ML20058M367

From kanterella
Revision as of 04:34, 1 April 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Application for Amend to License DPR-59,requesting Rev to TS Re Esws Pump Surveillance Requirement 4.11.D.1
ML20058M367
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 09/28/1993
From: Ralph Beedle
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML20058M359 List:
References
NUDOCS 9310050137
Download: ML20058M367 (1)


Text

--

i

., '.- i J

... ' 3 BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION 1 4

in the matter of ) .

NEW YORK POWER AUTHORITY ) Docket No. 50-333 .;

James A. FitzPatrick Nuclear Power Plant ): >

APPLICATION FOR AMENDMENT TO OPERATING LICENSE 'f f

The New York ,wer Authority requests an amendment to the Technical Specifications contained in Appendix A to Facility Operating License DPR-59 for the James A. FitzPatrick Nuclear Power Plant. This application is filed in - l~

accordance with Section 10 CFR 50.90 of the Nuclear Regulatory Commission's regulations.

This application for an Amendment to the James A. FitzPatrick Technical Specifications proposes to revise Emergency Service Water System (ESWS) pump Surveillance Requirement 4.11.D.1. The proposed change addresses  ;

the limitations of the " shut off head" ESW pump surveillance test currently '!

required by the FitzPatrick Technical Specifications. The proposed  ;

surveillance test would add a flow requirement and test the pump in '

accordance with the FitzPatrick Inservice Testing Program which is designed . ,

to address appropriate portions of Section XI of the American Society of i Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code. To i add operational flexibility, the Authority has also revised pump flow rate l requirements based on changes to the system alignment, revised heat load i calculations and revised component flow requirements.

This submittal satisfies a commitment to improve the ESW pump  !

surveillance test.

The proposed change to the Technical Specifications is Attachment I to this -

Application for Amendment to the Operating License. The Safety Evaluation j for the proposed change is included as Attachment 11. A markup of the ~1 affected Technical Specification pages is included as Attachment Ill. ,

+

New York Power Authority LG ;g ' y C :I Ralph E. Beedle~ N Executive Vice President STATE OF NEW YORK Nuclear Generation M COUNTY OF WESTCHESTER ,

, Subscribed and sworn to before me KAmLEEN D. GALLAGHER this Jf 6 day ofd6&&1993. Notary Pubhc. State of New York No 5004481 r

/ +

.// / Ouehfied m westchester Courit Comrnissen Expires Nov.16,1 , i MML / d hu ,

N tary Public

/ v 9310050137.930928 DIN PDR ADOCK 05000333  ;

P ppg. ((}

1