ML17046A229
Jump to navigation
Jump to search
Similar Documents at Salem | |
---|---|
Category:Letter
MONTHYEARIR 05000272/20240032024-10-30030 October 2024
[Table view]Integrated Inspection Report 05000272/2024003 and 05000311/2024003 ML24296B1932024-10-23023 October 2024 Project Manager Assignment LR-N24-0068, Core Operating Limits Report - Cycle 282024-10-21021 October 2024 Core Operating Limits Report - Cycle 28 LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) IR 05000272/20244032024-09-25025 September 2024 And Salem Nuclear Generating Station, Units 1 and 2, Cybersecurity Inspection Report 05000354/2024403, 05000272/2024403, and 05000311/2024403 (Cover Letter Only) ML24267A1082024-09-23023 September 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) IR 05000272/20240052024-08-29029 August 2024 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Report 05000272/2024005 and 05000311/2024005) IR 05000272/20240022024-07-30030 July 2024 Integrated Inspection Report 05000272/2024002 and 05000311/2024002 LR-N24-0012, Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding2024-07-24024 July 2024 Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding ML24145A1772024-07-15015 July 2024 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24099A1572024-05-29029 May 2024 Issuance of Amendment Nos. 348 and 330 Permanent Extension of Type a and Type C Containment Leak Rate Test Frequencies ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response IR 05000272/20240102024-05-16016 May 2024 Fire Protection Team Inspection Report 05000272/2024010 and 05000311/2024010 05000272/LER-2024-001, Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger2024-05-0909 May 2024 Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger IR 05000272/20240012024-05-0707 May 2024 Integrated Inspection Report 05000272/2024001 and 05000311/2024001 LR-N24-0039, Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage2024-05-0606 May 2024 Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums ML24071A2132024-03-12012 March 2024 Senior Reactor and Reactor Operator Initial License Examinations LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report LR-N24-0022, Spent Fuel Cask Registration2024-02-29029 February 2024 Spent Fuel Cask Registration IR 05000272/20230062024-02-28028 February 2024 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023006 and 05000311/2023006 IR 05000272/20244012024-02-26026 February 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) LR-N24-0009, In-Service Inspection Activities2024-02-0505 February 2024 In-Service Inspection Activities IR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 ML24009A1022024-01-26026 January 2024 – Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000272/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 ML24004A1542024-01-0808 January 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24250A0582023-11-14014 November 2023 PSEG to Marine Mammal Stranding Center, Salem Sea Turtle Stranding Response Services IR 05000272/20230032023-11-13013 November 2023 Integrated Inspection Report 05000272/2023003 and 05000311/2023003 LR-N23-0072, Core Operating Limits Report Cycle 302023-11-0101 November 2023 Core Operating Limits Report Cycle 30 IR 05000272/20230102023-10-12012 October 2023 Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) ML23233A0762023-08-21021 August 2023 Requalification Program Inspection ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location 2024-09-25 Category:Quality Assurance Program MONTHYEARML23103A3232023-04-13013 April 2023
