MONTHYEARULNRC-06853, Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.7172024-01-29029 January 2024 Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.717 ULNRC-06847, Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01)2023-12-21021 December 2023 Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01) ULNRC-06849, License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds2023-12-20020 December 2023 License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds ULNRC-06844, Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification2023-12-0707 December 2023 Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification ULNRC-06827, Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029)2023-11-20020 November 2023 Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029) ULNRC-06824, Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A2023-08-17017 August 2023 Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A ULNRC-06830, Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak2023-08-15015 August 2023 Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak ULNRC-06223, Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004)2023-07-25025 July 2023 Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004) ULNRC-06799, Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications2023-07-13013 July 2023 Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications ULNRC-06821, Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301)2023-06-21021 June 2023 Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301) ULNRC-06822, Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a2023-06-14014 June 2023 Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a ULNRC-06815, Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a2023-06-0505 June 2023 Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a ULNRC-06818, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate .2023-06-0505 June 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate . ULNRC-06816, Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015)2023-05-0909 May 2023 Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015) ULNRC-06812, Submittal of 2022 Annual Radiological Environmental Operating Report2023-04-27027 April 2023 Submittal of 2022 Annual Radiological Environmental Operating Report ULNRC-06806, Submittal of Radiological Emergency Response Plan, Revision 552023-04-12012 April 2023 Submittal of Radiological Emergency Response Plan, Revision 55 ULNRC-06807, Submittal of Single Positive Test Forms2023-04-0303 April 2023 Submittal of Single Positive Test Forms ULNRC-06798, Submittal of Status of Plant Decommissioning Funding and ISFSI Decommissioning Funding Plan2023-03-30030 March 2023 Submittal of Status of Plant Decommissioning Funding and ISFSI Decommissioning Funding Plan ULNRC-06801, CFR 50.46 Annual Report Regarding ECCS Evaluation Model Revisions2023-03-30030 March 2023 CFR 50.46 Annual Report Regarding ECCS Evaluation Model Revisions ULNRC-06804, Submittal of Nuclear Property Insurance Reporting2023-03-29029 March 2023 Submittal of Nuclear Property Insurance Reporting ULNRC-06751, Application to Revise Technical Specifications to Adopt TSTF-501-A, Rev. 1, Relocate Stored Oil & Lube Oil Volume Values to Licensee Control2023-03-29029 March 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Rev. 1, Relocate Stored Oil & Lube Oil Volume Values to Licensee Control ULNRC-06803, Submittal of Response to Request for Additional Information Regarding Results of Steam Generator Tube In-Service Inspection2023-03-29029 March 2023 Submittal of Response to Request for Additional Information Regarding Results of Steam Generator Tube In-Service Inspection ULNRC-06805, Transmittal of Special Report 2023-02 Non-Functionality of Containment Hydrogen Analyzer Channel for Greater than 30 Days2023-03-21021 March 2023 Transmittal of Special Report 2023-02 Non-Functionality of Containment Hydrogen Analyzer Channel for Greater than 30 Days ULNRC-06802, Special Report 2023-01 (PAM Report); Non-Functionality of a Post-Accident Monitoring Instrument2023-03-0909 March 2023 Special Report 2023-01 (PAM Report); Non-Functionality of a Post-Accident Monitoring Instrument ULNRC-06795, Submittal of Fitness for Duty Reports for 2022, Including Single Positive Test Forms2023-01-24024 January 2023 Submittal of Fitness for Duty Reports for 2022, Including Single Positive Test Forms ULNRC-06794, Submittal of Fitness for Duty Program Data for 20222023-01-24024 January 2023 Submittal of Fitness for Duty Program Data for 2022 ULNRC-06787, Response to Request for Additional Information Regarding License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications (LDCN 21-0015)2022-12-0808 December 2022 Response to Request for Additional Information Regarding License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications (LDCN 21-0015) ULNRC-06781, License Amendment Request to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029)2022-12-0101 December 2022 License Amendment Request to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029) ULNRC-06780, Additional Supplement to License Amendment Request to Adopt TSTF-439 and TSTF-505, LDCN 20-0072022-11-30030 November 2022 Additional Supplement to License Amendment Request to Adopt TSTF-439 and TSTF-505, LDCN 20-007 ULNRC-06772, 10 CFR 50.59 and 10 CFR 72.48 Summary Report2022-11-23023 November 2022 10 CFR 50.59 and 10 CFR 72.48 Summary Report ULNRC-06777, Operating Quality Assurance Manual (Oqam) Revision 362022-11-16016 November 2022 Operating Quality Assurance Manual (Oqam) Revision 36 ULNRC-06779, ULNRC-06779: Contesting of Green NCV 05000483/2022010-03, Failure to Perform Required Inservice Testing of Residual Heat Removal Heat Exchanger Pneumatically (Air) Operated Outlet and Bypass Valves2022-11-14014 November 2022 ULNRC-06779: Contesting of Green NCV 05000483/2022010-03, Failure to Perform Required Inservice Testing of Residual Heat Removal Heat Exchanger Pneumatically (Air) Operated Outlet and Bypass Valves ULNRC-06765, License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Testing Frequencies (LDCN 2020-0004)2022-11-0303 November 2022 License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Testing Frequencies (LDCN 2020-0004) ULNRC-06773, Results of Steam Generator Tube In-Service Inspection2022-11-0101 November 2022 Results of Steam Generator Tube In-Service Inspection ULNRC-06775, Submittal of Non-Functionality of Loose-Part Detection System Channel for Greater than 30 Days2022-10-27027 October 2022 Submittal of Non-Functionality of Loose-Part Detection System Channel for Greater than 30 Days ULNRC-06771, Correction to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections (LDCN 21-0013)2022-10-25025 October 2022 Correction to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections (LDCN 21-0013) ULNRC-06770, Cycle 25 Commitment Change Summary Report2022-10-19019 October 2022 Cycle 25 Commitment Change Summary Report ULNRC-06766, Correction of Text Contained in Enclosures Provided with Supplements to Request for License Amendment and Regulatory Exemptions for a Risk-Informed Approach to Address GSI-191 and Respond to GL 2004-02 (LDCN 19-0014)2022-09-0808 September 2022 Correction of Text Contained in Enclosures Provided with Supplements to Request for License Amendment and Regulatory Exemptions for a Risk-Informed Approach to Address GSI-191 and Respond to GL 2004-02 (LDCN 19-0014) ULNRC-06767, Presentation Information for Pre-Application Meeting Regarding New License Amendment Request for Use of Framatome Fuel Assemblies2022-09-0606 September 2022 Presentation Information for Pre-Application Meeting Regarding New License Amendment Request for Use of Framatome Fuel Assemblies ULNRC-06764, Revised Response to Request for Additional Information Regarding License Amendment Request for Adoption Off Alternate Source Term and Revision of Technical Specifications (LDCN 21-0015)2022-09-0101 September 2022 Revised Response to Request for Additional Information Regarding License Amendment Request for Adoption Off Alternate Source Term and Revision of Technical Specifications (LDCN 21-0015) ULNRC-06763, Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspection (LDCN 21-0013)2022-09-0101 September 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspection (LDCN 21-0013) ULNRC-06762, Submittal of Owner'S Activity Reports (OAR-1 Forms) for Cycle/Refuel 252022-08-25025 August 2022 Submittal of Owner'S Activity Reports (OAR-1 Forms) for Cycle/Refuel 25 ULNRC-06758, Union Electric Co. - Renewed Facility Operating License NPF-30, Withdrawal of License Amendment Request and Exemption Request Regarding Transition to Framatome Fuel (LDCN 22-0002)2022-08-0404 August 2022 Union Electric Co. - Renewed Facility Operating License NPF-30, Withdrawal of License Amendment Request and Exemption Request Regarding Transition to Framatome Fuel (LDCN 22-0002) ULNRC-06755, Response to Requests for Additional Information for Proposed Revision to Radiological Emergency Response Plan Regarding Response and Notification Goals2022-07-13013 July 2022 Response to Requests for Additional Information for Proposed Revision to Radiological Emergency Response Plan Regarding Response and Notification Goals ULNRC-06754, Response to Request for Additional Information Regarding Licensee Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications2022-07-0505 July 2022 Response to Request for Additional Information Regarding Licensee Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications ULNRC-06739, Post-Audit Supplement to License Amendment Request to Adopt TSTF-439 and TSTF-505 (LDCN 20-0007)2022-06-30030 June 2022 