MONTHYEARML18152B3571999-10-22022 October 1999 Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML20216F1381999-09-0808 September 1999 Forwards Retake Exam Repts 50-280/99-302 & 50-281/99-302 on 990824.One SRO Applicant Who Received re-take Operating Test Passed re-take Exam ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 ML18152B4261999-05-28028 May 1999 Provides Formal Notification of Effect of Recent Organizational Restructuring on OLs of North Anna & Surry Power Stations,Per NRC 990513 Telcon Request ML18152B4221999-05-27027 May 1999 Forwards Info Concerning Changes to ECCS Evaluation Models & Application in Existing Licensing Analyses for Surry & North Anna Power Stations,Units 1 & 2 ML18152B4231999-05-26026 May 1999 Informs That Vepc Will Revise 180 Day Response to NRC GL 96-05,within 120 Days of Date of Ltr to Incorporate Commitment to Participate in Joint Owners Group Program as Applicable ML18152B4211999-05-25025 May 1999 Forwards Rev 1 to Relief Request P-11 to Clarify Original Intent of Request by Specifically Requesting Relief from Requirements of Section 6.1 of OM-6 ML18152A4741999-05-19019 May 1999 Forwards Completed Registration Form for Renewal of ASTs at Surry Nuclear Power Station,Iaw Section 9VAC 25-91-100.F ML18152B4171999-05-17017 May 1999 Provides Notification of Number of Steam Generator Tubes That Were Plugged During Spring 1999 Refueling Outage Planned ISI ML20217D6621999-05-14014 May 1999 Forwards NRC Operator Licensing Exams 50-280/99-301 & 50-281/99-301 (Including Completed & Graded Exams) for Tests Administered on 990329-0401 & 990412-15.Nine Candidates Passed (& One Failed) Exam ML18152A3701999-05-13013 May 1999 Submits Proposal to Use Provisions of ASME Section XI Code Case N-597 for Analytical Evaluation of Class 1,2 & 3 Carbon & Low Alloy Steel Piping Components Subjected to Wall Thinning as Result of Flow Accelerated or Other Corrosion ML18152B4121999-05-0303 May 1999 Forwards Application for Renewal of License for SV Ross. Encl Withheld Per 10CFR2.790(a)(6) ML18152B4101999-04-29029 April 1999 Forwards Scope & Objectives for 990803 Surry Power Station Emergency Exercise.Without Encls ML18152B6561999-04-23023 April 1999 Forwards Annual Radioactive Effluent Release Rept for Surry Power Station,Jan-Dec 1998, Which Includes Summary of Quantities of Radioactive Liquid & Gaseous Effluents & Solid Waste Released During CY98 ML18152B6491999-04-13013 April 1999 Forwards MOR for Mar 1999 for Surry Power Station,Units 1 & 2.MOR for Feb 1999 Incorrectly Stated Gross Electrical Energy Generated (Mwh) for Unit 2.Rept Should Have Stated Monthly Figure as 568965.0 ML18151A5851999-03-31031 March 1999 Forwards Rept on Status of Decommissioning Funding for Each of Four Nuclear Power Reactors,Per 10CFR50.75(f)(1) ML18152A2801999-03-30030 March 1999 Forwards Summary of Structural Integrity Evaluation of Thermally Induced Over Pressurization of Containment Penetration Piping During DBA for SPS & Naps,Units 1 & 2,per GL 96-06.Draft Proposed UFSAR Revised Pages,Encl ML18153A2721999-03-29029 March 1999 Forwards LER 99-002-00 Per 10CFR50.73.Listed Commitments Contained in Ltr 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML18152B3571999-10-22022 October 1999 Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 ML18152B4261999-05-28028 May 1999 Provides Formal Notification of Effect of Recent Organizational Restructuring on OLs of North Anna & Surry Power Stations,Per NRC 990513 Telcon Request ML18152B4221999-05-27027 May 1999 Forwards Info Concerning Changes to ECCS Evaluation Models & Application in Existing