IR 05000259/2021011
From kanterella
ML21236A028 | |
Person / Time | |
---|---|
Site: | Browns Ferry |
Issue date: | 08/24/2021 |
From: | Shawn Smith Reactor Projects Region 2 Branch 6 |
To: | Jim Barstow Tennessee Valley Authority |
References | |
IR 2021011 | |
Download: ML21236A028 (13) | |
Similar Documents at Browns Ferry | |
---|---|
Category:Inspection Report
MONTHYEARIR 05000259/20230102023-12-11011 December 2023
[Table view]Commercial Grade Dedication Inspection Report 05000259/2023010 and 05000260/2023010 and 05000296/2023010 IR 05000259/20230032023-11-13013 November 2023 Integrated Inspection Report 05000259/2023003, 05000260/2023003 and 05000296/2023003 IR 05000259/20230402023-11-0202 November 2023 Supplemental Inspection Supplemental Report 05000259 2023040 and Follow-Up Assessment Letter IR 05000259/20230052023-08-29029 August 2023 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2023005, 05000260/2023005 and 05000296/2023005 IR 05000259/20230022023-08-10010 August 2023 Integrated Inspection Report 05000259/2023002, 05000260/2023002, 05000296/2023002 and 07200052/2023001 IR 05000259/20233012023-07-18018 July 2023 NRC Operator License Examination Report Nos. 05000259/2023301, 05000260/2023301, and 05000296/2023301 IR 05000259/20234022023-06-12012 June 2023 Material Control and Accounting Program Inspection Report 05000259 2023402, 05000260 2023402 and 05000296 2023402 IR 05000259/20230912023-05-0808 May 2023 Final Significance Determination of a White Finding and Nov and Assessment Followup Letter; NRC Inspection Report 05000259/2023091 IR 05000259/20230012023-05-0303 May 2023 Integrated Inspection Report 05000259/2023001, 05000260/2023001 and 05000296/2023001 IR 05000259/20234402023-03-23023 March 2023 Special Inspection Supplemental Report 05000259 2023440 and 05000260 2023440 and 05000296 2023440 Cover Letter IR 05000259/20234012023-03-0808 March 2023 Security Baseline Inspection Report 05000259 2023401 and 05000260/2023401 and 05000296/2023401 IR 05000259/20230902023-03-0202 March 2023 NRC Inspection Report 05000259/2023090 and 05000260 2023090 and Preliminary White Finding and Apparent Violation IR 05000259/20220062023-03-0101 March 2023 Annual Assessment Letter for Browns Ferry Nuclear Plant, Units 1, 2 and 3 Report 05000259/2022006, 05000260/2022006 and 05000296/2022006 IR 05000259/20220042023-02-0707 February 2023 Integrated Inspection Report 05000259/2022004, 05000260/2022004 and 05000296/2022004 IR 05000259/20220032022-11-0909 November 2022 Browns Perry Nuclear Plant - Integrated Inspection Report 05000259/2022003, 05000260/2022003 and 05000296/2022003 IR 05000259/20220122022-09-20020 September 2022 Biennial Problem Identification and Resolution Inspection Report 05000259 2022012, 05000260 2022012 and 05000296 2022012 IR 05000259/20220112022-09-16016 September 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000259/2022011 and 05000260/2022011 and 05000296/2022011 IR 05000259/20224022022-09-0606 September 2022 Security Baseline Inspection Report 05000259/2022402 and 05000260/2022402 and 05000296/2022402 Cover Letter IR 05000259/20220052022-08-30030 August 2022 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 Report 05000259/2022005, 05000260/2022005 and 05000296/2022005 IR 05000259/20220022022-08-0808 August 2022 Integrated Inspection Report 05000259/2022002, 05000260/2022002 and 05000296/2022002 IR 05000259/20224202022-07-19019 July 2022 Security Baseline Inspection Report 05000259/2022420, 05000260/2022420 and 05000296/2022420 ML22181A9562022-06-29029 June 2022 Bf Report 2022-401 Base Public Cover Letter ML22173A1622022-06-21021 June 2022 Replacement Steam Dryer Visual Inspection Results (U3R20) IR 05000259/20220012022-05-12012 May 2022 Integrated Inspection Report 05000259/2022001, 05000260/2022001, 05000296/2022001 and Exercise of Enforcement Discretion IR 05000259/20220102022-03-30030 March 2022 Triennial Fire Protection Inspection Report 05000259/2022010 and 05000260/2022010 and 05000296/2022010 and Apparent Violation IR 05000259/20224012022-03-0808 March 2022 Information Request for the Cyber-Security Baseline Inspection Notification to Perform Inspection 05000259/2022401; 05000260/2022401; 05000296/2022401 IR 05000259/20210062022-03-0202 March 2022 Annual Assessment Letter for Browns Ferry Nuclear Plant, Units 1, 2 and 3 (Report