Insp Rept 50-482/98-03 on 980202-06.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Mgt Program,Training & Qualifications,Qa Oversight, Facilities & Equipment & Annual Repts
ML20203K918
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 02/26/1998
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20203K907 List:
References
50-482-98-03, 50-482-98-3, NUDOCS 9803050277
Download: ML20203K918 (18)


See also: IR 05000482/1998003

Text

4

ENGLQEURE

U.S. NUCLEAR REGULATORY COMMISSION

REGION IV

Docket No.: 50-482

License No.: NPF-42

Report No.: 504 82/98-03

Licensee: Woli Oreek Nuclear Operating Corporation

Facility; Wo. Oteek Nucleer Station

Location: 1550 Oxen Lane, NE

S

Burlington, Kansas

Dates: February 2 to 6,1998

Inspector: J. Blair Nicholas, Ph.D., Senior Radiation Specialist

Plant Support Branch

Approved By: Blaine Murray, Chief, Plant Support Branch

Divisiu. of Reactor Saidy

Attachment: SupplementalInformation

.

49

2

G rn _

- . - _ . . --. .- - - _ _ _ _ _ - _ _ _ _ _ . _ _ - . _ . _ .

4

.

2

EXECUTIVE SUMMARY

Wolf Creek Naclear Station

NRC Inspection Report 50482/98 03

1his announced routine inspection reviewed the implementation of the liquid and (,aseous

radioactive waste management program. Training and qualifications, quakty assurance

oversight, facihties and equipment, .and annual reports were also reviewed.

P_laoLSuppott

. The liquid and gaseous radioactive waste effluent management program was properly

implemented. Between 1993 and 1996, the licensee was in the first quartile (best

performance) for airbome lodine /particulates and near the median for airborne tritium for ,

pressurized water reactors; however, the licensee was in the third and fourth quartiles for

airborne gas, liquid mixed isotopes, and liquid tritium. The licensee's 1997 effluent data

showed a significant reduction in the liquid and gaseous effluent curies released and a

continuing reduction in the volume of liquid effluents discliarged (Sections R1.1, R1.2,

and R3.1).

. The engineered safety feature air cleaning ventilation systems' surveillance testing

program was properly implemented (Section R1.3).

. Liquid and gaseous radioactive waste management systems were operated properly and

more efficiently (Section R2.1).

  • Allliquid and gaseous effluent radiation monitoring instrumentation were operable and

properly maintained, tested, and calibrated (Section R2.2).

. Training and qualification nrograms for chemistry technicians, radwaste operators, and

nuclear strdion operators were properly implemented. Chemistry personnel had an

excellen; understanding of the radioactive liquid and gaseous waste rnanagement

program (Sections R4 and RS).

  • Effectivo quality assurance and self assessment programs were maintained regarding

the radioactive waste effluent activities. Program improvement requests were closed in a

'

timely manner (Section R7.1).

. An effective performance evaluation program had been established for contractor

chemistry laboratories (Section R7.2).

. Dunng the exit meeting. Mr Clay Warren, Vice President, Operations / Chief Operating

Officer, stated that the meteorological validation program will be in effect, and the 1997

meteorological instrument tower data will be validated by March 15,1998.

. - -

.

.

s

3

!

flt9911.Qttalla

Summary of Plant Stalys ,

. The plant was operating at full power during the entire inspection.

IV. Plant Sunport -

R1 Radiological Protection and Chemistry Controla

R1.1 Radioloaical Waste Effluent Manaamment Proarams

s. Inacection ScopeJ84I50)

<

Implementation of the radioactive waste efflNnt management program, as described in

the Offsite Dose Calculation Manual, was reviewed. This review included; radioactive

effluent waste processing, radioactive effluent waste sampling and analyses, analytical

sensitivities and results, offsite dose fesults, and performance cf required surveillance

tests. The following documentation was reviewed:

. Selected batch radioactive liquid waste effluent release permits for the period

January through December 1997

7

. Selected batch radioacfsve gaseous waste effluent release permits for the period  ;

January through Dece:nber 1997

+ Selected gaseous waste effluent sample analyses for samples from the plant's

unit vent stack and the radweste building continuous releases for the period

January through Cecember 1997

The following activities were observed
  • Collection of the weekly air particulate filter and lodine charcoal cartridge samples

and monthly tritium and noble gas samples from the plant's unit vent stack and

the radweste building vent stack and the performance of the required surveillance

testing analyses to monitor the continuous effluent release points

.

b. Observations and Findegg

-The inspector observed the collection of air particulate filter, lodine charcoal cartridge,

noble gas, and tritium samples from the unit vent stack and the radwaste building vent

i

, stack for analyses and update of the continuous gaseous release permits for the unit

vent and the radweste bui! ding vent. The inspector noted that the chemistry techr. clan

referred i ; and followed the appropriate sampling procedures while performing th6

sample tollections. The inspector observed a chemistry technician perform the required .

radiochemistry analyses (principal gamma emitters. tritium, and gross alpha) on the

samples in the radiochemistry counting room. All aspects of the sample collections and

,c e w. _ _

_ _ _ _ _ . . . _ _ _ _ _ - _ . .,

- -

. - - - -

i

.

i.

