Category:Manual
MONTHYEARML22251A3982022-09-0808 September 2022 Technical Specification Bases Revision 74 and Technical Requirements Manual Revision 70 ML16154A5812015-09-30030 September 2015 PVNGS, Units 1, 2, and 3 - Technical Requirements Manual, Revision 63 ML16154A5832015-09-30030 September 2015 PVNGS, Units 1, 2, and 3 - Technical Requirements Manual, Revision 63, Replacement Pages and Insertion Instructions ML15027A1242014-11-12012 November 2014 Technical Requirements Manual(Trm) Revision 62 ML15027A1262014-11-12012 November 2014 Technical Requirements Manual (TRM) Revision 62, Replacement Pages and Insertion Instructions ML14255A0652014-08-20020 August 2014 Technical Requirements Manual, Revision 61 ML14255A0662014-08-20020 August 2014 PVNGS Technical Requirements Manual (Trm), Revision 61, Replacement Pages and Insertion Instructions ML14091A9592013-09-25025 September 2013 Technical Requirements Manual, Revision 59 ML14091A9602013-09-25025 September 2013 Technical Requirements Manual, Revision 59 Replacement Pages and Insertion Instructions ML14035A4042013-08-29029 August 2013 3INT-ISI-3, Rev. 3, Palo Verde, Unit 3, 3rd Interval: Inservice Inspection Program Summary Manual ML14035A4022013-08-28028 August 2013 3INT-ISI-2, Rev. 4, Palo Verde, Unit 2, 3rd Interval: Inservice Inspection Program Summary Manual ML14035A4002013-08-22022 August 2013 INT-ISI-1, Rev. 3, 3rd Interval, Inservice Inspection Program Summary Manual ML13217A0562013-07-0303 July 2013 Enclosure 1 - Technical Requirements Manual, Revision 58 ML13217A0572013-07-0303 July 2013 Enclosure 1 - Technical Requirements Manual, Revision 58 ML14035A4032013-05-31031 May 2013 3INT-ISI-3, Rev. 2, Palo Verde, Unit 3, 3rd Interval: Inservice Inspection Program Summary Manual ML14035A3992013-05-31031 May 2013 INT-ISI-1, Rev. 2, 3rd Inspection Interval, Inservice Inspection Program Summary Manual ML14035A4012013-05-31031 May 2013 INT-ISI-2, Rev. 3, 3rd Inspection Interval, Inservice Inspection Program Summary Manual ML13120A5032013-04-10010 April 2013 Technical Requirements Manual, Revision 57 ML12138A3222012-04-27027 April 2012 Offsite Dose Calculation Manual, Revision 26 ML12193A0442011-11-17017 November 2011 Technical Requirements Manual, Revision 56, Replacement Pages and Insertion Instructions ML12193A0432011-11-17017 November 2011 Technical Requirements Manual, Revision 56 ML11287A0322011-09-0101 September 2011 Technical Requirements Manual, Revision 55 ML11287A0312011-09-0101 September 2011 Technical Requirements Manual (TRM) Revision 55 ML1106107582011-01-26026 January 2011 Technical Requirements Manual, Revision 54 ML1106107572011-01-26026 January 2011 PVNGS Technical Requirements Manual, Revision 54. List of Effective Pages ML1033506452010-11-10010 November 2010 Technical Requirements Manual, Revision 53 ML0814306962008-05-23023 May 2008 Region I Utility Group Comments on Proposed Safety Culture Revisions Manual Chapter 0305 and IP95003 - Detailed Comments ML0712203072006-09-15015 September 2006 Offsite Dose Calculation Manual, Revision 21 ML0612300902005-08-31031 August 2005 Appendix D, Offsite Dose Calculation Manual Revision 20 ML0512902802004-05-14014 May 2004 Offsite Dose Calculation Manual for Palo Verde Nuclear Generating Station Units 1, 2, and 3, Revision 19 ML0512902772004-03-24024 March 2004 Offsite Dose Calculation Manual for Palo Verde Nuclear Generating Station Units 1, 2 and 3, Revision 18 2022-09-08
[Table view] Category:Report
