ML17334B036

From kanterella
Revision as of 06:32, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Proposed Tech Spec 3.9.7 Re Refueling Operations Crane Travel in Spent Fuel Storage Pool Bldg
ML17334B036
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 01/13/1987
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17334B035 List:
References
NUDOCS 8701200358
Download: ML17334B036 (4)


Text

Attachment toAEP:NRC:0514S ProposedRevisedTechnical Specification Pages"8701200358 870113PDRADQCK.05000315,I "P;.='.'.."..;-",,

P.DR.LI tf REFUELING OPERATIONS CRANETRAVEL-SPENTFUELSTORAGEPOOLBUILDING*

LIMITINGCONDITION FOROPERATION 3.9.7Loadsinexcessof2,500pounds**shallbeprohibited fromtraveloverfuelassemblies inthestoragepool.Loadscarriedoverthespentfuelpoolandtheheightsatwhichtheymaybecarriedoverrackscontaining fuelshallbelimitedinsuchawayastoprecludeimpactenergiesover24,240in.-lbs.,

iftheloadsaredroppedfromthecrane.APPLICABILITY:

Withfuelassemblies inthestoragepool.ACTION'ith therequirements oftheabovespecification notsatisfied, placethecraneloadinasafecondition.

Theprovisions ofSpecification 3.0.3arenotapplicable.

SURVEILLANCE REUIREMENTS 4.9.7.1Craneinterlocks andphysicalstopswhichpreventcranetravelwithloadsinexcessof2,500poundsoverfuelassemblies shallbedemonstrated OPERABLEwithin7dayspriortocraneuseandatleastonceper7daysthereafter duringcraneoperation.

4.9.7.2Thepotential impactenergyduetodroppingthecrane'sloadshallbedetermined tobe(24,240in.-lbs.priortomovingeachloadoverrackscontaining fuel.*SharedsystemwithD.C.COOK-UNIT1'I~*Thisdoesnotincludethemainloadblock,whichweighsapproximately 4.25tons.Whenevertheloadblockismovedoverthepool,themainhoistmustbedeenergized andbecarryingnoload.D.C.COOK-UNIT23/49-7Amendment No.

REFUELING OPERATIONS CRANETRAVE-SPENTFUELSTORAGEPOOLBUILDING*

IGCONDITION FOROPERATION 3.9'Loadsinexcessof2,500pounds**shallbeprohibited fromtraveloverfuelassemblies inthestoragepool.Loadscarriedoverthespentfuelpoolandtheheightsatwhichtheymaybecarriedoverrackscontaining fuelshallbelimitedinsuchawayastoprecludeimpactenergiesover24,240in.-lbs.,

iftheloadsaredroppedfromthecrane.APPLICABILITY:

Withfuelassemblies inthestoragepool.ACTION:Withtherequirements oftheabovespecification notsatisfied, placethecraneloadinasafecondition.

Theprovisions ofSpecification 3.0.3arenotapplicable.

SURVEILLANCE REUIREMENTS 4.9.7.1Craneinterlocks andphysicalstopswhichpreventcranetravelwithloadsinexcessof2,500poundsoverfuelassemblies shallbedemonstrated OPERABLEwithin7dayspriortocraneuseandatleastonceper7daysthereafter duringcraneoperation.

4.9.7.2Thepotential impactenergyduetodroppingthecrane'sloadshallbedetermined tobe<24,240in.-lbs.priortomovingeachloadoverrackscontaining fuel.*SharedsystemwithD.C.COOK-UNIT2**Thisdoesnotincludethemainloadblock,whichweighsapproximately 4.25tons.Whenevertheloadblockismovedoverthepool,themainhoistmustbedeenergized andbecarryingnoload.D.C.COOK-UNIT13/49-8Amendment No.