4, l

t

t

) analyses were properly performed. The inspector observed that the chemistry technician

properly performed the weekly update of the continuous gaseous .elease permits for the

unit vent and radwaste building vent to monitor the gaseous effluent discharged.

The inspector verified that the processirg, sampling, analyses, and monitoring of the

batch liquid radioactive waste effluents, taatch gaseous radioactive waste effluents,

containment purges, and continuous releases of the liquid and gaseous radioactive

j waste effluents were conducted properly. Quantities of radionuclides released in the

i liquid and gaseous radioactive waste effluonts were within the limits specified in the

i Offsite Dose Calculation Manual. Offsite doses were calculated according to proper

j methodologies and were within regulatory limits. Required analyses of monthly and

quarterly composite samples of liquid an.1 gaseous radioactive waste effluents were

performed in accordance with Offsite Dose Calculation Manual requirements.

'

]

c. Conclusions

! The liquid and gaseous radioactive waste effluent management program was properly

implemented. Quantities of radionuclides released in the liquid and gaseous radioactive

waste effluents and offsite doses to the environment from the liquid and gaseous

radioactive waste effluents were within regulatory limits.

-

R1.2 Badi9 Active _Wasle EffluentRata

I

t

a. lDSDC.Gilon3QQDe (84750)

.

The inspector evaluated the radioactive waste effluent data and the licensee's

'

effectiveness in identifying, resolving, and preventing problems in the processing and

treatment of radwaste effluents.

l

j b. QhservaliODs and Findinas

'

The licensee's effluent data, when compared with the industry's effluent data for

pressurized water reactors, showed that between 1993 and 1996 the amount of gaseous

- curies released was in the third and fourth quartiles (worst) for airborne gas, in the

second and first quartiles (best) for airborne iodine /particulates, and in the second

j quartile for airborne intium. The 1997 estimated gaseous effluent value showed a

i significant decrease in the curies of airbome gas referssed. The amount was less than

j 4 percent of the curies released during 1996 which indicated 3 marked improvement and

approached the estimated 1997 median value for the industry. The licensee's estimated

!

curies of airborne /particulates released during 1997 maintained the licensee iri the

'

estimated firsi quarti'e. The liquid effluent data showed that between 1993 and 1996 the

licensee was in the third and fourth quartiles for liquid mixed isotopes and in the fourth

- quartile for liquid tritium. The estimated curies of liquid mixed isotopes released during

i 1996 showed a significant increase which was attributed to the inefficient processing of

the radioactive liquid waste by the primary waste processing skid prior to release. In

- 1997, the licensee installed a leased ultra filtration skid in the liquid waste processing

~

system upstream to the primary liquid waste processing skid, The installation and use of

4

_ _ . . _ . - _ _ _ _ _ _ _ - _ - _ . _ . _ _ - ~ - _ _ _ - _ . _ . . _ , _ _ _ . _ __-_,_ _

.

t

5-

the ultra filtration skid improved the performance of the liquid waste processing system

and significantly reduced the curies of liquid mixed isotopes released. The 1997 data

showed an order of magnitude decrease indicating a marked improvement. The  ;

estimated curies released approached the estimated median value for curies released by

pressurized water reactors during 1997. The total volu'ne of liquio affluents discharged

has shown a continual decrease since 1994.

The licensee informed the inspector that they were aware of their status in the industry

relative to their effluent discharges and stated that improvement in the reduction of

effluent radioactivity released from the plant had a high priority. The 1997 estimated

effluent data reflected the licensee's efforts to reduce the curies discharged to the

environment.

c. Conclusions

Between 1993 and 1996, the licensee was in the first quartile (best performance) for

airborne iodine /particulates and near the median for airborne tntium for pressurized water

reactors; however, the licensee was in the third and fourth quartiles for airborne gas,

liquid mixed isotopes, and liquid tritium. The licensee's 1997 effluent data showed a

significant reduction in the liquid and airborne effluent curies released and a continuing

reduction in the volume of liquid effluents discharged.