MONTHYEARML24103A2482024-04-12012 April 2024 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2023 ML24019A2012024-01-19019 January 2024 Fourth 10-Year Interval, Second Period Owners Activity Report Number 1R24 ML23325A1612023-10-26026 October 2023 Relief Request 70 - Proposed Alternatives in Accordance with 10 CFR 50.55a(z)(1) for Pressurizer Lower Shell Temperature Nozzle ML22308A1662022-11-0404 November 2022 23rd Refueling Outage Steam Generator Tube Inspection Report ML22091A3072022-04-0101 April 2022 Independent Spent Fuel Storage Installation (Isfsi), Evacuation Time Estimate Study ML21077A2562021-03-18018 March 2021 El Paso Electric Co., Application for Approval of Indirect Transfer of Control of Licenses Pursuant to 10 C.F.R. 50.80 and 72.50 ML21005A2712020-12-29029 December 2020 102-08208 PVNGS Communication Required by Confirmatory Order EA-20-054 ML19136A4092019-05-16016 May 2019 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for Calendar Year 2018 ML19046A3512019-02-15015 February 2019 Third 10-Year Interval, Third Period: Owner'S Activity Report Number U2R21 ML18187A4172018-07-0606 July 2018 License Amendment Request and Exemption Request to Support the Implementation of Framatome High Thermal Performance Fuel ML17181A5152017-06-29029 June 2017 Flooding Focused Evaluation Summary ML17248A5262017-05-30030 May 2017 3INT-ISI-3, Revision 4, Third Inspection Interval Inservice Inspection Program Summary Manual, Unit 3, Enclosure 3 to 102-07551-MDD/MSC ML17006A2172017-01-0505 January 2017 Third 10-Year Interval, Third Period: Owner'S Activity Report Number U3R19 ML16306A4442016-11-14014 November 2016 Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation ML16321A0032016-10-31031 October 2016 WCAP-18030-NP, Revision 1, Criticality Safety Analysis for Palo Verde Nuclear Generating Station Units 1, 2, and 3. ML16221A6042016-09-13013 September 2016 Staff Assessment of Information Provided Under Title 10 of Code of Federal Regulations Part 50, Section 50.54(F), Seismic Hazard Reevaluations for Recommendation 2.1 of Near-Term Task Force Review of Insights from . ML16120A3892016-04-28028 April 2016 1-SR-2016-001-00, Fuel Building Ventilation System High Range Radioactive Gaseous Effluent Monitor Nonfunctional ML15336A0842015-11-30030 November 2015 NET-300047-07 Revision 1, Material Qualification Report of Maxus for Spent Fuel Storage. ML15188A0492015-06-30030 June 2015 Third 10-Year Interval, Third Period: Owner'S Activity Report Number U3R18 ML15111A4302015-04-17017 April 2015 Attachments 2 & 3: Flaw Fracture Mechanics, Corrosion & Loose Parts Evaluations for One Cycle Relief (DAR-MRCDA-15-6-NP) and APS Response to NRC Request for Additional Information Dated April 14, 2015 ML15076A0732015-03-10010 March 2015 Seismic Hazard and Screening Report ML15012A4462015-01-0606 January 2015 Third 10-Year Interval, Second Period: Owner'S Activity Report Number U1R18 ML15027A1222014-12-19019 December 2014 Technical Specification (TS) Bases Revision 61 ML14184B3822014-06-27027 June 2014 Third 10-Year Interval, Third Period: Owner'S Activity Report Number U2R18 ML14189A5332014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 ML14189A5312014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5 ML14189A5372014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5 ML14189A5002014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 5 ML14189A4982014-06-19019 June 2014 Stars Response to Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program - Vendor Information Request ML14189A5432014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 ML14126A6362014-04-30030 April 2014 APS Supplement to the Seismic Walkdown Report Requested by the NRC Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1, 2.3, and 9.3 of the Near-Term Task Force. ML14087A1882014-04-11011 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident