IR 05000219/2007404

From kanterella
Revision as of 11:00, 23 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
IR 05000219-07-404, on 05/23/2007; Oyster Creek Generating Station; Inspection of Additional Security Measures for Radioactive Material Quantities of Concern (RAMQC)
ML071720072
Person / Time
Site: Oyster Creek
Issue date: 06/19/2007
From: Lorson R K
Decommissioning Branch I
To: Crane C M
AmerGen Energy Co
References
IR-07-404
Download: ML071720072 (8)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I475 ALLENDALE ROADKING OF PRUSSIA, PENNSYLVANIA 19406-1415 June 19, 2007Mr. Christopher M. CranePresident and CNO AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-E Kennett Square, PA 19348

SUBJECT: OYSTER CREEK GENERATING STATION - NRC INSPECTION REPORT 05000219/2007404

Dear Mr. Crane:

On May 23, 2007, the United States Nuclear Regulatory Commission completed an inspectionat your Oyster Creek Generating Station. The enclosed inspection report documents the inspection results which were discussed on May 23, 2007, with Mr. A. Farenga of your staff.This inspection examined activities conducted under your license as they relate to safety,common defense and security, and compliance with NRC Orders related to the transportation of radioactive material and the handling of safeguards information. The inspection was based upon Temporary Instruction (TI) 2201/001 - Inspection of Additional Security Measures for Radioactive Material Quantities of Concern (RAMQC). The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.Based on the results of this inspection, no violations were identified. No reply to this letter isrequired. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, itsenclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/Raymond Lorson, ChiefDecommissioning Branch Division of Nuclear Materials SafetyDocket No.05000219 License Nos.DPR-16

Enclosure:

Inspection Report 05000219/2007404

w/Attachment:

Supplemental Information

ML071720072DOCUMENT NAME: G:\D&LB\RAMQC Non-Safeguards Inspection Reports\Oyster Creek Inspection Report TI 2201-001.wpdAfter declaring this document "An Official Agency Record" it will/be released to the Public.To receive a copy of this document, indicate in the box:

" C" = Copy without attachment/enclosure " E" = Copy with attachment/enclosure " N" = No copyOFFICEDNMS/RIEDNMS/RIDNMS/RINAMELKauffman/lapSChaudhary/skcRLorson/rklDATE06/12/0706/12/0706/19/07 C. M. Crane2cc w/encl:Chief Operating Officer, AmerGen Site Vice President, Oyster Creek Nuclear Generating Station, AmerGen Plant Manager, Oyster Creek Generating Station, AmerGen Regulatory Assurance Manager, Oyster Creek, AmerGen Senior Vice President - Nuclear Services, AmerGen Vice President - Mid-Atlantic Operations, AmerGen Vice President - Operations Support, AmerGen Vice President - Licensing and Regulatory Affairs, AmerGen Director Licensing, AmerGen Manager Licensing - Oyster Creek, AmerGen Vice President, General Counsel and Secretary, AmerGen T. O'Neill, Associate General Counsel, Exelon Generation Company J. Fewell, Assistant General Counsel, Exelon Nuclear Correspondence Control Desk, AmerGen J. Matthews, Esquire, Morgan, Lewis & Bockius LLP Mayor of Lacey Township K. Tosch, Chief, NJ Bureau of Nuclear Engineering, Dept of Environmental Protection R. Shadis, New England Coalition Staff N. Cohen, Coordinator - Unplug Salem Campaign E. Gbur, Chairwoman - Jersey Shore Nuclear Watch E. Zobian, Coordinator - Jersey Shore Anti Nuclear Alliance P. Baldauf, Assistant Director, NJ Radiation Protection Programs C. M. Crane3Distribution w/encl:(via E-mail)S. Collins, RAM. Dapas, DRA B. Holian, RI M. Thaggard, RI L. Kauffman, RI R. Lorson, RI R. Bellamy, DRP S. Barber, DRP M. Ferdas, DRP, Senior Resident Inspector R. Treadway, DRP, Resident Inspector J. DeVries, DRP, Resident OA J. Lamb, RI OEDO H. Chernoff, NRR J. Lubinski, NRR E. Miller, PM, NRR J. Hughey, NRR, Backup B. Westrich, NSIR G. Purdy, NSIR M. Gray, DRP C. Khan, DRP Region I Docket Room (with concurrences)ROPreports@nrc.gov EnclosureU.S. NUCLEAR REGULATORY COMMISSIONREGION IDocket No:50-219 License No:DPR-16 Report No:05000219/2007404 Licensee:AmerGen Energy Company, LLC (AmerGen)