R1.3 Engineered Safetv Feature Air Cleanina Systems

a. [nspection Scooe (84750)

Selected survoillence tests and test results for the engineered safety feature air cleaning

ventilation systems' testing program were reviewed to deterraine compliance with

Technical Specification requirements,

b. Observations and Finding $

The inspector verified that the required surveillance tests of the control room emergency

ventilation system, emergency exhaust System auxiliary building, and emergency

exhaust sys'.em fuel building were performed. The inspector reviewed the last

performed surveillance tests' results for each of the safety related air cleaning ventilation

systems an:1 verified that the previous surveillanc~ tests were performed at the required

18 month frequency The licensee performed the in place filter testing. A contractor

laboratory performed the activated charcoallaboratory surveillance tests. The

surveillance test results were verified to be within Technical Specification limits.

The inspector performed a visualinspection of the control room emergency ventilation

system arid the emergency exhaust systems with the system engineer. The visual

-inspection of the engineered safety feature ventilation systems indicated no problems.

All filter housing doors were tightly closed, and all door gaskets were in place and not

teaking. The filter housings and ducts were well maintained. The areaa surrounding the

_ . _ . _ . _ - _ _ _ _ _ _ _ _ _ _

- ._. _ _ _ _ _._ _. _ _ . _ _ . _ _ _ . . . _ . _ _ _ - - _ __

,

  • ,

!

'

,

-

6-

!

ventilation units were clean, free of debris, and adequately lighted to proside for visual

inspection of housings and components.

P

c. Conclusions

'

The engineered safety feature air cleaning ventilatiori systems' surveillance testing

program was properly implemented, and the systems were properly maintained.

i Status of Chemistry and Radiological Waste Effluents Facilities and Equipment

R2

r

}

! R2.1 Radiochemistry Countina Room and Radioactive Waste Effluent Processina Systems i

'

s. lDanction Scone (34750)

The inspector observed / reviewed / inspected the following

. Analyses of radiological effluent samples *

.

.

. Radiochemistry counting room instrumentation calibration and quakty control

i doc; mentation

. Liquid und gaseous radioactive waste processing equipment including waste

monitor tanks, secondary liquid waste monitor tanks, liquid waste effluent

l processing equipment, waste gas decay tanks, and radwaste control room

^

b. ObaeDratiou.an1Eindban

F

The radiochemistry counting room maintained sufficient state-of the art analytical

instrumentation to perform the required radiochemistry analytical measurements of the

{ radioactive waste effluents. The analyticalinstrumentation was properly maintained and

L  ::ahbrated. Records of cahbrat!ons and daily operational quality control checks were

i properly maintained.

The liquid and gaseous radioactive waste processing and storage systems were installed

i as described in the Updated Safety Analysis Report and were operated in accordance

with station procedures.

.

No permanent major equipment or design modifications were made to the liquid or

< gaseous radioactive waste management systems during 1997._ A leased ultra filtration  ;

skid was temporarily installed in the liquid waste processing system upstream to the

primary liquid waste processing skid. The ultra filtration skid was used as a pretreatment

to the liquid radwaste water prior to being processed by the primary waste processing

system. The ultra filtration skid helped prevent the inefficient clogging of the primary .

waste processing skid and improved the efficiency of the primary waste processing skid

to remove radioactive nuclides from the liquid radioactive effluent prior to discharge.

,

s

,..,.n.,e , ,m, ,.,.,,,,--,-n ,- , , . , , _ ,.-n,.. .-,,.,na.,,-,.,..n.,e-,., - _ - --,--.,, , _ ,,,w..,,, e . , , . . , ,, - ,

_ _ _ _ _ _ _ _ _ - _ _

_

.

.

7-

c. Conclusions

The radiochemistry counting room was equipped with state-of the ari analytical

instrumentation. The analyticalinstrumentation was properly maintained, tested, and

calibrated. Liquid and gaseous radioactive waste management systems were properly

operated and more efficiently.

<

R2.2 Liould and Gaseous Effluent Radiation Monitqts

a. Inspection Scoon (84750)

The liquid and gaseous effluent radiation monitors were inspected for operation,

calibration, and reliability. The liquid and gaseous rodioactive waste effluent radiation

monitor source check, channel check, channel functional test, and channel calibration

records were reviewed to determine compliance with the Offsite Dose Calculation

Manual requirements for the time period January through December 1997.

b. Observations and Findinas

All records and surveillance tests reviewed indicated that the liquid and gaseous

radioactive waste effluent monitoring instrumentation was properly maintained, tested,

and calibrated in compliance with the surveillance requirements specified in the Offsite

Dose Calculation Manual.