Post-Audit Supplement to License Amendment Request to Adopt TSTF-439 and TSTF-505 (LDCN 20-0007) ULNRC-06752, Evacuation Time Estimates Report2022-06-27027 June 2022 Evacuation Time Estimates Report ULNRC-06753, Presentation Information for Pre-Submittal Meeting Regarding Updated Spent Fuel Criticality Safety Analysis2022-06-23023 June 2022 Presentation Information for Pre-Submittal Meeting Regarding Updated Spent Fuel Criticality Safety Analysis ULNRC-06750, Submittal of Cycle 26 Core Operating Limits Report (COLR)2022-06-13013 June 2022 Submittal of Cycle 26 Core Operating Limits Report (COLR) ULNRC-06735, Response to Request for Additional Information Regarding Request for License Amendment and Regulatory Exemptions for Risk-Informed Approach to Address GSI-191 and Respond to Generic Letter 2004-02 (LDCN 19-0014).2022-05-27027 May 2022 Response to Request for Additional Information Regarding Request for License Amendment and Regulatory Exemptions for Risk-Informed Approach to Address GSI-191 and Respond to Generic Letter 2004-02 (LDCN 19-0014). 2024-01-29
[Table view] |
Text
'W Ameren MISSOURI Callaway Plant ULNRC-06150 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington , DC 20555-0001 Ladies and Gentlemen:
10 CFR 2.101 10 CFR 2.109(b) 10 CFR 50.4 10 CFR 50.30 10 CFR 51.53(c) 10 CFR 54 DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO. FACILITY OPERATING LICENSE NPF-30 COMMITMENT RELATED TO THE REVIEW OF THE FINAL SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT (SEIS)
Reference:
- 1) ULNRC-05830 dated December 15, 2011 By the referenced letter , Union Electric Company (Ameren Missouri) submitted a license renewal application (LRA) for Callaway Plant Unit 1. The application included an environmental report (Operating License Renewal Stage) prepared in accordance with 10 CFR 54.23 and 10 CFR Part 51 , Subpart A. As a result of questions raised by the US Fish and Wildlife Service (FWS) with regard to the biological assessment for the proposed Callaway Plant Unit 1 license renewal, Ameren Missouri has agreed to commit to conducting an entrainment and impingement study of the plant closed-cycle make-up water intake structure and its impact on the pallid sturgeon (Scaphirhynchus albus). The study , including Missouri River sampling, is described below and will be completed by December 31 , 2016. A report describing the results of the study will be submitted to the NRC by March 31 , 201 7 with copies provided to the US Fish and Wildlife Service , the Missouri Department ofNatural Resources, and the Missouri Department of Conservation. **********
PO Box 620 Fulton, MO 65251 AmerenMissouri
.com STARS* Alliance ************* ************* ************* ************* *************
ULNRC-06150 October 31,2014 Page2 Specifically, Ameren Missouri will perform a one-year pallid sturgeon entrainment and impingement study for the Callaway Plant Unit 1 closed-cycle make-up water intake structure.
- The impingement study will consist of a once-per-week sample over a 52 consecutive week period. The sample will be obtained from the traveling screen wash trough of the plant cycle make-up water intake structure, with the exception that three (3) samples per week will be obtained and processed during May through July. Samples will be taken on consecutive days, when possible.
- The entrainment study will be conducted in either 2015 or 2016 and will require a weekly sample to be obtained and processed in the second half of March, April, August, and September.
In addition, three (3) samples per week will be obtained and processed throughout May through July. Samples will be taken on non-consecutive days, when possible.
Entrainment samples will be obtained and processed from the plant closed-cycle make-up water intake structure on the discharge side of the traveling screens.
- Missouri River sampling will be conducted at three (3) locations opposite the intake structure during four (4) consecutive weeks (during May or June based on monitored water temperatures favorable for sturgeon spawning) on a once per week basis.
- A final report documenting the study results will be provided.
This letter provides a copy of the Preliminary Entrainment and Impingement Monitoring Plan Description (Enclosure 1 ). This preliminary plan description provides a high level summary of the proposed elements of the monitoring plan. The detailed plan is expected to be developed and finalized in early 2015. Enclosure 2 to this letter contains one (1) formal commitment.
This commitment will be subject to the Callaway Commitment Management Program, which is consistent with Nuclear Energy Institute (NEI) 99-04, "Guideline For Managing NRC Commitments." If you have any questions with regard to this commitment, please contact Sarah Kovaleski at (573) 489-9435 or Tom Elwood at (314) 225-1905.
