Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23325A161 | 26 October 2023 | Relief Request 70 - Proposed Alternatives in Accordance with 10 CFR 50.55a(z)(1) for Pressurizer Lower Shell Temperature Nozzle | Boric Acid Safe Shutdown Earthquake Hydrostatic Nondestructive Examination Finite Element Analysis Code Reconciliation Earthquake Pressure Boundary Leakage Exclusive Use Affidavit |
ML22308A166 | 4 November 2022 | 23rd Refueling Outage Steam Generator Tube Inspection Report | |
ML22091A307 | 1 April 2022 | Independent Spent Fuel Storage Installation (Isfsi), Evacuation Time Estimate Study | Pandemic |
ML21005A271 | 29 December 2020 | 102-08208 PVNGS Communication Required by Confirmatory Order EA-20-054 | Finite Element Analysis COVID-19 |
ML18187A417 | 6 July 2018 | License Amendment Request and Exemption Request to Support the Implementation of Framatome High Thermal Performance Fuel | Boric Acid Shutdown Margin Loop seal Anticipated operational occurrence Post Accident Monitoring Hydrostatic Coatings Operating Basis Earthquake Nondestructive Examination License Renewal Exemption Request Earthquake Fuel cladding Coast down Power Uprate Affidavit |
ML17248A526 | 30 May 2017 | 3INT-ISI-3, Revision 4, Third Inspection Interval Inservice Inspection Program Summary Manual, Unit 3, Enclosure 3 to 102-07551-MDD/MSC | Weld Overlay Nondestructive Examination VT-2 Aging Management Liquid penetrant Dissimilar Metal Weld |
ML16321A003 | 31 October 2016 | WCAP-18030-NP, Revision 1, Criticality Safety Analysis for Palo Verde Nuclear Generating Station Units 1, 2, and 3. | Non-Destructive Examination Earthquake Fuel cladding |
ML15336A084 | 30 November 2015 | NET-300047-07 Revision 1, Material Qualification Report of Maxus for Spent Fuel Storage. | Boric Acid |
ML15076A073 | 10 March 2015 | Seismic Hazard and Screening Report | Safe Shutdown Earthquake Probabilistic Risk Assessment Fukushima Dai-Ichi Earthquake |
ML15027A122 | 19 December 2014 | Technical Specification (TS) Bases Revision 61 | Safe Shutdown Unanalyzed Condition Boric Acid Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Non-Destructive Examination Grab sample Stroke time Anticipated operational occurrence Post Accident Monitoring Hydrostatic Probabilistic Risk Assessment Missed surveillance Pressure and Temperature Limits Report Surveillance Frequency Control Program Operability Determination Earthquake Fuel cladding Pressure Boundary Leakage Offsite Circuit Power change Unidentified leakage Power Uprate |
ML14189A498 | 19 June 2014 | Stars Response to Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program - Vendor Information Request | Commercial Grade Dedication Coatings Finite Element Analysis |
ML14126A636 | 30 April 2014 | APS Supplement to the Seismic Walkdown Report Requested by the NRC Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1, 2.3, and 9.3 of the Near-Term Task Force. | Safe Shutdown Unanalyzed Condition Ultimate heat sink Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Emergency Lighting Fukushima Dai-Ichi Earthquake Scaffolding Flow Induced Vibration |
ML14087A188 | 11 April 2014 | Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident | Unanalyzed Condition Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
ML13329A038 | 31 August 2013 | WCAP-17787-NP, Rev 0, Palo Verde Nuclear Generating Station STAR Program Implementation Report. | Shutdown Margin Nondestructive Examination Temporary Modification Fuel cladding |
ML13120A503 | 10 April 2013 | Technical Requirements Manual, Revision 57 | Safe Shutdown Boric Acid Time of Discovery Shutdown Margin High Radiation Area Offsite Dose Calculation Manual Fire Barrier Anticipated operational occurrence Post Accident Monitoring Hydrostatic Pressure and Temperature Limits Report Annual Radioactive Effluent Release Report Process Control Program Operability Determination Earthquake Offsite Circuit Fire Protection Program Fire Watch Power change |
ML12355A748 | 31 December 2012 | Evacuation Time Estimate Study; Cover Through Section 4 | |
ML12355A751 | 14 December 2012 | Evacuation Time Estimate Study; Section 5 Through 12 | |
ML12355A752 | 14 December 2012 | Evacuation Time Estimate Study; Appendix a Through H | |
ML12278A100 | 7 September 2012 | Pressurized Water Reactor (PWR) Internals Aging Management Program Plan | Nondestructive Examination Functionality Assessment Aging Management EVT-1 |
ML12229A120 | 3 August 2012 | Attachment 5, PVNGS Engineering Study 13-NS-C089, Revision 0, PRA Evaluation of LPSI Pump Failing to Trip on RAS | |
ML12229A119 | 3 August 2012 | Attachment 4, PVNGS Engineering Study 13-ES-A037, Revision 0, Fault Tree Analysis and Reliability Evaluation for Low Pressure Safety Injection (LPSI) Pump Trip at the Recirculation Actuation Signal (RAS) | Mission time |
ML110610758 | 26 January 2011 | Technical Requirements Manual, Revision 54 | Safe Shutdown Boric Acid Time of Discovery Shutdown Margin High Radiation Area Offsite Dose Calculation Manual Fire Barrier Anticipated operational occurrence Post Accident Monitoring Hydrostatic Pressure and Temperature Limits Report Annual Radioactive Effluent Release Report Process Control Program Operability Determination Earthquake Offsite Circuit Fire Protection Program Fire Watch Power change |