Facility:Oyster Creek Generating Station Location:Forked River, NJ 08731 Date:May 23, 2007 Inspectors:L. Kauffman, Health PhysicistS. Chaudhary, Reactor EngineerApproved by:Raymond Lorson, ChiefDecommissioning Branch Division of Nuclear Materials Safety Enclosure

SUMMARY OF FINDINGS

IR 05000219/2007404; 05/23/2007; Oyster Creek Generating Station; Inspection of AdditionalSecurity Measures for Radioactive Material Quantities of Concern (RAMQC)The report covered an announced one-day inspection related to safety, common defense andsecurity, and compliance with NRC Orders related to the transportation of radioactive material and the handling of safeguards information. The inspection was conducted by two regional inspectors and was based upon Temporary Instruction (TI) 2201/001, "Inspection of Additional Security Measures for Radioactive Material Quantities of Concern (RAMQC)." The inspectors determined that the licensee had developed an adequate program for the transportation of radioactive material and the handling of safeguards information.A.

NRC Identified and Self-Revealing Findings

Cornerstone: Physical Security

None.

B.Licensee-Identified Violations

None.

Enclosure

REPORT DETAILS

4OA5Other Activities.1Temporary Instruction (TI) 2201/001 - Inspection of Additional Security Measures forRadioactive Material Quantities of Concern (RAMQC) - 1 sample

a. Inspection Scope

The inspectors reviewed the RAMQC program to assess the licensee'simplementation of the additional security measures (ASM) imposed by NRC Order EA-05-007, "Imposing Additional Security Measures on the Transportation of RAMQC," issued July 19, 2005. The inspectors also reviewed the implementation of the Safeguards Information-Modified Handling (SGI-M) protection requirements specified in NRC Order EA-04-0191, "Imposing Requirements for the Protection of Certain Safeguards Information," issued November 5, 2004.The inspectors reviewed each ASM and SGI-M requirement identified in the ordersreferenced above. The inspectors interviewed personnel and reviewed program documents and implementing procedures.b.Findings and ObservationsNo findings of significance were identified. The inspectors concluded that AmerGenpersonnel developed an adequate RAMQC program.40A6Meetings, Including ExitExit Meeting SummaryOn May 23, 2007, the NRC inspectors presented the inspection results toMr. A. Farenga. The inspectors confirmed that proprietary and safeguards information were not included in this inspection report.Attachment:Supplemental Information A-1Attachment

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

AmerGen Energy Company

A. Farenga, Radiation Protection Technical Support Manager
G. Ewart, Site Security Supervisor
M. McKenna, Operations Shift Supervisor

LIST OF ITEMS

OPENED, CLOSED AND DISCUSSEDOPENTemporary Inspection (TI) 2201/001 - Inspection of Additional SecurityMeasures for Radioactive Material Quantities of Concern (RAMQC)CLOSEDTemporary Inspection (TI) 2201/001 - Inspection of Additional SecurityMeasures for Radioactive Material Quantities of Concern (RAMQC)

LIST OF DOCUMENTS REVIEWED

Section 4OA5 Other ActivitiesProceduresRP-AA-600, "Radioactive Material/Waste Shipments"RP-AA-600-1006, "Notification Requirements for Radioactive/Waste Shipments Greater than the Radioactive Material Quantities of Concern (RAMQC)"

LIST OF ACRONYMS

ASMAdditional Security MeasuresRAMQCRadioactive Material Quantities of Concern

SGI-MSafeguards Information-Modified Handling

TIT emporary Instruction