'

During 1997, effluent radiation monitoring instrumentation was not out of service in

excess of Offsite Dose Calculation Manual requirements.

1

c. Conclusion

All liquid and gaseous effluent radiation monitoring instrumentation was operable and

properly maintained, tested, and calibrated.

R1 Radioactive Waste Cfluent and Chemistry Procedures and Documentation

R3.1 Radioactlye Waste Effluent Procedures. Offsite Dose Calculation Manual. and Annual

Radioactive EffluentEgleaggEsports

a. insoection Scoos (84750)

Revisions to the procedures for sempling, analysis, and release of radioactive liquid and

gaseous waste effluents were reviewed. Revision 1 to the Offsite Dose Calculation

Manual was reviewed. The 1997 Annual Radioactive Effluent Release Report was

reviewed.

-(

!

_ _ . _ _ - - - - _

.

.

8

b. Observations and Findings

The radioactive wasta eifluent program's implementing procedures described the

responsibilities for conection and analyses of liquid and gaseous radioactive waste

effluent samp!es. Procedures for batch and continuous release of liquid and gaseous

radioactive waste effluents provided proper instruction for sampling, analyses, release

permit generation, release limits, monitoring, and approvals. The procedures were

written with sufficient detail to effectively conduct the required radioactive waste effluent

program activities.

The annual radioactive effluent release report for 1997 was written in the format

described in NRC Regulatory Guide 1.21, Revision 1. June 1974, and contained the

required information. Summaries of the quantities of radioactive liquid and gaseous

effluents released to the environment, and their essociated doses to members of the

public were properly documented. A summary of the radioactive I quid and gaseous

effluent releases and associated doses is presented in Attachment 3 to this report.

No unplanned relenses of radioactive liquid or gaseous waste were reported during

1997.

c. Conclualona

implementing proaedures for the liquid and gaseous radioactive waste effluent

managemeat program provided proper guidance. Changes to the Offsite Dose

Calculation Manual were properly documented. The annual radioactive effluent release

report for 1997 was submitted in a timely manner and contained the required inforraation.

R4 Staff Knowledge and Performance

a. Inspection Scoce (EEjiQ)

Chemistry personnel were observed and interviewed to determine their knowledge of

regulatory and Offsite Dose Calculation Manual requirements for the implementation of

the liquid and gaseous radioactive waste effluent management program.

b. Observations and Findings

The inspector observed chemistry technicians perform some of the duties and

responsibilities required for the implementation of the radioactive waste effluents

program and determined that they were familiar with the requirements. Chemistry

personnel including the radwaste supervisor and technicians were knowledgeable of :he

programmatic procedures and regulatory requirements and maintained a high level of

performance. Batch radioactive liquid waste effluent releases and batch and continuous

radioactive gaseous waste effluent releases were prcperly performed during 1997.

...__ _ _ .- _ _ _ _ . _ .

.

.

9

c. Conclugn

Chemistry personnel had an excellent understanding of the liquid and gaseous

radioactive waste management procedures, Offsite Dose Calculation Manual, and

regulatory requirements.

R6 Staff Training and Qualification

a. Insoection Scoon (84750)

Training and qualification programs for chemistry technicians, radweste operators,

nuclear station operators involved in conducting the radioactive waste effluent

management program were reviewed. Training and qualifications of the chemistry

technicians, radwaste operators, and nuclear station operators were verfied.

b. Observations and Findinas

The inspector determined that appropriate training and qualification programs were

implemented for the chemistry technicians and radwaste operators which included

required formal classroom training and on the job training.

The inspector venfied that 14 of the 17 chemistry technicians had completed the required

training to be shift qualified and, therefore, were qualified to independently perform all

routine radioactive waste effluent management program activities. Three recently hired

chemistry technicians were in the process of completing their required training and

qualifications to be shift qualified.

The inspector verified that the five radwaste operators and at least one nuclear station

operator on each of the six operating shift crews were trained and qualified to conduct

radioactive waste liquid and gaseous effluent batch releases and operate the radiocctive

waste processing equipment.

c. Conclusions

Training and qualification programs for chemistry technicians, radwaste operators, and

nuclear station operators were _ implemented properly. The experience, training, and

working knowledge of the chemistry and radwaste operations personnel met the training

and qualification requirements.