ML14034A1472014-01-24024 January 2014 Third 10-Year Interval, Second Period: Owner'S Activity Report Number U3R17 ML13329A0382013-08-31031 August 2013 WCAP-17787-NP, Rev 0, Palo Verde Nuclear Generating Station STAR Program Implementation Report. ML13252A1112013-08-31031 August 2013 WCAP-17680-NP, Supplement 1, Rev. 0, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Submittal Report for Palo Verde Nuclear Generating Station Unit 2 - Supplemental Information. CY-12-009, Closure Options for Generic Safety Issue (GSI) - 191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance2013-05-16016 May 2013 Closure Options for Generic Safety Issue (GSI) - 191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance ML13120A5032013-04-10010 April 2013 Technical Requirements Manual, Revision 57 ML1307003422013-02-28028 February 2013 APS Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) ML13022A4072013-01-14014 January 2013 Third 10-Year Interval, Second Period: Owner'S Activity Report for Unit 2 Refueling Outage 17 (U2R17) ML12355A7482012-12-31031 December 2012 Evacuation Time Estimate Study; Cover Through Section 4 ML12355A7512012-12-14014 December 2012 Evacuation Time Estimate Study; Section 5 Through 12 ML12355A7522012-12-14014 December 2012 Evacuation Time Estimate Study; Appendix a Through H ML12278A1002012-09-0707 September 2012 Pressurized Water Reactor (PWR) Internals Aging Management Program Plan ML12229A1192012-08-0303 August 2012 Attachment 4, PVNGS Engineering Study 13-ES-A037, Revision 0, Fault Tree Analysis and Reliability Evaluation for Low Pressure Safety Injection (LPSI) Pump Trip at the Recirculation Actuation Signal (RAS) ML12229A1202012-08-0303 August 2012 Attachment 5, PVNGS Engineering Study 13-NS-C089, Revision 0, PRA Evaluation of LPSI Pump Failing to Trip on RAS 2024-04-12
[Table view] Category:Technical
MONTHYEARML24103A2482024-04-12012 April 2024 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2023 ML23325A1612023-10-26026 October 2023 Relief Request 70 - Proposed Alternatives in Accordance with 10 CFR 50.55a(z)(1) for Pressurizer Lower Shell Temperature Nozzle ML22308A1662022-11-0404 November 2022 23rd Refueling Outage Steam Generator Tube Inspection Report ML22091A3072022-04-0101 April 2022 Independent Spent Fuel Storage Installation (Isfsi), Evacuation Time Estimate Study ML21005A2712020-12-29029 December 2020 102-08208 PVNGS Communication Required by Confirmatory Order EA-20-054 ML18187A4172018-07-0606 July 2018 License Amendment Request and Exemption Request to Support the Implementation of Framatome High Thermal Performance Fuel ML17248A5262017-05-30030 May 2017 3INT-ISI-3, Revision 4, Third Inspection Interval Inservice Inspection Program Summary Manual, Unit 3, Enclosure 3 to 102-07551-MDD/MSC ML16321A0032016-10-31031 October 2016 WCAP-18030-NP, Revision 1, Criticality Safety Analysis for Palo Verde Nuclear Generating Station Units 1, 2, and 3. ML15336A0842015-11-30030 November 2015 NET-300047-07 Revision 1, Material Qualification Report of Maxus for Spent Fuel Storage. ML15076A0732015-03-10010 March 2015 Seismic Hazard and Screening Report ML15027A1222014-12-19019 December 2014 Technical Specification (TS) Bases Revision 61 ML14189A4982014-06-19019 June 2014 Stars Response to Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program - Vendor Information Request ML14126A6362014-04-30030 April 2014 APS Supplement to the Seismic Walkdown Report Requested by the NRC Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1, 2.3, and 9.3 of the Near-Term Task Force. ML14087A1882014-04-11011 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident ML13329A0382013-08-31031 