[Table view]Submittal of Updated Final Safety Analysis Report, Rev. 26, Summary of Revised Regulatory Commitments for Hope Creek, Summary of Changes to PSEG Nuclear LLC, Quality Assurance Topical Report, NO-AA-10, Rev. 89 CNL-22-027, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 40 - Annual Update and Proposed Changes to Revision 402022-04-28028 April 2022 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 40 - Annual Update and Proposed Changes to Revision 40 ML17157B2652017-05-0909 May 2017 Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 22, Hope Creek Technical Specification Bases Changes, 10CFR54.37(b) Review Results for Hope Creek and PSEG Nuclear LLC Quality Assurance Topical Repor LR-N17-0088, Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 22, Hope Creek Technical Specification Bases Changes, 10CFR54.37(b) Review Results for Hope Creek and Pseg Nuclear LLC Quality Assurance Topical Re2017-05-0909 May 2017 Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 22, Hope Creek Technical Specification Bases Changes, 10CFR54.37(b) Review Results for Hope Creek and Pseg Nuclear LLC Quality Assurance Topical Repor ML17164A3142017-02-24024 February 2017 Enclosures 1 & 2: PSEG Nuclear, LLC Quality Assurance Topical Report, NO-AA-10, Revision 86 LR-N17-0088, Enclosures 1 & 2: Pseg Nuclear, LLC Quality Assurance Topical Report, NO-AA-10, Revision 862017-02-24024 February 2017 Enclosures 1 & 2: Pseg Nuclear, LLC Quality Assurance Topical Report, NO-AA-10, Revision 86 ML17046A2292017-01-30030 January 2017 Submittal of Revision 29 to Updated Final Safety Analysis Report, and Technical Specification Bases Changes and Quality Assurance Topical Report, NO-AA-10, Rev. 85 LR-N17-0034, Salem Generating Station, Units 1 & 2, Submittal of Revision 29 to Updated Final Safety Analysis Report, and Technical Specification Bases Changes and Quality Assurance Topical Report, NO-AA-10, Rev. 852017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Submittal of Revision 29 to Updated Final Safety Analysis Report, and Technical Specification Bases Changes and Quality Assurance Topical Report, NO-AA-10, Rev. 85 LR-N12-0156, Submittal of Updated Final Safety Analysis Report, Revision 26, Salem Units 1 & 2 Technical Specification Bases Changes, 10 CFR 54.37(b) Review Results and PSEG Nuclear LLC Quality Assurance Topical Report, NO-AA-10, Revision 822012-05-21021 May 2012 Submittal of Updated Final Safety Analysis Report, Revision 26, Salem Units 1 & 2 Technical Specification Bases Changes, 10 CFR 54.37(b) Review Results and PSEG Nuclear LLC Quality Assurance Topical Report, NO-AA-10, Revision 82 ML19031A3811979-01-18018 January 1979 Response to Request for Additional Information on Quality Assurance & Subcompartment Analysis, Which Will Be Incorporated Into Fasr in Amendment to Application 2023-04-13 Category:Technical Specification MONTHYEARLR-N24-0012, Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding2024-07-24024 July 2024
[Table view]Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding LR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-06-23023 June 2023 License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML22270A3172022-09-27027 September 2022 Submittal of Technical Specification Bases Changes, Amendment No. 201 LR-N22-0078, Submittal of Technical Specification Bases Changes, Amendment No. 2152022-09-27027 September 2022 Submittal of Technical Specification Bases Changes, Amendment No. 215 LR-N21-0078, Hope and Creek Generating Station, Supplement to License Amendment Request to Revise Technical Specifications (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS2021-11-18018 November 2021 Hope and Creek Generating Station, Supplement to License Amendment Request to Revise Technical Specifications (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS LR-N21-0048, One-Time License Amendment Request to Revise Unit 2 Technical Specification Action for Rod Position Indicators2021-06-18018 June 2021 One-Time License Amendment Request to Revise Unit 2 Technical Specification Action for Rod Position Indicators LR-N21-0045, Submittal of Changes to Technical Specifications Bases2021-06-16016 June 2021 Submittal of Changes to Technical Specifications Bases LR-N21-0006, Application to Revise Technical Specifications to Adopt TSTF-569 Revision of Response Time Testing Definitions2021-02-16016 February 2021 Application to Revise Technical Specifications to Adopt TSTF-569 Revision of Response Time Testing Definitions