R6 Chemistry Organization and Administration

a, Insoection Scone (84750)

The organization, staffing, and assignment of the radioactive waste effluent management

. program responsibilities were reviewed. Administrative and chemistry departmental

procedures were reviewed for the assignment of responsibilities for the management and

implementation of the radioactive waste effluent management program.

__. -

i

  • l

l

.

10-

b. Observations and Findings

The inspector venfied that the chemistry and radwaste operations organizations and staff

were responsible for the implemantation of the radioactive s.aste effluent management

program.

The inspector determined that the chemistry and radwaste operations organizations

were adequately staffed. The chemistry and health physics departments were recently

combined and reorgardzed under one manager. The new chemistry / health physics

department manager was fully qualified and had been the previous chemistry

superintendent. A new, fully qualified chemistry radwaste supervisor was recently

assigned under the new organization. Three new chemistry techniciens were hired

during the past year. The radwaste operations staff of five operators was supplemented

with qualified nuclear station operators and had experienced little change during the past

year.

c. CDDChliQD

The chemistry and radwaste operations organizations were properly staffed.

R7 Quality Assurance in Chemistry and Radiological Wasto Effluents Activities

R7.1 Radioactive Waste Effluent Quality Assurance Program

a. inipection Scoce (84750)

The quality assurance program of the radioactive waste effluent management program

activities was reviewed for scope, thoroughness of program evaluation, and timely

followup of identified deficiencies. The review included:

. Quality assurance audit performed since January 1997

. Qualifications of auditors and technical specialists

. Chemistry department self easements performed since January 1997

b. QhARIYations and FiridiDQS

The review of the quality assurance biennial audit schedule revised on January 29,1997,

indicated that the environmental management audit, which included the radiological

environmental monitoring program, Offsite Dose Calculations Manual and implementing

procedures, and effluent and environmental monitoring program, was scheduled on a

12 month frequency in compliance with Technical Specifications 6.5.2.8.g and J. The

audit of the Offsite Dose Calculation Manual and implementing procedures was

scheduled on a 24 month frequency in compliance with Technical Specification 6.5.2.8.h.

The quality assurance audit of the radioactive waste effluent management program

activities and the Offsite Dose Calculation Manual was performed during 1997. Qualified

auditors and technical specialists from nu lear power facilities, who were knowledgeable

s

-- - _ - -_ - - _ - _ _ _ _ - -

.

.

11-

of radioactive waste effluent programs and Offsite Dose Calculation Manual

requirements, performed this audit. The aud:t provided good oversight ar'd evaluation of

the licensee's performance in implementing the radiocctive waste effluent management

program.

The self assessments conducted by the chemistry department of the activities required

by the Offsite Doso Calculation Manual and the chemistry training program provided

detailed observations and evaluations in those program areas. The self assessments

were an enhancement to the required quality assurance audit program.

No negative trends were identified during the review of program improvement request

reports written since January 1907. It was noted that recommendations to prevent

'

recurrence of issues identified in the program improvement requests were appropriate,

and corrective actions were closed in a timely manner.

c. Conclusions

An effective quality assurance program was maintained. Management oversight of the

radioactive waste effluent management program was good. The quality assurance audit

of the raceological waste effluent management program activities provided good program

evaluation. Good chemistry department self assessments of the chemistry department's

implementation of the radioactive waste effluent management program were performed

and were an enhancement to the quality assurance audit program. Program

improvement requests related to liquid and gaseous radioactive waste management

program activities were closed in a timely manner.

R7.2 Quality Assurance Proaram for Contractors

a. Insoection Scooe (8475D)

The quality assurance audit program regarding contractors performing surveillance

activities involving the radioactive waste effluent program and safety related air cleaning

ventilation systems was reviewed.

b. Observations and Findinas

The licensee used a contractor laboratory to perform required radiochemistry analyses of

radioactive waste effluent comoosite samples. The licensee usec' another contractor to

perform laboratory charcoal adsorber analyses on the station's engineered-safety feature

air cleaning ventilation systems. The licensee obtained Nuclear Procurement issues

Committee audits regarding the contractors responsible for performing radiochemistry

,

and charcoal adsorber analyses. The licensee used these audits to evaluate the

performance of the contractors in performing the surveillance testing requirements and to

retain their current status on the licensee's routine tuppliers list. The inspector reviewed

the audits performed on the contractors and determined that the audits were satisfactory

to evaluate the contractor's abilities to perform the Technical Specification required

testing and surveillance activities.

. ..

_ _

4

.

12-

c. Conclusion

An effective performance evaluation program had been established for the contractor

chemistry laboratories.