August 2013 WCAP-17787-NP, Rev 0, Palo Verde Nuclear Generating Station STAR Program Implementation Report. ML13120A5032013-04-10010 April 2013 Technical Requirements Manual, Revision 57 ML12355A7482012-12-31031 December 2012 Evacuation Time Estimate Study; Cover Through Section 4 ML12355A7512012-12-14014 December 2012 Evacuation Time Estimate Study; Section 5 Through 12 ML12355A7522012-12-14014 December 2012 Evacuation Time Estimate Study; Appendix a Through H ML12278A1002012-09-0707 September 2012 Pressurized Water Reactor (PWR) Internals Aging Management Program Plan ML12229A1192012-08-0303 August 2012 Attachment 4, PVNGS Engineering Study 13-ES-A037, Revision 0, Fault Tree Analysis and Reliability Evaluation for Low Pressure Safety Injection (LPSI) Pump Trip at the Recirculation Actuation Signal (RAS) ML12229A1202012-08-0303 August 2012 Attachment 5, PVNGS Engineering Study 13-NS-C089, Revision 0, PRA Evaluation of LPSI Pump Failing to Trip on RAS ML1106107572011-01-26026 January 2011 PVNGS Technical Requirements Manual, Revision 54. List of Effective Pages ML1106107582011-01-26026 January 2011 Technical Requirements Manual, Revision 54 ML1021500372010-07-22022 July 2010 Engineering Study 13-MS-B094, Revision 0 ML1016607492009-05-0101 May 2009 Adeq 2009a Palo Verde Aquifer Protection Permit (Area Wide) No. P-100388. Issued by Arizona Dept of Environmental Quality. May 2009 ML0828200292008-10-0101 October 2008 Request for Amendment to Technical Specification 5.5.16, Containment Leakage Rate Testing Program ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 ML0906410162008-06-30030 June 2008 WCAP-16835-NP, Rev. 0, Palo Verde Nuclear Generating Station Units 1, 2, and 3; Basis for RCS Pressure and Temperature Limits Report. ML0810801162008-04-10010 April 2008 Request for Amendment to Technical Specification 3.5.5, Refueling Water Tank (RWT) to Increase the RWT Minimum Water Level Under Exigent Circumstances ML0719303162007-03-12012 March 2007 Chemical Effect Head Loss Test Specification ML0719303652007-03-0707 March 2007 CCI Chemical Laboratory Bench Top Test Rev 0 ML0626301802006-08-16016 August 2006 Request for Amendment to Technical Specification Section 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.9, 3.8.1.10, & 3.8.1.14 ML0617804692006-04-30030 April 2006 Enclosure 2D, Non-Proprietary, Redacted Westinghouse Response to NRC Request for Additional Information Regarding Technical Specification Improvement and Tubesheet Inspection Depth for Steam Generator Tubes ML0602005772006-01-13013 January 2006 Revised Redacted Version of Response to Information Request Dated February 24, 2005 ML0602005752006-01-13013 January 2006 Revised Redacted Version of Recirculation Sump Void Testing and Probabilistic Risk Assessment Preliminary Results Dated December 27, 2004 ML0534802032005-12-0505 December 2005 Report of Boron Deposit at Control Element Drive Mechanism Vent ML0531203902005-10-28028 October 2005 Revised Station Blackout Evaluation ML0525601382005-07-0505 July 2005 Redacted Version of Proprietary Submittal Dated February 15, 2005 Regarding Safety Significance Evaluation of ECCS Containment Sump Voided Piping ML0517903492005-06-21021 June 2005 List of References Associated with ASME Code Case N-499 to Support NRC Review of Inservice Inspection (ISI) Program Relief Request No. 33 for Pressurizer Base Material Heating ML0519404732005-02-28028 February 2005 Attachment 2-E, DAR-OA-05-3, Revision 0, Report of SBLOCA Analyses with Degraded ECCS Flow After RAS Performed for Arizona Public Service in Support of Palo Verde Nuclear-Generating Station Units 1, 2, and 3 ML0505402582005-02-15015 February 2005 