ML060200577
From kanterella
Jump to navigation
Jump to search
ML060200577 | |
Person / Time | |
---|---|
Site: | Palo Verde |
Issue date: | 01/13/2006 |
From: | Troy Pruett NRC/RGN-IV/DRP/RPB-D |
To: | James M. Levine Arizona Public Service Co |
References | |
Download: ML060200577 (24) | |
Similar Documents at Palo Verde | |
---|---|
Category:Letter
MONTHYEARML24019A2012024-01-19019 January 2024
[Table view]Fourth 10-Year Interval, Second Period Owners Activity Report Number 1R24 ML24019A1362024-01-18018 January 2024 Inservice Inspection Request for Information ML24012A2452024-01-12012 January 2024 Response to Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24010A1532024-01-10010 January 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection ML23341A0062023-12-21021 December 2023 Project Manager Assignment IR 05000528/20230112023-12-18018 December 2023 License Renewal Inspection Report 05000528/2023011 ML23335A0782023-11-30030 November 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1602023-11-17017 November 2023 Supplemental Submittal - Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20234032023-11-13013 November 2023 NRC Security Inspection Report 05000528 2023403, 05000529 2023403, 05000530 2023403 (Full Report) ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23299A3052023-10-26026 October 2023 Response to Request for Additional Information Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20230032023-10-17017 October 2023 Integrated Inspection Report 05000528 2023003 and 05000529 2023003 and 05000530 2023003 ML23270B9232023-09-28028 September 2023 Notification of Age-Related Degradation Inspection (05000528/2024012, 05000529/2024012, and 05000530/2024012) and Request for Information ML23251A2332023-09-13013 September 2023 Notification of Post Approval Site Inspection for License Renewal and Request for Information Inspection (05000528/2023011) ML23241B0182023-09-13013 September 2023 Use of Honeywell Mururoa V4F1 and MTH2 Supplied Air Suits within Respiratory Protection Program IR 05000528/20243012023-09-0606 September 2023 Notification of NRC Initial Operator Licensing Examination 05000528/2024301; 05000529/2024301; 05000530/2024301 IR 05000528/20230102023-08-22022 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000528/2023010, 05000529/2023010 and 05000530/2023010 IR 05000528/20230052023-08-21021 August 2023 Updated Inspection Plan for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Report 05000528/2023005 and 05000529/2023005 and 05000530/2023005) ML23222A2762023-08-10010 August 2023 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canister Identification Numbers AMZDFX175 and AMZDFX176 and Vertical Concrete Cask Identification Numbers AMZDNE175, and AMZDNE176 ML23199A2942023-08-0909 August 2023 Issuance of Amendment Nos. 221, 221, and 221, to Revise Technical Specifications to Adopt TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable IR 05000528/20230022023-08-0808 August 2023 Integrated Inspection Report 05000528/2023002 and 05000529/2023002 and 05000530/2023002 ML23207A2482023-07-26026 July 2023 License Renewal Pressurizer Surge Line Inspection ML23188A1872023-07-0707 July 2023 Fourth 10-Year Interval, Second Period Owners Activity Report Number 2R24 ML23166B0832023-07-0505 July 2023 Independence Spent Fuel Storage Installation - Issuance of Exemption ML23181A1602023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, and Revision 3 to Operations Quality Assurance Program Description ML23180A2222023-06-29029 June 2023 Application to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) - Operating, TS 3.5.2, Safety Injection Tanks (Sits) - Shutdown, and TS 3.6.5, Containment Air Temperature ML23181A0772023-06-29029 June 2023 Program Review - Simulator Testing Methodology ML23157A1292023-06-0101 June 2023 Annual Report of Guarantee