R8 Miscellaneous Radiological Protection and Chemistry issues

R8.1 (Ocen) intoection Followuo item 9617-01: Evaluation and Validation of Meteoroloalcal

Monitorina Data

This item was discussed in NRC Inspection Report 50 482/96-17 and involved the lack ;!

proper validation of meteorological data. Tha meteorological tower design engineer v'as

not properly trained to evaluate and validate the meteorological data. No ;astructions o -

validation enteria had been developed to provide the frequency and methods to

accurately validate the meteorological data. The licensee had previously relied on the

plant computer's radiological release information system to monitor and validate the

meteorological data. However, in 1990, the radiological release information system was

replaced with the nuclear plant information system. The computer program used for

meteorological data verification and validation that was formerly in the radiological

release information system was not subsequentiy included in the nuclear plant

information system.

The licensee reviewed the Updated Safety Analysis Report Table 2.3-29b, " Data

Recovery Statistics," for March 1980 to March 1981, and the samlannual and Annual

Radioactive Effluent Release Reports from July 1985 to December 1990 to assure that

the meteorologic'l data recovery percentage was greater than 90 percent. The 1995

and 1996 equipment out-of service logs, Technical Specification surveil lance tests, and

computer down time were usod to generate accurate meteorological data in the 1996

Annual Radioactive Effluent Release Report. The licensee was working to generate

validation enteria which can be programed into the nuclear plant information system

computer to verify and validate meteorological tower instrument data.

The inspector determined that the licensee was in the process of testing the proposed

meteorological data screening criteria on the 1997 meteorological tower instrumentation

data and developing a computer program to perform the meteorclogical data validation.

At the exit raeeting on February 6,1998, Mr. Clay Warren, Vice President,

Operations / Chief Operating Officer, stated that the testing of the meteorological data

screening criteria and development of a computer program to validate the meteorological

tower instrumentation data would be completed by March 15,1998. The licensee also

stated that: (1) the meteorological tower instrumentation data for 1997 will be validated

by March 15,1998, using the tested criteria and computer program, (2) the

meteorological validation program will be procedura!y control;ed, (3) the meteorological

tower instrumentation data for the years 1990 through 1996 will be validated using the

meteorological validation program, and (4) the results will be reported in the 1997 Annual

Effluent Release Report as stated in the 1996 Annual Effluent Release Report. This

inspection followup item will remain open pending the implementation of the

. _ _ _ - ____ _ _.__._. .__ _ _. _ ._. _ ______. _ ..._ _ _ _ _ ._. -

,

. .

l

I

e

13

,

meteorological validation program and the verification and validation of the

meteot ological tower instrument data from 1990 through 1997, i

i

V. Management Meetings

f

X1 Exit Meeting Summary

'

The inspectoi presented the inspection results to members of licensee management at

an exit meeting on February 6,1998. The licensee acknowledged the findings

presented. No proprietary information was identified. During the exit meeting, Mr Clay

Warren, Vice President, Operations / Chief Operating Officer, stated that the

meteorological validation program will be in effect, and the 1997 meteorological

Instrument tower data will be validated by March 15,1998.

d

,

d

.

e--,e, -n ,-~- , , , e-, se-,e =~w-----m,- k~.-s.-+ ,a

es m - - - e,---r c-m-,. -- -- ,e,e -

e ---

_. ... - - - _ . - _ - _ _ - . - - - _ . . . _ . - _ - . - - - - . . - -_-._- . -

'

t

.