Attachment 2-F, 13-NS-C074, Rev 0, Significance Determination of Containment Sump Air Entrainment. ML0504503532005-02-0404 February 2005 Submittal of Redacted Version of Recirculation Sump Void Testing and Probabilistic Risk Assessment Preliminary Results ML0429603662004-07-0202 July 2004 Discussion and Proposed Resolution of NRC AIT URI (Unresolved Issue) Relating to MSIS Impact on AF-A Operability (6/14/04 Three Unit LOOP Trip). ML0424500452004-06-30030 June 2004 Reformatted Technical Report SIR-04-045, Revision 0, Supporting the Palo Verde Pressurizer Heater Sleeve Mid-Wall Repair ML0429603432004-06-28028 June 2004 Evaluation of CVCS Soft Parts Due to High Temperature Letdown Event. ML0412102272004-04-15015 April 2004 Emergency Core Cooling System (ECCS) Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report ML0316201772003-06-0404 June 2003 ISFSI, Registration of Dry Spent Fuel Transportable Storage Canister Identification No. AMZDFX003 & Report of Cask Performance ML0309806332003-04-0202 April 2003 Response to Request for Additional Information Regarding Relaxation Request to NRC Order EA-03-009 ML0233004122002-11-21021 November 2002 Supplement to Request for a License Amendment to Support Replacement of Steam Generators & Uprated Power Operations 2024-04-12
[Table view] |
Text
PVNGS Technical Requirements Manu_l (TRM)
Revision 54 Replacement Pages and Insertion InstrJctions The following LDCRs are part of this lange:
LDCR 08-R008 LDCR 09-R005 LDCR 10-R013 Instructions Remove Paqe: Insert NeN Pa.qe:
Cover Page Cover Page List of Effective Pages, List of Effective Pages, Pages 1,2, 3 and 4 Pages 1 2, 3 and 4 T3.1.101-2 T3.1.101..2 T3.3.103-2 T3.3.103.2 T5.0.500-11 T5.0.500.11 T5.0.500-12 T5.0.500..12 T6.0.100-7 T6.0.100..7 Stephenson, Carl Digitally signed by Stephenson, Carl J(Z05778)
DN: cn=Stephenson, Carl J(Z05778)
Reason: I attest to the accuracy and integrity of J(Z05778) this document Date: 2011.01.25 08:54:27 -07'00'
Technical Requirements Manual Revision 54 January 26, 2011
_tpn"_e-'-enson ! J,Z0_,78,DigltallysignedbySteph DN:cn=Stephenson, Carl.... Carl J(Z05'78) p i //,_lFr_ p ,..w m r_\ R...... I ..... ttoth ....... cylnd t_aEIJtLU_//,_) integrityofthis document Date: 2011.01.2508:35:37-07'0 PALOVERDEUNITS i, 2, 3
Technical Requirements Mant_al LIST OF EFFECTIVEPAGES Page No. Revision No. Page No. Revision No.
TOCpage i 33 T3.3.103-I 51 TOCpage ii 48 T3.3.103-2 54 TOCpage iii 33 T3.3.103-3 13 TOCpage iv 52 T3.3.103-4 13 T1.1.100-1 0 T3.3.104-1 46 T1,2.100-1 0 T3.3.104-2 0 T1.3.100-I 0 T3.3.105-1 46 T1.4.100-1 0 T3.3.105-2 48 T2.0 100-1 0 T3.3.105-3 48 T3.0 100-1 47 T3.3.106-1 46 T3.0 100-2 40 T3.3.106-2 14 T3.0 100-3 23 T3.3.107-1 0 T3.0 100-4 47 T3.3.107-2 46 T3,] 100-1 0 T3.3.108-1 0 T3.1 100-2 0 T3.3.108-2 0 T3.1 101-1 0 T3.3.200-1 46 T3.1 101-2 54 T3.3.200-2 31 T3.1 101-3 0 T3.3.201-1 0 T3,1 102-1 0 T3.4.100-1 28 T3.1 103-1 1 T3.4.101 1 0 T3.1 104-1 0 T3.4.101 2 0 T3.1 104-2 0 T3.4.101 3 0 T3.1 105-1 46 T3.4.101 4 0 T3.1 105-2 0 T3.4.102 1 0 T3.1 105-3 50 T3.4.102-2 0 T3.1 200-I 46 T3.4.103-1 53 T3.1 200-2 24 T3.4.104-1 28 T3.1 201-1 0 T3.4.104-2 0 T3.1 202-1 53 T3.4.200-1 52 T3.1 202-2 46 T3.4.201-1 46 T3.1 203-1 29 T3.4.202-1 46 T3.1 204-1 33 T3,4.203-1 46 T3.1 205-1 33 T3.4.204-1 46 T3.2 200-1 53 T3.5.200-1 46 T3.3 100-1 46 T3 5.200-2 0 T3.3 100-2 10 T3 5.200-3 0 T3,3.101-1 40 T3 5.201-1 16 T3.3.101-2 46 T3 5.201-2 47 T3.3,101-3 18 T3 5.202-1 46 T3.3.101-4 18 T3 5.202-2 39 T3.3.101-5 52 T3.5.202-3 47 T3.3.102-1 21 T3.5.202-4 0 T3.3.102-2 40 T3.5.203-1 46 PALOVERDEUNITS 1, 2, 3 1 Rev 54 1/26/11
Technical Requirements Mantlal LIST OF EFFECTIVEPAGES Page No. Revision No. Page No. Revision No.