of Payment of Deferred Premium ML23144A3722023-05-24024 May 2023 Response to Regulatory Issue Summary (RIS) 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23143A3912023-05-23023 May 2023 Independent Spent Fuel Storage Installation - Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Batch 3 Design Requirements ML23145A2772023-05-17017 May 2023 10-PV-2023-05 Post-Exam Comments ML23132A3392023-05-12012 May 2023 Application to Revise Technical Specifications 3.3.11 to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls IR 05000528/20230012023-05-0808 May 2023 and Independent Spent Fuel Storage Installation - Integrated Inspection Report 05000528/2023001 and 05000529/2023001 and 05000530/2023001 and 07200044/2023001 ML23128A0692023-05-0808 May 2023 Notification of Biennial Problem Dentification and Resolution Inspection and Request for Information ML23122A1822023-04-29029 April 2023 Transmittal of Technical Specification Bases Revision 76 ML23122A1912023-04-29029 April 2023 Unit 1 Core Operating Limits Report Revision 32, Unit 2 Core Operating Limits Report Revision 25, Unit 3 Core Operating Limits Report Revision 31 ML23116A2772023-04-26026 April 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2022 ML23115A4012023-04-26026 April 2023 Review of the 2022 Steam Generator Tube Inspections During Refueling Outage 23 ML23115A4982023-04-25025 April 2023 2022 Annual Environmental Operating Report IR 05000528/20230122023-04-19019 April 2023 Notification of Commercial Grade Dedication Inspection (05000528/2023012, 05000529/2023012, and 05000530/2023012) and RFI ML23108A0342023-04-18018 April 2023 NRC Initial Operator Licensing Examination Approval 05000528/2023301; 05000529/2023301; 05000530/2023301 ML23103A4642023-04-13013 April 2023 Annual Radiological Environmental Operating Report 2022 ML23103A4312023-04-13013 April 2023 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2022 IR 05000528/20224012023-04-13013 April 2023 Cyber Security Inspection Report 05000528/2022401 and 05000529/2022401 and 05000530/2022401 ML23102A3292023-04-12012 April 2023 Application for Authorized Use of Mururoa Single-Use, Supplied Air Suits, Models V4F1 and MTH2 ML23102A3242023-04-12012 April 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-107-A, Separate Control Rods That Are Untrippable Versus Inoperable ML23089A4002023-03-30030 March 2023 Consolidated Decommissioning Funding Status Report - 2022 ML23088A4012023-03-30030 March 2023 Project Manager Assignment IR 05000528/20234022023-03-29029 March 2023 and 3 - NRC Security Inspection Report 05000528-2023402, 05000529-2023402, and 05000530-2023402, (Cover Letter Only) ML23080A3002023-03-21021 March 2023 Present Levels of Financial Protection 2024-01-19 Category:Report MONTHYEARML24019A2012024-01-19019 January 2024
[Table view]Fourth 10-Year Interval, Second Period Owners Activity Report Number 1R24 ML23325A1612023-10-26026 October 2023 Relief Request 70 - Proposed Alternatives in Accordance with 10 CFR 50.55a(z)(1) for Pressurizer Lower Shell Temperature Nozzle ML22308A1662022-11-0404 November 2022 23rd Refueling Outage Steam Generator Tube Inspection Report ML22091A3072022-04-0101 April 2022 Independent Spent Fuel Storage Installation (Isfsi), Evacuation Time Estimate Study ML21077A2562021-03-18018 March 2021 El Paso Electric Co., Application for Approval of Indirect Transfer of Control of Licenses Pursuant to 10 C.F.R. 50.80 and 72.50 ML21005A2712020-12-29029 December 2020 102-08208 PVNGS Communication Required by Confirmatory Order EA-20-054 ML19136A4092019-05-16016 May 2019 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for Calendar Year 2018 ML19046A3512019-02-15015 February 2019 Third 10-Year Interval, Third Period: Owner'S Activity Report Number U2R21 ML18187A4172018-07-0606 July 2018 License Amendment Request and Exemption