Matl Control & Accounting Insp Rept 70-1100/85-04 on 850618-21.No Noncompliance Noted.Major Areas Inspected: Measurement Sys,Records & Repts
ML20134B105
Person / Time
Site: 07001100
Issue date: 07/19/1985
From: Della Ratta A, Keimig R, Zibulsky H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20134B103 List:
References
70-1100-85-04, 70-1100-85-4, NUDOCS 8508150517
Download: ML20134B105 (3)


Text

.

1 U.S. NUCLEAR REGULATORY COMMISSION I

REGION I Report No. 70-1100/85-04 Docket No. 70-1100 L' cense No. SNM-1067 Safeguards Group: RI Licensee: Combustion Engineering, Inc.

P.O. Box 500 Windsor, Connecticut 06095 Facility Name: Combustion En2 i neering - Nuclear Fuel Manufacturing Inspection At: Windsor, Connecticut Inspection Conducted: June 18-21 t 1985 l

Date of Last Material Control and Accounting Inspection: Mar _ch_4-8,_1985 Type of Inspection: Unannounced Material Control and Accounting

.ino, ."

Inspectors:

4[. De7Ia tf$ /]U[

Ratta, i$g,(( _ Auditor afeguards

_ j' date

?-&

t M '__ .__ _M'date -

l II. Zib7 sty, j e ards Ilhemist l

Approved by: _ ._

]- u_

r

_. My f/_

~Uife f ,y' ,, ogua rd s fes_t i on , ate

/ . R.Nuclear Keim ateria .

- safety and Safeguards Bra i Inspection Summary: Routine Unannounced Ins ection on June 18-21,~1985 Onsje_ction_ReportNo'.~76;1100785;o4)~~'^p~

'~

Areas Inspected: Measuremont systems, and Records and Reports. The inspection involved 65 hours7.523148e-4 days <br />0.0181 hours <br />1.074735e-4 weeks <br />2.47325e-5 months <br /> by two NRC inspectors.

Results: The licensee was in compliance with NRC requirements in the areas Inspe_cted.

l l

0,jgoGy)yj ! ,,$0 C

l DETAILS l

1. Key Persons Contacted
  • T. B. Bowie, Manager, Nuclear Material and Security
  • R. E. Sheeran, Manager, Nuclear Licensing, Safety, Accountability, i Criticality, and Security G. Kersteen, Manager of Production
  • H. T. Cohen, Supervisor, Nuclear Material Accountability
  • present at exit interview The inspectors also interviewed other Itcensee employees involved with nuclear material control and production.
2. 30703 - Exit Interview The inspectors met with licensee representatives (listed in paragraph 1) at the conclusion of the inspection on June 21, 1985, and summarized the scope and findings of the inspection. At no time during this inspection was written material provided to the licensee by the inspectors, i
3. 92713 - Independent Inspection Effort Independent inspection effort was conducted by a tour of the plant, during which the inspectors observed plant operations and personnel handling special nuclear material. No problems were noted.
4. 85207 - Measurement Systems The inspector reviewed the Windsor SNM Measurement Control-Audit / Review, dated December 20, 1984. The audf U losed out a (Iiiding of~the previous audit, dated January 10, 1984. Measurement standards are currently listed in a controlled document as indicated in the Fundamental Nuclear Material Control Plan (FNMCP). The December review identified seven weaknesses that are being pursued by the licensee. This will be reviewed by the NRC at a subsequent inspection. (Inspector Follow-Up Item 85-04-01).

The inspector observed the licensee sampling green scrap, grinder sludge, screened hard scrap, mixed UO, scrap, sintered pellets, ground pellets, and virgin VO, powder to be sent to their laboratory and their contrac-tors' laboratories for the U and U-235 analyses. Duplicato saeples were taken for the NRC, to be sont to the New Brunswir.k Laboratory, for inde- '

pondent analyses. On completion of the analyses by all the laboratories, a statistical evaluation will be made by the NRC inspector. This evalu- '

ation will determine the adequacy of the Itcensee's laboratory and their i contractors' laboratories. (Inspector Follow-up Item 85-04-02). '

3 ,

5. 85215 - Records and Reports The inspector audited the nuclear material control records and reports for the low enriched uranium physical inventory material balance period September 7, 1984, through March 19, 1985. All line items on the SNM

, inventory report were traced by the inspector to the source documents and cross-checked to the records maintained by the licensee and to the DOE-NMMSS computer tabulations. The licensee's ledgers were add-checked for accuracy for the same period. Nuclear Material Transaction Reports (00E/NRC Form-741) that documented receipts, shipments, measured discards were reviewed for timeliness, format, and accuracy of content. No dis-crepancies were identified.

Material Status Reports (00E/NRC Form-742) submitted for the material balance period ending March 19, 1985 were also reviewed for the same '

l attributes. No discrepancies were identified.

l The inspector determined that the licensee's control and subsidiary records for the period under review were adjusted to the results of the physical inventory, as required by NRC regulation.