LR-N20-0072, License Amendment Request to Amend Tech Specs to Revise and Relocate the Reactor Coolant System Pressure & Temperature Limits & Pressurizer Overpressure Protection System Limits to a Pressure & Temperature Limits Report2020-12-0606 December 2020 License Amendment Request to Amend Tech Specs to Revise and Relocate the Reactor Coolant System Pressure & Temperature Limits & Pressurizer Overpressure Protection System Limits to a Pressure & Temperature Limits Report LR-N20-0003, License Amendment Request to Adopt TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec2020-09-17017 September 2020 License Amendment Request to Adopt TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec ML17157B2652017-05-0909 May 2017 Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 22, Hope Creek Technical Specification Bases Changes, 10CFR54.37(b) Review Results for Hope Creek and PSEG Nuclear LLC Quality Assurance Topical Repor LR-N17-0088, Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 22, Hope Creek Technical Specification Bases Changes, 10CFR54.37(b) Review Results for Hope Creek and Pseg Nuclear LLC Quality Assurance Topical Re2017-05-0909 May 2017 Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 22, Hope Creek Technical Specification Bases Changes, 10CFR54.37(b) Review Results for Hope Creek and Pseg Nuclear LLC Quality Assurance Topical Repor ML17046A2292017-01-30030 January 2017 Submittal of Revision 29 to Updated Final Safety Analysis Report, and Technical Specification Bases Changes and Quality Assurance Topical Report, NO-AA-10, Rev. 85 LR-N17-0034, Salem Generating Station, Units 1 & 2, Submittal of Revision 29 to Updated Final Safety Analysis Report, and Technical Specification Bases Changes and Quality Assurance Topical Report, NO-AA-10, Rev. 852017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Submittal of Revision 29 to Updated Final Safety Analysis Report, and Technical Specification Bases Changes and Quality Assurance Topical Report, NO-AA-10, Rev. 85 LR-N16-0003, License Amendment Request to Amend the Accident Monitoring Instrumentation Technical Specifications2016-11-17017 November 2016 License Amendment Request to Amend the Accident Monitoring Instrumentation Technical Specifications LR-N16-0114, License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing Using the Consolidated Line .2016-08-30030 August 2016 License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing Using the Consolidated Line . LR-N15-0187, Emergency License Amendment Request to Remove Pressurizer Power Operated Relief Valve (PORV) Position Indication Instrumentation from the Accident Monitoring Instrumentation Technical Specifications2015-08-31031 August 2015 Emergency License Amendment Request to Remove Pressurizer Power Operated Relief Valve (PORV) Position Indication Instrumentation from the Accident Monitoring Instrumentation Technical Specifications LR-N15-0021, License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems2015-04-0303 April 2015 License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems LR-N15-0020, License Amendment Request to Revise Technical Specification 3/4.3.1, Reactor Trip System Instrumentation2015-03-27027 March 2015 License Amendment Request to Revise Technical Specification 3/4.3.1, Reactor Trip System Instrumentation ML14210A4842014-07-28028 July 2014 License Amendment Request to Revise Technical Specifications to Adopt TSTF-510, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection Using the Consolidated Line Item Improvement Process ML1118615602011-07-28028 July 2011 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, License Amendment, Issuance of Amendments Approval of Cyber Security Plan LR-N11-0056, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2011-02-23023 February 2011 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program LR-N10-0355, Hope Creek, CY-AA-170-500, Revision 0, Meteorological Monitoring System Calibration and Maintenance2010-10-14014 October 2010 Hope Creek, CY-AA-170-500, Revision 