Request to Support the Implementation of Framatome High Thermal Performance Fuel ML17181A5152017-06-29029 June 2017 Flooding Focused Evaluation Summary ML17248A5262017-05-30030 May 2017 3INT-ISI-3, Revision 4, Third Inspection Interval Inservice Inspection Program Summary Manual, Unit 3, Enclosure 3 to 102-07551-MDD/MSC ML17006A2172017-01-0505 January 2017 Third 10-Year Interval, Third Period: Owner'S Activity Report Number U3R19 ML16306A4442016-11-14014 November 2016 Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation ML16321A0032016-10-31031 October 2016 WCAP-18030-NP, Revision 1, Criticality Safety Analysis for Palo Verde Nuclear Generating Station Units 1, 2, and 3. ML16221A6042016-09-13013 September 2016 Staff Assessment of Information Provided Under Title 10 of Code of Federal Regulations Part 50, Section 50.54(F), Seismic Hazard Reevaluations for Recommendation 2.1 of Near-Term Task Force Review of Insights from . ML16120A3892016-04-28028 April 2016 1-SR-2016-001-00, Fuel Building Ventilation System High Range Radioactive Gaseous Effluent Monitor Nonfunctional ML15336A0842015-11-30030 November 2015 NET-300047-07 Revision 1, Material Qualification Report of Maxus for Spent Fuel Storage. ML15188A0492015-06-30030 June 2015 Third 10-Year Interval, Third Period: Owner'S Activity Report Number U3R18 ML15111A4302015-04-17017 April 2015 Attachments 2 & 3: Flaw Fracture Mechanics, Corrosion & Loose Parts Evaluations for One Cycle Relief (DAR-MRCDA-15-6-NP) and APS Response to NRC Request for Additional Information Dated April 14, 2015 ML15076A0732015-03-10010 March 2015 Seismic Hazard and Screening Report ML15012A4462015-01-0606 January 2015 Third 10-Year Interval, Second Period: Owner'S Activity Report Number U1R18 ML15027A1222014-12-19019 December 2014 Technical Specification (TS) Bases Revision 61 ML14184B3822014-06-27027 June 2014 Third 10-Year Interval, Third Period: Owner'S Activity Report Number U2R18 ML14189A5332014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5 ML14189A5432014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 ML14189A5372014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 ML14189A5312014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5 ML14189A5002014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 ML14189A4982014-06-19019 June 2014 Stars Response to Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program - Vendor Information Request RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 ML14126A6362014-04-30030 April 2014 APS Supplement to the Seismic Walkdown Report Requested by the NRC Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1, 2.3, and 9.3 of the Near-Term Task Force. ML14087A1882014-04-11011 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident ML14034A1472014-01-24024 January 2014 Third 10-Year Interval, Second Period: Owner'S Activity Report Number U3R17 ML13329A0382013-08-31031 August 2013 WCAP-17787-NP, Rev 0, Palo Verde Nuclear Generating Station STAR Program Implementation Report. ML13252A1112013-08-31031 August 2013 WCAP-17680-NP, Supplement 1, Rev. 0, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Submittal Report for Palo Verde Nuclear Generating Station Unit 2 - Supplemental Information. CY-12-009, Closure Options for Generic Safety Issue (GSI) - 191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance2013-05-16016 May 2013 Closure Options for Generic Safety Issue (GSI) - 191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance ML13120A5032013-04-10010 April 2013 Technical Requirements Manual, Revision 57 ML1307003422013-02-28028 February 2013 APS Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) ML13022A4072013-01-14014 January 2013 Third 10-Year Interval, Second Period: Owner'S Activity Report for Unit 2 Refueling Outage 17 (U2R17) ML12355A7482012-12-31031 December 2012 Evacuation