Licensing Analyses for Surry & North Anna Power Stations,Units 1 & 2 ML18152B4231999-05-26026 May 1999 Informs That Vepc Will Revise 180 Day Response to NRC GL 96-05,within 120 Days of Date of Ltr to Incorporate Commitment to Participate in Joint Owners Group Program as Applicable ML18152B4211999-05-25025 May 1999 Forwards Rev 1 to Relief Request P-11 to Clarify Original Intent of Request by Specifically Requesting Relief from Requirements of Section 6.1 of OM-6 ML18152B4171999-05-17017 May 1999 Provides Notification of Number of Steam Generator Tubes That Were Plugged During Spring 1999 Refueling Outage Planned ISI ML18152A3701999-05-13013 May 1999 Submits Proposal to Use Provisions of ASME Section XI Code Case N-597 for Analytical Evaluation of Class 1,2 & 3 Carbon & Low Alloy Steel Piping Components Subjected to Wall Thinning as Result of Flow Accelerated or Other Corrosion ML18152B4121999-05-0303 May 1999 Forwards Application for Renewal of License for SV Ross. Encl Withheld Per 10CFR2.790(a)(6) ML18152B4101999-04-29029 April 1999 Forwards Scope & Objectives for 990803 Surry Power Station Emergency Exercise.Without Encls ML18152B6561999-04-23023 April 1999 Forwards Annual Radioactive Effluent Release Rept for Surry Power Station,Jan-Dec 1998, Which Includes Summary of Quantities of Radioactive Liquid & Gaseous Effluents & Solid Waste Released During CY98 ML18152B6491999-04-13013 April 1999 Forwards MOR for Mar 1999 for Surry Power Station,Units 1 & 2.MOR for Feb 1999 Incorrectly Stated Gross Electrical Energy Generated (Mwh) for Unit 2.Rept Should Have Stated Monthly Figure as 568965.0 ML18151A5851999-03-31031 March 1999 Forwards Rept on Status of Decommissioning Funding for Each of Four Nuclear Power Reactors,Per 10CFR50.75(f)(1) ML18152A2801999-03-30030 March 1999 Forwards Summary of Structural Integrity Evaluation of Thermally Induced Over Pressurization of Containment Penetration Piping During DBA for SPS & Naps,Units 1 & 2,per GL 96-06.Draft Proposed UFSAR Revised Pages,Encl ML18153A2721999-03-29029 March 1999 Forwards LER 99-002-00 Per 10CFR50.73.Listed Commitments Contained in Ltr ML18153A3421999-03-26026 March 1999 Provides Updated Medical Status Rept for Wb Gross in Accordance with License SOP-20476-02,Docket 55-5228,as Amended by 980320 License Amend.Informs That Gross Exhibits No Performance Problems & Will Continue on Current Medicine ML20204H0331999-03-17017 March 1999 Forwards Rev 5 to PSP for Surry & North Anna Power Stations & Associated Isfsis.Description & Justification for Changes Included with Plan Rev.Rev 5 to PSP Withheld Per 10CFR73.21 ML18153A3411999-03-15015 March 1999 Forwards Signed Applications & Medical Certificates for Initial License at Surry Power Station Units 1 & 2 for Listed Individuals.Without Encls 1999-09-08
[Table view] |
Text
e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 September 23,'1993 United States Nuclear Regulatory Commission Attention:
Document Control Desk Washington, D. C. 20555 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 Serial No.93-473 NA&F/JRH-CGL R1 Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REGARDING RESPONSE TO GENERIC LETTER 92-01, REV. 1 The stated purpose of Generic Letter 92-01, Revision 1, was to obtain information needed to assess compliance with requirements and commitments regarding reactor vessel integrity.
Virginia Electric and Power Company provided the requested information for Surry Units 1 and 2 in a June 29, 1992 letter (Serial No.92-211 ). By letter dated July 21, 1993, the NRC requested additional information regarding the Surry response.