I declare under penalty of perjury that the foregoing is true and correct. Sincerely, Executed on: Octob<.-r 3\ , )O\'-( Sarah Kovaleski Director, Engineering Design DS/nls
Enclosures:
- 1) Preliminary Entrainment and Impingement Monitoring Plan Description
- 2) List of Commitments ULNRC-06150 October 31, 2014 Page 3 cc: Mr. Marc L. Dapas Regional Administrator U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. John Daily, Senior Project Manager Project Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-11F1 Washington, DC 20555 Mr. Tam Tran Project Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-11F1 Washington, DC 20555 Elaine Keegan Project Branch 2 Division of License Renewal Office ofNuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-11F1 Washington, DC 20555 Mr. Fred Lyon Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8B1 Washington, DC 20555-2738 ULNRC-06150 October 31,2014 Page4 Mr. Gregory A. Pick U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Mr. Tom Melius Midwest Regional Director U.S. Fish and Wildlife Service 5600 American Blvd. West, Suite 990 Bloomington, MN 55437-1458 Ms. Jane Ledwin Biologist U.S. Fish and Wildlife Service Missouri Ecological Services Field Office 101 Park DeVille Dr., Suite A Columbia, MO 65203 Ms. Amanda Sappington Missouri Department of Natural Resources PO Box 176; 1101 Riverside Drive Jefferson City, MO 65102-0176 Ms. Jennifer Campbell-Allison Missouri Department of Conservation Conservation Headquarters 2901 W. Truman Blvd. Jefferson City, MO 65109 ULNRC-06150 October 31, 2014 Page 5 Index and send hardcopy to QA File A160.0761 Hardcopy:
Certrec Corporation 4150 International Plaza Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attaclunents as long as they are non-safeguards and may be publicly disclosed.)
Electronic distribution for the following can be made via Tech Spec ULNRC Distribution:
F. M. Diya S. P. Banker D. W. Neterer L. H. Graessle T. E. Hemnann B. L. Cox M. A. McLachlan G. S. Kremer S. G. Kovaleski J. S. Geyer S. A. Maglio T. B. Elwood Corporate Communications NSRB Secretary B. C. Daniels R. C. Wink STARS Regulatory Affairs Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP) Missouri Public Service Commission Ms. Leanne Tippett-Mosby (DNR) E. A. Blocher (STARS PAM COB) J. Pozzo M. Smallwood G. P. Gary ULNRC-06150 October 31, 2014 Enclosure 1 Page 1 of4 CALLAWAY PLANT UNIT 1 LICENSE RENEWAL APPLICATION PRELIMINARY ENTRAINMENT AND IMPINGEMENT MONITORING PLAN DESCRIPTION ULNRC-06150 October 31,2014 Enclosure 1 Page 2 of4 CALLA WAY PLANT UNIT 1 PRELIMINARY ENTRAINMENT AND IMPINGEMENT MONITORING PLAN DESCRIPTION Purpose: To conduct an entrainment and impingement study at the Callaway Plant Unit 1 cycle make-up water intake structure for pallid sturgeon (Scaphirhynchus a/bus) and to provide information on the occurrence of larval sturgeon from the Missouri River in the vicinity of the Callaway Plant Unit 1 intake. Goals: To resolve questions raised by the US Fish & Wildlife Service with regard to the biological assessment to support the Callaway Plant Unit 1 Nuclear Regulatory Commission license renewal application.
Monitoring plan design: Entrainment
- Sampling duration-mid-March through September
- Sampling frequency o Mid-March, April, August and September:
once per week o May through July: three (3) times per week (Samples will be taken on non-consecutive days, when possible.)