Time Estimate Study; Cover Through Section 4 ML12355A7512012-12-14014 December 2012 Evacuation Time Estimate Study; Section 5 Through 12 ML12355A7522012-12-14014 December 2012 Evacuation Time Estimate Study; Appendix a Through H ML12278A1002012-09-0707 September 2012 Pressurized Water Reactor (PWR) Internals Aging Management Program Plan ML12229A1192012-08-0303 August 2012 Attachment 4, PVNGS Engineering Study 13-ES-A037, Revision 0, Fault Tree Analysis and Reliability Evaluation for Low Pressure Safety Injection (LPSI) Pump Trip at the Recirculation Actuation Signal (RAS) ML12229A1202012-08-0303 August 2012 Attachment 5, PVNGS Engineering Study 13-NS-C089, Revision 0, PRA Evaluation of LPSI Pump Failing to Trip on RAS ML12200A0312012-06-26026 June 2012 Third 10-Year Interval, First Period: Owner'S Activity Report Number U3R16 2024-01-19 Category:Technical MONTHYEARML23325A1612023-10-26026 October 2023
[Table view]Relief Request 70 - Proposed Alternatives in Accordance with 10 CFR 50.55a(z)(1) for Pressurizer Lower Shell Temperature Nozzle ML22308A1662022-11-0404 November 2022 23rd Refueling Outage Steam Generator Tube Inspection Report ML22091A3072022-04-0101 April 2022 Independent Spent Fuel Storage Installation (Isfsi), Evacuation Time Estimate Study ML21005A2712020-12-29029 December 2020 102-08208 PVNGS Communication Required by Confirmatory Order EA-20-054 ML18187A4172018-07-0606 July 2018 License Amendment Request and Exemption Request to Support the Implementation of Framatome High Thermal Performance Fuel ML17248A5262017-05-30030 May 2017 3INT-ISI-3, Revision 4, Third Inspection Interval Inservice Inspection Program Summary Manual, Unit 3, Enclosure 3 to 102-07551-MDD/MSC ML16321A0032016-10-31031 October 2016 WCAP-18030-NP, Revision 1, Criticality Safety Analysis for Palo Verde Nuclear Generating Station Units 1, 2, and 3. ML15336A0842015-11-30030 November 2015 NET-300047-07 Revision 1, Material Qualification Report of Maxus for Spent Fuel Storage. ML15076A0732015-03-10010 March 2015 Seismic Hazard and Screening Report ML15027A1222014-12-19019 December 2014 Technical Specification (TS) Bases Revision 61 ML14189A4982014-06-19019 June 2014 Stars Response to Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program - Vendor Information Request ML14126A6362014-04-30030 April 2014 APS Supplement to the Seismic Walkdown Report Requested by the NRC Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1, 2.3, and 9.3 of the Near-Term Task Force. ML14087A1882014-04-11011 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident ML13329A0382013-08-31031 August 2013 WCAP-17787-NP, Rev 0, Palo Verde Nuclear Generating Station STAR Program Implementation Report. ML13120A5032013-04-10010 April 2013 Technical Requirements Manual, Revision 57 ML12355A7482012-12-31031 December 2012 Evacuation Time Estimate Study; Cover Through Section 4 ML12355A7512012-12-14014 December 2012 Evacuation Time Estimate Study; Section 5 Through 12 ML12355A7522012-12-14014 December 2012 Evacuation Time Estimate Study; Appendix a Through H ML12278A1002012-09-0707 September 2012 Pressurized Water Reactor (PWR) Internals Aging Management Program Plan ML12229A1202012-08-0303 August 2012 Attachment 5, PVNGS Engineering Study 13-NS-C089, Revision 0, PRA Evaluation of LPSI Pump Failing to Trip on RAS ML12229A1192012-08-0303 August 2012 Attachment 4, PVNGS Engineering Study 13-ES-A037, Revision 0, Fault Tree Analysis and Reliability Evaluation for Low Pressure Safety Injection (LPSI) Pump Trip at the Recirculation Actuation Signal (RAS) ML1106107582011-01-26026 January 2011 Technical Requirements Manual, Revision 54 ML1106107572011-01-26026 January 2011 PVNGS Technical Requirements Manual, Revision 54. List of Effective Pages ML1021500372010-07-22022 July 2010 Engineering Study 13-MS-B094, Revision 0 ML1016607492009-05-0101 