ML20150B802

From kanterella
Revision as of 02:07, 15 June 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
IE Inspec Rept 70-1100/78-06 on 780814,30,31 During Which No Items of Noncompliance Were Noted.Areas Inspec:Nuc Matl Control & Accounting,Incl Reconcilliation of NRC Rept Inventory Difference History Before May 1974
ML20150B802
Person / Time
Site: 07001100
Issue date: 09/29/1978
From: Della Ratta A, Joyner J, Woltner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20150B789 List:
References
70-1100-78-06, 70-1100-78-6, NUDOCS 7811080303
Download: ML20150B802 (3)


Text

. _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

U.S. NUCLEAR REGULATORY COMMISSION O OFFICE OF INSPECTION AND ENFORCEMENT Region I Report No. 70-1100/78-06 Docket No. 70-1100 Safeguards Group 3 License No. SNM-1067 Priority 1 Category UR Licensee: Combustion Engineerino Incorporated P. O. box 500 Windsor, Connecticut 06095 Facility Name: Manufacturing -Nuclear Power Systems Inspection at: Windsor, Connecticut Inspection conducted: August 14, 30 - 31, 1978 Inspectors: O_ /k #~~ E - 2 ? - 78 A. Della Ratta, Auditor date signed

$? Q- 28-78 E. Woltner, Auditor date signed date signed Approved by:

> . JuL/ cA.z g_7A

. H. JgynA'r, / thief, Nuclear Material date signed ontroPSupport Section, Safeguards Branch Inspection Summary:

inspection on August 14, 30-31, 1978 (Report No. 70-1100/78-06)

Areas Inspected: Non-routine announced inspection by regional based inspectors of nuclear material control and accounting, including reconciliation of NRC report, " Inventory Difference History Before May 1974" to licensee's inventory difference records. The inspection involved eight inspector-hours onsite by two NRC regional based inspectors on August 14 and twelve inspector-hours onsite by one NRC regional based inspector on August 30-31.

Results: No items of noncompliance were identified.

$7((hhhM S Region I Form 12 (Rev. April 77)

I i

DETAILS

1. Persons Contacted
  • T. B. Bowie, Nuclear Materials Manager ,
  • denotes attendance at the exit interview.
2. Reconcil f ation of Prior Years Inventory Differences The inspectors reviewed the licensee's nuclear material control and accounting records and reconciled the NRC report, " Inventory Differ-ence History Before May 1974", to the inventory differences shown on the licensee's records.

The inspectors determined that the differences were primarily the result of the NRC report showing the licensee's low enriched uranium book inventory amount instead of the physical inventory amount on October 31, 1969. The attached Schedule I accurately reflects the low enriched uranium inventory. difference data for the material balance periods of October 1,1968 to July 29, 1976.

3. Exit Interview The inspector met with the licensee representative (denoted in Paragraph 1) at the conclusion of the inspection on August 31, 1978. The inspector summarized the scope and findings of the inspection.

\

  • n

' ~

SCHEDULE I LICENSEE: Combustion Engineering, Inc.

LOCATION: Windsor, CT LICENSE NO. SNM-1067  ; DOCKET NO. 70-1100 1

[

LOW ENRICHED URANIUM MATERIAL BALANCE INVENTORY DIFFERENCE DATA PERIOD URANIUM U-235 Units in Kilograms 1 10-01-68/10-31-69 64.941 1.806 11-01-69/09-30-70 (30.884) (l.059) 10-01-70/12-31-71 22.574 .873 01-01-72/12-31-73 341.270 5.140 01-01-74/03-31-74 136.294 1.085 03-31-74/09-21-74 (177.342) (2.374) 09-21-74/02-25-75 25.700 1.232 02-25-75/07-10-75 52.642 0.383 07-10-75/01-19-76 87.001 4.071 01-19-76/07-29-76 (17.165) 0.816 Cumulative Total 505.031' 11.973

_-_m___.__-.-_ -m- _