The response to your request for additional information (RAI) is provided in Attachment
- 1. Consistent with the intent of Generic Letter 92-01, we have also reviewed regulatory requirements governing reactor vessel integrity, the information provided in response to Generic Letter 92-01, and the information and reports provided previously to the NRC regarding reactor vessel material fracture toughness, material surveillance program, and confirmation of fracture toughness requirements for protection against pressurized thermal shock events. Based on our review, we conclude that current compliance with the regulations governing reactor vessel integrity has been demonstrated for Surry Units 1 and 2. Further, we conclude that sufficient information has been provided to demonstrate compliance with applicable reactor vessel regulations through the end-of-license, pending confirmation of actual n7QCP8 t::, . ....
fluence.s experienced by each unit's reactor vessel. The basis for these conclusions is provided in Attachment
- 2. If you have further questions or require additional information, please contact us. Very truly yours, (}.PON~ \o/' W. L. Stewart Senior Vice President
-Nuclear Attachments:
- 1. Response to Request for Additional Information Regarding the Response to Generic Letter 92-01, Revision 1, for Surry Units 1 and 2 2. Basis for Demonstration of Compliance with Regulations Governing Reactor Vessel lntegr!ty for Surry Units 1 and 2 cc: U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W. Suite 2900 Atlanta, Georgia 30323 Mr. M. W. Branch NRC Senior Resident Inspector Surry Power Station Mr. D. L. Howell B&W Nuclear Services Company 3315 Old Forest Road Lynchburg, VA 24501 Mr. S. A. Collard, Chairman B&WOG Reactor Vessel Working Group 700 Universe P. 0. Box 14000 Juno Beach, FL 33408 COMMONWEAL TH OF VIRGINIA ) ) COUNTY OF HENRICO ) The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by J. P. O'Hanlon who is Vice President
-Nuclear Operations, for W. L. Stewart who is Senior Vice President
-Nuclear, of Virginia Electric and Power Company. He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief. 4 Acknowledged before me this 2? (#day of h-AJ, 191-~ . My Commission Expires: l &'fJ :fl, , 19'1!i_. (/;;tdul Notary Public (SEAL)*
ATTACHMENT 1 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REGARDING THE RESPONSE TO GENERIC LETTER 92-01, REVISION 1, FOR SURRY UNITS 1 AND 2 SURRY UNIT 1 RAI on Question 2a in GL 92-01 Attachment 1 Page 1 of 6 Your response only reported the initial Upper Shelf Energy (USE) value for weld SA-1585. The initial USE values for the remaining four types of welds can be found in Report BAW-1803, Rev. 1, where[as]
the USE values for welds SA-1494 and J726 cannot be substantiated.
An owners group report on USE equivalent margin analysis regarding beltline welds with low USE values for Levels A and B is under preparation by B&WOG; a similar B&WOG report for Levels C and D (BAW-2178P) is under NRC review now. Confirm that these two topical reports will be used as the licensing bases to demonstrate that all beltline welds including welds SA-1494 and J726 will meet the USE requirements of Appendix G, 10 CFR 50. Response SA-1494 SA-1494 is a Linde 80 weld material with an initial CvUSE estimate of 70 ft-lb, as documented in Table 3-5 of BAW-1803, Rev. 0 ("Correlations for Predicting the Effects of Neutron Radiation on Linde 80 Submerged-Arc Welds," dated January 1984). This material constitutes the Surry Unit 1 intermediate shell longitudinal welds L3 and L4, and the lower shell longitudinal weld L 1. According to a Reg. Guide 1.99, Rev. 2, Paragraph C.1.2 calculation, the USE for this material at the 1/4-T location is conservatively predicted to be above 50 ft-lb at end-of-license. (A fluence of <1>18=0.639E19 is obtained from WCAP-11017, Rev. 1, "Surry Units 1 and 2 Reactor Vessel Fluence and RT Prs Evaluations for Consideration of Life Extension." This value corresponds to a <1>114_ r=0.394E19 for an 8.05 inch thickness.
With [Cu]=0.18 wt% and CvUSE 0=70 ft-lb, a decrease in CvUSE of 25% is calculated, resulting in a 1/4-T CvUSErnL=52.5.)
With the flux reduction program scheduled to be implemented beginning with Surry 1 Cycle 13, the irradiated CvUSE is predicted to be greater than 50 ft-lb at the end of a postulated 20 year license renewal. It is on this basis that Virginia Power has concluded that SA-1494 will meet the USE requirements of 10 CFR 50, Appendix G at the end of the current license period. J726 is a Rotterdam weld with a lower bound CvUSE estimate of 90 ft-lb, based on available CvUSE data for similar weld materials documented in BAW-1909, Rev. 1 ("Reactor Pressure Vessel and Surveillance Program Materials Licensing Information for Surry Units 1 and 2," dated August 1986). This material constitutes the Surry Unit 1 nozzle-to-intermediate shell circumferential weld. The available CvUSE data for similar Attachment 1 Page 2 of 6 weld materials consists only of the Surry 2 Surveillance Material (R3008) which has an initial CvUSE of 91 ft-lb. Although J726 has a high bulk copper content (0.33 wt%), it is in a low fluence location, above the active region of the core. According to a Reg. Guide 1.99, Rev. 2, Paragraph C.1.2 calculation, the USE for this material at the 1/4-T location is conservatively predicted to be above 50 ft-lb at end-of-license.
