenas for/C. Johnson DATE 5/5/15 5/19/15 5/19/15 5/28/15 5/28/15