ML20055C720

From kanterella
Jump to navigation Jump to search
Partially Withheld Insp Rept 70-1100/90-201 on 900507-10 (Ref 10CFR2.790).Violations Noted.Major Areas Inspected: Mgt & Assessment,Internal Controls,Measurement Sys/Controls & Repts
ML20055C720
Person / Time
Site: 07001100
Issue date: 06/14/1990
From: Kasum D, Mike Williams
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To:
Shared Package
ML19298E348 List:
References
70-1100-90-201, NUDOCS 9006210225
Download: ML20055C720 (1)


Text

_ _ _ - _ _ _ -

l e

9 The information on this page is considered to be appropriate for public disclosure pursuant to 10 CFR 2.790(d).

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS i

Report No.:

70-1100/90-201 License No.:

SNM-1067 l

t Safeguards Group:

III Licensee:

Combustion Engineering, Inc.

1000 Prospect Hill Road j

Windsor, Connecticut 06095-0500' Facility Name:

CE-Windsor i

Inspection Conducted:

y7 1996' Inspector:

4-6-90 M. Williams, MC&A Physical Ecientist Date Signed Physical ~ Security and MC&A Licensing and Inspectio Section, SGDB; SGTR, NMSS-Approved by:

7 7 IY 6[/ hrD D. J. Kasun', Section Leader Date Signed Physical' Security and MC&A Licensing d

and Inspection.Section, SGOB, SGTR, HMSS j

SUMMARY

Scope:-

The areas examined during this routine inspection included I

MC&A system management and assessment, internal controls, measurement systems, measurement controls,'and records and reports..

Results: Within the areas inspected..the following viola, tion was-

]

identified:

Failure to cumplete-the biennialiindependent assessment of the effectiveness of-the material control and i

accounting system in the specified time. -

?M' B'"n ~...f.

~

ENCLOSURE 1

,1. -

j oc.

e