May 2009 Adeq 2009a Palo Verde Aquifer Protection Permit (Area Wide) No. P-100388. Issued by Arizona Dept of Environmental Quality. May 2009 ML0828200292008-10-0101 October 2008 Request for Amendment to Technical Specification 5.5.16, Containment Leakage Rate Testing Program ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 ML0906410162008-06-30030 June 2008 WCAP-16835-NP, Rev. 0, Palo Verde Nuclear Generating Station Units 1, 2, and 3; Basis for RCS Pressure and Temperature Limits Report. ML0810801162008-04-10010 April 2008 Request for Amendment to Technical Specification 3.5.5, Refueling Water Tank (RWT) to Increase the RWT Minimum Water Level Under Exigent Circumstances ML0719303162007-03-12012 March 2007 Chemical Effect Head Loss Test Specification ML0719303652007-03-0707 March 2007 CCI Chemical Laboratory Bench Top Test Rev 0 ML0626301802006-08-16016 August 2006 Request for Amendment to Technical Specification Section 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.9, 3.8.1.10, & 3.8.1.14 ML0617804692006-04-30030 April 2006 Enclosure 2D, Non-Proprietary, Redacted Westinghouse Response to NRC Request for Additional Information Regarding Technical Specification Improvement and Tubesheet Inspection Depth for Steam Generator Tubes ML0602005772006-01-13013 January 2006 Revised Redacted Version of Response to Information Request Dated February 24, 2005 ML0602005752006-01-13013 January 2006 Revised Redacted Version of Recirculation Sump Void Testing and Probabilistic Risk Assessment Preliminary Results Dated December 27, 2004 ML0534802032005-12-0505 December 2005 Report of Boron Deposit at Control Element Drive Mechanism Vent ML0531203902005-10-28028 October 2005 Revised Station Blackout Evaluation ML0525601382005-07-0505 July 2005 Redacted Version of Proprietary Submittal Dated February 15, 2005 Regarding Safety Significance Evaluation of ECCS Containment Sump Voided Piping ML0517903492005-06-21021 June 2005 List of References Associated with ASME Code Case N-499 to Support NRC Review of Inservice Inspection (ISI) Program Relief Request No. 33 for Pressurizer Base Material Heating ML0519404732005-02-28028 February 2005 Attachment 2-E, DAR-OA-05-3, Revision 0, Report of SBLOCA Analyses with Degraded ECCS Flow After RAS Performed for Arizona Public Service in Support of Palo Verde Nuclear-Generating Station Units 1, 2, and 3 ML0505402582005-02-15015 February 2005 Attachment 2-F, 13-NS-C074, Rev 0, Significance Determination of Containment Sump Air Entrainment. ML0504503532005-02-0404 February 2005 Submittal of Redacted Version of Recirculation Sump Void Testing and Probabilistic Risk Assessment Preliminary Results ML0429603662004-07-0202 July 2004 Discussion and Proposed Resolution of NRC AIT URI (Unresolved Issue) Relating to MSIS Impact on AF-A Operability (6/14/04 Three Unit LOOP Trip). ML0424500452004-06-30030 June 2004 Reformatted Technical Report SIR-04-045, Revision 0, Supporting the Palo Verde Pressurizer Heater Sleeve Mid-Wall Repair ML0429603432004-06-28028 June 2004 Evaluation of CVCS Soft Parts Due to High Temperature Letdown Event. ML0412102272004-04-15015 April 2004 Emergency Core Cooling System (ECCS) Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report ML0316201772003-06-0404 June 2003 ISFSI, Registration of Dry Spent Fuel Transportable Storage Canister Identification No. AMZDFX003 & Report of Cask Performance ML0309806332003-04-0202 April 2003 Response to Request for Additional Information Regarding Relaxation Request to NRC Order EA-03-009 ML0233004122002-11-21021 November 2002 Supplement to Request for a License Amendment to Support Replacement of Steam Generators & Uprated Power Operations ML0230903252002-10-29029 October 2002 Special Report 1-SR-2002-002 2023-10-26 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML060200577&oldid=1850211"