ML17263A933

From kanterella
Revision as of 12:54, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Rev 5 to Att-17.0, Attachment SD-1. W/950203 Ltr
ML17263A933
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/03/1995
From: WIDAY J A
ROCHESTER GAS & ELECTRIC CORP.
To: JOHNSON A
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
ATT-17.0, NUDOCS 9502130285
Download: ML17263A933 (7)


Text

PRIORITY(ACCELERATED RIDSPROCESSIX REGULATORY INFORMATION DISTRIBUTION SYSTEM(RIDS)ACCESSION NBR:9502130285 DOC.DATE:

95/02/03NOTARIZED:

NODOCKETFACIL:50-244 RobertEmmet GinnaNuclearPlant,Unit1,Rochester G05000244AUTH.NAMEAUTHORAFFILIATION WYDAY,Z.A.

Rochester Ges&ElectricCorp.RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.

ProjectDirectorate I-3(PDl-3)(Post941001)

SUBJECT:

Rev5toAtt-17.0, "Attachment SD-1."W/950203ltr.DISTRIBUTION CODEA045DCOPIESRECEIVED:LTR JENCLSIZE:TITLE:ORSubmittal:

Emergency Preparedness,Pla s,Implement'g Procedures, Cpi0NOTES:License Expdateinaccordance with10CFR2,2.109(9/19/72).

05000244RRECIPIENT IDCODE/NAME PD1-3PDINTERNAL~ICECENTERP1~NUDOCSA'BSTRACT EXTERNAL:

NOACCOPIESLTTRENCL11111111RECIPIENT IDCODE/NAME JOHNSON,A NRR/DRSS/PEPB NRCPDRCOPIESLTTRENCL111111D0UNNOTETOALL"RIDS"RECIPIENTS:

PLEASEHELPUSTOREDUCEiVASTE!CONTACI'THE DOCUMENTCONTROL DESK,ROOMPI-37(EXT.504-2083)TOELlih!INATEYOURNAMEFRO~IDISTRIBUTION LISTSFORDOCI;MENTS YOUDON"I'LED!TOTALNUMBEROFCOPIESREQUIRED:

LTTR7ENCL7 t<<P,/.<<III<<I

<<<<<<<<<<<<&'J<<<<<<<<<<<<<<<<<<<<I ROCHESTER GASANDELECTRICCORPORATION o89EASTAVENUE,ROCHESTER, N.Y.14649-0001 TELEPHONE AREACOOE71B546-2700February3,1995Mr.AllenJohnsonProjectDirectorate I-3U.S.NuclearRegulatory Commission DocumentControlDeskWashington, D.C.20555

Subject:

Emergency Operating Procedures R.E.GinnaNuclearPowerPlantDocketNo.50-244

DearMr.Johnson:

Asrequested, enclosedareGinnaStationEmergency Operating Procedures.

VeryTrulyYours,a.dosephA.WidayJAW/jdwxc:Mr.LeeBettenhausen, USNRC,Region1ResidentInspector, GinnaStationRG&ENuclearSafety&Licensing y/,on2S9502130285 950203PDRADOCK05000244FPDR Page2

Enclosures:

ATT-17.0Revision5 EOP:ATT-17.01'ILE:ATTACHMENT SD-1REV:4PAGE1/of2Surintendent Date7Perfmthefollowing localactionstocompletenormalsecondary systeshutdown:

osereheater4thpasstemperature controlvalves:V-2432(SWcorner1AMSR)oV-2433(SWcorner1BMSR)oV-2434(SWcorner2AMSR)o-2435(SWcorner2BMSR)Closerheatersteamchainvalves:oV-350(SWof1BMSR)oV-351(SWof1bMSR)oV-355(NWof1AMSR)oV-3553(NWof1AMSR)0OpenReheatersteamline ventsmiddlefloor):oV-8500oV-8501oV-8502oV-8504oV-8505SWcornerofcondenser, Closeflangehetingsolationvalves:oMOV-3601A (TBidieLvlWestofTURBL.O.Reservoir) oMOV-3602A NOTE:IFeitherS/GpessureiLESSTHANcondensate headerpressure, THENmanualisoationoftheMFWregulating andbypassvalveshouldbecsideredbeforealigningforcooldownreirculation.

Opentheollowingvalvestoalignforcondensate feedsystemoldownRECIRC:oV982B(atN5heaterouetheader)o-3983B(atN5heateroutetheader)oV-4363(atN5heateroutleheader)oV-4365(byMFWregulating ives)V-4361(southwest cornerofcondenser, middlefloor)oV-3976AMFPAdischarge valvbypassvalveoV-3977AMFPBdischarge valvebypassvalveSecureall5secondary chemicaladdtionpumpsonTURBBLDGmiddlefloorbyN5heaters.oSecureall3ammoniapumps,TURBBLDGbasementbyMCCA.

+1QIIAtlt EOP:ATT-17.0ATTACHMENT SD-1REV:4PAGE2of2oIsolateSWfromthefollowing coolers:oMFWPumpOilCoolers(MFWpumproom)oV-4703oV-4704oExciterAirCooler:oV-4679(chainvalvenexttocondensate transferpump)oBusDuctAirCooler(TURBBLDGbasementEastofbusductcooler)oV-4674oV-4674C(minibypassaroundV-4674)oThrottleSWasnecessary fromfollowing coolers:oGenerator SealOilUnitCoolers(H2sideandairside):oV-4674A(minibypassdischvalveinsidesealoilenclosure Bldg.NWcorner)oV-4677A(minibypassdischvalveinsidesealoilenclosure Bldg.NWcorner)oMainLubeOilCoolers(SWcornerofTurbOilReservoir) oV-4691oV-4692oWHENtheturbineshaftstops,THENnotifyControlRoom.ControlRoompersonnel willdetermine ifadequatepoweravailable tostartturninggear.oTransferhouseheatingsteamtohouseheatingboilerifnecessary (refertoT-35H,NUCLEARHOUSEHEATINGSTEAMTOBOILERSTEAMSUPPLYCHANGE).oPerformT-14G,STEAMGENERATOR BLOWDOWNHEATRECOVERYSYSTEMSHUTDOWN.

oRestoreMAKEUPtoCSTsasdirectedbyControlRoom.

-~