(<l>18=0.396E19 (WCAP-11017, Rev. 1, with an axial multiplier of 10%) corresponds to a <l>114_T=0.244E19 for an 8.05 inch thickness.
With [Cu]=0.33 wt%, and CvUSE 0=90 ft-lb, a decrease in CvUSE of 34% is calculated, resulting in a 1/4-T CvUSEEoL=59.4.)
Discussion It is Virginia Power's preference to demonstrate compliance with the USE requirements of 10 CFR 50, Appendix G via RG 1.99, Rev. 2 calculations or surveillance data when possible.
However, if a Linde 80 material cannot be demonstrated via Reg. Guide calculation or surveillance data to meet the USE requirements of Appendix G, it is necessary to reference the B&WOG Low USE Reports as the basis for compliance.
The Surry Unit 1 beltline materials, with the exception of the intermediate-to-lower shell circumferential weld (SA-1585) and the lower shell longitudinal weld L2 (SA-1526), can be demonstrated via RG 1.99, Rev. 2, Paragraph C.1.2 calculations to meet the USE requirements of Appendix G. As described below, SA-1585 and SA-1526 may be demonstrated via RG 1.99, Rev. 2, Paragraph C.2.2 ("Surveillance Data Available")
to remain above 50 ft-lb for the current license period without flux reduction, and throughout a postulated 20 year license renewal if the flux reduction program is implemented as planned. According to RG 1.99, Rev. 2, Paragraph C.1.2 CvUSE calculations based on fluence and chemical composition, the limiting Surry Unit 1 material is the intermediate-to-lower shell circumferential weld, SA-1585. As documented in the Surry Unit 1 response to GL 92-01 (BAW-2166, dated June 1992, transmitted by our June 29, 1992 letter (Serial No.92-211)), calculations based on surrogate weld data from the Point Beach Unit 1 surveillance weld material SA-1263, performed in accordance with RG 1.99, Rev. 2, Paragraph C.2.2, demonstrate that the CvUSE for SA-1585 will remain above 50 ft-lb throughout the current license period without flux reduction.
If flux reduction targets are demonstrated to be met, the CvUSE for SA-1585 will remain above 50 ft-lb throughout a postulated 20 year license renewal. This conclusion will be re-confirmed with additional SA-1585 and surrogate weld data from the B&WOG MIRVSP. The results of the Surry Unit 1 surveillance Capsule V analysis (WCAP-11415, dated February 1987) demonstrate that SA-1526 has approximately 50 ft-lb CvUSE at a fluence of 1.94 x 10 19 n/cm 2. Without flux reduction, the lower shell longitudinal weld L2 (SA-1526) is predicted to experience an inner surface fluence of 6.39 x 10 18 n/cm 2 at end-of-license, or 9.83 x 10 18 n/cm 2 at the end of a postulated 20 year license renewal. (See WCAP-11017, Rev. 1.) The Surry 1 flux reduction program targets an inner surface Attachment 1 Page 3 of 6 fluence of 7.5 x 10 18 n/cm 2 at the end of a 20 year license renewal. The 1/4-T fluence will be approximately 62% of these values. With or without flux reduction, it is evident based on this data that the lower shell longitudinal weld L2 (SA-1526) will remain above the 50 ft-lb threshold throughout the current license period, and throughout a 20 year license renewal. This conclusion will be re-confirmed with additional SA-1526 data from the Surry Unit 1 reactor vessel materials surveillance program. Summary To summarize, the Surry 1 beltline materials have been demonstrated to remain above 50 ft-lb throughout the current license period. For beltline materials other than the intermediate-to-lower shell circumferential weld (SA-1585) and the lower shell longitudinal weld L2 (SA-1526), compliance with the requirements of 10 CFR 50, Appendix G may be demonstrated on the basis of RG 1.99, Rev. 2, Paragraph C.1.2 calculations.