No. 05000259/2021006, 05000260/2021006 and 05000296/2021006 IR 05000259/20210042022-01-31031 January 2022 Integrated Inspection Report 05000259/2021004, 05000260/2021004 and 05000296/2021004 IR 05000259/20214032022-01-19019 January 2022 NRC Inspection Report 05000259/2021403, 05000260/2021403 and 05000296/2021403 IR 05000259/20214022022-01-18018 January 2022 Brows Ferry Nuclear Plant - Security Baseline Inspection Report 05000259/2021402 and 05000260/2021402 and 05000296/2021402 IR 05000259/20210032021-11-0909 November 2021 Integrated Inspection Report 05000259/2021003, 05000260/2021003, 05000296/2021003 and 07200052/2021001 IR 05000259/20214012021-08-31031 August 2021 Security Baseline Inspection Report 05000259/2021401 and 05000260/2021401 and 05000296/2021401 IR 05000259/20210112021-08-24024 August 2021 Temporary Instruction 2515/TI-193 Inspection Report 05000259/2021011, 05000260/2021011, and 05000296/2021011 IR 05000259/20210052021-08-23023 August 2021 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2, and 3- Report Nos. 05000259/2021005, 05000260/2021005 and 5000296/2021005 ML21217A2832021-08-0505 August 2021 Resident Integrated Inspection Report 2021-002 IR 05000259/20213012021-07-28028 July 2021 NRC Operator License Examination Report Nos. 05000259/2021301, 05000260/2021301, 05000296/2021301 IR 05000259/20210102021-07-26026 July 2021 Design Basis Assurance Inspection (Teams) Inspection Report 05000259/2021010 and 05000260/2021010 and 05000296/2021010 IR 05000259/20204012021-05-26026 May 2021 Security Baseline Inspection Report 05000259/2020401 and 05000260/2020401 and 05000296/2020401(U) IR 05000259/20210012021-04-28028 April 2021 Integrated Inspection Report 05000259/2021001, 05000260/2021001 and 05000296/2021001 IR 05000259/20200062021-03-0303 March 2021 Annual Assessment Letter for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2020006, 05000260/2020006 and 05000296/2020006 IR 05000259/20200042021-01-28028 January 2021 Integrated Inspection Report 05000259/2020004, 05000260/2020004, 05000296/2020004, 07200052/2020002 and Exercise of Enforcement Discretion IR 05000259/20204022021-01-0808 January 2021 Material Control and Accounting Program Inspection Report 05000259/2020402, 05000260/2020402 and 05000296/2020402 IR 05000259/20200032020-11-10010 November 2020 Integrated Inspection Report 05000259/2020003, 05000260/2020003 and 05000296/2020003 IR 05000254/20200032020-11-0909 November 2020 Integrated Inspection Report 05000254/2020003; 05000265/2020003 and 07200053/2020001 IR 05000259/20200112020-10-26026 October 2020 Biennial Problem Identification and Resolution Inspection Report 05000259/2020011, 05000260/2020011 and 05000296/2020011 IR 05000259/20204042020-09-29029 September 2020 NRC Security Inspection Report 05000259/2020404 and 05000260/2020404 and 05000296/2020404 and Apparent Violation (U) IR 05000259/20200052020-08-18018 August 2020 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2020005, 05000260/2020005, and 05000296/2020005 IR 05000259/20200022020-08-0606 August 2020 Brown Ferry Nuclear Plant Integrated Inspection Report 05000259/2020002, 05000260/2020002, 05000296/2020002, and 07200052/2020001 IR 05000259/20200102020-06-19019 June 2020 Triennial Inspection of Evaluation of Changes, Test and Experiments Baseline Inspection Report 0500259/2020010 and 05000260/2020010 and 05000296/2020010 IR 05000259/20200012020-05-0707 May 2020 Integrated Inspection Report 05000259/2020001, 05000260/2020001, and 05000296/2020001 2023-08-29 Category:Letter MONTHYEARML24032A4762024-02-0101 February 2024
[Table view]Final Report of a Part 21 Evaluation Associated with Starter Contactors for the BFN Unit 1 High Pressure Coolant Injection Suppression Pool Inboard Suction Valve ML24023A2802024-01-23023 January 2024 Final Report of a Deviation or Failure to Comply Associated with a Relay in the Reactor Core Isolation Cooling Condensate Pump CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions ML24016A3042024-01-16016 January 2024 Final Report of a Part 21 Evaluation Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump CNL-23-071, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-472024-01-11011 January 2024 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 ML24022A1732024-01-0303 January 2024 Receipt and Availability of the Subsequent License