T3.5.203-2 35 T3 9.200-2 29 T3.6.100-1 48 T3 9.201-1 46 T3.6.100-2 0 T3 10 200- 40 T3.6.200-1 22 T3 10 201- 0 T3.6.200-2 22 T3 10 201- 0 T3.6.201-1 47 T3 10 202- 40 T3.6.300-I 48 T3 10 202- 0 T3.6.300-2 48 T3 11 100- 40 T3.7 100-1 27 T3 11 100- 38 T3.7 100-2 27 T3 11 100- 38 T3.7 101-1 46 T3 11 100- 38 T3.7 101-2 46 T3 11 100- 38 T3.7 102-1 0 T3 11 100- 38 T3.7 102-2 0 T3 11 100- 38 T3.7.102-3 0 T3 11 100- 38 T3.7.200-1 42 T3 11 100- 38 T3.7_200-2 53 T3 11 101- 40 T3.7_201-1 46 T3.11 101 46 T3.7.202-1 46 T3.11 101 46 T3 7.203-1 46 T3.11.101 39 T3 7 204-1 46 T3.11.101 46 T3 7 205-1 46 T3.11.102 46 T3 7 205-2 46 T3.11.102 4 T3 7 206-1 0 T3.11.102- 4 T3 7 207-1 46 T3.11.102- 4 T3 8 100-1 46 T3.11.102-5 18 T3 8 100-2 0 T3.11.103-1 46 T3 8 101-1 46 T3.11.103-2 49 T3 8 101-2 40 T3.11.104-1 44 T3 8 101-3 12 T3.11.104-2 4 T3 8 101-4 0 T3.11.104-3 4 T3 8 102-1 0 T3.11.104-4 18 T3 8 102-2 0 T3 11.105-1 46 T3 8 200-1 0 T3 11 105-2 4 T3 9 100-1 0 T3 11 105-3 18 T3 9 101-1 0 T3 11 106-1 40 CORRECTED T3 9 102-1 0 T3 11 106-2 49 T3 9 102-2 0 T3 11 107-I 40 CORRECTED T3 9 103-1 0 T3 11 107-2 4 T3 9 104-i 0 T3 11 i07-3 4 T3 9 104-2 0 T4 0.100-I 0 T3 9 104-3 0 T5 0.100-I 0 T3 9 200-I 46 T5 0.200-] 0 PALOVERDEUNITS 1, 2, 3 2 Rev 54 1/26/11
Technical RequirementsMant_al LIST OF EFFECTIVEPAGES Page No. Revision No. Page No. Revision No.