AIIACHMENI._1

f

SUPPLEMENTAL INFORMATION

.i

PARTIAL LIST OF PERSO% CONTACTED

Licensee

C. Warren, Vice President, Operations / Chief Operating Officer

M. Angus, Manager, Licensing and Corrective Action

4 M. Blow, Superintendent, Chemistry

-

S. Burkdoll, Supervising Instructor, Health Physics / Chemistry

R Butz, System Engineer, Radiation Monitors

V. Canales, Supervisor, Suppliers / Materials Quality / Purchasing and Material Services

T. Damashek, Supervisor, Licensing

4 R. Denton, Quahty Specialist, Quakty Evaluations

S. Devena System Engineer

, S. Koenig, Supervisor, Quakty Evaluations

R. Hubbard, Superintendent, Operations

B. McKinney, Plant Manager

i T. Morrill, Assistant to Vice President of Engineering

M. McMullen, Senior Engineer, Design Engineering

K. Mitchell, Chemistry Technician

, R. Muench, Vice President, Engineering

W. Norton, Manager, Performance improvement and Assessment

4

C. Palmer, Supervisor, Chemistry

R. Parker, Supervisor, Chemi6try

G. Pendergrass, Supervising Engineer, Performance

J. Pippin, Manager, Training

C. Reekle, Engineering Specialist, Regulatory Compliance

L. Rockers, Chemistry Technician

S. Steen, Supervisor, Chemistry

H. Stubby, Supervisor, Technical Training

T. Wilson, Supervisor, Operations Treatment Systems

a

NRG

F. Ringwald, Senior Resident inspector

J. Pellet, Chief, Operations Branch

G. Guerra, Radiation Specialist

T. McKernen, Operations Examiner

D. Graves, Senior Project Engineer

LIST OF INSPECTION PROCEDURES USED

~

IP 84750 Radioactive Waste Treatment and Effluent and Env!ronmental Monitoring

. . - . . .- .- -. - - -. .- . - . - -. -. . - _ . . . . . . _

_ __

.

.

2-

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSEU

DiKums

50-482/9617 01 IFl Evaluation and Validation of Meteorological Monitoring Data

LIST OF DOCUMENTS REVIEWED

ORGANIZATION CHARTS

Chemistry / Health Physics Department January 1999

Operating Crews January 1998

TRAINING DOCUMENTATION

Chemistry department training records

Senior nuclear station operator training records

Raowaste operator training records

QUALITY ASSURANCE DOCUMENTS

Quakty Evaluations Biennial Audit Schedule, Revision 13, dated Janaary 29,1997

Quaktv Assurance Audit

Quality Evaluations Audit Report K-477, " Environmental Management (REMP/ODCM/EEMP),"

conducted April 10 through June 30,1997

Vendor Audits

NUPlc Joint Quakty Assurance Audit of NCS Corporation, conducted November 18 21,1996

NUPIC Joint Quakty Assurance Audit of Teledyne Brown Engineering Environmental Services,

conducted April 21-24,1997

NUPIC Joint Quality Assuranc6 Aedit of Flanders /CSC, conducted January 1417,1997

Self angssments

Self A*sessmtnt Report SEL 97 008," Assessment of Chemistry Actions Required by the

ODCM, Technical Specifications, USAR, and NPDES Permit " dhted March 7,1997

Se4 Assessment Report SEL 97-019,"Self Assessn'ent of the Chemistry Training Program,"

dated June 13,1997

.-. . _ ._- . - _ - _ . _ _ .

.

.

3-

PROCEDURES

AdministratiYeflotedunts

GEN 00 020 " Liquid Waste Processing," Revision 12, January 14,1997

AP 02 002 " Chemistry Surveillance Program," Revision 5, December 30,1997

AP 02-009 * Chemistry Group Organization," Revision 0, June 19,1997

AP 02E-001 " Chemistry Calibration Program," Revision 5, May 6,1997

AP 078-001 " Radioactive Releases," Revision 3, February 17,1997

AP 161001 'l&C Group Calibration of Process Instrumentation and Special

Maintenance,' Revision 0, September 15,1995

AP 17C 009 " Nuclear Station Operator Qualifications and Responsibilities," Revision 3,

May 2,1997

AP 17C-015 ' Operations Watchstation Qualifications," Revision 4, March 26,1996

AP 17C 017 " Superintendent Chemistry Duties and Responsibilities," Revision 1,

May 10,1596

AP 20A-003 " Audit / Surveillance Scheduling," Revision 2. February 12,1997

AP 20A-004 " Audit Procedure," Revision 3, March 13,1997

AP 300 002 " Nuclear Station Operator (NSO) Requalification Training," Revision 3,

August 15,1997

AP 30D-006 " Chemistry Technician Training Program," R:s.sion 3, November 18,1997

Administrative instructions

Al 078 019 " Effluent Management System (EMS) Instructions for Liquid Release Permits,"

Revision 5, May 3,1996

Al 078-020 " Instructions for Composite Preparation," Revision 6, August 16,1997

At 07B 022 " Effluent Management System (EMS) Instructions for Gas Decay Tank

Permits," Revision 3, February 3,1997

Al 078-024 " Effluent Management System (EMS) Instructions for Containment Purge

Permits," Revision 5, November 9,1997

At 078 026 " Effluent Management System (EMS) Instructions for Unit and Radwaste Vent

Permits," Revision 3, August 22,1997

. - _ . . - . .. - - - . - _ _ __ _ . _- - - -___ - - . . _ - _ _ _

.

.