0, Meteorological Monitoring System Calibration and Maintenance ML1100504152010-10-14014 October 2010 Hope Creek, CY-AA-170-500, Revision 0, Meteorological Monitoring System Calibration and Maintenance ML1100503982010-10-14014 October 2010 Attachment 3 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Comparison Matrix LR-N10-0355, Attachment 1 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Strike-out Version)2010-10-14014 October 2010 Attachment 1 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Strike-out Version) LR-N10-0355, Attachment 2 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Clean Version)2010-10-14014 October 2010 Attachment 2 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Clean Version) LR-N10-0355, Attachment 4 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Supporting Documents (Cd with Paper Index)2010-10-14014 October 2010 Attachment 4 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Supporting Documents (Cd with Paper Index) ML1100503992010-10-14014 October 2010 Attachment 4 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Supporting Documents (Cd with Paper Index) LR-N10-0355, Attachment 3 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Comparison Matrix2010-10-14014 October 2010 Attachment 3 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Comparison Matrix ML1100503752010-10-14014 October 2010 Attachment 1 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Strike-out Version) ML1100504022010-10-14014 October 2010 Attachment 2 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Clean Version) ML1025802412010-09-0808 September 2010 License Amendment Request S10-01 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program LR-N10-0355, Hope Creek, HC.OP-AB.ZZ-0150(Q), Rev. 6, 125VDC System Malfunction2010-08-24024 August 2010 Hope Creek, HC.OP-AB.ZZ-0150(Q), Rev. 6, 125VDC System Malfunction ML1100505182010-08-24024 August 2010 Hope Creek, HC.OP-AB.ZZ-0150(Q), Rev. 6, 125VDC System Malfunction ML1100505002010-07-13013 July 2010 Hope Creek, HC.OP-AB.HVAC-0002(Q), Rev. 7, Control Room Environment LR-N10-0355, Hope Creek, HC.OP-AB.HVAC-0002(Q), Rev. 7, Control Room Environment2010-07-13013 July 2010 Hope Creek, HC.OP-AB.HVAC-0002(Q), Rev. 7, Control Room Environment LR-N10-0355, Hope Creek, HC.OP-AB.RPV-0009(Q), Rev. 7, Shutdown Cooling2010-06-24024 June 2010 Hope Creek, HC.OP-AB.RPV-0009(Q), Rev. 7, Shutdown Cooling ML1100505162010-06-24024 June 2010 Hope Creek, HC.OP-AB.RPV-0009(Q), Rev. 7, Shutdown Cooling ML1100504772010-05-0303 May 2010 Hope Creek, HC.OP-AB.CONT-0002(Q), Rev. 9, Containment LR-N10-0355, Hope Creek, HC.OP-AB.CONT-0002(Q), Rev. 9, Containment2010-05-0303 May 2010 Hope Creek, HC.OP-AB.CONT-0002(Q), Rev. 9, Containment ML1100505052010-04-21021 April 2010 Hope Creek, HC.OP-AB.MISC-0002(Q), Rev. 10, Crids/Overhead Annunciators/Ppc Computer LR-N10-0355, Hope Creek, HC.OP-AB.MISC-0002(Q), Rev. 10, Crids/Overhead Annunciators/Ppc Computer2010-04-21021 April 2010 Hope Creek, HC.OP-AB.MISC-0002(Q), Rev. 10, Crids/Overhead Annunciators/Ppc Computer ML1100505062010-04-21021 April 2010 Hope Creek, HC.OP-AB.RPV-0003(Q), Rev. 21, Recirculation System/Power Oscillations LR-N10-0355, Hope Creek, HC.OP-AB.RPV-0003(Q), Rev. 21, Recirculation System/Power Oscillations2010-04-21021 April 2010 Hope Creek, HC.OP-AB.RPV-0003(Q), Rev. 21, Recirculation System/Power Oscillations LR-N10-0355, Hope Creek, Offsite Dose Calculation Manual, Revision 252010-04-16016 April 2010 Hope Creek, Offsite Dose Calculation Manual, Revision 25 ML1100504172010-04-16016 April 2010 Hope Creek, Offsite Dose Calculation Manual, Revision 25 LR-N10-0355, Hope Creek, HC.IC-GP.BB-0003(Q) - Rev. 17, Nuclear Boiler - Nondivisional Channel L-11683/B21-N027 Rx Cavity Flood Up Level/Rx Shutdown Range Level Setup2010-03-17017 March 2010 Hope Creek, HC.IC-GP.BB-0003(Q) - Rev. 17, Nuclear Boiler - Nondivisional Channel L-11683/B21-N027 Rx Cavity Flood Up Level/Rx Shutdown Range Level Setup ML1100504742010-03-17017 March 2010 Hope Creek, HC.IC-GP.BB-0003(Q) - Rev. 17, Nuclear Boiler - Nondivisional Channel L-11683/B21-N027 Rx Cavity Flood Up Level/Rx Shutdown Range Level Setup LR-N10-0355, Hope Creek, HC.OP-AB.MISC-0001(Q), Rev. 15, Acts of Nature2010-03-0505 March 2010 Hope Creek, HC.OP-AB.MISC-0001(Q), Rev. 15, Acts of Nature 2024-07-24 Category:Bases Change MONTHYEARLR-N24-0012, Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding2024-07-24024 July 2024