ML110610757 | 26 January 2011 | PVNGS Technical Requirements Manual, Revision 54. List of Effective Pages | |
ML102150037 | 22 July 2010 | Engineering Study 13-MS-B094, Revision 0 | Stroke time |
ML101660749 | 1 May 2009 | Adeq 2009a Palo Verde Aquifer Protection Permit (Area Wide) No. P-100388. Issued by Arizona Dept of Environmental Quality. May 2009 | |
ML082820029 | 1 October 2008 | Request for Amendment to Technical Specification 5.5.16, Containment Leakage Rate Testing Program | Safe Shutdown Boric Acid Ultimate heat sink Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Coatings Large early release frequency Moisture barrier Earthquake Maintenance Rule Program |
ML082190013 | 7 August 2008 | Monthly Operating Reports Second Quarter 2008 | Reserve Station Service Transformer Power change |
ML090641016 | 30 June 2008 | WCAP-16835-NP, Rev. 0, Palo Verde Nuclear Generating Station Units 1, 2, and 3; Basis for RCS Pressure and Temperature Limits Report. | Anticipated operational occurrence Hydrostatic Finite Element Analysis Pressure and Temperature Limits Report Exemption Request |
ML081080116 | 10 April 2008 | Request for Amendment to Technical Specification 3.5.5, Refueling Water Tank (RWT) to Increase the RWT Minimum Water Level Under Exigent Circumstances | Boric Acid Shutdown Margin Anticipated operational occurrence |
ML071930316 | 12 March 2007 | Chemical Effect Head Loss Test Specification | Boric Acid Grab sample Coatings |
ML071930365 | 7 March 2007 | CCI Chemical Laboratory Bench Top Test Rev 0 | Boric Acid |
ML062630180 | 16 August 2006 | Request for Amendment to Technical Specification Section 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.9, 3.8.1.10, & 3.8.1.14 | Safe Shutdown Anticipated operational occurrence Fuel cladding Offsite Circuit |
ML061780469 | 30 April 2006 | Enclosure 2D, Non-Proprietary, Redacted Westinghouse Response to NRC Request for Additional Information Regarding Technical Specification Improvement and Tubesheet Inspection Depth for Steam Generator Tubes | Condition Adverse to Quality |
ML060200577 | 13 January 2006 | Revised Redacted Version of Response to Information Request Dated February 24, 2005 | |
ML060200575 | 13 January 2006 | Revised Redacted Version of Recirculation Sump Void Testing and Probabilistic Risk Assessment Preliminary Results Dated December 27, 2004 | Probabilistic Risk Assessment |
ML053480203 | 5 December 2005 | Report of Boron Deposit at Control Element Drive Mechanism Vent | Boric Acid |
ML053120390 | 28 October 2005 | Revised Station Blackout Evaluation | Safe Shutdown Emergency Lighting |
ML052560138 | 5 July 2005 | Redacted Version of Proprietary Submittal Dated February 15, 2005 Regarding Safety Significance Evaluation of ECCS Containment Sump Voided Piping | Probabilistic Risk Assessment |
ML051790349 | 21 June 2005 | List of References Associated with ASME Code Case N-499 to Support NRC Review of Inservice Inspection (ISI) Program Relief Request No. 33 for Pressurizer Base Material Heating | Finite Element Analysis Earthquake Fatigue Rule |
ML051940473 | 28 February 2005 | Attachment 2-E, DAR-OA-05-3, Revision 0, Report of SBLOCA Analyses with Degraded ECCS Flow After RAS Performed for Arizona Public Service in Support of Palo Verde Nuclear-Generating Station Units 1, 2, and 3 | Loop seal Past operability |
ML050540258 | 15 February 2005 | Attachment 2-F, 13-NS-C074, Rev 0, Significance Determination of Containment Sump Air Entrainment. | Safe Shutdown High winds Mission time Internal Flooding Earthquake |
ML050450353 | 4 February 2005 | Submittal of Redacted Version of Recirculation Sump Void Testing and Probabilistic Risk Assessment Preliminary Results | Probabilistic Risk Assessment Large early release frequency |
ML042960366 | 2 July 2004 | Discussion and Proposed Resolution of NRC AIT URI (Unresolved Issue) Relating to MSIS Impact on AF-A Operability (6/14/04 Three Unit LOOP Trip). | |
ML042450045 | 30 June 2004 | Reformatted Technical Report SIR-04-045, Revision 0, Supporting the Palo Verde Pressurizer Heater Sleeve Mid-Wall Repair | |
ML042960343 | 28 June 2004 | Evaluation of CVCS Soft Parts Due to High Temperature Letdown Event. | |
ML041210227 | 15 April 2004 | Emergency Core Cooling System (ECCS) Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report | Fuel cladding |
ML031620177 | 4 June 2003 | ISFSI, Registration of Dry Spent Fuel Transportable Storage Canister Identification No. AMZDFX003 & Report of Cask Performance | |
ML030980633 | 2 April 2003 | Response to Request for Additional Information Regarding Relaxation Request to NRC Order EA-03-009 | |
ML023300412 | 21 November 2002 | Supplement to Request for a License Amendment to Support Replacement of Steam Generators & Uprated Power Operations | Anticipated operational occurrence Coast down Power Uprate Affidavit |
ML023090325 | 29 October 2002 | Special Report 1-SR-2002-002 |