T5.0.300-1 0 T6 0 100-2 53 T5.0.400-1 0 T6 0 100-2 53 T5.0.500-1 53 T6 0 100-2 53 T5.0.500-2 24 T6 0 100-2 53 T5.0.500-3 0 T6 0 100-2 53 T5.0.500-4 53 T6 0 100-2 53 T5.0.500-5 0 T6 0 100-2 53 T5.0.500-6 0 T6 0 100-2 53 T5.0.500-7 0 T6 0 100-2 53 T5.0.500-8 22 T6.0 100-3 53 T5.0.500-9 0 T6.0 100-3 53 T5.0.500-10 0 T6.0.100-3 53 T5.0.500-11 54 T6.0.100-3 53 T5.0.500-12 54 T6.0.100-3 53 T5.0.500-13 11 T6.0.100-3 53 T5.0.500-14 20 T6.0.100-3 53 T5 0 500-15 53 T6.0.100-3 53 T5 0 500-16 53 T7.0.100-1 52 T5 0 500-17 8 T7.0.100-2 52 T5 0 500-18 8 T7.0.100-3 0 T5 0 600-1 37 T7.0.200-1 52 T5 0 600-2 37 T7.0.200-2 52 T5 0 700-1 34 T7.0.200-3 0 T6 0 100-1 40 T7.0.300-1 50 T6 0 100-2 40 T7.0.300-2 41 T6 0 100-3 40 T7.0.300-3 32 T6 0 100-4 40 T7.0.300-4 43 T6 0 100-5 46 T7.0.300-5 32 T6 0 100-6 40 T7.0.300-# 32 T6 0 100-7 54 T7.0.300-7 32 T6 0 100-8 46 T7 0.300-8 32 T6 0 100-9 40 T7 0.400- 0 T6 0 100-10 40 T7 0.400- 0 T6 0 100-11 40 T7 0 400- 0 T6 0 100-12 40 T7 0 400- 51 T6 0 100-13 46 17 0 400- 0 T6 0 100-14 46 T7 0 500- 0 T6 0 100-15 53 TA-i 52 T6 0 100-16 53 TA-i 52 T6 0 100-17 53 TA-i i 52 T6 0 100-18 53 TA-1 52 T6 0 i00-19 53 TA-2 52 T6 0 100-20 53 TA-3 52 PALOVERDEUNITS 1, 2, 3 3 Rev 54 1/26/11
Technical Requirements ManJal LIST OF EFFECTIVEPAGES Page No. Revision No. Page No. Revision No, TA-4 52 TA-5 52 TA-6 52 TA-7 52 TA-8 52 TA-9 52 TA-IO 52 TA-11 52 TA-12 52 TA-13 52 TA-14 52 TA-15 52 TA-16 52 PALOVERDEUNITS 1, 2, 3 4 Rev 54 1/26/11
Flow Paths - Operating TRM3.1.101 ACTIONS (continued)
B. Required Action and B.I Enter TLCO3.0..00.3. Immediately associated completi on time of Condition A not met.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.1.101.1 Verify that each valve (manual, ower- 31 days operated, or automatic) in the flow path that is not locked, sealed, or o_herwise secured in position, is in its ccrrect position.
(continued)
PALOVERDEUNITS 1, 2, 3 T3.1.101-2 Rev 54 01/26/11
Seismic Monitoring TRM3.3.103 ACTIONS (continued)
C. Seismic event (_ O.02g) C.1 Perform TSR3.1 103.2 5 days I on each seismic monitoring instrument actuated AND C.2 Retrieve data rom Immediately actuated instrlments and perform an, lysis to determine tfe magnitude of tfe vibratory grourd moti on.
AND C.3 Initiate a corrective In accordance action to evaILate the with the PVNGS magnitude, frecuency corrective spectrum, and action program.
resultant effect upon facility features important to s_fety.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.3.103.1 NOTE- .......
Applicable to Digital Recorders of Table 3.3.103-1 only.
Perform a CHANNEL CHECK. 31 days (continued)
PALOVERDEUNITS 1, 2, 3 T3.3.103-2 Rev 54 1/26/11
ProgramsandManuals TRM5.0.500 5.0.500 Programs and Manuals (continued) 5.0.500.7 Reactor Coolant PumpFlywheel Inspectic_n Program The purpose of the Reactor Coolant Pum) Flywheel Inspection Program is to provide for the inspecti _n of each reactor coolant pump flywheel. The PVNGSProgram Engi leering group is the program owner.
The program requirements are specified in ITS 5.5.7.
5.0.500.8 Inservice Inspection and Testing Progr_ims The purpose of the Inservice Inspectiorl (ISI) and Inservice Testing (IST) Programs is to provide c(_ntrols for ASMEinspection and testing of ASMECode Class 1, 2 an( 3 components. The PVNGS Program Engineering group is the progrim owner for IST and the PVNGSComponent Programs group is the _rogram owner for ISl.
In addition to the program requirement specified in ITS 5.5.8, the following also applies:
- a. Inservice inspection shall be performed in accordance with Section XI of the ASMEBoiler and P_'essure Vessel Code and applicable Addenda as required by 1( CFR 50, Section 50.55a(g).