Renewal Application ML23319A1992024-01-0303 January 2024 Issuance of Amendment Nos. 333, 356, and 316 Regarding the Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves ML23355A2062023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23348A3942023-12-14014 December 2023 Interim Part 21 Report of a Potential Deviation or Failure to Comply Associated with Starter Contactors for the High Pressure Coolant Injection Suppression Pool Inboard Suction Valve IR 05000259/20230102023-12-11011 December 2023 Commercial Grade Dedication Inspection Report 05000259/2023010 and 05000260/2023010 and 05000296/2023010 ML23335A0722023-12-0101 December 2023 Interim Report of a Deviation or Failure to Comply Associated with a Relay in the Unit 2 Reactor Core Isolation Cooling Condensate Pump ML23334A2492023-11-30030 November 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-070, Submittal of Fifth 10-Year Interval Inservice Testing Program Plan2023-11-29029 November 2023 Submittal of Fifth 10-Year Interval Inservice Testing Program Plan ML23331A2532023-11-27027 November 2023 Summary Report for 10 CFR 50.9 Evaluations, Technical Specifications Bases Changes, Technical Requirement Manual Changes, and NRC Commitment Revisions CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23325A1102023-11-21021 November 2023 Anchor Darling Double Disc Gate Valve Commitment Revision ML23320A2542023-11-16016 November 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump IR 05000259/20230032023-11-13013 November 2023 Integrated Inspection Report 05000259/2023003, 05000260/2023003 and 05000296/2023003 IR 05000259/20230402023-11-0202 November 2023 Supplemental Inspection Supplemental Report 05000259 2023040 and Follow-Up Assessment Letter ML23292A2532023-10-18018 October 2023 BFN 2024-301, Corporate Notification Letter (210-day Ltr) ML23282A0022023-10-0606 October 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump ML23278A0122023-10-0505 October 2023 Updated Final Safety Analysis Report, Amendment 30 ML23271A1702023-09-28028 September 2023 Site Emergency Plan Implementing Procedure Revision ML23270A0702023-09-26026 September 2023 SLRA Pre-Application Meeting Summary 09-13-2023 ML23257A1232023-09-22022 September 2023 Administrative Changes to Technical Specification Pages Issued for License Amendment Nos. 332, 355, and 315 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23263B1042023-09-20020 September 2023 Special Report 260/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation ML23205A2132023-09-0808 September 2023 Issuance of Amendment Nos. 332, 355, and 315 Regarding the Revision of Technical Specifications to Adopt TSTF-566-A and TSTF-580-A, Rev. 1 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000259/20230052023-08-29029 August 2023 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2023005, 05000260/2023005 and 05000296/2023005 ML23233A0432023-08-18018 August 2023 Enforcement Action EA-22-122 Inspection Readiness Notification ML23219A1542023-08-17017 August 2023 Request to Use Later Edition of ASME Code for Operation and Maintenance and Alternative Requests BFN-IST-01 Through 05 for the Fifth 10-Year Interval Inservice Testing Program ML23228A1642023-08-16016 August 2023 Site Emergency Plan Implementing Procedure Revision ML23228A0202023-08-15015 August 2023 (BFN) Unit 1 - Special Report 259/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation IR 05000259/20230022023-08-10010 August 2023 Integrated Inspection Report 05000259/2023002, 05000260/2023002, 05000296/2023002 and 07200052/2023001 ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills ML23171A8862023-07-24024 July 2023 Issuance of Amend. Nos. 331, 354, and 314; 365 and 359 Regarding Adoption of TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML23201A2182023-07-20020 July 2023 Registration of Use of Cask to Store Spent Fuel (MPC-298 and -299) ML23159A2552023-07-20020 July 2023 Proposed Alternative to the Requirements of the ASME Code Regarding Volumetric Inspection of Standby Liquid Control Nozzles ML23199A3072023-07-18018 July 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions IR 05000259/20233012023-07-18018 July 2023 NRC Operator License Examination Report Nos. 05000259/2023301, 05000260/2023301, and 05000296/2023301 2024-02-01 |
Inspection Report - Browns Ferry - 2021011 | |
---|---|