The limiting CvUSE material (SA-1585) has been demonstrated via RG 1.99, Rev. 2, Paragraph C.2.2 calculations, based on surrogate weld data from the Point Beach Unit 1 surveillance weld material SA-1263, to remain above 50 ft-lb throughout the current license period without flux reduction, as well as throughout a postulated 20 year license renewal if flux reduction fluence targets are demonstrated to be met. On the basis of Surry 1 surveillance program data, the lower shell longitudinal weld L2 (SA-1526) has been demonstrated to remain above the 50 ft-lb threshold throughout the current license period, as well as throughout a postulated 20 year license renewal with or without flux reduction.
In the event the RG 1.99, Rev. 2 calculations, surveillance data, or fluence estimates which support the conclusion that the Surry 1 beltline materials remain above 50 ft-lb for the current license period are invalidated, the B&WOG Low USE Reports may be used to demonstrate compliance with the USE requirements of 10 CFR 50, Appendix G. However, it is Virginia Power's preference to demonstrate compliance with the USE requirements of 10 CFR 50, Appendix G via RG 1.99, Rev. 2 calculations or surveillance data.
-SURRY UNIT 1 RAI on Question 2b in GL 92-01 e Attachment 1 Page 4 of 6 Your response indicates that a generic initial RTNoT of -5 °F, which is the mean RTNoT value for 34 Linde 80 welds (BAW-1803, Revision 1), has been used for all welds except the weld J726. Provide justification for not using the generic mean value for Linde 80 welds of O °Fas required by 10 CFR 50.61. Response Use of a -5 °F initial RT NDT for Linde 80 welds is justified by the analysis documented in BAW-1803, Rev. 1 ("Correlations for Predicting the Effects of Neutron Radiation on Linde 80 Submerged-Arc Welds," dated May 1991, page 8-3). Weld J726 is a Rotterdam weld. An initial RTNDT of O °F, with a standard deviation of 20 °F, is applicable to Rotterdam welds. (See BAW-1909, Rev. 1. The discussion of SECY 82-465, "Pressurized Thermal Shock," is cited.)
SURRY UNIT 2 RAI on Question 2a in GL 92-01 ------------Attachment 1 Page 5 of 6 Your response only reported the initial Upper Shelf Energy (USE) value for weld SA-1585. The initial USE values for the remaining four types of welds can be found in Report BAW-1803, Rev. 1, where[as]
the USE value for weld L737 cannot be substantiated.
An owners group report on USE equivalent margin analysis regarding beltline welds with low USE values for Levels A and B is under preparation by B&WOG; a similar B&WOG report for Levels C and D (BAW-2178P) is under NRC review now. Confirm that these two topical reports will be used as the licensing bases to demonstrate that all beltHne welds including weld L737 will meet the USE requirements of Appendix G, 10 CFR 50. Response L737 is a Rotterdam weld with a lower bound CvUSE estimate of 90 ft-lb, based on available CvUSE data for similar weld materials documented in BAW-1909, Rev. 1 ("Reactor Pressure Vessel and Surveillance Program Materials Licensing Information for Surry Units 1 and 2," dated August 1986). This material constitutes the Surry Unit 2 nozzle-to-intermediate shell circumferential weld. The available CvUSE data for similar weld materials consists only of the Surry 2 Surveillance Material (R3008) which has an initial CvUSE of 91 ft-lb. Although L737 has a high bulk copper content (0.35 wt%), it is in a low fluence location, above the active region of the core. According to a Reg. Guide 1.99, Rev. 2, Paragraph C.1.2 calculation, the USE for this material at the 1/4-T location is conservatively predicted to be above 50 ft-lb at end-of-license.
(<l>15=0.343E19 (WCAP-11017, Rev. 1, with an axial multiplier of 10%) corresponds to a <l>114_r=0.212E19 for an 8.05 inch thickness.
With [Cu]=0.35 wt%, and CvUSE 0=90 ft-lb, a decrease in CvUSE of 34% is calculated, resulting in a 1/4-T CvUSEEoL=59.4.)