- b. Inservice Testing shall be performe( in accordance with the ASMECode for Operation and Maintenance of Nuclear Power Plants (ASMEOMCode) and applicable Addencla as required by 10 CFR50.55a(f).
- c. The testing frequency specified in _iection XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda for the inservice inspection and testing ac;ivities required by the ASMEBoiler and Pressure Vessel Cod_ and applicable Addenda shall be applicable as specified in PVNGSITS 5.5.8.a for ITS and TRMrequirements.
- d. The provisions of ITS SR 3.0.2 are _pplicable to ITS 5.5.8.a for performing inservice inspection and testing activities. The testing frequency specified in the J_SME OMCode and applicable Addenda for the inservice testing ac:tivities required by the ASMEOMCode and applicable Addenda shall be as specified in PVNGSITS 5.5.8a for ITS and TRMrecuirements.
(continued)
PALOVERDEUNITS 1, 2, 3 T5.0.500-11 Rev 54 1/26/11
Programs and Manuals TRM5.0.500 5.0,500 Programs and Manuals (continued)
- e. Whentesting ECCStrains pursuant t( PVNGSITS SR 3.5.3,3, l verify that each of the following pLmpsdevelops the indicated differential pressure at or greater than their respective minimum allowable recirculation flov
- 1. High pressure safety injection pLmpgreater than or equal to 1761 psid.
- 2. Low pressure safety injection punp greater than or equal to 165 psid.
- f. When testing the Containment Spray _ystem pursuant to PVNGSITS l SR 3.6.6.3, verify that each pumpdevelops an indicated head differential pressure of greater th_n or equal to 260 psid at greater than or equal the minimum allowable recirculation flowrate.
- g. The provisions of TLCO3.0,100.3 an( TSR 3.0.100.3 are applicable to the program requirements T5.0.500.8e and T5.0.500.8.f.
5.0.500.9 Steam Generator (SG) Tube Surveillance Program The purpose of the Steam Generator Tube Surveillance Program is to provide controls for the Inservice Inspection of steam generator tubes to ensure that structural integrity of this portion of the RCSis maintained. The PVNGSSystem Ergineering Group is the program owner.
The program requirements are specified n ITS 5.5.9.
(continued)
PALOVERDE UNITSI, 2, 3 T5.0.500-12 Rev 54 1/26/11
TRMSpecification Bases TRM6.0.100 T3.1.100, T3.1.101, T3.1.102, 3.1.103, T3.1.104, T3.1.105 TRMSPECIFICATIONBASES (continued)
APPLICABILITY The normal makeupsystem contains th'ee charging pumps, all of which are normally in service. With the RCStemperature above 210°F, a minimum of two charging puml)s is required to mitigate the effects of a small line break ow_r all of the expected operating pressures. A minimum of tl_o boron injection systems is also required to ensure single fuilctional capability in those events where an assumedfailur_ renders one of the systems inoperable. With the RCStew_perature below 210°F, one system is acceptable without single =ailure consideration based on the stable reactivity condition o the reactor and the additional restrictions prohibiting OREALTERATIONS and positive reactivity changes.
In MODES1-4, charging pumps are rec Lired in order to accomplish boron injection over the 'ull range of expected reactor coolant system pressure. Th,_provision of three charging pumpswhen only two are reqLLired provides for maintenance and flexibility of operal;ion. In modes 5 and 6, the safety grade high pressure and l(_w pressure safety injection pumps are capable of deliw_ring the required flow rates. Since they are also energize( from an emergency power supply, they are acceptable alternatves if a charging pump is not OPERABLE at low system pressures ACTIONS In MODES1-4, the allowable out-of-s_rvice period of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> for one required boration system in%erable is consistent with those for safety related equipment. This time allows for minor component repair or corrective actior without undue risk of overall facility safety during the r_pair period. If restoration can not be accomplished in 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, enter TLCO 3.0.100.3 and initiate corrective action in accordance with PVNGScorrective action program and initiate an operability determination, as necessary to detern_ine the impact on equipment in the technical specifications. This should include an assessment of the plant configuralion and a determination of the appropriate compensatory action and/or Mode changes to maintain safe operation and compliance with design and licensing basis.
(continued)
PALOVERDEUNITS1, 2, 3 T6.0.I00-7 Rev 54 1/26/11