Errata for Turkey Point Nuclear Generating Station, Units 3 and 4 -NRC Security Inspection Report 05000250/2015201 and 0500251/2015201
ML15194A212
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/15/2015
From: Rachel Johnson
Division of Security Operations
To: Kiley M
Florida Power & Light Co
Shared Package
ML15194A207 List:
References
IR 2015201
Download: ML15194A212 (3)


Text

uly 15, 2015

SUBJECT:

ERRATA FOR TURKEY POINT NUCLEAR GENERATING STATION, UNITS 3 and 4 - NRC SECURITY INSPECTION REPORT 05000250/2015201 AND 05000251/2015201

Dear Mr. Kiley:

Due to an error in U.S. Nuclear Regulatory Commission (NRC) Inspection Report 05000250/2015201 and 05000251/2015201, dated May 28, 2015, we are requesting you please replace that report with the entire enclosed document.

On April 30, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Turkey Point Nuclear Generating Station, Units 3 and 4, and discussed the results of this inspection with Mr. Mitch Guth and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report.

NRC inspectors documented one finding of very low security significance (Green) in this report.

This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest this violation or the significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Nuclear Security and Incident Response; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at the Turkey Point Nuclear Generating Station, Units 3 and 4.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region II; the Director, Office of Nuclear Security, and Incident Response; and the NRC resident inspector at the Turkey Point Nuclear Generating Station, Units 3 and 4.

The enclosure transmittal herewith contains Safeguards Information. When separated from the enclosure, the transmittal document is decontrolled. T. Summers -2-In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Request for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 Protection of Safeguards Information; Performance Requirements, and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information -

Withhold from Public Disclosure Under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1)

and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Robert C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket Nos. 50-250, 50-251 License Nos. DPR-31, DPR-41 Nonpublic Enclosure: Inspection Report 05000250/2015201 and 05000251/2015201 w/Attachments: Supplemental Information cc w/encl: Timothy Eck, Security Manager ML15194A207 (Package)

OFFICE NSIR/DSO NSIR/DSO/SPEB NAME D. Johnson C. Johnson DATE 7/10/15 7/15/15