[Table view]Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding ML22270A3172022-09-27027 September 2022 Submittal of Technical Specification Bases Changes, Amendment No. 201 LR-N22-0078, Submittal of Technical Specification Bases Changes, Amendment No. 2152022-09-27027 September 2022 Submittal of Technical Specification Bases Changes, Amendment No. 215 LR-N21-0078, Hope and Creek Generating Station, Supplement to License Amendment Request to Revise Technical Specifications (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS2021-11-18018 November 2021 Hope and Creek Generating Station, Supplement to License Amendment Request to Revise Technical Specifications (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS LR-N21-0045, Submittal of Changes to Technical Specifications Bases2021-06-16016 June 2021 Submittal of Changes to Technical Specifications Bases LR-N20-0003, License Amendment Request to Adopt TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec2020-09-17017 September 2020 License Amendment Request to Adopt TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec ML17157B2652017-05-0909 May 2017 Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 22, Hope Creek Technical Specification Bases Changes, 10CFR54.37(b) Review Results for Hope Creek and PSEG Nuclear LLC Quality Assurance Topical Repor LR-N17-0088, Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 22, Hope Creek Technical Specification Bases Changes, 10CFR54.37(b) Review Results for Hope Creek and Pseg Nuclear LLC Quality Assurance Topical Re2017-05-0909 May 2017 Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 22, Hope Creek Technical Specification Bases Changes, 10CFR54.37(b) Review Results for Hope Creek and Pseg Nuclear LLC Quality Assurance Topical Repor LR-N17-0034, Salem Generating Station, Units 1 & 2, Submittal of Revision 29 to Updated Final Safety Analysis Report, and Technical Specification Bases Changes and Quality Assurance Topical Report, NO-AA-10, Rev. 852017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Submittal of Revision 29 to Updated Final Safety Analysis Report, and Technical Specification Bases Changes and Quality Assurance Topical Report, NO-AA-10, Rev. 85 ML17046A2292017-01-30030 January 2017 Submittal of Revision 29 to Updated Final Safety Analysis Report, and Technical Specification Bases Changes and Quality Assurance Topical Report, NO-AA-10, Rev. 85 LR-N16-0003, License Amendment Request to Amend the Accident Monitoring Instrumentation Technical Specifications2016-11-17017 November 2016 License Amendment Request to Amend the Accident Monitoring Instrumentation Technical Specifications LR-N16-0114, License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing Using the Consolidated Line .2016-08-30030 August 2016 License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing Using the Consolidated Line . LR-N15-0187, Emergency License Amendment Request to Remove Pressurizer Power Operated Relief Valve (PORV) Position Indication Instrumentation from the Accident Monitoring Instrumentation Technical Specifications2015-08-31031 August 2015 Emergency License Amendment Request to Remove Pressurizer Power Operated Relief Valve (PORV) Position Indication Instrumentation from the Accident Monitoring Instrumentation Technical Specifications LR-N15-0021, License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems2015-04-0303 April 2015 License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems ML14210A4842014-07-28028 July 2014 License Amendment Request to Revise Technical Specifications to Adopt TSTF-510, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection Using the Consolidated Line Item Improvement Process LR-N11-0056, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2011-02-23023 February 2011 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program ML1100503982010-10-14014 October 2010 Attachment 3 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Comparison Matrix LR-N10-0355, Attachment 3 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Comparison Matrix2010-10-14014 October 2010 Attachment 3 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Comparison Matrix ML1100503992010-10-14014 October 2010 Attachment 4 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Supporting Documents (Cd with Paper Index) LR-N10-0355, Attachment 4 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Supporting Documents (Cd with Paper Index)2010-10-14014 October 2010 Attachment 4 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Supporting Documents (Cd with Paper Index) LR-N10-0355, Attachment 2 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Clean Version)2010-10-14014 October 2010 Attachment 2 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Clean Version) ML1100504152010-10-14014 October 2010 Hope Creek, CY-AA-170-500, Revision 0, Meteorological Monitoring System Calibration and Maintenance LR-N10-0355, Hope Creek, CY-AA-170-500, Revision 0, Meteorological Monitoring System Calibration and Maintenance2010-10-14014 October 2010 Hope Creek, CY-AA-170-500, Revision 0, Meteorological Monitoring System Calibration and Maintenance LR-N10-0355, Attachment 1 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Strike-out Version)2010-10-14014 October 2010 Attachment 1 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Strike-out Version) ML1100503752010-10-14014 October 2010 Attachment 1 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Strike-out Version) ML1100504022010-10-14014 October 2010 Attachment 2 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Clean Version) ML1025802412010-09-0808 September 2010 License Amendment Request S10-01 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program ML1100505182010-08-24024 August 2010 Hope Creek, HC.OP-AB.ZZ-0150(Q), Rev. 6, 125VDC System Malfunction LR-N10-0355, Hope Creek, HC.OP-AB.ZZ-0150(Q), Rev. 6, 125VDC System Malfunction2010-08-24024 August 2010 Hope Creek, HC.OP-AB.ZZ-0150(Q), Rev. 6, 125VDC System Malfunction LR-N10-0355, Hope Creek, HC.OP-AB.HVAC-0002(Q), Rev. 7, Control Room Environment2010-07-13013 July 2010 Hope Creek, HC.OP-AB.HVAC-0002(Q), Rev. 7, Control Room Environment ML1100505002010-07-13013 July 2010 Hope Creek, HC.OP-AB.HVAC-0002(Q), Rev. 7, Control Room Environment LR-N10-0355, Hope Creek, HC.OP-AB.RPV-0009(Q), Rev. 7, Shutdown Cooling2010-06-24024 June 2010 Hope Creek, HC.OP-AB.RPV-0009(Q), Rev. 7, Shutdown Cooling ML1100505162010-06-24024 June 2010 Hope Creek, HC.OP-AB.RPV-0009(Q), Rev. 7, Shutdown Cooling ML1100504772010-05-0303 May 2010 Hope Creek, HC.OP-AB.CONT-0002(Q), Rev. 9, Containment LR-N10-0355, Hope Creek, HC.OP-AB.CONT-0002(Q), Rev. 9, Containment2010-05-0303 May 2010 Hope Creek, HC.OP-AB.CONT-0002(Q), Rev. 9, Containment LR-N10-0355, Hope Creek, HC.OP-AB.RPV-0003(Q), Rev. 21, Recirculation System/Power Oscillations2010-04-21021 April 2010 Hope Creek, HC.OP-AB.RPV-0003(Q), Rev. 21, Recirculation System/Power Oscillations LR-N10-0355, Hope Creek, HC.OP-AB.MISC-0002(Q), Rev. 10, Crids/Overhead Annunciators/Ppc Computer2010-04-21021 April 2010 Hope Creek, HC.OP-AB.MISC-0002(Q), Rev. 10, Crids/Overhead Annunciators/Ppc Computer ML1100505062010-04-21021 April 2010 Hope Creek, HC.OP-AB.RPV-0003(Q), Rev. 21, Recirculation System/Power Oscillations ML1100505052010-04-21021 April 2010 Hope Creek, HC.OP-AB.MISC-0002(Q), Rev. 10, Crids/Overhead Annunciators/Ppc Computer LR-N10-0355, Hope Creek, Offsite Dose Calculation Manual, Revision 252010-04-16016 April 2010 Hope Creek, Offsite Dose Calculation Manual, Revision 25 ML1100504172010-04-16016 April 2010 Hope Creek, Offsite Dose Calculation