SURRY UNIT 2 RAI on Question 2b in GL 92-01 Attachment 1 Page 6 of 6 Your response indicates that a generic initial RTNDT of -5 °F, which is the mean RTNDT value for 34 Linde 80 welds (BAW-1803, Revision 1 ), has been used for all welds except the welds L737 and R3008. Provide justification for not using the generic mean value for Linde 80 welds of O °Fas required by 10 CFR 50.61. Your response indicates that the phosphorus and sulfur contents for the beltline weld L737 are not known. Confirm this. Response Use of a -5 °F initial RT Nor for Linde 80 welds is justified by the analysis documented in BAW-1803, Rev. 1. Welds L737 and R3008 are Rotterdam welds. An initial RTNDT of 0 °F, with a standard deviation of 20 °F, is applicable to Rotterdam welds. (See BAW-1909, Rev. 1. The discussion of SECY 82-465, "Pressurized Thermal Shock," is cited.) The phosphorus and sulfur contents for the beltline weld L737 (nozzle-to-intermediate shell circumferential weld) are not known.
ATTACHMENT 2 BASIS FOR DEMONSTRATION OF COMPLIANCE WITH REGULATIONS GOVERNING REACTOR VESSEL INTEGRITY FOR SURRY UNITS 1 AND 2
. . .. e Attachment 2 Page 1 of 1 Compliance with the 10 CFR 50.61 Pressurized Thermal Shock Rule: On the basis of our letter dated December 10, 1991 (Serial No.91-328), Surry Units 1 and 2 reactor vessel beltline materials have been demonstrated to meet the 10 CFR 50.61 PTS screening criteria through end-of-license.
This conclusion requires confirmation of actual end-of-license fluences and assumes implementation of the Surry Unit 1 flux reduction program as described in the December 10, 1991 letter. Compliance with the Fracture Toughness Requirements of 10 CFR 50, Appendix G: On the basis of the Surry Units 1 and 2 response to Generic Letter 92-01 (BAW-2166, "B&W Owners Group Response to Generic Letter 92-01," dated June 1992, transmitted by our June 29, 1992 letter (Serial No.92-211)), as supplemented by the attached response to your RAI, the Surry Units 1 and 2 beltline materials have been demonstrated to meet the 10 CFR 50, Appendix G requirements for Upper Shelf Energy through end-of-license.
Specifically, RG 1.99, Rev. 2 calculations demonstrate that the upper shelf energy of the Surry Units 1 and 2 beltline materials remains above 50 ft-lb through end-of-license.
This conclusion requires confirmation of actual end-of-license fluences, but does not require implementation of the Surry Unit 1 flux reduction program. In the event the RG 1.99, Rev. 2 calculations, surveillance data, or fluence estimates which support the conclusion that the Surry beltline materials remain above 50 ft-lb for the current license period are invalidated, the B&WOG Low USE Reports may be used to demonstrate compliance with the USE requirements of 10 CFR 50, Appendix G. Compliance with the Surveillance Requirements of 10 CFR 50, Appendix H: Because the limiting Surry Unit 1 and 2 material for Upper Shelf Energy concerns (SA-1585 -Surry 1 intermediate-to-lower shell circumferential weld, and the Surry 2 intermediate shell longitudinal welds L3 (100%) and L4 (ID 50%)) is not included in either the Surry Unit 1 or Unit 2 surveillance program, Virginia Power is participating in the B&WOG Master Integrated Reactor Vessel Surveillance Program (MIRVSP) (as described in BAW-1543, Revision 3, dated September 1989). The MIRVSP includes several capsules with SA-1585. In addition, the Point Beach Unit 1 surveillance program includes a weld material (SA-1263) which has been identified in the MIRVSP documentation as a surrogate for SA-1585. The Surry Units 1 and 2 plant-specific surveillance programs include the weld materials predicted to be limiting in terms of calculated end-of-license PTS reference temperature (i.e., the Surry 1 lower shell longitudinal weld (SA-1526) and the Surry 2 intermediate-to-lower shell circumferential weld (R3008)).
With the exception of SA-1585, the Surry 1 and 2 surveillance program will provide sufficient data for evaluation of the irradiated properties and fluences experienced by beltline materials predicted to be limiting in terms of the proximity of of-license CvUSE values and PTS reference temperatures to regulatory limits.