4 j

Al 078-027 " Instructions for Updating the Effluent Management System (EMS) with

Isotopic Composite Results " Revision 1, May 14,1997

Al 070 028 Instructions for Calculation of the Low Setpoint for Gaseous Effluent

4

Monitors," Revisien 0, February 22,1996

Al 070 032 " Chemistry Radioactive Release Reports," Revision 1, September 12,1996

Chemistty_P.LotedVIRS

CHA RC 001 " Gross Alpha Measurement," Revision 0, May 31,1996 l

' Tritium Analysis," Revision 4, October 23,1997 l

CHA RC-003

CHA RC 004 " Gamma Isotopic Analysis," Revision 2, April 14,1997 l

CHA RC 005 ' Determination of Gas Activity,' Revision 3, February 25,1997

CHS AX G01 " Sampling of the Unit and Radwaste Vents for Radioactive Gas and Tritium,"

Revision 2, April 18,1997

CHS AX G02 " Exchange of Radioactive Gaseous Monitor Particulate and lodine Filters,"

Revision 8, October 31,1997

CHS AX G03 * Sampling of Building Atmosphere for Radioactive Gas and Tritium,"

Revision 2, June 19,1097

CHS RW G01 " Sampling of the Waste Gas Decay Tanks " Revision 0, October 3,1994

CHS RW LO1 *Radwaste Building Local Liquid Sampling Instructions,' Revision 4,

December 12,1997

CHS SJ 144 *Radwaste Building Sample Station SJ 144 Sampling Instruction," Revision

5, October 31,1997

CHS TB-LO1 " Turbine Building Local Liquid Sampling,' Revision 9 December 9,1997

Surveillanceletts

STN SP-018 " Analog Channel Operational Test Liquid Radwaste Discharge Radiation

Monitor HBRE18," Revision 8, July 10,1996

STN SP-045 " Analog Channel Operational Test Secondary Liquid Waste System

Radiation Monitor HFRE45," Revision 5 February 22,1996

STN SP 052 " Analog Channel Operational Test Steam Generator Blowdown Discharge

Radiation Monitor BMRE52," Revision 5. February 20,1996

STN SP 059 " Analog Channel Operational Test Turbine Building Drain Radiation

Monitor LERE59," Revision 6, March 23,1996

-- --- - . _ _ . - -

- . _ _ _ __ _ _ _ _ _ - . _ - _ _ - - _ _ . . - - - _

,

,

5-

STN SP 095 " Analog Channel Calibration Test High and Low TDS Discharge to Waste

Water Treatment Radiation Monitor HFRE95," Revision 7, February 23,1996

STN SP 110A * Channel Calibration Radwaste Building Vent Radiation Monitor GHRE10A,"

Revision 2, February 11,1994

STN SP 1100 * Channel Calibration Radwaste Building Vent Radiation Monitor

GHRE100," Revision 3, August 24,1995

STN SP-118 " Channel Calibration Liquid Radwaste Discharge Radiation Monitor

HBRE18," Revision 2, October 31,1995

STN SP 122 * Channel Calibration Containment Purge System Radiation Monitor

GTRE22," Revision 5, November 21,1994

STN SP 133 " Channel Calibtation Containment Purge System Radiation Monitor

GTRE33," Revision 4, December 9,1994

STN SP-145 * Channel Calibration Secondary Liquid Waste Radiation Monitor HFRE45,"

Revision 3, December 15,1995

STN SP 152 " Channel Calibration Steam Generator Blewdown Discharge Radiation

Monitor BMRES2," Revision 1, November 10,1995

STN SP 159 "Chennel Calibration Turbine Buildir g Effluent Radiation Monitor LERE59,"

Revision 2, December 8,1995

STN SP 195 " Channel Calibration Hi/Lo TDS Dist,harge to Waste Water Treatment

Radiation Monitor HFRE95," Revisia n 2, November 30,1995

STS IC-474B " Channel Calibration Unit Ventilation Sydem Radiation Monitor GTRE21B,"

Revision 7, August 24,1995

STN CH 011 " Calibration of the Particulate Detector for Gaseous Monitors," Revision 1,

July 18,1991

STN CH-012 " Calibration of the lodine Detector for Gaseous Monitors," Revision 1,

July 23,1991

STN CH-013 " Calibration of the Gaseous Detector for Gaseous Radiation Monitors,"

Revision 2, February 19,1992

MLSCELLANEOUS DOCUMENTS

Selected Liquid and Gaseous Radioactive Waste Batch Release Permits

Engineered safety feature ad cleaning systems surveillance test records

Annual Operating Radioactive Effluent Report - 1996

AP 078-003 "Offsite Dose Calculaiion Manual,' Revision 1, tuary 19,1998

. - - -