Manual, Revision 25 ML1100504742010-03-17017 March 2010 Hope Creek, HC.IC-GP.BB-0003(Q) - Rev. 17, Nuclear Boiler - Nondivisional Channel L-11683/B21-N027 Rx Cavity Flood Up Level/Rx Shutdown Range Level Setup LR-N10-0355, Hope Creek, HC.IC-GP.BB-0003(Q) - Rev. 17, Nuclear Boiler - Nondivisional Channel L-11683/B21-N027 Rx Cavity Flood Up Level/Rx Shutdown Range Level Setup2010-03-17017 March 2010 Hope Creek, HC.IC-GP.BB-0003(Q) - Rev. 17, Nuclear Boiler - Nondivisional Channel L-11683/B21-N027 Rx Cavity Flood Up Level/Rx Shutdown Range Level Setup LR-N10-0355, Hope Creek, HC.OP-AB.MISC-0001(Q), Rev. 15, Acts of Nature2010-03-0505 March 2010 Hope Creek, HC.OP-AB.MISC-0001(Q), Rev. 15, Acts of Nature ML1100505022010-03-0505 March 2010 Hope Creek, HC.OP-AB.MISC-0001(Q), Rev. 15, Acts of Nature ML1100504992009-09-0909 September 2009 Hope Creek, HC.OP-AB.COOL-0004(Q), Rev. 4, Fuel Pool Cooling LR-N10-0355, Hope Creek, HC.OP-AB.COOL-0004(Q), Rev. 4, Fuel Pool Cooling2009-09-0909 September 2009 Hope Creek, HC.OP-AB.COOL-0004(Q), Rev. 4, Fuel Pool Cooling ML1100505012009-04-25025 April 2009 Hope Creek, HC.OP-AB.IC-0003(Q), Rev. 3, Reactor Protection System LR-N10-0355, Hope Creek, HC.OP-AB.IC-0003(Q), Rev. 3, Reactor Protection System2009-04-25025 April 2009 Hope Creek, HC.OP-AB.IC-0003(Q), Rev. 3, Reactor Protection System ML1100504312009-03-0909 March 2009 Hope Creek, HC.lC-CC.SE-0001(Q), Rev. 28, Nuclear Instrumentation System - Channel a Source Range Monitor C51-K6OOA 2024-07-24 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARML23103A3232023-04-13013 April 2023
[Table view]Submittal of Updated Final Safety Analysis Report, Rev. 26, Summary of Revised Regulatory Commitments for Hope Creek, Summary of Changes to PSEG Nuclear LLC, Quality Assurance Topical Report, NO-AA-10, Rev. 89 LR-N23-0027, Updated Final Safety Analysis Report, Rev. 26,2023-04-13013 April 2023 Updated Final Safety Analysis Report, Rev. 26, LR-N22-0090, Supplement to Submittal of Salem Generating Station Updated FSAR, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem2022-11-10010 November 2022 Supplement to Submittal of Salem Generating Station Updated FSAR, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem ML22298A0542022-10-24024 October 2022 Submittal of Updated Final Safety Analysis Report, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results LR-N22-0086, Unit 2, Updated Final Safety Analysis Report, Revision 332022-10-24024 October 2022 Unit 2, Updated Final Safety Analysis Report, Revision 33 LR-N21-0046, Submittal of Salem Generating Station Updated Final Safety Analysis Report, Revision 32, Summary of Revised Regulatory Commitments for Salem, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem2021-06-17017 June 2021 Submittal of Salem Generating Station Updated Final Safety Analysis Report, Revision 32, Summary of Revised Regulatory Commitments for Salem, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem LR-N19-0102, Revision 31 to Updated Final Safety Analysis Report, Chapter 4, Reactor2019-12-0505 December 2019 Revision 31 to Updated Final Safety Analysis Report, Chapter 4, Reactor LR-N18-0053, Revision 30 to Updated Final Safety Analysis Report, Appendix a, TMI Lessons Learned2018-05-11011 May 2018 Revision 30 to Updated Final Safety Analysis Report, Appendix a, TMI Lessons Learned ML17157B2652017-05-0909 May 2017 Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 22, Hope Creek Technical Specification Bases Changes, 10CFR54.37(b) Review Results for Hope Creek and PSEG Nuclear LLC Quality Assurance Topical Repor LR-N17-0088, Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 22, Hope Creek Technical Specification Bases Changes, 10CFR54.37(b) Review Results for Hope Creek and Pseg Nuclear LLC Quality Assurance Topical Re2017-05-0909 May 2017 Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 22, Hope Creek Technical Specification Bases Changes, 10CFR54.37(b) Review Results for Hope Creek and Pseg Nuclear LLC Quality Assurance Topical Repor