Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23325A16126 October 2023Relief Request 70 - Proposed Alternatives in Accordance with 10 CFR 50.55a(z)(1) for Pressurizer Lower Shell Temperature NozzleBoric Acid
Safe Shutdown Earthquake
Hydrostatic
Nondestructive Examination
Finite Element Analysis
Code Reconciliation
Earthquake
Pressure Boundary Leakage
Exclusive Use
Affidavit
ML22308A1664 November 202223rd Refueling Outage Steam Generator Tube Inspection Report
ML22091A3071 April 2022Independent Spent Fuel Storage Installation (Isfsi), Evacuation Time Estimate StudyPandemic
ML21005A27129 December 2020102-08208 PVNGS Communication Required by Confirmatory Order EA-20-054Finite Element Analysis
COVID-19
ML18187A4176 July 2018License Amendment Request and Exemption Request to Support the Implementation of Framatome High Thermal Performance FuelBoric Acid
Shutdown Margin
Loop seal
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Coatings
Operating Basis Earthquake
Nondestructive Examination
License Renewal
Exemption Request
Earthquake
Fuel cladding
Coast down
Power Uprate
Affidavit
ML17248A52630 May 20173INT-ISI-3, Revision 4, Third Inspection Interval Inservice Inspection Program Summary Manual, Unit 3, Enclosure 3 to 102-07551-MDD/MSCWeld Overlay
Nondestructive Examination
VT-2
Aging Management
Liquid penetrant
Dissimilar Metal Weld
ML16321A00331 October 2016WCAP-18030-NP, Revision 1, Criticality Safety Analysis for Palo Verde Nuclear Generating Station Units 1, 2, and 3.Non-Destructive Examination
Earthquake
Fuel cladding
ML15336A08430 November 2015NET-300047-07 Revision 1, Material Qualification Report of Maxus for Spent Fuel Storage.Boric Acid
ML15076A07310 March 2015Seismic Hazard and Screening ReportSafe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Earthquake
ML15027A12219 December 2014Technical Specification (TS) Bases Revision 61Safe Shutdown
Unanalyzed Condition
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Grab sample
Stroke time
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Probabilistic Risk Assessment
Missed surveillance
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
Operability Determination
Earthquake
Fuel cladding
Pressure Boundary Leakage
Offsite Circuit
Power change
Unidentified leakage
Power Uprate
ML14189A49819 June 2014Stars Response to Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program - Vendor Information RequestCommercial Grade Dedication
Coatings
Finite Element Analysis
ML14126A63630 April 2014APS Supplement to the Seismic Walkdown Report Requested by the NRC Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1, 2.3, and 9.3 of the Near-Term Task Force.Safe Shutdown
Unanalyzed Condition
Ultimate heat sink
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Emergency Lighting
Fukushima Dai-Ichi
Earthquake
Scaffolding
Flow Induced Vibration
ML14087A18811 April 2014Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant AccidentUnanalyzed Condition
Safe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
ML13329A03831 August 2013WCAP-17787-NP, Rev 0, Palo Verde Nuclear Generating Station STAR Program Implementation Report.Shutdown Margin
Nondestructive Examination
Temporary Modification
Fuel cladding
ML13120A50310 April 2013Technical Requirements Manual, Revision 57Safe Shutdown
Boric Acid
Time of Discovery
Shutdown Margin
High Radiation Area
Offsite Dose Calculation Manual
Fire Barrier
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Pressure and Temperature Limits Report
Annual Radioactive Effluent Release Report
Process Control Program
Operability Determination
Earthquake
Offsite Circuit
Fire Protection Program
Fire Watch
Power change
ML12355A74831 December 2012Evacuation Time Estimate Study; Cover Through Section 4
ML12355A75114 December 2012Evacuation Time Estimate Study; Section 5 Through 12
ML12355A75214 December 2012Evacuation Time Estimate Study; Appendix a Through H
ML12278A1007 September 2012Pressurized Water Reactor (PWR) Internals Aging Management Program PlanNondestructive Examination
Functionality Assessment
Aging Management
EVT-1
ML12229A1203 August 2012Attachment 5, PVNGS Engineering Study 13-NS-C089, Revision 0, PRA Evaluation of LPSI Pump Failing to Trip on RAS
ML12229A1193 August 2012Attachment 4, PVNGS Engineering Study 13-ES-A037, Revision 0, Fault Tree Analysis and Reliability Evaluation for Low Pressure Safety Injection (LPSI) Pump Trip at the Recirculation Actuation Signal (RAS)Mission time
ML11061075826 January 2011Technical Requirements Manual, Revision 54Safe Shutdown
Boric Acid
Time of Discovery
Shutdown Margin
High Radiation Area
Offsite Dose Calculation Manual
Fire Barrier
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Pressure and Temperature Limits Report