- Sampling intensity-one collection every six (6) hours over 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (composited prior to sample processing)
- Sampling magnitude-minimum 100 m 3 sample volume per collection
- Sampling location-tap off cooling water make-up line post traveling screens or other post-screen location TBD
- Ancillary data collection o pump operation data o water temperature o dissolved oxygen o river discharge and stage
- Sample processing o Identification (to lowest practicable level) and counting of all collected species by lowest practicable taxonomic level o Length measurement of up to 25 larvae per taxon per sampling day o Identification, counting, and measurement of pallid sturgeon (larval identification by DNA sequencing and morphological characteristics)
ULNRC-06150 October 31,2014 Enclosure 1 Page 3 of4 Impingement
- Sampling duration-52 consecutive weeks
- Sampling frequency o Once per week during August through April o Three (3) times per week during May through July (samples will be taken on non-consecutive days, when possible)
- Sampling intensity-one 24-hour collection composited from screen washings
- Sampling location-traveling screen wash trough
- Sample processing o Identification to species, counting, and measurement (weight and length) of up to 25 randomly selected individuals (i.e., all species impinged) per collection day o Identification, counting, measurement, and photodocumentation of all Acipensiformes, with identification by DNA sequencing of suspected pallids, and morphological characteristics prior to release of live fish, or preservation of dead fish o Strict quality control procedures for species identification to include qualified fisheries biologists, use of taxonomic keys and voucher specimens, and verification of identification by outside taxonomy expert for uncommon species or uncertain identification of individuals o Condition of each specimen (initially live, stunned or dead) upon collection from screen wash trough o Impinged Acipensiformes assumed to die o Impinged fish that are diseased or show signs of dying previous to impingement (e.g., fungus, injury) will be excluded o Any non-fish organisms such as reptiles, amphibians, mammals, and birds that are collected will be noted River sampling for larval sturgeon
- Sampling gear o Tapered rectangular-frame nets with dimensions (Refer to Reference
- 1) o Deployed by boat
- Sampling location o Three (3) locations opposite the intake (e.g., channel margin near intake, channel thalweg, and channel margin on/near channel margin on inside bend opposite intake) o At bottom and near surface
- Sampling duration-four (4) consecutive weeks during May or June based on monitored water temperatures favorable for sturgeon spawning ULNRC-06150 October 31,2014 Enclosure 1 Page 4 of4
- Sampling frequency-once per week during daylight and darkness
- Sample processing o Identification, counting, and measurement of all sturgeon larvae and eggs o Identification by DNA sequencing and/or morphological characteristics Additional Reporting Requirements-Unusual or Important Environmental Events (Refer to Reference
- 2) "Any occurrence of an unusual or important event that indicates or could result in significant environmental impact casually related to plant operation shall be recorded and reported to the NRC within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> followed by a written report per Subsection 5.4.2. The following are examples:
excessive bird impaction events, on-site plant or animal disease outbreaks, mortality or unusual occurrence of any species protected by the Endangered Species Act of 1973, fish kills, increase in nuisance organisms or conditions, and unanticipated or emergency discharge of waste water or chemical substances.
No routine monitoring programs are required to implement this condition." References Cited 1. Braaten, P.J., D.B. Fuller, R.D. Lott, M.P. Ruggles and R.J. Holm. 2010. Spatial distribution of drifting pallid sturgeon larvae in the Missouri River inferred from two net designs and multiple sampling locations.
N. Amer. J. Fish. Mgmt. 30:1062-1074.
- 2. Source: Callaway Plant Unit 1 Operating License (OL) Appendix B-Environmental Protection Plan (Non-Radiological);
Implemented by site procedure APA-ZZ-00520, "Reporting Requirements and Responsibilities", Revision 43-Attachment 2, Item 12.
ULNRC-06150 October 31, 2014 Enclosure 2 Page 1 of2 CALLAWAY PLANT UNIT 1 LICENSE RENEWAL APPLICATION LIST OF COMMITMENTS ULNRC-06150 October 31, 2014 Enclosure 2 Page 2 of2 LIST OF COMMITMENTS The following table identifies those actions committed to by Callaway Plant in this document.
Any other statements in this submittal are provided for information purposes and are NOT considered to be commitments.
Please direct questions regarding these commitments to Mr. Tom Elwood, Regulatory Affairs & Licensing Supervisor (314) 225-1905.
COMMITMENT Due Date COMN Pallid Sturgeon Impingement and Entrainment Study at 50399 Callaway Plant Unit 1: 1) Perform a one-year pallid sturgeon impingement field study of the Callaway Plant Unit 1 closed-cycle make-up water intake structure.
- 2) Perform a six and one-half ( 6 Y2) month pallid Field study to be sturgeon entrairunent field study of the Callaway completed by Plant Unit 1 closed-cycle make-up water intake December 31, 2016 structure. 3) Perform a river sampling field study at three (3) locations opposite Callaway Plant Unit 1 closed-cycle make-up water intake structure.
- 4) Submit a final report documenting the impingement, entrairunent and river sampling study results to the Report to be submitted NRC with copies provided to the US Fish and by March 31, 2017 Wildlife Service, the Missouri Department of Natural Resources, and the Missouri Department of Conservation.