ML17046A4632017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 9.3, Process Auxiliaries ML17046A3462017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.5-1 to 4.5-4 ML17046A2802017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 3.3, Wind and Tornado Loadings ML17046A5902017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Tables A-1 to A-5 ML17046A4332017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 7.9, Physical Separation and Electrical Isolation ML17046A4982017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 11.3, Gaseous Waste System ML17046A4622017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figures 9.2-1A Through 9.2-11 ML17046A2552017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 2.3, Figure 2.3-1, Sources of Meteorological Records ML17046A2772017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 3, Table of Contents ML17046A4102017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 7, Table of Contents ML17046A4832017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 10.2, Turbine Generator ML17046A5012017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 11.4, Radiological Monitoring ML17046A4162017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Tables 7.3-1 Through 7.3-9 ML17046A5292017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 12.4, ALARA Program ML17046A5892017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Appendix a, TMI Lesson Learned ML17046A2852017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 3.5, Missile Protection ML17046A4602017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 9.2, Water Systems ML17046A4732017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 10, Steam and Power Conversion System - Summary Description ML17139C0442017-01-30030 January 2017 Redacted Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 5.5-1 Through 5.5-7 ML17046A5582017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 14.5, Test Program Organization, Unit 1 ML17046A4662017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 9.4, Heating, Ventilation, and Air Conditioning Systems ML17046A5562017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 14.4, Initial Testing of the Operating Reactor ML17046A5312017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 13, Table of Contents ML17046A5722017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figure 15.3-1 Through 15.3-68 ML17046A3472017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML17046A5592017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 14.5, Figure 14.5-1 Through Figure 14.5-2 ML17046A5522017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 14.2, Table 14.2-1, Tests Performed Prior to Initial Reactor Fueling ML17046A4142017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figures 7.2-1 Through 7.2-7 ML17046A5242017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 12, Radiation Protection ML17046A5402017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 13.4, Review and Audit ML17046A3992017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 6, Table of Contents ML17046A5682017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figure 15.2-1 Through 15.2-46 ML17046A5912017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figures A-1 to A-6, Intentionally Deleted ML17046A2322017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Master Table of Contents ML17046A4692017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figures 9.4-1A Through 9.4-6B ML17046A3502017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Figures 5.1-1 to 5.1-13 ML17046A4152017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 7.3, Engineered Safety Features Instrumentation ML17046A4962017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Tables 11.2-1, Liquid Waste System Performance Data to 11.2-9 ML17046A5822017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 17.1, Quality Assurance During the Design and Construction Phases ML17046A4242017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figure 7.6-1 2023-04-13 |