Annual Radioactive Effluent Release Report
Process Control Program
Operability Determination
Earthquake
Offsite Circuit
Fire Protection Program
Fire Watch
Power change
ML11061075726 January 2011PVNGS Technical Requirements Manual, Revision 54. List of Effective Pages
ML10215003722 July 2010Engineering Study 13-MS-B094, Revision 0Stroke time
ML1016607491 May 2009Adeq 2009a Palo Verde Aquifer Protection Permit (Area Wide) No. P-100388. Issued by Arizona Dept of Environmental Quality. May 2009
ML0828200291 October 2008Request for Amendment to Technical Specification 5.5.16, Containment Leakage Rate Testing ProgramSafe Shutdown
Boric Acid
Ultimate heat sink
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Coatings
Large early release frequency
Moisture barrier
Earthquake
Maintenance Rule Program
ML0821900137 August 2008Monthly Operating Reports Second Quarter 2008Reserve Station Service Transformer
Power change
ML09064101630 June 2008WCAP-16835-NP, Rev. 0, Palo Verde Nuclear Generating Station Units 1, 2, and 3; Basis for RCS Pressure and Temperature Limits Report.Anticipated operational occurrence
Hydrostatic
Finite Element Analysis
Pressure and Temperature Limits Report
Exemption Request
ML08108011610 April 2008Request for Amendment to Technical Specification 3.5.5, Refueling Water Tank (RWT) to Increase the RWT Minimum Water Level Under Exigent CircumstancesBoric Acid
Shutdown Margin
Anticipated operational occurrence
ML07193031612 March 2007Chemical Effect Head Loss Test SpecificationBoric Acid
Grab sample
Coatings
ML0719303657 March 2007CCI Chemical Laboratory Bench Top Test Rev 0Boric Acid
ML06263018016 August 2006Request for Amendment to Technical Specification Section 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.9, 3.8.1.10, & 3.8.1.14Safe Shutdown
Anticipated operational occurrence
Fuel cladding
Offsite Circuit
ML06178046930 April 2006Enclosure 2D, Non-Proprietary, Redacted Westinghouse Response to NRC Request for Additional Information Regarding Technical Specification Improvement and Tubesheet Inspection Depth for Steam Generator TubesCondition Adverse to Quality
ML06020057713 January 2006Revised Redacted Version of Response to Information Request Dated February 24, 2005
ML06020057513 January 2006Revised Redacted Version of Recirculation Sump Void Testing and Probabilistic Risk Assessment Preliminary Results Dated December 27, 2004Probabilistic Risk Assessment
ML0534802035 December 2005Report of Boron Deposit at Control Element Drive Mechanism VentBoric Acid
ML05312039028 October 2005Revised Station Blackout EvaluationSafe Shutdown
Emergency Lighting
ML0525601385 July 2005Redacted Version of Proprietary Submittal Dated February 15, 2005 Regarding Safety Significance Evaluation of ECCS Containment Sump Voided PipingProbabilistic Risk Assessment
ML05179034921 June 2005List of References Associated with ASME Code Case N-499 to Support NRC Review of Inservice Inspection (ISI) Program Relief Request No. 33 for Pressurizer Base Material HeatingFinite Element Analysis
Earthquake
Fatigue Rule
ML05194047328 February 2005Attachment 2-E, DAR-OA-05-3, Revision 0, Report of SBLOCA Analyses with Degraded ECCS Flow After RAS Performed for Arizona Public Service in Support of Palo Verde Nuclear-Generating Station Units 1, 2, and 3Loop seal
Past operability
ML05054025815 February 2005Attachment 2-F, 13-NS-C074, Rev 0, Significance Determination of Containment Sump Air Entrainment.Safe Shutdown
High winds
Mission time
Internal Flooding
Earthquake
ML0504503534 February 2005Submittal of Redacted Version of Recirculation Sump Void Testing and Probabilistic Risk Assessment Preliminary ResultsProbabilistic Risk Assessment
Large early release frequency
ML0429603662 July 2004Discussion and Proposed Resolution of NRC AIT URI (Unresolved Issue) Relating to MSIS Impact on AF-A Operability (6/14/04 Three Unit LOOP Trip).
ML04245004530 June 2004Reformatted Technical Report SIR-04-045, Revision 0, Supporting the Palo Verde Pressurizer Heater Sleeve Mid-Wall Repair
ML04296034328 June 2004Evaluation of CVCS Soft Parts Due to High Temperature Letdown Event.
ML04121022715 April 2004Emergency Core Cooling System (ECCS) Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual ReportFuel cladding
ML0316201774 June 2003ISFSI, Registration of Dry Spent Fuel Transportable Storage Canister Identification No. AMZDFX003 & Report of Cask Performance
ML0309806332 April 2003Response to Request for Additional Information Regarding Relaxation Request to NRC Order EA-03-009
ML02330041221 November 2002Supplement to Request for a License Amendment to Support Replacement of Steam Generators & Uprated Power OperationsAnticipated operational occurrence
Coast down
Power Uprate
Affidavit
ML02309032529 October 2002Special Report 1-SR-2002-002